Task Name Three-story Office Building (76,000 square feet) General Conditions Receive notice to proceed and sign

contract Submit bond and insurance documents Prepare and submit project schedule Prepare and submit schedule of values

Resource Names

G.C. General Management G.C. Project Management,G.C. General Management G.C. Project Management,G.C. Scheduler G.C. General Management,G.C. Project Management G.C. Project Management,G.C. Obtain building permits Procurement Submit preliminary shop G.C. Project Management,G.C. drawings Procurement Submit monthly requests for payment Long Lead Procurement Submit shop drawings and order long lead items steel Submit shop drawings and order long lead items roofing Submit shop drawings and order long lead items elevator Submit shop drawings and order long lead items plumbing Submit shop drawings and order long lead items electric Submit shop drawings and order long lead items HVAC Detail, fabricate and deliver steel Mobilize on Site

Steel Erection Contractor Management Roofing Contractor Management Elevator Contractor Management Plumbing Contractor Management

Electric Contractor Management

HVAC Contractor Management Steel Erection Contractor Management,Steel Erection Contractor

Install temporary power Electric Contractor Install temporary water service Plumbing Contractor G.C. Superintendent,G.C. Labor Set up site office Crew[10%] Set line and grade benchmarks G.C. Survey Crew Prepare site - lay down Site Grading Contractor,G.C. yard and temporary fencing Labor Crew

Site Grading and Utilities Clear and grub site Stone site access and temporary parking area Rough grade site (cut and fill) Install storm drainage Install exterior fire line and building fire riser

Site Grading Contractor Site Grading Contractor Site Grading Contractor Site Grading Contractor Plumbing Contractor

Perform final site grading Site Grading Contractor Erect building batter boards and layout building Foundations Excavate foundations Excavate elevator pit Form column piers and spread foundations Rough-in electric and plumbing in elevator Form elevator pit walls Set reinforcing and anchor bolts Pour column piers and foundations Pour concrete elevator walls Cure elevator wall concrete Cure piers and foundations Strip wall forms Strip column piers and foundation forms Install pneumatic tube in elevator pit Prepare and pour concrete floor in elevator pit Steel Erection Erect steel columns, beams and joist - 1st and 2nd floors Erect steel columns, beams and joist - 3rd floor and roof Install miscellaneous iron and bracing - 1st and 2nd floors Install miscellaneous iron and bracing - 3rd floor and roof

G.C. Survey Crew Site Grading Contractor Site Grading Contractor G.C. Rough Carpenter Crew Plumbing Contractor,Electric Contractor G.C. Rough Carpenter Crew G.C. Rough Carpenter Crew G.C. Concrete Crew G.C. Concrete Crew G.C. Labor Crew G.C. Labor Crew G.C. Labor Crew G.C. Labor Crew Elevator Contractor

G.C. Concrete Crew

Steel Erection Contractor

Steel Erection Contractor

Steel Erection Contractor

Steel Erection Contractor

Install stairs and miscellaneous iron railing Touch-up paint on steel Form and Pour Concrete Floors and Roof Form 2nd floor including all floor openings Install rebar and in-floor utilities (including mechanical, electrical, plumbing) Pour 2nd floor slab Cure 2nd floor slab Strip forms from 2nd floor slab Form 3rd floor including all floor openings Install rebar and in-floor utilities (including mechanical, electrical, plumbing) Pour 3rd floor slab Cure 3rd floor slab Strip forms from 3rd floor slab Form roof slab including all floor openings Install rebar and in-floor utilities (including mechanical, electrical, plumbing) Pour roof slab Cure roof slab Strip forms from roof slab Form 1st floor Install electrical underground Install plumbing underground Install rebar and in-floor utilities Pour 1st floor slab Cure 1st floor slab Strip forms from 1st floor slab Carpentry Work Install exterior sheathing and metal studs Masonry Work

Steel Erection Contractor Steel Erection Contractor

G.C. Rough Carpenter Crew,G.C. Labor Crew

G.C. Labor Crew,Plumbing Contractor,Electric Contractor G.C. Concrete Crew G.C. Labor Crew G.C. Labor Crew G.C. Rough Carpenter Crew,G.C. Labor Crew G.C. Labor Crew[33%],Plumbing Contractor[33%],Electric Contractor[33%] G.C. Concrete Crew G.C. Labor Crew[10%] G.C. Labor Crew G.C. Rough Carpenter Crew,G.C. Labor Crew

