1. 2. 3. 4. 5. 6. 7. Basis of design for the project Process description Process flow diagrams Process block flow diagrams Heat and mass balance Process control & operational philosophy Mechanical design basis & materials of construction 8. Utility & Effluent summary (i) 9. Utility flow diagrams 10. Summary of chemicals and catalysts 11. Process data sheets for equipment 12. Piping & instrumentation diagrams(Process) (i) 13. Process & Relief Valve Sizing 14. Thermal rating of heat exchangers 15. Battery limit co-ordination schedule (i) Interface points along with process parameters 16. Instrument process data sheets for NPK Process plant 17. Instrument process data sheets for other noncore process areas 18. Process control functional specification 19. Safety instrumentation system functional specs 20. Hydraulic calculations (i) APG to carry out for 21. changed lines after 22. Stress analysis / final routing. 23. HAZOP 24. Hazardous area drawings 25. Supervisory operation manual 26. Process performance guarantee requirement
19. Bills of quantities for UG services, 20. earthworks 21. Site development drawing, Site grading 22. drawing, storm water drain (battery limits)
Steelwork
Structural steelwork design criteria Structural steelwork specifications Structural outline drawings Standard details for steelwork incl. Vessels 27. platforms, stairs, ladders, hand railing DFPCL APG REMARKS 28. Typical steelwork details connections 29. Input structural steelwork design into 3D 30. model 31. Structural steelwork GA floor and platforms to 32. process structures and pipe racks 33. Prepare and record all detailed design 34. calculations 35. 36. 37. 38. Structural steelwork elevations and sections Structural steelwork GA vessel platforms Structural steelwork GA and details structures access stairway 23. 24. 25. 26.
41. Pipe support steelwork APG, main pipe support. 42. Minor support by piping contractor. 43. Preparation and Review of steelwork 44. subcontractors fabrication drawings and 45. connection design 46. By construction 47. Contractor. 48. Bill of quantities for structural steelwork 49. subcontract 50. For construction tender. 51. Bulk steelwork take-off 52. As built drawings APG to update based on 53. site markups a. T & C for sub contract packages