SITE IDENTIFICATION DETAILS


Site Name Site ID Site Address
LOCATION VISIT DATE TIME DUTWA TZ 0693 DUTWA/BARIADI BARIADI 16/10/2012 08.30

Page 1 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

1. General Site Details


1.1 Owner and Site Details
Site ID TZ 0693 Site Name DUTWA Property owner Address Contact Telephone No. Notice for Access If Yes, specify time / details? Constructional Access AIRTEL/TANZANIA
BARIADI

0784 670032 + Yes Yes No + Mountain Area Commercial Bldg Industrial Bldg. Residential Bldg. New Rooftop Poles Roadside Agricultural Area Others: Ex. Rooftop No

TIME 08.30 DATE 16/10/2012

Site Area/Location

Education Institute. Govt. Est. Private Est. Health Institute. New Greenfield + Tower N/A TRINGLE New 30 MT Shelter

Site Type Antenna Support Tower / Pole Manufacturer Tower / Pole Type Tower / Pole Height (m) Aviation Lamp Height distance from ground to Aviation light. Equipment Housing Shelter/Building size (m x m x m) Power Source GPS Surveyed Latitude (WGS84) GPS Surveyed Longitude (WGS84) GPS Surveyed Altitude Road Mark Distance from Road Mark to Site Other Information/Site direction DWG:

+ Ex. Greenfield

+ Existing 50 MT 50 MT +Outdoor Building

H. W.L. Gridpower 02 28 17.0 S . Deg 033 57 06.6 E .. Deg ..........Meters + Generator Others

Page 2 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

1.2 Telecom site details

BTS Information
Cabinet # Manufacturer In Operation Type 3900A.WCDM A Config. Cooling

Measured Amp VDC 48 Watt 32

HUAWEI

YES

Total BTS
Transmission Information
Cabinet # Manufacturer Installed in Cab # Type TMC 11H Config. Qty 1

48 Measured Amp 3 VDC 48

1536

Watt 32

HUAWEI

YES

Total Transmission
Amp

48

1536

VDC 48

Watt 3072

Total Power consumption Telecom

Page 3 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

1.3 Additional Load Information Additional Load Information


Description Working Light: Security Light: Air-condition : Air-condition : Air-condition: Aviation light: Electric fence: Other: Other: Total Power Consumption V AC Total Power Consumption V DC 400 NEMTEK DRUID N/A N/A N/A 4 1 240 1.5 230 230 12 Manufacturer N/A N/A Type 4FT 4FT 4 4 Qty Watt/Unit 160 160 Amp/Unit 0.3 0.3 VAC 230 230 VDC

1.4 Power Survey General Information


Power Survey General Information Gridpower Sub-Station Available Power Source Power Room / Box Private Network Power Source Reference No. Power Source distance to Site Available Existing MDB . Meters + Yes No Transmission Line Street Light Others: + Generator

Page 4 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

1.5 Generator Information

Generator
Manufacturer Type Serial No. Condit ion AC Fuse Run hours kVA No of Phases VAC Bat. VDC

SOUTH AFRICA

YANMAH

N/A

GOOD

63

N/A

13

3P

400

12

AMF / Remote Panel


Manufacturer Type Serial No. Condition Remote start /stop Alarm 1 Alarm 2 Alarm 3

INTEL LITE

SOUTH AFRICA

AMF 25

GOOD

MANUAL

1.6 ATS Information


Existing ATS Manufacturer INTELI LITE Type AMF 25 Serial no. N/A Condition GOOD In operation YES Build in AMF Stand alone AMF

Other information:

1.7 Existing Hybrid solution Information


Existing Solar / Wind solution / Hybrid Manufacturer Emerson Type N/A Serial no. N/A Condition N/A N/A Qty W/panel N/A Total W N/A

Page 5 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

2 Map/DWGs
2.1 Site locationMap

2.2 Site Layout

Page 6 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

3 Site Bill of Quantity


Description
Windturbine Unit Qty

Rigging and installation of Windturbine Installation of Topmount Installation of AWL and Power Cable Installation of Connection box and connection of cables Installation of AWL x 3
Solar panels

EA EA m EA EA
Unit Qty

Installation of Solar panels 12 panels Installation of Solar panels 2 x 10 panels or 2 x 8 Installation of Solar stand Installation and connection of control box
Battery Installation

EA EA EA EA
Unit Qty

Installation of batteries in cabinet per string ( string has 4 ) Termination per string
Generator + Fuel tank Installation

