TAKING OUT QUANTITIES FOR SMALL R.C.C.

STRUCTURE SUCH AS HALL:

Length of straight Bar with Hooks at both ends


1. Length of straight Bar (main) = Clear span + 2X (End Bearing) - 2 X End cover+2 X 9d
= (L +2 X b) -2 X s + 2 X 9d, where d is diameter of bar.

2. Length of Bent up Bar with hooks at both ends


Additional length due to inclination = 1.414x - x = 0.414x
.'. x = center to center distance between top portion & bottom portion of bars.
= Total depth of beam - (Top & Bottom cover) - half dia. of main bar at top - half dia. of main bar at bottom
Length of bent up bar = length of straight Bar + 2 (Additional length due to inclination)
= (L +2 X b) -2 X s + 2 X 9d +2X 0.414x

3. Length of stirrups (Mild Steel)


Depth of stirrups = Total Depth - Top cover - Bottom Cover
Width stirrups = Total width - 2 (Side cover)
Length of stirrups = 2 (Depth of stirrups) +
2 (Width of stirrups) +
Where

- diameter of bar

4. Number of stirrups
Total length - 2 x end cover
No. of stirrups = ---------------------------------------- + 1
Spacing

S = End cover
b = End Bearing
L = Clear span

5. Weight of bar
Weight of bar per running meter
= C/s Area of bar x density of bar
4

6. Quantity of Bar
Quantity of Reinforcement = No. of Bars x Length of Bar x Wt of bar in Kg/m
Note: Standard length of one Reinforcement bar = 12m

7. Lap length

8. Quantity of Form work


1) For RCC Beam
Quantity = (b+2d) x l Sq. meter
2) For RCC Rectangular Column
Quantity = 2 (l+b) x h Sq. meter
3) For RCC Circular Column

Procedure:1) Study the given drawings carefully.


2) Finalize the items of the work with their units of measurements. Prepare a check list of the items.
3) Write brief description of each item of the work on the measurement sheet.

Bar bending schedule: DM Plant building(foundation)

4) Calculate length, width & depth of different components for calculation of quantity of concrete & form work.
5) Calculate the quantity of form work for beam, column. (One sample).
6) Enter the length, width/breath & depth/height in measurement sheet for concrete & form work item.
7) Prepare bar bending schedule.
8) Calculate the length of bars of different diameter in different components such as slab, beam, column, footing etc.
9) Calculate the number of bars of different diameter in different components.
10) Enter the number, length & weight of bar for different bars in different components in Bar bending schedule.
11) Calculate the quantities of items of the work in the measurement sheet.
The quantities of each items of work are calculated and entered in measurement sheet against each item with their unit of
measurement

S.no

Membe

Bar mark

Diameter of

No. per

No. of

Total no.

Cutting

Net

bars

member

members

of bars

length

length

Shape

Unit wt.

Net wt.(kg)

