The Construction Project Engineering handbook is one of the Construction Engineerings main references, set up to assist students now enrolled within the framework of the Civil Engineering Department English Section of the Technical University of Civil Engineering of Bucharest. The purpose of this present handbook is to present fundamental and practical information in the field of plain and reinforced concrete, ensuring that works are undertaken in an orderly manner, as sequence, and follow the required principles of execution. The handbook covers the whole project cycle for workers, equipment, materials, procedures, organization and quality control for concrete, reinforced concrete and precast concrete, serving as a reference guide for general contractors, construction managers, specialty subcontractors, estimators, project engineers, project managers, construction superintendents, scheduling engineers, sales engineers, or inspectors. The content of this book is arranged in 6 chapters that are summarized below. Chapter 1. Concrete Mix Design, addresses the design requirements and methodology regarding selection and proportioning of ingredients for concrete to meet its desired properties for concrete works. Chapter 2. Rate of Concrete Placement Rough Estimate, presents basic information and specifies simplified means of estimating concrete rate of placement in formwork. Chapter 3. Concrete Formwork Design, specifies the materials, construction and removal of formwork and shoring made for wood and steel, including fundamental concepts and equations that are used to design and execute them. Chapter 4. Concrete Maturity, provides an overview regarding concrete maturity determination, outlining current experience in relation to using an effective and rational method in evaluating in-situ concrete strength at different ages. Chapter 5. Estimates, establishes guidance in describing methods, procedures, and formats for the preparation of construction project cost estimates, from planning phases through modification estimates during concrete construction. Chapter 6. Concrete Warehouse Structural Frame Erection, provides information concerning planning, detailing, sequencing and erection of concrete warehouse structural frames using precast reinforced and prestressed concrete members.

O.G. Ilinoiu, Bucharest 2004

ACKNOWLEDGMENTS
These notes were originally based on ideas of Drs. Mihai Teodorescu and Radu Popa. However, sketches, views, calculations and preference regarding comments are the writer's own. The author has written this presenting some positions as starting points for drafting a handbook rather than as the only positions that can be adopted. The author gratefully acknowledges the assistance and support of a number of organizations, institutions, trade associations and manufacturers and who have provided information and photographs, and by permitting reproduction of certain elements of their material: American Concrete Institute - ACI, USA; American Society of Civil Engineers - ASCE, USA; American Society for Testing and Materials - ASTM, USA; APA. The Engineering Wood Association USA; Building Science Insight - BSI, Canada; BUMAR LABEDY S.A., Poland; Canadian Building Digest - CBD, Canada; Civil Engineering Corps Washington CECW, USA; Cement and Concrete Association Australia; ECCON, ZIPACON, Romania; EFCO, USA; Heidelberg Cement AG, Germany; IPCT, Romania; International Council for Building Research and Documentation - CIB, Canada; International Union of Testing and Research Laboratories for Materials and Structures RILEM; Institute for Research in Construction - IRC, Canada; IPC, Romania; LIEBHERR-Werk Nenzing Gmbh, Germany; MACON SA, Romania; National Research Council - NRCC, Canada; National Institute of Standards and Technology - NIST, USA; Preconstructa AEBTE, Greece; Prefabricate Vest, Romania; UBEMAR S.A., Romania; UMT Timisoara, Romania; TELEMAC, UBEMAR, Romania; US Army Corps of Engineers. Directorate of Military Programs, Engineering Division, USA and The Engineering Wood Association - APA, USA

Construction Project Engineering

CONTENTS
PREFACE ........................................................2 ACKNOWLEDGMENTS...............................2 CONTENTS.....................................................3 TABLE OF FIGURES ....................................4 TABLES ...........................................................5 CHAPTER 1. CONCRETE MIX DESIGN ..6
1.1. General Considerations ................................ 6 1.2. Designing the Concrete Mix......................... 6 1.2.1. Mix Design Procedure .......................... 6 1.2.2. Quality Requirements and Factors Affecting Designed Concrete ......................... 6 1.3. Determination of Job Parameters ................. 8 1.4. Example of Concrete Mix Design .............. 10 1.5. Appendix .................................................... 15 References ......................................................... 23 4.5. Rate of Concrete Hardening in Accordance with its Thermal History ....................................55 4.6. Concrete Curing Minimum Duration ..........55 4.7. Example ......................................................57 References..........................................................58

CHAPTER 5. ESTIMATES ........................ 59


5.1. General Considerations ...............................59 5.2. Types of Estimates ......................................59 5.2.1. Rough Estimating................................59 5.2.2. Detailed Estimate ................................60 5.3. Example of Project Estimates .....................62 5.3.1. Estimate Quantity of Materials, Labor and Cost for Concrete, Reinforcement and Formwork......................................................62 5.3.2. Estimate Calculation of Labor Consumption for Concrete, Reinforcement and Formwork Placement..............................64 5.4. Item tabulations of material consumption and labor costs for construction works...............65 References..........................................................70

CHAPTER 2. RATE OF CONCRETE PLACEMENT ROUGH ESTIMATE .........25


2.1. General Considerations .............................. 25 2.2. Example 1................................................... 25 2.3. Example 2................................................... 25 References ......................................................... 26

CHAPTER 6. CONCRETE WAREHOUSE STRUCTURAL FRAME ERECTION....... 71


6.1. General Considerations ...............................71 6.2. Job Planning................................................72 6.3. Preliminary Execution Works .....................73 6.3.1. Standardized Prefabricated Reinforced and Prestressed Concrete Members...............73 6.3.2. Manufacturing, Transport and Storage of Precast Units .............................................90 6.3.3. Inspection of Units After Transport and Storage ..........................................................92 6.3.4. Unit Preparation ..................................92 6.3.5. Lifting Devices....................................92 6.3.6. Selection of Lifting Equipment ...........99 6.4. Erection of Precast Units...........................114 6.4.1. Sequence, Schemes and Procedures for Unit Erection ...............................................114 6.4.2. Unit Erection Detailing Sequences....115 6.5. Erection characteristics calculation...........116 6.6. Connections...............................................118 6.7. Inspection of Erection and Correction of Dimensional Tolerances...................................119 6.8. Construction Project Planning and Scheduling .......................................................120 6.8.1. Example Bar Chart Schedule GantT Chart and Labor Schedule ...........................121 6.8.2. Example Network Schedules.............122 6.9. Health, Safety and Welfare Regulations ...123 6.10. Example Working Drawings...................124 References........................................................135

CHAPTER 3. CONCRETE FORMWORK DESIGN..........................................................27


3.1. General Considerations .............................. 27 3.2. Modular Plywood Formwork ..................... 27 3.3. Shoring Members ....................................... 30 3.4. Formwork Principles .................................. 32 3.4.1. Formwork Loads ................................ 32 3.4.2. Formwork Pressures ........................... 32 3.4.3. Form Material Properties.................... 35 3.5. Wall, Slab Formwork and Shoring Systems Design ............................................................... 36 3.5.1. Slab Formwork and Shoring System Design........................................................... 36 3.5.2. Wall and Column Formwork Design.. 40 3.6. Example Working Drawings ...................... 43 3.7. Steel Modular Panel Formwork.................. 49 3.7.1. General Considerations....................... 49 3.7.2. Modular Steel Column Formwork...... 49 3.7.3. Example of Working Drawing............ 52 References ......................................................... 52

CHAPTER 4. CONCRETE MATURITY...53


4.1. General Considerations Regarding Concrete Maturity............................................................. 53 4.2. Maturity Index Method .............................. 53 4.3. Minimum Duration for Concrete Strength Attainment......................................................... 53 4.4. Critical Concrete Hardening Level............. 54

ABBREVIATIONS AND SYMBOLS ...... 135 CONVERSION TABLE ............................ 135

Construction Project Engineering

TABLE OF FIGURES
Figure 3-1. Typical plywood panel ....................................................................................................... 27 Figure 3-2 (a). Plywood panel formwork .............................................................................................. 28 Figure 3-2 (b). a,b,c and d- panel accessories ....................................................................................... 28 Figure 3-3. Typical steel telescopic joists. ............................................................................................ 30 Figure 3-4. Typical adjustable steel pipe shore (prop) .......................................................................... 31 Figure 3-5. Lateral pressure on wall form according to rate of concrete placement ............................. 33 Figure 3-6. Symbols for cross section of rectangular beam .................................................................. 36 Figure 3-7. Typical view of joist and prop ............................................................................................ 38 Figure 3-8. Schematic view of prop (shore).......................................................................................... 40 Figure 3-9. Pressure distribution of lateral face of panel ...................................................................... 40 Figure 3-10. Pressure of concrete on wall form .................................................................................... 41 Figure 3-11. Spacing between ties ........................................................................................................ 42 Figure 3-12. Typical assembly of steel modular panels ........................................................................ 49 Figure 3-13. Typical E75 scaffold, view and assembly phases a, b and c ............................................ 51 Figure 3-14. Assembly phases of steel modular column formwork a to g ............................................ 51 Figure 4-1. Temperature variation of concrete for different ages and freezing temperatures .............. 54 Figure 6-1. Transverse girder beam warehouse .................................................................................... 71 Figure 6-2. Longitudinal girder beam warehouse. ................................................................................ 72 Figure 6-3. Standardized catalog prefabricated reinforced and prestressed concrete members used for ground floor warehouses............................................................................................................... 75 Figure 6-4 Typical trailers..................................................................................................................... 90 Figure 6-5. Typical storage of reinforced and prestressed concrete members ...................................... 91 Figure 6-6. Typical prefabricated cup shaped foundations ................................................................... 91 Figure 6-7. Typical lifting devices for precast concrete members ........................................................ 92 Figure 6-8. Track-mounted crane .......................................................................................................... 99 Figure 6-9. Lorry mounted crane ........................................................................................................ 100 Figure 6-10. Self propelled crane ........................................................................................................ 100 Figure 6-11. Crane clearances ............................................................................................................. 101 Figure 6-12. AMT 950. Source: ECCON ........................................................................................... 102 Figure 6-13. DST-0285. Source: BUMAR LABEDY S.A. ............................................................. 103 Figure 6-14. DST-0505. Source: BUMAR LABEDY S.A. ............................................................ 104 Figure 6-15. DUT-0502. Source: BUMAR LABEDY S.A............................................................. 105 Figure 6-16. TELEMAC HT 15. Source: UBEMAR...................................................................... 106 Figure 6-17. TELEMAC HTA -7. Source: UBEMAR S.A. .............................................................. 107 Figure 6-18. LIEBHERR LHM 100. Source: LIEBHERR-Werk Nenzing Gmbh.............................. 108 Figure 6-19. LIEBHERR LHM 150. Source: LIEBHERR-Werk Nenzing Gmbh.............................. 109 Figure 6-20. LIEBHERR LHM 1060/2. Source: LIEBHERR-Werk Nenzing Gmbh ....................... 110 Figure 6-21. LIEBHERR LHM 1040/4. Source: LIEBHERR-Werk Nenzing Gmbh ....................... 111 Figure 6-22. LIEBHERR LHM 1030. Source: LIEBHERR-Werk Nenzing Gmbh........................... 112 Figure 6-23. LIEBHERR LHM 1160. Source: LIEBHERR-Werk Nenzing Gmbh............................ 113 Figure 6-24. Erection characteristics of columns ................................................................................ 116 Figure 6-25. General view typical assembly procedure of columns ................................................... 116 Figure 6-26. Erection characteristics of bridge beams ........................................................................ 116 Figure 6-27. Erection characteristics of girder beams......................................................................... 117 Figure 6-28. Erection characteristics of roof slabs .............................................................................. 117 Figure 6-29. General view typical assembly procedure of roof slabs ................................................. 118 Figure 6-30. Typical warehouse connections...................................................................................... 118

Construction Project Engineering

TABLES
Table A. Characteristic strength of concrete .......7 Table 1-1. Recommended concrete slump for various types of construction ....................15 Table 1-2. Exposure class for concrete in different environmental conditions...........15 Table 1-3. Minimum requirements for concrete durability assurance according to exposure conditions..................................................16 Table 1-4. Minimum cement content for concrete durability assurance ..................................16 Table 1-5. Requirements for concrete durability assurance according to type of environment conditions..................................................17 Table 1-6. Grading classes ................................17 Table 1-7. Upper and lower limits of gradation 18 Table 1-8. Standard types of Portland cement...18 Table 1-9. Cement types according to Romanian standards (SR)...........................................19 Table 1-10. Recommended types of cement used for concrete works in normal exposure conditions..................................................20 Table 1-11. Recommended types of cements for plain and reinforced concrete works exposed to sea water and severe freezing .21 Table 1-12. Recommended types of cements for plain and reinforced concrete works subjected to aggressive waters..................21 Table 1-13. Estimated mixing water requirement for various slumps ....................................22 Table 1-14. Relative density..............................22 Table 1-15. Approximate volume of airentrainment according to maximum size aggregates .................................................22 Table 1-16. Maximum values for w/c ratio after preliminary tests (grade II concrete homogeneity) ............................................22 Table 1-17. Concrete strength at 28 days after preliminary tests for grade II homogeneity ..................................................................23 Table 1-18. Values that will be subtracted or added to the recommended values for grade II ...............................................................23 Table 1-19. Concrete mix design parameters ....23 Table 3-1. Panel nominal dimensions ...............27 Table 3-2. Allowable spans d (m) between joists in accordance with span and load....30 Table 3-3. Allowable axial load P (daN) on shore in accordance with length. ..............32 Table 3-4. Characteristics of concrete pressure on formwork ..................................................34 Table 3-5. Coefficient according to rate of concrete placement. ................................. 35 Table 3-6. Combination of loads according to member .................................................... 35 Table 3-7. Nomenclature of symbols ............... 36 Table 3-8. Modular steel formwork components ................................................................. 50 Panel ................................................................. 50 Table 4-1 Recommended critical cold weather maturity level for concrete (Mk)............... 54 Table 4-2. Recommended striking off maturity level for concrete (M)............................. 54 Table 4-3. Values of coefficient ki of equivalency .............................................. 56 Table 4-4. Striking time for concrete formwork56 Table 4-5. Control chart for calculating the concrete maturity index ........................... 57 Table 5-1. Estimate schedule............................ 60 Table 5-2. Concrete .......................................... 65 Table 5-3. Formwork........................................ 67 Table 5-4. Reinforcement ................................. 69 Table 6-1. Erection characteristics table........... 73 Table 6-2. Typical prefabricated ground floor warehouse concrete members .................. 73 Table 6-3. Lifting devices for columns ............ 93 Table 6-4. Lifting devices for beams................ 94 Table 6-5. Lifting devices for beams and roof slabs ......................................................... 95 Table 6-6. Universal lifting devices ................. 98 Table 6-8. Lifting Capacities for Telescopic Boom DST-0285.................................... 103 Table 6-9. Lifting Capacities for Telescopic Boom DST-0505.................................... 104 Table 6-10. Lifting Capacities for Telescopic Boom DUT-0502 ................................... 105 Table 6-11. Lifting Capacities for Telescopic Boom TELEMAC HT ........................... 106 Table 6-12. Lifting Capacities for Telescopic Boom TELEMAC HTA -7 .................... 107 Table 6-13. Lifting Capacities for Telescopic Boom LIEBHERR LHM 1060/2 ........... 110 Table 6-14. Lifting Capacities for Telescopic Boom LIEBHERR LHM 1040/4 ........... 111 Table 6-15. Lifting Capacities for Telescopic Boom LIEBHERR LHM 1030 .............. 112 Table 6-16. Lifting Capacities for Telescopic Boom LIEBHERR LHM 1160 .............. 113

Construction Project Engineering

CHAPTER 1. CONCRETE MIX DESIGN


1.1. GENERAL CONSIDERATIONS
Concrete is a conglomerate of hydraulic cement, sand, stone, and water. The sand and stone are dispersed particles in a multiphase matrix of cement paste. When mixed with water, the cement powder hydrates to form cement paste (through a chemical reaction called hydration), which is an interconnected network of solid and semi-solid phases that gives concrete its strength, forming a natural stone imitation, known as concrete. Within this process lies the key to a remarkable characteristic of concrete: it is plastic and malleable when freshly mixed, strong and durable when hardened. The key to achieving a strong, durable concrete rests in the careful selection and proportioning of its constituent ingredients.