EA EA
Unit Qty

Placement of generator on plinth Placement of fuel tank on plinth Connecting all cables to existing gen-set
Enclosure installation

EA EA EA
Unit Qty

Installation of 2 bay outdoor cabinet Installation of 3 bay outdoor cabinet


Installation of cooling system existing shelters

EA EA
Unit Qty

Installation of Free aircooling Installation of Heat exchanger Installation of Air Conditioner Supply & install of PVC Trunking for shelter 75 mm x 75 mm Supply & install of PVC Trunking for shelter 50 mm x 50 mm

EA EA EA m m

Page 7 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

Description
Foundations Unit Qty

Basic foundations Foundation for Outdoor cabinet type2, 2000x900x200mm Foundation for Genset Foundation for Solar panel Shed 300x300x300mm
Optional items

m3 EA EA EA
Unit Qty

Installation of LED light for existing shelter Supply and install 100mm ducting on site for cables including all cable installation Installation of Flood light Installation of 48/24VDC PSU Transport of material to site Crane hire Structural analysis of existing towers
Distances

EA m EA EA Site h EA
Unit Qty

From proposed location of Cabinet to Gen-set From proposed location of Cabinet to Solar Panel From proposed location of Cabinet to Telecom outdoor cabinet From proposed location of Cabinet to Telecom Shelter From proposed location of Cabinet to middle Aviation Lights From proposed location of Cabinet to top Aviation Lights From proposed location of Cabinet to Flood light From proposed location of Cabinet to Security light

m m m m m m m m

Page 8 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

4 Other information 3.1


Permits
Yes Yes Yes Yes Yes Yes No No No No No No + + Environmental or Cultural problems? Permit required?

Any Aviation concerns? Any additional Permit for windturbine ? Any Military or Security concerns? Permit required? Other Information:

3.2 Rooftop/building information if applicable


Height of the Building ( Ave. Ground to Roof level ) Height of Penthouse from Roof level Height of the Parapet wall from Roof level Elevator available ( size, capacity, etc ) Describe roof cover Describe horizontal load bearing structure (e.g. concrete slab, beams etc) Describe wall cover (e.g. render, bricks etc) Describe vertical load bearing structure (e.g. bearing walls, columns etc) Access for crane Type of building/structure Condition of building (1 to 5) 1-bad, 5-good Yes No Meters Meters Meters Yes: No:

Other information:

Page 9 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

3.3 Greenfield information


General topography and soil/pavement type New road required (length, width, gradient) Access for crane Area size (meter x meter) Other information: +Yes NO

3.4 Space availabity


Location Space for Solar panels Space for cabinet Can Cabinet be located under the solar panel? Other information: + Yes No Area m x m

3.5 Operating room details


Dimensions Height (m): Length (m): Restriction in space in the clear of mounting area: Wall type: Floor Type : Ceiling Type : Lighting : Width (m): No

Yes

Page 10 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

3.6 Obstruction
DESCRIBE ALL Obstruction of Height Equal or Higher than the Site. # AZIMUTH W 1 2 N 3 4 5 6 7 8 9 10 11 12 Other information: DISTANCE FROM TOWER 35 MT 35 MT 50 MT HEIGHT DESCRIPTION AIR TEL AIR TEL GSM ANTENA

Page 11 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

4 Power DB
4.1 Batteries
Battery Type N/A Model Number N/A Qty 24 Battery/Rack 1 1 Qty of Racks

4.2 Rectifier/Converter information


# 1 2 3 4
Type Model Number Input voltage Output voltage Number of Modules Number of slots kW/ module Output breaker size Meas ured Amp

EPW30-48 A

EPW3048 A

48

48

63

46

4.3 DC Distribution Boxes


Does DC DB have fuses or circuit breakers supply cable to DC DB Size of incoming power cables

25 mm

Colour

BLUE/BLACK

Number of incoming cables

# 1 2 3 4 5 6 7 8 9 10 11 12

Type of DC 48

Current rating

Equipment Supplying 48

Conductor Size

Qty

Page 12 of Date: Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

TECHNICAL SITE SURVEY

4.4 Cable Routing


Does the runway extend to the proposed position of the new equipment: Is there sufficient space for new cables: Height of cable tray runway :

Trunking Dimensions

Grid span Dimensions

Positioning and fastening

Qty

Routing Diagram

4.5 Earthing system


Earthing system suitable Total earth resistance (<5 Ohms required) New earth system to be provided Material of earth bar Spare positions on earth bar Yes+ Yes Yes + No No + No

Page 13 of Date: Site ID: