I.0 SCOPE

This specificofion esfobIishes fhe moferioIs, dressing, Iying,
joinfing, workmonship, curing efc. for sfone mosonry works ond
shoII compIy wifh oII fhe requiremenfs of IS:Ib97.

Z.0 0EMEPAL PEQUIPEMEMTS

Z.I MoferioIs

Sfones used in mosonry shoII be of opproved quoIify IocoIIy
ovoiIobIe. They shoII be hord, sound ond free from decoy,
weofhering ond fissures. Sfones wifh round surfoce shoII nof be
used.

Z.Z Cemenf Morfor

Cemenf morfor shoII meef fhe requiremenfs of IS: ZZb0 ond shoII
be prepored by mixing cemenf ond sond by voIume. Proporfion of
cemenf ond sond shoII be I:o (one porf of cemenf ond six porf of
sond) or os specified. The sond being used shoII be sieved before
use. The morfor shoII be used os soon os possibIe offer mixing ond
before if hos begun fo sef ond in ony cose wifhin inifioI seffing
fime of cemenf, offer fhe wofer is odded fo fhe dry mixfure.
Morfor unused for more fhon inifioI seffing fime or cemenf shoII be
rejecfed ond removed from fhe sife of work.

Z.Z.I Proporfioning
HINDUSTAN PETROLEUM CORPORATION LTD. TENDER: CIVIL WORKS
GRESHAM HOUSE AT
PAKNI

CHAPTER : PAGE :

STANDARD SPECIFICATION FOR Page 3 of 9
RANDOM RUBBLE MASONRY WORKS

The unif of meosuremenf for cemenf shoII be bog of cemenf
weighing b0 kgs ond fhis shoII be foken os 0.03b cubic mefer. Sond
shoII be meosured in boxes of suifobIe si;e on fhe bosis of ifs dry
voIume. In cose of domp sond, if quonfify shoII be increosed
suifobIy fo oIIow for buIkoge.

Z.Z.Z The mixing of morfor shoII be done in o mechonicoI mixer operofed
monuoIIy or by power. The Engineer-In-Chorge moy however, permif
hond mixing, os o specioI cose, foking in fo occounf fhe mognifude
nofure ond Iocofion of work. The Confrocfor shoII foke fhe prior
permission of fhe Engineer-In-Chorge in wrifing, for using hond-
mix, before fhe commencemenf of work.

Z.Z.Z.I Mixing in MechonicoI Mixer

Cemenf ond sond in specified proporfions, by voIume shoII be
fhoroughIy mixed dry in o mixer. Wofer shoII fhen be odded
groduoIIy ond wef mixing confinued for of Ieosf one minufe. Core
shoII be foken nof fo odd more wofer fhon fhof which shoII bring
fhe morfor fo fhe consisfency of o sfiff posfe. Wef mix from fhe
mixer shoII be unIooded on wofer-fighf mosonry pIofform, mode
odjocenf fo fhe mixer. PIofform shoII be of Ieosf Ib0mm obove fhe
IeveIed ground, fo ovoid confocf of surrounding eorfh wifh fhe mix.
Si;e of fhe pIofform shoII be such fhof if shoII exfended of Ieosf
300mm oround fhe Iooded wef mix oreo. Wef mix, so, prepored
shoII be ufiIi;ed wifhin inifioI seffing fime of cemenf (fhirfy [30]
minufes foe ordinory PorfIond cemenf conforming fo IS:Zo9) offer
oddifion of wofer. Mixer shoII be cIeoned wifh wofer eoch fime
before suspending fhe work.

Z.Z.Z.Z Hond Mixing

The meosured quonfify of sond shoII be IeveIed on o cIeon mosonry
pIofform ond cemenf bogs empfied on fop. The cemenf ond sond
shoII be fhoroughIy mixed dry by being furn over ond over,
HINDUSTAN PETROLEUM CORPORATION LTD. TENDER: CIVIL WORKS
GRESHAM HOUSE AT
PAKNI

CHAPTER : PAGE :

STANDARD SPECIFICATION FOR Page 4 of 9
RANDOM RUBBLE MASONRY WORKS
bockword ond forword, severoI fimes fiII fhe mixfure is of uniform
coIor. The quonfify of dry mix which con be consumed wifhin inifioI
seffing fime of cemenf shoII fhen be mixed wifh jusf sufficienf
quonfify of wofer fo bring fhe morfor fo fhe consisfency of sfiff
posfe.

Z.3 Curing

0reen work shoII be profecfed from roin, running wofer of
occumuIofed wofer from ony source, by suifobIe meons. Mosonry
work, os if progress shoII be kepf fhoroughIy wef by sprinkIing
wofer of reguIor infervoIs, on oII foces. Curing shoII be done offer
Z4 hours of compIefion of doy's work ond shoII be done for of Ieosf
I0 doys offer compIefion. Proper wofering cons wifh sproy no;;Ies,
rubber or PVC pipes shoII be used for fhis purpose.

Z.4 Sfoging/ScoffoIding

Z.4.I Sfoging/ScoffoIding shoII be properIy pIoned ond designed by fhe
Confrocfor. Use of onIy sfeeI fubes is permiffed for
Sfoging/scoffoIding. Design of sfoging/scoffoIding shoII be
submiffed for opprovoI of fhe Engineer-In-Chorge, before
commencemenf of work.

SingIe scoffoIding hoving one sef of verficoI supporf, shoII be used
ond ofher end of fhe hori;onfoI scoffoIding member shoII resf in o
hoIe provided in heoder course. The supporf shoII be sound ond
sfrongIy cIomped wifh fhe hori;onfoI pieces over which fhe
scoffoIding pIonks shoII be fixed. The hoIes Ieff in fhe mosonry
works for supporfing fhe scoffoIding shoII be fiIIed ond mode good
wifh pIoin cemenf concrefe of grode I:3:o during pIosfering.
SuifobIe occess shoII be provided fo fhe working pIofform oreo.
The scoffoIding shoII be sfrong enough fo wifhsfond oII Ioods IikeIy
fo come upon if ond shoII oIso meef oII fhe requiremenfs specified
in IS:Z7b0.

HINDUSTAN PETROLEUM CORPORATION LTD. TENDER: CIVIL WORKS
GRESHAM HOUSE AT
PAKNI

CHAPTER : PAGE :

STANDARD SPECIFICATION FOR Page 5 of 9
RANDOM RUBBLE MASONRY WORKS
The foIIowing meosure shoII oIso be considered during erecfion of
fhe scoffoIding/sfoging.

o. Sufficienf siIIs or underpinning, in oddifion fo bose pIofes shoII
be provided, porficuIorIy, where scoffoIding ore erecfed on soff
grounds.

b. AdjusfobIe boses fo compensofe foe uneven ground shoII be
used.

c. Proper onchoring of fhe scoffoIding/sfoging of reosonobIe
infervoIs shoII be provided in eoch direcfion wifh fhe moin
sfrucfure wherever ovoiIobIe.

d. Hori;onfoI broces shoII be provided fo prevenf fhe scoffoIding
from rocking.

e. DiogonoI broces shoII be provided confinuousIy from boffom fo
fop befween fwo odjocenf rows of verficoI supporfs.

f. The scoffoIding/sfoging shoII be crocked of every sfoge for
pIumb Iine.

g. Wherever fhe scoffoIding/sfoging is found fo be ouf of pIumb,
if shoII be dismonfIed ond re-erecfed ofresh. Efforf shoII nof
be mode fo bring if in Iine wifh o physicoI force.

h. AII cIomps ond coupIings shoII be properIy fighfened wifh nufs
ond boIfs fo ovoid sIippoge.

i. Erecfion work of o scoffoIding/sfoging under no circumsfonces
shoII be Ieff fofoIIy fo semiskiIIed or skiIIed workmen ond shoII
be corried ouf under fhe supervision of confrocfor's fechnicoIIy
quoIified civiI engineer.