1.2. DESIGNING THE CONCRETE MIX


The necessary first step to be taken to design a concrete mix is to establish clearly the requirements that the mix design must meet. These generally include one or more of the followings: mechanical strength, durability, characteristics of concrete member, and special requirements specified by the project design. 1.2.1. MIX DESIGN PROCEDURE The mix design cannot be resolved totally analytically, it requires, after the determination of job parameters (e.g. quantities of water, cement, aggregate, w/c ratio), calculation of weights, experimental adjutants (trial) tests on concrete for ensuring that it meets the design specifications. With this information and the aid of tables or simple calculations, the quantities (kg) of cement, coarse aggregate, water, and entrained air required per cubic meter can be determined. The absolute volumes of the ingredients can be calculated and totaled. Based on a 1 m3 of mix, subtracting the total of the four ingredients from 1 will provide the absolute volume of the fine aggregate required. From the absolute volume, the mass of the fine aggregate can then be calculated. The quantities of materials required for 1 m3 of concrete shall be estimated and trial batches of 30 l made based on the quantities calculated. If adjustments are necessary further batches should be made by keeping the quantity of water and aggregate constant and only by adjusting the cement content to produce the desired slump and compressive strength. 1.2.2. QUALITY REQUIREMENTS AND FACTORS AFFECTING DESIGNED CONCRETE The physical characteristics, chemical composition, and the proportions of the ingredients from mix affect the properties of concrete, in its fresh and hardened state. When designing, we must consider the following quality requirements of concrete: - Fresh concrete: air content, flow behavior (workability/consistency), bleeding, cement type, setting time, hydration heat limitation. - Hardened concrete: strength at specified age - short term (e.g. initial pre stress force and long term), durability environment / exposure (e.g. carbonation, chloride penetration, acid resistance, sulfate resistance), frost-thaw resistance, permeability (fluids, gas), resistance against early age cracking. Factors to be considered regarding durability: - Choice of slump. - Environment conditions (dry, humid, humid with frost, marine and chemical aggressiveness).

Construction Project Engineering Exposure conditions (constructions protected against rain and humidity, frost-thaw saturated (no saturated) with water, exposure to water under pressure, exposed to marine or chemical environment etc.). - Maximum size of aggregate. - w/c ratio. - Type of additive / admixture used. - Minimum cement content: Factors to be considered: 10 20 Watertightness (grades: P410 , P810 , P12 , P420 , P820 , P12 it may be tested by measuring the flow through a saturated specimen, of 100 mm respectively 200 mm, subjected to pressure. Freeze-thaw resistance G50, G100, G150. Proportioning relates to the following aspects: - Workability (regarding fresh concrete). - Durability, strength (regarding hardened concrete). - Economy by: Minimizing the amount of cement and w/c ratio. Minimizing the amount of water, to reduce cement content, and to increase strength durability. - Batch weights calculations. - Adjustments. Factors to be considered when choosing aggregates: - Economical consideration: Minimize water and cement, stiffest possible mix; Largest particle max size of aggregate, shape, surface texture; Optimize ratio of fine to coarse; Grading and its significance: consistency and strength. - Size and shape of members: maximum size aggregate; - Physical properties: strength; - Exposure condition: air entraining or not, sulfate attack; - Maximum aggregate size: The largest maximum aggregate size that will conform to limitations given below: Nominal maximum size aggregate (Dmax) should not be larger than: Dmax 1/4 of narrowest dimension of structural member; 1/3 thickness of slab 1/6 reservoir wall thickness spacing between re-bars 5 mm 1,3 x concrete cover of re-bars 1/3 concrete pump piping Factors to consider when choosing water to cement ratio: - Compressive strength is inversely proportional to w/c: - Economical consideration: minimize water and cement, stiffest possible mix.
Table A. Characteristic strength of concrete
Concrete grades (MPa) fc,28
cylinder

C* 2,8/ 3,5 2,8

C C* C C C C* C C C* C C* 4/ 6/ 8/ 12/ 16/ 18/ 20/ 25/ 28/ 30/ 32/ 5 7,5 10 15 20 22,5 25 30 35 37 40 Characteristic strength of concrete Source: NE 012-1999 4 6 8 12 16 18 20 25 28 30 32

C 35/ 45 35

C 40/ 50 40

C 45/ 55 45

C 50/ 60 50

fc,28 cube 3,5 5 7,5 10 15 20 22,5 25 30 35 37 40 45 50 55 60 * concrete classes that remain effective until Romanian Design Codes come into effect (accordance Eurocode 2).

Construction Project Engineering

1.3. DETERMINATION OF JOB PARAMETERS


Step 1: Durability conditioning of concrete Environment conditions (table 1-2) class of exposure Requirements of grade and durability (table 1-3 and 1-4). 1. W/C ratio: Table 1-3 suggested w/c ratio. 2. Cement content: Table 1-4 suggested minimum cement content C (kg/m3). Step 2: Preliminary procedures for determining the quality mix proportions of concrete constituents 1. Slump: Table 1-1 suggested slump T (mm). 2. Minimum cement content: Table 1-5 suggested minimum cement content c (kg/m3). 3. Aggregates: a) Selection of aggregates by type (table 1-14). b) Nominal maximum size of aggregates: Computed according to the following restrictions: Dmax minimum dimension of bearing member/4; Dmax thickness of slab/3; Dmax thickness of reservoir (tank) wall/6; Dmax minimum distance between re-bars 5 mm; Dmax 1,3 x reinforcement concrete cover; Dmax diameter of pump hose/3 ~ 31 mm 4. Gradation of aggregate particles: Table 1-6 suggested grading curve table 1-7 upper and lower gradation limits. 5. Cement: Table 1-10, 1-11, 1-12 Recommended cement type and grade. 6. Water-cement maximum ratio: Table 1-5 recommended water-cement maximum ratio. Step 3: Procedures for determining the batch weights for mix proportions of constituents 1. Estimate mixing water and air content: Table 1-13 w (kg/m3) Correction of water quantity according to maximum nominal size aggregate w' = w x c (kg/m3). Table 1-15 suggested volume of air-entrainment 2. Water-cement ratio: Table 1-16 suggested w/c ratio. Final adopted value of w/c = minimum value between (step 2.6. and step 3.2) 3. Cement:
C '= w' w/c

[kg/m3]

Final adopted value of C = maximum value between (step 2.5. and step 3.3) 4. Estimate coarse aggregate: (First estimate of aggregate weight) The total amount of dry aggregates will be calculated as follows: Knowing that V=m/ 8

Construction Project Engineering V ag = V total V water = V cement V air Ag = ag x (1000 C/c - A'/a - p) [kg/m3] Where:ag = relative density of aggregates (2,7 kg/dm3); c = relative density of cement (3,0 kg/dm3); p = void parameter (table 11), when not using additives, (when using additives the parameter will be computed according to laboratory tests). 5. Gradation of aggregate: Table 1-7 percentage limits of aggregate passing. The amount of aggregate for each grade is found as follows:

A gi = A g x

p i p i1 (kg/m3) 100

Where:Ag = amount of aggregates (kg); pi = percent passing by mass through sieve "i"; pi-1= percent passing by mass through sieve "i-1"; 6. Adjustment for moisture in aggregate: u 3 A = A gi x i (l/m ) 100 Where: Agi = amount of aggregate form sieve "i' (kg); ui = free moisture of sieve "i" (%); n = total numbers of sieves. A* = A' - A (l/m3) The free amount of moisture form fine aggregates (UFA%), is calculated as follows:
An = Agi x ui kg/m3 100

The free amount of moisture form coarse aggregates (UCA%), is calculated as follows:
A p = Agi x ui kg/m3 100

The total amount of free moisture is calculated as follows: A = An + A p kg/m3 Adjusted amount of water: A* = A' - A (kg/m3) 7. Adjustment of total amount of aggregates by sieve sizes: The of total amount of aggregates by sieve sizes, is found as follows: u i (kg/m3) A* gi = A gi x 1 + 100 Where:Agi - amount of aggregate form sieve "i' (kg); ui = free moisture of sieve "i" (%). 8. Final adjustment of aggregate weight: The of total amount of aggregates, is found as follows: Ag* = Agi * (kg/m3) * Where:Ag = adjusted amount of aggregate form sieve "i' (kg); n = number of sieves sizes. Ag * = A*gi kg/m3 9. Total mass of concrete produced: The total mass of concrete produced will be calculated as follows: b = A* + C + Ag* b will be compared with the value of normal weight concrete that ranges between 2160 to 2560 kg/m3

Construction Project Engineering

1.4. EXAMPLE OF CONCRETE MIX DESIGN


Design a normal weight concrete mix that is to test C 12/15 at 28 days, that will be located in definite site. Determine the correct amount of ingredients for the concrete mix in accordance to the following characteristics: A. Data required: 1. Specified concrete (grade/class): C 12/15 2. Characteristics of bearing member: a) Type of bearing member: bearing walls. b) Minimum section (dimension) of concrete member: b = 200 mm c) Concrete cover of reinforcing bars: c = 25 mm d) Minimum spacing of reinforcing bars: D = 100 mm 3. Conditions (class) of exposure and environment conditions: Dry moderate environment, concrete member protected against weather or aggressive conditions. 4. Work conditions: Normal conditions, using plywood form panels. 5. Transport and placement of concrete: Transit mix trucks and concrete pumps. 6. Aggregates: Siliceous riverbed. 7. Relative density: 2.70 (kg/dm3) 8. Moisture content in aggregates: - F.A. (fine aggregate) (0 - 7 mm): uS = 2%; - C.A. (coarse aggregate) (7 - 71 mm): uG = 1%. 9. Grade of homogeneity: II. 10. Air content: 2% (20 dm3/m3). 11. Permeability grade: P10 4 12. Freeze thaw grade: G100 B. Durability conditioning of concrete: From table 1-2, in accordance with the type environment conditions (moderate dry), we find the conditions (class) of exposure 1.a. The concrete mix will be designed according to the requirements of grade and durability (table 1-3 and 1-4). The requirements for durability assurance will be specified according to rules that consider the concrete mix and the choosing of its components (cement type, maximum w/c ratio, permeability grade, freeze-thaw grade etc.). 1. W/C ratio: From table 1-3, in accordance with the environmental conditions, concrete grade and permeability grade, results a suggested w/c ratio 0,65. 2. Cement content: A minimum cement content is necessary to be adopted to assure no alkalinity reaction of concrete, a main condition for protection against re-bar corrosion and for workability assurance for a known w/c ratio. From table 4, in accordance with the exposure conditions and aggressiveness intensity, results the minimum cement content. C= 250 kg/m3. C. Preliminary procedures for determining the quality mix proportions of concrete constituents: 1. Concrete consistency (slump): From table 1-1, in accordance with the type of structural member (bearing wall), transport equipment (transit mix truck), technology of concrete placing (pump) and type of 10

Construction Project Engineering concrete (reinforced), results from item no. 3 the recommended consistency T3/T4 (slump 100 20 mm). 2. Minimum cement content: From table 1-5 we find the minimum cement content of 300 kg/m3, according to the type of concrete (reinforced) and the conditions of exposure (1.a.). 3. Aggregates: a) Selection of aggregates by type: natural or crushed aggregates. We will use natural riverbed aggregates with the relative density ag = 2,7 kg/dm3 (see table 1-14). b) Nominal maximum size of aggregates: Is computed according to the following restrictions: Dmax minimum dimension of bearing member/4; Dmax thickness of slab/3; Dmax thickness of reservoir (tank) wall/6; Dmax minimum distance between re-bars 5 mm; Dmax 1,3 x reinforcement concrete cover; Dmax diameter of pump hose/3 ~ 31 mm According to the assignments initial data: type of concrete member (bearing walls), minimum length of section being formed (b = 200 mm), minimum distance between re-bars (D = 100 mm), transport and placement of concrete and minimum concrete cover of reinforcing bars (c = 25 mm): D max 1/3 x c = 1/3 x 25 = 32,5 mm ; D max 1/4 x b = 1/4 x 200 = 50 mm ; D max D 5 mm = 100 - 5 = 95 mm ; Pumpability D max = 31 mm. According to the exposure conditions (dry environment), the concrete cover of reinforcing bars do not condition the maximum size of aggregates. All these conditions have to be simultaneously respected, results Dmax 31 mm. We chose Dmax = 31 mm. c) Gradation of aggregate particles: From table 1-6 results the grading zone (I) according to the minimum cement content 300 kg/dm3. Knowing the grading curve (I) and the maximum size of aggregate 31 mm, from table 1-7.4. results the following upper and lower gradation limits: sieve 0 - 0,2 mm : recommended 10 - 15% : we chose 12%; sieve 0,2 1 mm : recommended 30 - 40% : we chose 33%; sieve 1 - 3 mm : recommended 40 - 50% : we chose 43%; sieve 3 - 7 mm : recommended 60 - 70% : we chose 63%; sieve 7 - 16 mm : recommended 80 - 90% : we chose 83%; sieve 16 31 mm : recommended 95 - 100%: we chose 97%. 4. Cement: According to the exposure conditions (concrete surfaces protected against weather or aggressive conditions) and environment conditions (moderate dry) results the type of cement form table 1-10, conditioned by the type and section of concrete element (bearing wall) and concrete class (C 12/15). Recommended cement type CEM II A - 32,5 N. 5. Water-cement maximum ratio: From table 1-5, according to the type of concrete (reinforced) and the exposure conditions (1.a.) results the water-cement maximum ratio (w/c maximum = 0,65). D. Procedures for determining the batch weights for mix proportions of constituents 1. Estimate mixing water and air content: The estimated water quantity needed (w) is determined according to the concrete grade (C 12/15) and the slump (T3/T4). 11

Construction Project Engineering From table 1-13, w = 200 l/m3 This quantity will be adjusted with a coefficient (c= 1) determined by the maximum aggregate size 31 mm, as follows: w' = w x c = 200 x 1 = 200 l/m3 2. Water-cement ratio: From table 1-14, according to the concrete grade (C 12/15) and cement grade (32,5N), concrete homogeneity grade II, results the water: cement ratio A/C = 0,70. The value will be adjusted with a coefficient for crushed aggregates if it is necessary and the resulting value of A/C will be compared with the maximum value calculated of A/C, determined at section 2.5. From the two values the minimum one will be chosen A/C maxim = 0,65. 3. Cement: The cement quantity is calculated as follows: C '= W ' = 200 = 308
W /C 0,65

[kg/m3] >

minimum cement contents 250 and 300 kg/m3 (see section B and C). From the three values the maximum one will be chosen C = 308 kg/m3. 4. First estimate of aggregate weight: The total amount of dry aggregates will be calculated as follows: Knowing that V = m / : V ag = V total V water - V cement V air Aag = ag x (1000 C/c - A'/a - p) [kg/m3] From table 1-15 the approximate volume of air-entrainment will be chosen according to maximum size aggregates. For 31 mm maximum size the mix will have 4,5 % air entrainment volume (4,5% = 45 dm3/m3). Aag = 2.7 x (1000 308/3 200/1 - 45) = 1761.3 [kg/m3] Where:ag = relative density of aggregates (2,7 kg/dm3); c = relative density of cement (3,0 kg/dm3); p = void parameter (table 1-15), when not using additives, (when using additives the parameter will be computed according to laboratory tests). 5. Gradation of aggregate: According to the lower and upper limits of gradation recommended table 1-7.4, it can be determined the right amount of each grade of fine and coarse aggregate (this determination can be made by plotting the cumulative percent passing by mass through each sieve, see table 1-7. The amount of aggregate for each grade is found as follows:

A gi = A g x

p i p i1 (kg/m3) 100

Where:Ag = amount of aggregates (kg); pi = percent passing by mass through sieve "i"; pi-1= percent passing by mass through sieve "i-1"; First correction: 12 Sieve 0 - 0,2 mm; 100 x 1761.3 = 211.35 kg/m3 ; 33 12 Sieve 0,2 1 mm; 100 x 1761.3 = 369.87 kg/m3 ; 43 33 100 x 1761.3 = 176.13 kg/m3 ; Sieve 1 3 mm; 63 43 100 x 1761.3 = 352.26 kg/m3 ; Sieve 3 7 mm; 83 63 100 x 1761.3 = 352.26 kg/m3 ; Sieve 7 16 mm;

12

Construction Project Engineering

97 83 100 x 1761.3 = 246.58 kg/m3. Total: 1708.45 kg/m3 Second correction (to produce 1 m3 per trial batch the quantities must be adjusted): 12 Sieve 0 - 0,2 mm; 100 x (1761.3-1708.45) = 6,4 kg/m3 ; 33 12 Sieve 0,2 1 mm; 100 x 52.84 = 10,8 kg/m3 ; 43 33 100 x 52.84 = 5,4 kg/m3 ; Sieve 1 3 mm; 63 43 100 x 52.84 = 10,8 kg/m3 ; Sieve 3 7 mm; 83 63 100 x 52.84 = 10,8 kg/m3 ; Sieve 7 16 mm; 97 83 Sieve 16 31 mm; 100 x 52.84 = 7,5 kg/m3. Total: 51,7 kg/m3 The correct masses according to corrections for achieving the total amount of aggregate required is 1829 kg/m3: Sieve 0 - 0,2 mm; 211,35 + 6,4 = 217,75 kg/m3; Sieve 0,2 1 mm; 369,87 + 10,8 = 380,5 kg/m3; Sieve 1 3 mm; 176,13 + 5,4 = 181,53 kg/m3; Sieve 3 7 mm; 352,26 + 10,8 = 363,06 kg/m3; Sieve 7 16 mm; 352,26 + 10,8 = 363,06 kg/m3; Sieve 16 31 mm; 246,58 + 7,5 = 254,08 kg/m3. Total: 1759,98 kg/m3 6. Adjustment for moisture in aggregate: The right adjustment of water will be found according to the exact free moisture of the aggregates, as follows: 3 u A = Aagi x i (l/m )
Sieve 16 31 mm;
100

Where: Aagi = amount of aggregate form sieve "i' (kg); ui = free moisture of sieve "i" (%); n = total numbers of sieves. A* = A' - A (l/m3) The free amount of moisture form fine aggregates (2%), is calculated as follows:
An = Agi x ui 3 2 = x(217,75 + 380,5 + 181,53 + 363,06) = 22,85 kg/m 100 100

The free amount of moisture form coarse aggregates (1%), is calculated as follows:
A p = Agi x ui 3 1 = x(363,06 + 254,08) = 6,17 kg/m 100 100

The total amount of free moisture is calculated as follows: A = An + A p = 22,85 + 6,17 = 29,02 kg/m3 Adjusted amount of water: A* = A' - A = 200 29,02 = 170,97 kg/m3 7. Adjustment of total amount of aggregates by sieve sizes: The of total amount of aggregates by sieve sizes, is found as follows: u i (kg/m3) A* gi = A gi x 1 + 100 Where:Aagi - amount of aggregate form sieve "i' (kg); ui = free moisture of sieve "i" (%). 2 Sieve 0 - 0,2 mm; 217 x (1+ 100 ) = 222,10 kg/m3;
13

Construction Project Engineering 2 Sieve 0,2 1 mm; 380,5 x (1+ 100 ) = 388,11 kg/m3 ; 2 Sieve 1 3 mm; 181,53 x (1+ 100 ) = 185,16 kg/m3 ; 2 Sieve 3 7 mm; 363,06 x (1+ 100 ) = 370,32 kg/m3 ; 1 Sieve 7 16 mm; 363,06 x (1+ 100 ) = 366,69 kg/m3 ; 1 Sieve 16 31 mm; 254,08 x (1+ 100 ) = 256,62 kg/m3. Total: 1789,0 kg/m3 8. Final adjustment of aggregate weight: The of total amount of aggregates, is found as follows: Aag* = Aagi * (kg/m3) * Where:Aag = adjusted amount of aggregate form sieve "i' (kg); n = number of sieves sizes. Aag * = A*agi = 1789,0 kg/m3 9. Total mass of concrete produced: The total mass of concrete produced will be calculated as follows: b = A* + C + Aag* * G b = A + C + Aag* = 170,97 + 308 + 1789 = 2267,97 kg/m3 b = 2335,9 kg/m3 will be compared with the value of normal weight concrete that ranges between 2160 to 2560 kg/m3 10. Summary of mix design: Concrete class C 12/15 Batch percentage: 100 % Compressive strength at 28 days: 15 MPa Slump: Maximum 120 mm Minimum 80 mm Nominal maximum size of aggregate: 31 mm Cement type: CEM II A - 32,5N Water-cement ratio: 0.65 Concrete type: Reinforced Air content: 4.5 % Permeability: P10 4 Freeze-thaw: G100 Unit weight of aggregates: F.A. 1165,59 kg/m3 C.A. 623,97 kg/m3 Mass of batched concrete: c = 2268 kg/m3

14

Construction Project Engineering

1.5. APPENDIX
Table 1-1. Recommended concrete slump for various types of construction
Item no. 1 Type of concrete member Type of Transport Truck, bucket, belt conveyor Transit mix truck, bucket Transit mix truck Transit mix truck, bucket Transit mix truck, bucket Transit mix truck, bucket Consistency Grade Slump (mm) T2 3010 T3 T3/ T4 T4 T4/ T5 T5 7020 10020 12020 15030 18030

Plain or reinforced foundations /footings, massive elements 2 Plain or reinforced footings, massive elements, slabs, columns, beams, walls. 3 Plain or reinforced footings, massive elements, slabs, columns, beams, walls, reservoirs placed by concrete pump 4 Members and small reinforced monolithic sections with difficulties while compacting 5 Concrete prepared with plasticizers or superplasticizers additives 6 Concrete prepared with superplasticizer additives Source: NE 012-1999 Type of environment 0 1. Dry environment 1 a). Moderate b). Severe a). Moderate b). Severe

Table 1-2. Exposure class for concrete in different environmental conditions


Type or location of structure 2 Concrete surfaces protected against weather or aggressive conditions Concrete surfaces exposed permanent to temperatures grater that 30 oC Concrete surfaces exposed to freezing whilst sheltered form severe rain or freezing whilst wet Concrete surfaces exposed to freezing whilst continuously submerged under water; Concrete surfaces exposed to condensation or alternant wetting and drying; Concrete surfaces exposed to continuous water pressure on one side Concrete interior or exterior surfaces exposed to freezing and de-icing salts 1).Weak aggressive conditions 2).Intensive aggressive conditions 1).Weak aggressive conditions 2).Intensive aggressive conditions Concrete surfaces exposed permanent to sea water; Concrete surfaces situated over the variation level of the sea Concrete surfaces situated over the variation level of the sea Concrete surfaces exposed indirectly to marine environment Concrete surfaces exposed to freezing sheltered from wetting Concrete surfaces protected against weather without heating Concrete surfaces exposed to marine environment by alternant wetting, drying and salts. Concrete surfaces exposed industrial technological condensation of vapors. Mild chemical aggressive environment Moderate chemical aggressive environment Severe chemical aggressive environment Very severe chemical aggressive environment

2. Hummed environment

3. Hummed environment subjected to freezing and deicing salts a).No freezing

4. Marine environment

b).With freezing

5. Chemical aggressive environment

a). b).

c). d). Source: NE 012-1999

15

Construction Project Engineering


Table 1-3. Minimum requirements for concrete durability assurance according to exposure conditions
Exposure conditions 1. Dry environment 2. Hummed environment a). Moderate b). Severe a). Moderate b). Severe Concrete grade min. C 12/15 C 16/20 C 18/22,5 Permeability min. P4 P4 P8 P12 C 20/25 P8 Freezethaw min. G100 (150) G150 w/c max 0,65 0,50 0,45 0,40 0,45