Foundation F 1 : 2200X2750X500
1 N-S
2 E-W
3 N-S
4 E-W

RAFT

12mm@100c/

BOTTOM

RAFT

12mm@100c/

BOTTOM

RAFT

10mm@200c/

TOP

RAFT

10mm@200c/

TOP

28

252

2.586

651.672

0.888

576.685

22

198

3.136

620.928

0.888

551.384

14

126

2.594

326.844

0.617

201.756

12

108

3.144

339.552

0.617

209.504

965.888

0.888

857.70854

Foundation F1a/F1b/F1c=2750x2200x500
5 N-S
6 E-W
7 N-S
8 E-W

RAFT

12mm@100c/

BOTTOM

RAFT

12mm@100c/

BOTTOM

RAFT

10mm@200c/

TOP

RAFT

10mm@200c/

TOP

22

14

308

3.136

28

14

392

2.586

12

14

168

3.144

528.192

0.617

14

14

196

2.594

508.424

0.617

1013.71
2

0.888

4
900.17625
6
325.89446
4
313.69760
8

Foundation F 2 : 2800x2800x500
9 N-S

RAFT

12mm@100c/

BOTTOM

28

38

1064

3.186

3389.90
4

0.888

3010.235

10 E-W

11 N-S

12 E-W

RAFT

12mm@100c/

BOTTOM

RAFT

10mm@200c/

TOP

RAFT

10mm@200c/

TOP

28

38

1064

3.186

15

38

570

3.194

15

38

570

3.194

3389.90

0.888

3010.235

1820.58

0.617

1123.298

1820.58

0.617

1123.298

2.47

807.947

2.47

807.947

0.617

101.849

0.617

101.849

1.58

934.349

1.58

961.651

0.617

196.798

0.617

189.187

0.888

949.009

Foundation F 3/F 3(a) : 3750x3750x650


13 N-S
14 E-W
15 N-S
16 E-W

RAFT

12mm@100c/

BOTTOM

RAFT

12mm@100c/

BOTTOM

RAFT

10mm@200c/

TOP

RAFT

10mm@200c/

TOP

38
38
19
19

2
2
2
2

76

4.304

76

4.304

38

4.344

38

4.344

327.104
327.104
165.072
165.072

Foundation F 4/F 4(a)/F 4(b)/F 4(c) : 3150x2800x500


17 N-S
18 E-W
19 N-S
20 E-W

RAFT

12mm@100c/

BOTTOM

RAFT

12mm@100c/

BOTTOM

RAFT

10mm@200c/

TOP

RAFT

10mm@200c/

TOP

28
32
15
16

6
6
6
6

168

3.52

192

3.17

90

3.544

96

3.194

591.36
608.64
318.96
306.624

Foundation F 5/F 5(a)/F 5(b)/F 5(c) : 2550x2550x500


21 N-S

RAFT

12mm@100c/

26

14

364

2.936

1068.70

BOTTOM

22 E-W

RAFT

12mm@100c/

BOTTOM

23 N-S

RAFT

10mm@200c/

TOP

24 E-W

RAFT

10mm@200c/

TOP

4
26

13

13

14

14

14

364

2.936

182

2.944

182

2.944

1068.70
4

535.808

535.808

0.888

949.00915

0.617

330.594

0.617

330.59353

Foundation F6=3000x3000x600
25 N-S
26 E-W
27 N-S
28 E-W

RAFT

12mm@100c/

BOTTOM

RAFT

12mm@100c/

BOTTOM

RAFT

10mm@200c/

TOP

RAFT

10mm@200c/

TOP

30

60

30

60

16

32

16

32

3.52
3.52
3.528
3.528

211.2
211.2
112.896
112.896

0.888
0.888
0.617
0.617

187.5456
187.5456
69.657
69.656832

Foundation CF1=4600x3000x650
29 N-S
30 E-W
31 N-S
32 E-W

RAFT

16mm@125c/

BOTTOM

RAFT

16mm@125c/

BOTTOM

RAFT

10mm@125c/

TOP

RAFT

10mm@125c/

TOP

24

24

37

37

24

24

37

37

5.17
3.57
5.194
3.594

Foundation CF2=6000x3500x700

124.08
132.09
124.656
132.978

1.58
1.58
0.617
0.617

196.0464
208.7022
76.912752
82.047426

33 N-S
34 E-W
35 N-S
36 E-W

RAFT

20mm@125c/

BOTTOM

RAFT

20mm@125c/

BOTTOM

RAFT

10mm@125c/

TOP

RAFT

10mm@125c/

TOP

28

28

48

48

28

28

48

48

6.62
4.12
6.66
4.16

2.47

185.36

2.47

197.76

0.617

186.48

0.617

199.68

457.8392
488.4672
115.05816
123.20256

Foundation CF3=3500x7000x700
37 N-S
38 E-W
39 N-S
40 E-W

RAFT

20mm@150c/

BOTTOM

RAFT

25mm@125c/

BOTTOM

RAFT

10mm@125c/

TOP

RAFT

12mm@125c/

TOP

47

47

28

28

56

56

28

28

4.12
7.6
4.16
7.652

2.47

193.64

3.85

212.8

0.617

232.96

0.889

214.256

478.2908
819.28
143.73632
190.47358
4

TOTAL
=

22754.114