G.C. Labor Crew,Plumbing Contractor,Electric Contractor G.C. Concrete Crew G.C. Labor Crew G.C. Labor Crew G.C. Rough Carpenter Crew Electric Contractor Plumbing Contractor G.C. Labor Crew,Plumbing Contractor,Electric Contractor G.C. Concrete Crew G.C. Labor Crew G.C. Labor Crew

Drywall Contractor

Rough-in plumbing at toilets and masonry walls Lay masonry at core, mechanical, and toilets Install exterior masonry work Install roof drains Install tile in toilet rooms Clean masonry Clean toilet room tile Roofing Install flashing at parapet walls Pour lightweight concrete roof fill Install seamless roofing material Spread stone ballast on seamless roof Set rooftop equipment Window wall and store front closures Install window wall aluminum and glass Install interior stud walls and drywall Install interior doors and hardware Install store front doors and hardware Building Finishes Install millwork and wood trim Paint walls and woodwork Install conduit at ceiling plenum space Install duct in ceiling plenum space Install ceiling grid Install ceiling tile Hang wallpaper Install building carpet Install hardware and accessories Complete interior and exterior sod and plantings Pave, curb, and stripe parking lot Elevators Set elevator equipment in shafts Set equipment in mechanical room

Plumbing Contractor Masonry Contractor Masonry Contractor Roofing Contractor Tile Contractor Masonry Contractor Tile Contractor

Roofing Contractor Roofing Contractor Roofing Contractor Roofing Contractor HVAC Contractor

Window Contractor Drywall Contractor G.C. Finish Carpenter Crew Window Contractor

G.C. Finish Carpenter Crew Painting Contractor Electric Contractor HVAC Contractor Drywall Contractor Drywall Contractor Painting Contractor Carpet Contractor G.C. Finish Carpenter Crew Landscape Contractor Paving Contractor

Elevator Contractor Elevator Contractor

Test and align doors and equipment Plumbing Rough-in plumbing in drywall walls Tie-in fire line riser and set valves Set plumbing fixtures and trim Flush, test, and clean piping and fixtures Electrical Rough-in electrical in masonry walls Rough-in electrical in drywall walls Pull wire in conduit and set area transformers Install and terminate electrical devices Make electrical terminations for HVAC equipment Install light fixtures - test and clean Heating and Ventilating AC Set equipment in mechanical room Rough-in mechanical in masonry walls Rough-in mechanical in drywall walls Install duct in building chase Set HVAC trim and test and balance system Final Clean-up and Occupancy Install hard tile flooring in common areas Clean hard tile floors Remove debris from building and do final cleanup Substantial completion date Complete Final Inspections Complete elevator inspection and certification Perform architect's inspection

Elevator Contractor

Plumbing Contractor Plumbing Contractor Plumbing Contractor Plumbing Contractor

Electric Contractor Electric Contractor Electric Contractor Electric Contractor

Electric Contractor Electric Contractor

HVAC Contractor HVAC Contractor HVAC Contractor HVAC Contractor HVAC Contractor

Tile Contractor Tile Contractor[50%]

G.C. Labor Crew G.C. Superintendent

Elevator Contractor G.C. Superintendent,G.C. Project Management

Perform local building agency inspection Perform Fire Marshal's inspection

G.C. Project Management,G.C. Superintendent G.C. Superintendent,G.C. Project Management

G.C. Superintendent,G.C. Labor Crew,Plumbing Contractor,Electric Contractor,HVAC Contractor,Drywall Contractor,Carpet Complete punch list items Contractor,Paving from all inspections Contractor,Painting Contractor[ Obtain certificate of occupancy G.C. Project Management Issue final completion documents including warranties G.C. Project Management G.C. Project Management,G.C. Issue final request for Accounting,G.C. General payment Management

