A PROJECT PROPOSAL

SUBMITTED TO:

PROF.MELCHOR D.JALON
COLLEGE OF COMMUNICATION AND HUMANITIES WESTERN MINDANAO STATE UNIVERSITY

IN PARTIAL FULFILLMENT OF THE REQUIREMENTS IN ENGLISH 111 (TECHINICAL AND SCIETIFIC WRITING)

SUBMITTED BY: MICHAEL EURICK L. GONZALES BS ELECTRICAL ENGINEERING 5A

MARCH 11, 2013

WESTERN MINDANAO STATE UNIVERSITY COLLEGE OF ENGINEERING AND TECHNOLOGY

March 11, 2013

Prof. Melchor D. Jalon Professor in English 111 WMSU, Zamboanga City

Sir: This is to respectfully submit the project proposal on the PROPOSOSED Twostorey Residential Building to be constructed at ZONE V, Mercedes Z.C with the estimated cost of pesos and the duration of calendar days (April-August). We hope that you will find the needed information in the attached project proposal.

Yours Truly

, Michael Eurick L. Gonzales

I.

PROJECT PROFILE A. Project Title: Proposed Two-Storey Residential Building B. Proponent: 5th Year BS-Electrical Engineering C. Implementers: Jaycee Construction Inc. D. Standard Classification: Building Construction E. Project Site: Zone V, Mercedes Zamboanga City F. Total Project Cost: G. Project Brief Executive Summary H. Project Brief Executive Summary:

Residential building is a dwelling place of a person or group of person that will provide them their needs, comfort and shelter in their daily life style. This two-storey building will be design for a residential used or will be used as a house. PROJECT PROPOSAL PROPER A. Rationale: This proposal is intended to make a two-storey building that is designed for a lesser occupies the space area of a location site. It also gave a comfort for a person in the manner of proper arrangement of room area and also well to beautify the design of the building in the requirement of the location site. How to implement this proposal? To ensure the success of the proposal The Proposed Two-Residential Building we must take consideration some certain procedure. 1. A good site survey of what actual topography and actual size of the construction area. 2. Clearance and excavation on the construction site. 3. In the constructing building worker are requiring to wear safety gears to insure the less accident. 4. Installation electrical line and interior design. 5. Gave at least one month for drying of the cement before using the building.

Who will benefit from the proposal? This proposal is beneficial to residents who will use this building as house having a good quality.

How much does it cost to implement the proposal? Presumably, the amount that will consume is more or less 11111 in pesos.

By means of assumption, we can assume that we will be need not less than 111111 peso for the construction of two-storey residential building.

Who are involved in this proposal? Civil Engineer Geodetic Engineer Electrical Engineer

Objective 1. To build a two-storey building in a 2. To build a two-storey building with a cheaper cost but high quality in terms of durability. Significance of the study The proposal is most significant to the residents who will be living in this building they will have their own house and reliable to the location site. This study also helps some people to have job for the worker who will be dealing on this proposed project will have income. PROJECT COMPONET/STATERIES OF IMPLEMENTATION MAJOR ACTIVITIES 1.Site Survey 2 .Clearance and excavation STRATEGY OF IMPLEMENTATION Measuring the land area and the topography of the area Cleaning the whole area were we will build and an excavation for the foundation of the building and the purpose of leveling the area. Preparing the construction and building the proposed two storey building .this stage also will be implementing a safety first for the worker to avoid accident during work. After the installation of the electrical connections testing must be done right away. And also preparing the building by painting and designing the interior building. Let the building on touched within one month to let it dry the cement before it will fully occupied.

3.Construction

4.Electrical Installation\testing\ Interior Designing

5.Finishing

F. IMPLEMENTATION The following activities and schedule shall be considered Activities to be implemented 2013 Year April May June July Month 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 x x x x x x x x x x x x x x x x x x x x x x

Site Survey Clearing and Excavation Construction Electrical Installation\testing\interior Designing Finishing

Full Operation August

1 x G.ESTEMATED BUDGET QTY Unit 1 2

2 x

3 x

4 x

1 7

1 300 1 30 pcs pcs pcs kg pcs

Description Site Survey Geodetic Engineering (3day) Laborer(2days) Sub Total Clearance and Excavation Civil engineering(3day) Laborer(3day) Sub Total Construction Civil Engineering(55days) Laborer or Carpenters (55days) Mason(55days) Welder(8days) Forman (55 days) Hallow Blocks Welding rod Welding machine(8days) Assorted nails Door knob

Unit Cost 2,000 250

Total Cost 2,000 1,000 3,000 4,500 3,000 7,500 71,500 77,000 27,500 2,400 11,000 7,500 8,000 1,950

1,500 250

1,300 200 250 300 200 18 25 1,000 65 365

sack

Port land cement

400

5 12 2 3 4

galoons gallons pcs pcs

Paint Blue paint White paint Paint brush Paint roller Painter\Laborer(10days) Sub Total Grand Total

650 550 45 95 200

3,250 6,600 90 285 8,000 18,225