Example of Scope of Works for Electrical Services Below are the examples of Scope of Works for Electrical Services

a) Medium Voltage Distribution System b) Low Voltage Distribution System c) Standby Generator Set d) Earthing System e) Lightning Protection Installation f) Light & Power Installation g) Telephone System h) Information Technology (ICT) i) SMATV System j) PA System k) Security (CCTV System / IP Camera and Card Access System) l) Parking System m) Sound Reinforcement System n) SMS System o) External Lighting Installation p) SMATV System Posted by Ir. Fadzilayaty Ramli at 8:11 AM No comments: Labels: Design, LV Tuesday, September 6, 2011 Study Report 1 : Upgrading of Electrical Supply 1. Introduction:

To check the effect of load increase due to the new equipment to be installed in the factory

2. Reference Document:

a. as built drawings

b. latest electrical bill

c. on-hands information by the client's representative

3. Current installation:

a. Single chamber sub-station with 1000KVA Transformer

b. Current size of ACB is 1000A TPN with 1600A Busbar

c. Current MD is 600A

4. New Installation:

a. New equipment (MD = 720A)

b. New a/c load (MD = 86A)

5. Maximum Demand Load Analysis:

a. Future MD (A) = Current MD + New MD

= 600A + 720A + 86A

= 1406A

b. Future MD (KW) = 860KW

c. Future MD (KVA) = 1012KVA

6. Conclusion:

a. New load cannot be catered by existing TNB sub-station

b. Application on new load / increasing of the current load need to be submitted to TNB

c. New MSB need to be installed to cater for future load / to upgrade the existing MSB (1000A TPN ACB to 1600A TPN ACB)

Posted by Ir. Fadzilayaty Ramli at 12:04 PM No comments: Labels: LV, MSB, Study Report Monday, August 22, 2011 Forms of Assemblies - FORM 4 (Part 4)

Note: The above Form Code have been tabulated based on IEC 439-1, Part 1, Clause 7.7 - FORUM

Posted by Ir. Fadzilayaty Ramli at 9:26 AM No comments: Labels: FORM, LV, MSB, Shop Drawing Friday, July 15, 2011 Forms of Assemblies - FORM 3 (Part 3)

Note: The above Form Code have been tabulated based on the IEC 439-1 Part1, Clause 7.7 - FORUM

Posted by Ir. Fadzilayaty Ramli at 10:03 AM No comments: Labels: FORM, LV, MSB, Shop Drawing Thursday, June 30, 2011 Forms of Assemblies - FORM 1 & 2 (Part 2)

Note :

The above Form Code have been tabulated based on the IEC 439-Part 1, Clause 7.7 - FORUM Posted by Ir. Fadzilayaty Ramli at 11:15 PM No comments: Labels: Design, FORM, LV, MSB, Shop Drawing Sunday, May 1, 2011 Forms of Assemblies (Part 1) According to IEC 439-1, Clause 7.7 Forms of Assemblies can be obtained by means of partitions or barriers (metallic or non-metallic) into separate compartments or barriered sub-section.

Why is Forms of Assemblies is very important?

1. to enable a functional unit to remains in service - to reduce the risk of making accidential contact with the live part or adjacent units of busbars

2. to reduce the risk of loose part, tools, or even debris falling into or otherwise passing into an adjacent compartment

3. to limit the probability that ionised gas created by the operation of a short-circuit protective device, could cause flash over accross adjacent equipments or busbars

4. protection against contact with live parts belonging to the adjacent functional units

Note :

The above are a summarisation of Form Code IEC 439-Part 1, Clause 7.7 - FORUM Posted by Ir. Fadzilayaty Ramli at 4:48 PM No comments: Labels: FORM, LV, MSB, Shop Drawing Sunday, December 5, 2010 Kerja-Kerja Pengujian di Tapak

Setelah semua peralatan di pasang di pencawang, kerja-kerja pengujian perlu di jalankan di tapak sebelum PE tersebut boleh ditauliahkan. Ujian ujian ini adalah untuk mengesahkan bahawa kesemua peralatan elektrik adalah berada dalam keadaan normal dan sudah bersedia untuk dimulatugas. Berikut pula adalah senarai ujian yang perlu dilakukan di tapak :

Posted by Ir. Fadzilayaty Ramli at 2:02 AM 2 comments: Labels: EE, HT, LV, TnC Friday, December 3, 2010 FAT

Kerja-kerja pengujian terbahagi kepada dua. Pertama adalah ujian rutin yang dilakukan di kilang (Factory Acceptance Test, FAT) di mana ujian tersebut akan disaksikan oleh pihak klien, kontraktor dan perunding. Kedua adalah ujian di tapak sebelum kerja-kerja pentauliahan dilaksanakan. Berikut adalah senarai ujian rutin / semakan yang dijalankan semasa FAT :

Posted by Ir. Fadzilayaty Ramli at 1:52 AM No comments: Labels: EE, FAT, HT, LV Sunday, September 26, 2010 Sistem Perlindungan

You might also like