Task Name Resource Names Three-story Office Building (76,000 square feet) General Conditions Receive notice to proceed and sign contract G.C. General Management Submit bond and G.C. Project Management,G.C. insurance documents General Management[25%] G.C. Project Prepare and submit Management[25%],G.C. project schedule Scheduler G.C. General Prepare and submit Management[10%],G.C. Project schedule of values Management G.C. Project Management[50%],G.C. Obtain building permits Procurement[50%] G.C. Project Submit preliminary shop Management[50%],G.C. drawings Procurement[50%] Submit monthly requests for payment Long Lead Procurement Submit shop drawings and order long lead items steel Submit shop drawings and order long lead items roofing Submit shop drawings and order long lead items elevator Submit shop drawings and order long lead items plumbing Submit shop drawings and order long lead items electric Submit shop drawings and order long lead items HVAC Detail, fabricate and deliver steel Mobilize on Site

Steel Erection Contractor Management Roofing Contractor Management Elevator Contractor Management Plumbing Contractor Management

Electric Contractor Management

HVAC Contractor Management Steel Erection Contractor Management[50%],Steel Erection Contractor[50%]

Install temporary power Electric Contractor Install temporary water service Plumbing Contractor G.C. Superintendent,G.C. Labor Set up site office Crew[10%] Set line and grade benchmarks G.C. Survey Crew

Prepare site - lay down Site Grading Contractor,G.C. yard and temporary fencing Labor Crew[10%] Site Grading and Utilities Clear and grub site Stone site access and temporary parking area Rough grade site (cut and fill) Install storm drainage Install exterior fire line and building fire riser

Site Grading Contractor Site Grading Contractor Site Grading Contractor Site Grading Contractor Plumbing Contractor

Perform final site grading Site Grading Contractor Erect building batter boards and layout building Foundations Excavate foundations Excavate elevator pit Form column piers and spread foundations Rough-in electric and plumbing in elevator Form elevator pit walls Set reinforcing and anchor bolts Pour column piers and foundations Pour concrete elevator walls Cure elevator wall concrete Cure piers and foundations Strip wall forms Strip column piers and foundation forms Install pneumatic tube in elevator pit Prepare and pour concrete floor in elevator pit Steel Erection Erect steel columns, beams and joist - 1st and 2nd floors Erect steel columns, beams and joist - 3rd floor and roof Install miscellaneous iron and bracing - 1st and 2nd floors

G.C. Survey Crew Site Grading Contractor[50%] Site Grading Contractor G.C. Rough Carpenter Crew Plumbing Contractor,Electric Contractor G.C. Rough Carpenter Crew G.C. Rough Carpenter Crew G.C. Concrete Crew G.C. Concrete Crew G.C. Labor Crew[10%] G.C. Labor Crew[10%] G.C. Labor Crew[10%] G.C. Labor Crew Elevator Contractor

G.C. Concrete Crew

Steel Erection Contractor

Steel Erection Contractor

Steel Erection Contractor[75%]

Install miscellaneous iron and bracing - 3rd floor and roof Steel Erection Contractor[75%] Install stairs and miscellaneous iron railing Steel Erection Contractor[50%] Touch-up paint on steel Form and Pour Concrete Floors and Roof Form 2nd floor including all floor openings Install rebar and in-floor utilities (including mechanical, electrical, plumbing) Pour 2nd floor slab Cure 2nd floor slab Strip forms from 2nd floor slab G.C. Rough Carpenter Crew,G.C. Labor Crew[20%] G.C. Labor Crew[33%],Plumbing Contractor[33%],Electric Contractor[33%] G.C. Concrete Crew G.C. Labor Crew[10%] Steel Erection Contractor[20%]

G.C. Labor Crew G.C. Rough Carpenter Form 3rd floor including Crew[50%],G.C. Labor all floor openings Crew[20%] Install rebar and in-floor utilities (including G.C. Labor Crew[33%],Plumbing mechanical, electrical, Contractor[33%],Electric plumbing) Contractor[33%] Pour 3rd floor slab G.C. Concrete Crew Cure 3rd floor slab G.C. Labor Crew[10%] Strip forms from 3rd floor slab G.C. Labor Crew Form roof slab including all floor openings Install rebar and in-floor utilities (including mechanical, electrical, plumbing) Pour roof slab Cure roof slab Strip forms from roof slab Form 1st floor Install electrical underground Install plumbing underground G.C. Rough Carpenter Crew,G.C. Labor Crew[20%] G.C. Labor Crew[33%],Plumbing Contractor[33%],Electric Contractor[33%] G.C. Concrete Crew G.C. Labor Crew[10%] G.C. Labor Crew G.C. Rough Carpenter Crew Electric Contractor Plumbing Contractor G.C. Labor Crew[33%],Plumbing Contractor[33%],Electric Contractor[33%] G.C. Concrete Crew G.C. Labor Crew[10%]