4. Marine environment

3. Hummed environment subjected to freezing and deicing salts 1).Weak aggressive conditions a).No aggressive freezing 2).Intensive conditions b).With freezing a). b). c). d). 1).Weak aggressive conditions 2).Intensive conditions aggressive

C 25/30 C 18/22,5 C 18/22,5 C 18/22,5 C 25/30

P12 P8 P8 P12 P12

G100 -

0,40 0,50 0,50 0,45 0,45

Source: NE 012-1999

Table 1-4. Minimum cement content for concrete durability assurance


Exposure conditions 1 2 3 a 4 b a b a b Aggressiveness grade severe extreme severe extreme mild moderate severe extreme 1* extreme 2* extreme 3* 350 (+) (280) Minimum cement content (kg/m3) Plain concrete 150 180 200 300 325 300 350 300 325 Natural aggressive water 225 (180) 300 (230) 350 (280) Sulfate aggressiveness 2401 3301 3002 3302 3103 4102(+) 3703 4102(+) 4103 4103 Reinforced concrete 250 275 290 325 365 325 390 325 365 Natural aggressive Sulfate water aggressiveness 260 2701 3601 325 3402 3652 390 3503 4502 4103 390 (+) 4502 (+) 4503 4503 (+)

Note: * extreme 1, 2 or 3 according to the SO4 content mg/dm3. 1) Cement type CEM II A-S; Cement type H I; H II A-S; Cement type SR I; SR II A-S; (+) Special measures of protection; () the values between parentheses will be adopted for base layers or leveling concrete layers. Source: NE 012-1999

5. Chemical aggressive environment a b c d

16

Construction Project Engineering


Table 1-5. Requirements for concrete durability assurance according to type of environment conditions
Item no. Concrete mix components 1 Plain concrete Reinforced concrete Prestressed concrete 2 Plain concrete Reinforced concrete Prestressed concrete 3 Max. size aggregate 31 mm Size aggregate 16 mm Max. size aggregate 7 mm Frost resisting aggregates 4 5 6 Yes 150 300 350 300 300 350 250 350 350 0,65 0,60 1a 2 1b 3 0,65 0,60 0,55 2a 4 0,55 0,55 0,55 Environment conditions for concrete table 1-2.

0 1

2b 5 0,55 0,50 0,50

3 4a1 4a2 4b1 6 7 8 9 Water : Cement Ratio 0,50 0,55 0,55 0,50 0,50 0,50 0,50 0,50 0,50 0,50 0,45 0,45

4b2 10 0,50 0,45 0,40

5a 11 0,55 0,55 0,55

5b 12 0,50 0,50 0,50

5c 13 0,45 0,45 0,45

5d 14 0,40 0,40 0,40

Minimum cement content (kg/m3). 300 350 350 350 350 350 350 350 350 350 350 350 400 400 400 400 400 450

350 350 350 -

350 350 350 -

400 400 400 -

450 450 450 -

Percent of air entrained (%), min. 4 4 4 4 5 6 Yes 5 6 Yes 5 6 Yes 5 6 Yes

4 5

Plain concrete Reinforced concrete Prestressed concrete Frost resistance Plain concrete Reinforced concrete Prestressed concrete

P410 P410 P410 G50 G100 G100

P410 P810 P810

Watertightness grade, min. P810 P410 P410 P810 P810 P810 G150 G150 G150 P810 P810 P810 P810 P1210 P1210 G150 G150 G150

P810 P1210 P1210 G150 G150 G150

P410 P410 P410 -

P810 P810 P810 -

P1210 P1210 P1210 -

P1210 P1210 P1210 -

G100 G150 G150

Table 1-6. Grading classes


Grading class in accordance to the cement content (Kg/m3) 300-450 > 450 300 T2 I (II)* II (III)* III T3 and T3/T4 I (II)* II (III)* III T4, T4/T5, T5 I I (II)* II (III)* * Recommended when the concrete does not have tendency of honeycombing Upper and lower limit of gradation are as follows (annex 5): Table 5.1. to 5.6 for aggregate size 0...7 mm; 0...16 mm; 0...20 mm; 0...31 mm; 0...40 mm; 0...71 mm. Source: NE 012-1999 Consistency

17

Construction Project Engineering


Table 1-7. Upper and lower limits of gradation
Table 7.1. Aggregates between 0...7 mm. Source: NE 012-1999 Cumulative percent passing by mass (%) Limits 0,2 1 3 Max. 12 40 70 100 Min. 3 25 54 95 Table 7.2. Aggregates between 0...16 mm. Source: NE 012-1999 Grading Limits Cumulative percent passing by mass (%) class 0,2 1 3 7 I Max. 15 45 65 85 Min. 10 35 55 75 II Max. 10 35 55 75 Min. 5 25 45 65 III Max. 5 25 45 65 Min. 1 15 35 55 Table 7.3. Aggregates between 0...20 mm. Source: NE 012-1999 Grading Limits Cumulative percent passing by mass (%) Class 0,2 1 3 (9) 7 (10) I Max. 15 40 60 80 Min. 10 30 50 70 II Max. 10 30 50 70 Min. 5 20 40 60 Max. 5 20 40 60 III Min. 1 10 30 50 Table 7.4. Aggregates between 0...31 mm. Source: NE 012-1999 Grading Cumulative percent passing by mass (%) Limits Class 0,2 1 3 7 16 I Max. 15 40 50 70 90 Min. 10 30 40 60 80 II Max. 10 30 40 60 80 Min. 5 20 30 50 70 III Max. 5 20 30 50 70 Min. 1 10 20 40 60 Table 7.5. Aggregates between 0...40 mm. Source: NE 012-1999 Grading Limits Cumulative percent passing by mass (%) Class 0,2 1 3 (5) 7 (10) 20 I Max. 15 30 45 60 80 Min. 10 20 35 50 70 II Max. 10 25 35 50 70 Min. 5 15 25 40 60 III Max. 5 15 25 40 60 Min. 1 5 15 30 50 Table 7.6. Aggregates between 0...71 mm. Source: NE 012-1999 Limits Cumulative percent passing by mass (%) 0,2 1 3 7 16 25 31 40 Max. 8 18 32 45 61 70 77 84 Min. 1 6 13 22 38 50 57 68 7

16 100 95 100 95 100 95

20 100 95 100 95 100 95

31 100 95 100 95 100 95

40 100 95 100 95 100 95

71 100 95

Table 1-8. Standard types of Portland cement


1. According to national standards (S.R.) The S.R. has defined five types of Portland cement, identified in the specification (NE 012-99) by the Roman numerals I to V. These types, discussed below serve to indicate variations in properties that is brought about by varying composition and fineness. These types are identical with the European norm ENV 197 they are as follows: Type I - (SR 388), this cement is intended for general concrete construction where special properties are not necessary. It is a "ordinary" Portland cement. Type I is less restricted in chemical composition than the other types; Type II - (SR 1500), this cement is intended for use where concrete may be exposed to moderate sulphate action or where no more than moderate liberation of heat is advisable;

18

Construction Project Engineering


Type III (SR 3011), this cement is high-early-strength Portland cement it is called "rapid hardening." It is high in fineness. It develops good strength within one day, and is used where concrete must be placed in service as soon as possible (hydrotechnical cement); Type IV - this is called low heat cement. It is used where considerable thickness of concrete is required and temperature rise might be excessive, thus leading to excessive volume change and cracking. It is generally produced only for special, large projects. Type V - (SR 3011), this cement, which also is not always available, is for use severe high sulphate resistance is required. Air - entraining cement. - the norm adds "A" to its type numbers to indicate air-entraining cement. Various organic chemicals are added in amounts up to a few hundredths (by weight of cement) to entrain fine bubbles in the mix. The concrete containing by volume of these fine air bubbles has greatly increased resistance to scaling from frost action. The entrained air also produces a more workable mix. 2. Cement agreements 2.1. Other types of cements can be used, manufactured by the European norm ENV 197 special cements or manufactured by agreement. These will be used only when it is specified agreements certified by testing, by the manufacturers at a certified agreement institute, that will put the products to test. If the results are satisfactory a certificate is issued, and can then be used by the manufacturer. The certificates are widely recognized and can be used until such times, as the S.R. is prepared. 2.2. White and colored cements. According to S.R. 1055 and colored cements, according to S.P. Source: NE 012-1999