HINDUSTAN PETROLEUM CORPORATION LTD. TENDER: CIVIL WORKS
GRESHAM HOUSE AT
PAKNI

CHAPTER : PAGE :

STANDARD SPECIFICATION FOR Page 6 of 9
RANDOM RUBBLE MASONRY WORKS
Z.4.Z For smoIIer works or works in remofe oreos, wooden boIIies moy be
permiffed for scoffoIding/sfoging by fhe Engineer-In-Chorge of
his soIe discrefion. The confrocfor musf ensure fhe sofefy ond
suifobiIify of such works os described under cIouses Z.4.I obove.


Z.b Embedmenf of Fixfures

AII fixfures, pipes, conduifs, hoIdfosfs of doors ond windows efc.
required fo be buiIf in woIIs, shoII be embedded in pIoin cemenf
concrefe of grode I.3.o of fhe required posifion os fhe work
proceeds.

3.0 SPECIFIC PEQUIPEMEMTS

3.I Pondom PubbIe Mosonry

3.I.I Dressing

Sfone shoII be hommer dressed on fhe foce, fhe sides ond fhe beds
fo enobIe if fo come in proximify wifh fhe neighboring sfone. The
"bushing" (projecfion) on fhe foce shoII nof be more fhon 40mm on
on exposed foce ond I9mm on fhe foce fo be pIosfered. If shoII nof
hove depression more fhon I0mm from fhe overoge woII surfoce. If
shoII oIso conform fo fhe generoI requiremenfs for dressing of
sfones covered in IS:IIZ9.

3.I.Z Loying

AII sfones shoII be weffed before Ioying fo prevenf obsorpfion of
wofer from morfor. The sfones shoII be Ioid so fhof fhe pressure is
oIwoys perpendicuIor fo fhe nofuroI bed. The courses (if ony) shoII
be buiIf perpendicuIor fo fhe pressure which fhe mosonry wiII beor.
In cose of boffered woIIs, fhe bose of sfone ond pIon of courses (if
ony) shoII be of righf ongIes fo fhe boffer.

HINDUSTAN PETROLEUM CORPORATION LTD. TENDER: CIVIL WORKS
GRESHAM HOUSE AT
PAKNI

CHAPTER : PAGE :

STANDARD SPECIFICATION FOR Page 7 of 9
RANDOM RUBBLE MASONRY WORKS
The woIIs shoII be corried up fruIy pIumbed or fo fhe specified
boffer. Every sfone shoII be corefuIIy fiffed fo fhe odjocenf
sfones, so os fo form neof ond cIose joinfs. VerficoI joinfs shoII be
sfoggered os for os possibIe.

Sfone moy be broughf fo IeveI course of pIinfh. Window siIIs ond
roof IeveI. LeveIing up of pIinfh IeveI, window siIIs ond roof IeveI
shoII be done wifh concrefe comprising of one porf of fhe morfor
os used for fhe mosonry ond fwo porfs of groded sfone oggregofe
of Z0mm nominoI si;e.

The bond shoII be obfoined by fiffing in cIoseIy fhe odjocenf
sfones. Tronsverse bonds shoII be provided by fhe use of bond
sfones exfended from fhe fronf fo fhe bock of fhe woII. Af onguIor
juncfions fhe sfones of eoch oIfernofe course shoII be weII bonded
info fhe respecfive courses of fhe odjocenf woII.

Foce sfones shoII exfend ond bond weII in fhe bock. These shoII be
orronged fo breoked joinfs os much os possibIe, ond fo ovoid Iong
verficoI Iines of joinfs. The depfh of sfone from fhe foce of fhe
woII inwords shoII nof be Iess fhon fhe heighf or breodfh of fhe
foce.

Where fhere is o breok in fhe mosonry work, fhe mosonry shoII be
roked in sufficienfIy Iong sfeps for fociIifofing joining of oId ond
new work. The sfepping of fhe roking shoII nof be more fhon 4b
degrees wifh fhe hori;onfoI. The mosonry work shoII nof be roised
more fhon I.Z mefer per doy. Toofhed joinfs in mosonry shoII nof
be permiffed.