Install rebar and in-floor utilities Pour 1st floor slab Cure 1st floor slab

Strip forms from 1st floor slab Carpentry Work Install exterior sheathing and metal studs Masonry Work Rough-in plumbing at toilets and masonry walls Lay masonry at core, mechanical, and toilets Install exterior masonry work Install roof drains Install tile in toilet rooms Clean masonry Clean toilet room tile Roofing Install flashing at parapet walls Pour lightweight concrete roof fill Install seamless roofing material Spread stone ballast on seamless roof Set rooftop equipment Window wall and store front closures Install window wall aluminum and glass Install interior stud walls and drywall Install interior doors and hardware Install store front doors and hardware Building Finishes Install millwork and wood trim Paint walls and woodwork Install conduit at ceiling plenum space Install duct in ceiling plenum space Install ceiling grid Install ceiling tile Hang wallpaper Install building carpet Install hardware and accessories Complete interior and exterior sod and plantings

G.C. Labor Crew

Drywall Contractor

Plumbing Contractor Masonry Contractor Masonry Contractor Roofing Contractor Tile Contractor Masonry Contractor[50%] Tile Contractor[50%]

Roofing Contractor Roofing Contractor Roofing Contractor Roofing Contractor HVAC Contractor

Window Contractor Drywall Contractor G.C. Finish Carpenter Crew Window Contractor

G.C. Finish Carpenter Crew Painting Contractor Electric Contractor HVAC Contractor Drywall Contractor Drywall Contractor Painting Contractor Carpet Contractor G.C. Finish Carpenter Crew Landscape Contractor

Pave, curb, and stripe parking lot Elevators Set elevator equipment in shafts Set equipment in mechanical room Test and align doors and equipment Plumbing Rough-in plumbing in drywall walls Tie-in fire line riser and set valves Set plumbing fixtures and trim Flush, test, and clean piping and fixtures Electrical Rough-in electrical in masonry walls Rough-in electrical in drywall walls Pull wire in conduit and set area transformers Install and terminate electrical devices Make electrical terminations for HVAC equipment Install light fixtures - test and clean Heating and Ventilating AC Set equipment in mechanical room Rough-in mechanical in masonry walls Rough-in mechanical in drywall walls Install duct in building chase Set HVAC trim and test and balance system Final Clean-up and Occupancy Install hard tile flooring in common areas Clean hard tile floors Remove debris from building and do final cleanup Substantial completion date

Paving Contractor

Elevator Contractor Elevator Contractor Elevator Contractor

Plumbing Contractor Plumbing Contractor Plumbing Contractor Plumbing Contractor

Electric Contractor Electric Contractor Electric Contractor Electric Contractor

Electric Contractor Electric Contractor

HVAC Contractor HVAC Contractor HVAC Contractor HVAC Contractor HVAC Contractor

Tile Contractor Tile Contractor[50%]

G.C. Labor Crew G.C. Superintendent

Complete Final Inspections Complete elevator inspection and certification Perform architect's inspection Perform local building agency inspection Perform Fire Marshal's inspection

Elevator Contractor G.C. Superintendent[50%],G.C. Project Management[50%] G.C. Project Management[50%],G.C. Superintendent[50%] G.C. Superintendent[50%],G.C. Project Management[50%]

G.C. Superintendent[11%],G.C. Labor Crew[11%],Plumbing Contractor[11%],Electric Contractor[11%],HVAC Contractor[11%],Drywall Contractor[11%],Carpet Contractor[11%],Paving Complete punch list items Contractor[11%],Painting from all inspections Contractor[11%] Obtain certificate of occupancy G.C. Project Management Issue final completion documents including warranties G.C. Project Management G.C. Project Management[33%],G.C. Issue final request for Accounting[33%],G.C. General payment Management[33%]