Table 1-9. Cement types according to Romanian standards (SR)


Grade % Type 1 2 3 4 5 6 Portland Cement (without admixtures) Normal Portland cement (without 32,5N;42.5N; 52.5N SR388 CEM I admixtures) 32.5R;42.5R;52.5R Composite Cements (with admixtures) CEM SR Mixture of slag, ash, lime, Portland cement composite 6-20 II A-M 1500 pozzolan CEM Granulated blast furnace Portland cement with slag II A-S slag 32,5N;42.5N;52.5N CEM Portland cement with ash Pulverized fuel ash 32.5R;42.5R;52.5R II A-V CEM Portland cement with natural Natural pozzolan II A-P pozzolan CEM Portland cement with lime Lime II A-L CEM Mixture of slag, ash, lime, Portland cement composite SR 1500 21-35 II B-M pozzolan Granulated blast furnace CEM Portland cement with slag 32,5N; 42.5N slag II B-S 32.5R; 42.5R CEM Portland Cement with natural Natural pozzolan II B-P pozzolan CEM Portland cement with lime Lime II B-L Granulated blast furnace 32,5N; 32,5R CEM III A Blast furnace cement SR 1500 36-65 slag CEMIV A Pozzolan cement SR 1500 11-35 Pozzolan and ash 32,5N; 42.5N;32.5R Granulated blast furnace 32.5N; 32.5R CEM V A Composite cement SR 1500 18-30 slag + ash Pozzolan Hydrotechnical cements HI Cement without mixture HII/A-S 6- 20 SR 3011 Granulated blast furnace 32,5N;42,5N;52,5N HII/B-S Cement with slag 21-35 slag HIII/A 36-65 Type Sort SR Admixture

19

Construction Project Engineering


SRI Cement without admixture Sulfate resistant cements Granulated blast furnace 6-20 slag SR 3011 6-20 Natural pozzolan 32,5N;42,5N;52,5N Granulated blast furnace 21-35 slag 36-65 Pulverized fuel ash

SRII/A-S Cement with slag SRII/A-P Pozzolan cement SRII/B-S Cement with slag SRIII/A Cement with slag Source: NE 012-1999

Table 1-10. Recommended types of cement used for concrete works in normal exposure conditions
Item no. 0 1 Work conditions and/or member characteristics 1 Members or constructions with thickness smaller than 1,5m produced in periods other that winter Concrete grade 2 C 4/5 C 8/10 C 12/15 C 16/20 C 20/25 C 25/30 C 35/ C 30/37 C 40/ C 35/45 C 40/50 C 45/55 C 50/60 C 60/70 C 70/80 2 Massive members or constructions with thickness equal or larger than 1,5m < C 12/15 C 12/15 C 16/20 C 20/25 C 25/30 C 35/C 30/37 C 40/C 35/45 C 40/50 Type of concrete 3 Plain Recommended types of cement 4 (CEMIIIA, CEMIVA,CEMVA) 32,5 N CEM IIB - 32,5 N CEM IIA - 32,5 N Usable types of cement 5 (CEMIIIA, CEM IVA,CEM VA)32,5 N CEM IIA 32,5 N CEMIIB- 32,5(1)N; CEMIIB- 42,5(1)N; CEM I 32,5 N CEM IIA- 42,5 N CEM IIA - 32,5R; CEM IIA - 42,5N; CEM I - 42,5 N CEM I- 32,5(2)N; CEM I- 52,5N; CEM I 52,5A N

Reinforced

Reinforced Reinforced (prestressed) High strength reinforcement (prestressed) Plain Reinforced Reinforced Reinforced (prestressed)

CEM I - 32,5 N CEM I - 42,5 N CEM I -42,5A N CEMI52,5N/ 52,5R; CEMI52,5AN/ 52,5AR H III/A - 32,5 N H II/A - 32,5 N H I - 32,5 N H I - 42,5 N

C 50/60 Reinforced H I - 52,5 N C 60/70 (prestressed) C 70/85 Technical notes: 1. During winter conditions it is recommended to use, for members that have thickness over 1,5 m, cements with rapid setting time noted with R. 2. The setting for cement types CEM II B, II H, H II/B-S (that have a maximum amount of mixture of 35%), for reinforced concrete members will be made only with the approval of a specialist institute. Source: NE 012-1999

H II/B-S; CEMII B-S 32,5N; CEM I A-S 32,5N H I-32,5; HII/B-S32,5(1); CEMII A-S 32,5N CEMII A-S 32,5N; H II/A-S32,5; CEM I 32,5N H I-32,5(2); CEM I 42,5N; HII/A-S 42,5; H42,5/42,5 RA; CEMII A-S 42,5 N HII/A-S52,5N; H52,5/52,5-A N

20

Construction Project Engineering


Table 1-11. Recommended types of cements for plain and reinforced concrete works exposed to sea water and severe freezing
Type of Recommended types Item Work conditions and/or Usable types of cement Concrete grade concrete of cement no. Member characteristics 0 1 2 3 4 5 < C 16/20 Plain CEMIIA-32,5N/32,5R CEMI-32,5N/32,5R Members or constructions CEMIIA-32,5N/32,5R 1 C16/20-C35/ - Reinforced CEMI-32,5N/32,5R with thickness smaller CEMI- 42,5AN; than 1,5m CEMI- 42,5N/42,5R CEMI-42,5N CEMI-32,5N/32,5R; C30/37-C40/50 Reinforced CEMI-42,5N/42,5R CEMI-52,5N/52,5R CEMI-52,5AN C 45/55-C70/85 Reinforced CEMI-52,5N/52,5R H I-32,5; Massive members or < C 16/20 Plain H II/A-S32,5 II A-S32,5 constructions with 2 thickness equal or larger C 16/20-C 35/ Reinforced CEMIII-32,5N CEMIII-42,5N that 1,5m H I-52,5; C 30/37-C40/50 Reinforced H I-42,5 CEMI-52,5N C 45/55-C70/85 Reinforced H I-52,5 Source: NE 012-1999

Table 1-12. Recommended types of cements for plain and reinforced concrete works subjected to aggressive waters
Nature of Grade of Item aggressive aggressive no. environment 0 1 2 1 Alkalis Mild Mild Severe very severe Mild Moderate Moderate 3 Sulfate Recommended types of cement Reinforced Plain concrete concrete 3 4 CEMII AS32,5R/42,5N CEMII A-S 32,5N/42,5N CEMI 42,5N; Usable types of cement Reinforced Plain concrete concrete 5 6 CEMI 32,5N CEMI 32,5N; CEMII AHI H I; S32,5R/42,5N H II/A-S H II/A-S CEMI 32,5N; CEMI 32,5N; CEMII A-S H I;H II/AH I;H II/A32,5R/42,5R S32,5N/42,5N S32,5N/42,5N H I32,5N/42,5N H I32,5N/42,5N; CEMI 42,5R SRI32,5N/42,5N SR I32,5N/42,5N H II/AS32,5N/42,5N