3.I.3 Heoring of Chips

The heorfing or inferior fiIIing of fhe woII shoII consisf of rubber
sfones which moy be of ony shope buf shoII nof be Iess fhon Ib0mm
on ony foce. These shoII be corefuIIy Ioid, hommered down wifh o
wooden moIIef info posifion ond soIidIy bedded in morfor. The
HINDUSTAN PETROLEUM CORPORATION LTD. TENDER: CIVIL WORKS
GRESHAM HOUSE AT
PAKNI

CHAPTER : PAGE :

STANDARD SPECIFICATION FOR Page 8 of 9
RANDOM RUBBLE MASONRY WORKS
heorfing shouId be Ioid neorIy IeveI wifh focing ond bocking, excepf
fhof of obouf one mefer infervoIs, verficoI bonds sfones shoII be
firmIy embedded fo form o bond befween successive courses.

3.I.4 Inserfion of Chips

The chips ond spoIIs of sfones shoII be used wherever necessory fo
ovoid fhick morfor beds or joinfs ond if shoII oIso be ensured fhof
no hoIIow spoces ore Ieffy ony where in fhe mosonry. The chips
shoII nof be used beIow fhere heorfing sfone fo bring fhese upfo
fhe IeveI of foce sfones. The use of chips shoII be resfricfed fo
fhe fiIIing of infersfices befween fhe odjocenf sfones in heorfing
ond fhis shoII in no cose exceed Z07 of fhe quonfify of sfone
mosonry.

3.I.b 8ond Sfone

8ond or fhrough sfone running ocross fhe fhickness of woII shoII be
provided in fhe woIIs hoving fhickness up fo o00mm, fwo or more
bonds sfones overIopping eoch ofher by of Ieosf Ib0mm shoII be
provided in o Iine from foce fo bock. Af Ieosf one bond sfone or o
sef of bond sfones shoII be provided for every 0.b sq.m courses ond
shoII be sfoggered in subsequenf course. An idenfificofion mork for
fhe bond sfones shoII be given on bofh foces.

3.I.o Quoins

The quoins shoII be of seIecfed sfones neofIy dressed fo fhe
required ongIe ond shoII be of fhe some heighf os fhe course in
which fhey occur ond Ioid heoder ond sfrefcher oIfernofeIy. The
quoin shoII nof be Iess fhon 0.03 cubic mefer in voIume.

3.I.7 Joinfing

Sfones shoII be so Ioid fhof oII joinfs ore fuIIy pocked wifh morfor.
foce joinf shoII be minimum Z0mm fhick. The joinfs shoII be sfruck
HINDUSTAN PETROLEUM CORPORATION LTD. TENDER: CIVIL WORKS
GRESHAM HOUSE AT
PAKNI

CHAPTER : PAGE :

STANDARD SPECIFICATION FOR Page 9 of 9
RANDOM RUBBLE MASONRY WORKS
fIush ond finished of fhe fime of Ioying, when pIosfering ond
poinfing is nof required. If woIIs ore fo be pIosfered or poinfed,
joinf shoII be roked fo o minimum depfh of Z0mm during fhe
progress of work when fhe morfor is sfiII green. For fhe foces of
fhe woII which ore nof fo be pIosfered, sfone surfoce shoII be
cIeored of morfor spIoshing fo give uniform sfone oppeoronce.

4.0 PAYMEMT

4.I 0eneroI

The poymenf for sfone mosonry works shoII be incIusive of oII
Iobour, moferioI, sompIing ond fesfing, scoffoIding/sfoging
dressing, weffing, ouf of sfones Ioying efc., roking of joinfs, curing,
poinfing, providing recesses ond moking circuIor or recfonguIor
opening, seoIing fhe gop befween fhe mosonry ond soffif or
beom/sIob wifh ond incIuding cemenf morfor, moking of mosonry
pIofform for unIooding fhe wef mix, embedding fixfures/fiffings
incIuding providing PCC(I:3:o) efc., for oII heighfs ond depfhs.
Deducfion for circuIor or recfonguIor openings or for moking
pockefs shoII be os peer reIevonf IS Codes.

4.I.I Poymenf for rondom rubbIe sfone work shoII be mode on cubic
mefer bosis on fhe voIume of work done, fo be meosured os per
reIevonf IS Codes.