Carbon

CEMIII A;CEM IV A; CEMII AH II ACEMV A; CEMII B; S32,5N/42,5N S32,5N/42,5N CEMII A32,5N/42,5N

H I32,5N/42,5N; Severe or very H II/ASR II/B-S32,5N/42,5N SR I SR II/A-S H II/B-S H III/A S32,5N/42,5N; sever (for all SR III/A32,5N/42,5N cases) CEMII AS32,5N/42,5N H A-S; H III/A32,5N/42,5N H II/AH AH I; Sr I; Mild H II/B-S32,5N/42,5N S32,5N/42,5N S32,5N/42,5N SR II/A-S Magnesium H AH A-S; Severe or very SR II/B-S32,5N/42,5N SR II/AS32,5N/42,5N H II/A-S; sever SR III/A32,5N/42,5N S32,5N/42,5N H II/AH I; SR I S32,5N/42,5N H III A32,5N/42,5N H II/AH AH A-S; Mild H II/B-S32,5N/42,5N S32,5N/42,5N S32,5N/42,5N H I; SR I; SR II/A-S Nitrogen salts Severe or very SR II/B-S 32,5N/42,5N SR II/AH II/ASR I; H I; H II/A-S sever SR III/A32,5N/42,5N S32,5N/42,5N S32,5N/42,5N H II/A-S; II/A-S; Mild H II/A-S32,5N/42,5N H I H A-S Base SR I H I; Severe SR II/A-S32,5N/42,5N SR I H II/A-S H II/A-S

21

Construction Project Engineering


Table 1-13. Estimated mixing water requirement for various slumps
Concrete grade T2 C 4/5 160 C 8/10...C 20/25 170 > C 25/30 185 Source: NE 012-1999. Technical notes: The values concerning the quantities of water required for mix specified in annex 13. are valid only if used with natural aggregates size 0...31 mm. They will be increasing or decreasing as follows: decrees with 10% when using aggregates size 0...71 mm; - decrees with 5% when using aggregates size 0...40 mm; - decrees with 10-20% when using additives; - increase with 10% when using crushed stone; - increase with 20% when using aggregates size 0...7 mm; - increase with 10% when using aggregates size 0...16 mm; - increase with 5% when using aggregates size 0...20 mm. Water (l/m3) of concrete indicated by consistency T3 T3/T4 T4 170 185 200 220 200 215 230

Table 1-14. Relative density


Type of material Siliceous (stream deposits) Calcareous Ceramic Basalt Cement Maximum size aggregates (mm) Air-entrainment % of 7 6 10 6 16 6 20 5 Density ( Kg/dm3 ) 2,7 2,3...2,7 2,7 2,9 3,0 31 4,5 40 4 71 3,5

Table 1-15. Approximate volume of air-entrainment according to maximum size aggregates

Table 1-16. Maximum values for w/c ratio after preliminary tests (grade II concrete homogeneity)
Concrete grade 32,5 52,5 C 8/10 0,75 C 12/15 0,70 C 16/20 0,60 C 20/25 0,55 C 25/30 0,50 0,55 C 35/ 0,45 0,50 C 30/37 0,40 0,47 C 40/ 0,35 0,45 0,50 C 35/45 0,40 0,45 C 40/50 0,35 0,40 C 45/55 0,33 0,38 C 50/60 0,30 0,35 C 70/Source: NE 012-1999 Technical notes: 1. The values for the table are valid for grade II homogeneity. For grade I, the values rise with 0,05 and for grade III they decrease with 0,05. 2. When using crushed stone the values form the table rise with 10%. 3. According to the environment conditions and exposure the w/c ratio, resulted form annex 2, should not be exceeded. 4. When the concrete is cured in steam rooms, according to the final decrease of strength, the w/c ratio values will be adopted as follows: for grade I of homogeneity see table and - for grade II of homogeneity, the proposed values for the table decreased by 0,05 (corresponding to grade III). Cement grade 42,5

22

Construction Project Engineering


Table 1-17. Concrete strength at 28 days after preliminary tests for grade II homogeneity
Characteristic strength Characteristic strength Concrete grade fc preliminary (N/mm2) fc preliminary (N/mm2) Cube Cylinder Cube Cylinder C 8/10 18 14,5 C 40/51,5 41 C 12/15 23,5 19 C 45/35 56,5 45 C 16/20 29 23 C 50/40 62,5 50 C 20/25 36 29 C 55/45 68 54,5 C25/30 42 33,5 C 60/50 73 58,5 C 35/47 37,5 C 70/60 84,5 67,5 C 30/37 48 38,5 C 87/70 101 81 Technical notes: For grade I, respectively grade III of homogeneity, of the values required in the table, a certain value will be subtracted or added. Source: NE 012-1999 Concrete grade

Table 1-18. Values that will be subtracted or added to the recommended values for grade II
Concrete grade C 10/8 - C 20/16 C 25/20 - C 37/30 C 40/- - C 55/45 C 60/50 - C 85/70 Item 1 2 3 4 5 6 7 8 Concrete parameters Type of cement Type of additive w/ c ratio Minimum content of cement Workability Maximum size aggregate Water requirement Aggregate grading (N/mm2) (Cube) 3 4 5 6 2,5 3 4 5 (N/mm2) (Cylinder)

Table 1-19. Concrete mix design parameters


Basic requirements Concrete grade, Conditions of exposure, Characteristics of member Transport conditions, Placement, Characteristic required of concrete (durability, grade), Characteristics of member (section reinforcement) Concrete grade, Homogeneity grade achieved at batching, Water tightness, Conditions of exposure Conditions of exposure Conditions of transport and placement, Form and dimensions of member, Dense reinforcement Form and dimensions of member, Reinforcement, Conditions of transport and placement Workability (consistency), Type of admixture Cement content, Consistency, Technology of concrete placement

REFERENCES
1-1 1-2 1-3 1-4 1-5 1-6 1-7 1-8 1-9 1-10 1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 ACI Committee Report, Guide of Concrete 309R-96 ACI Manual of Concrete Practice 1998. Part 2. Asian Concrete Model Cod, Part II Materials and Construction, Level 1, 2001. Carare T., Cartea Fierarului Betonist. Editura Tehnica Bucuresti, 1986. pag.158-186. Cement & Concrete Association of Australia, The housing concrete handbook, 2000. Crainic L., Reinforced Concrete. Technical University of Civil Engineering of Bucharest, 1993. pag. 438. Dabija F.E., Buildings II. Technical University of Civil Engineering of Bucharest, 1994. Dean Y., Mitchells Building Series. Materials Technology. Pearson Education Ltd, 1999. Ilinoiu G. Quality of Concrete. Study on Code NE 012-1999. Nr. 3, Bulletin AICPS (2001), pp. 114-120. Ilinoiu G. Concrete durability. Journal Civil and Industrial Constructions. 2001, No. 24, pp. 36-37. Ilinoiu G. Decision making modeling of concrete requirements. Dimensi Teknik Sipil, Indonesia. Research Center of Petra Christian University. Vol. 3, no. 2, September 2001. Ilinoiu G. Conceptual approach of repair and rehabilitation works of structural members. Journal Civil and Industrial Constructions. 2001, No. 26, pp. 30-34. Ilinoiu G. Structural and mixture characteristics of Portland cement. Journal Civil and Industrial Constructions, 2002, No. 30, pp. 16-22. Ilinoiu G. Concrete permeability. Journal Civil and Industrial Constructions. 2001, No. 31, pp.18-24. Ilinoiu G. Concrete freeze-thaw. Journal Civil and Industrial Constructions, 2002, No. 33, pp.18-21. Ilinoiu G., Criteria for measuring concrete conformity. Journal Civil and Industrial Constructions, IV, Nr. 41 May 2003, pp.14-20. Ilinoiu G., Uncertainty modeling measurement of concrete quality. Journal Civil and Industrial Constructions, IV, Nr. 44 August 2003, pp.16-21. Ilinoiu G., Compliance criteria for concrete conformity. Journal AICPS, 2/2003, pp.49-55. Ilinoiu G., Construction Engineering. Conspress, Bucharest 2003.

23

Construction Project Engineering


1-19 1-20 1-21 1-22 1-23 1-24 1-25 1-26 1-27 1-28 1-29 1-30 1-31 1-32 1-33 1-34 1-35 1-36 1-37 1-38 1-39 1-40 1-41 1-42 1-43 1-44 1-45 1-46 1-47 1-48 1-49 1-50 1-51 1-52 1-53 1-54 1-55 1-56 1-57 1-58 1-59 1-60 1-61 1-62 1-63 1-64 1-65 Ionescu I., Ispas T., Proprietile i tehnologia betoanelor. Editura Tehnic, Bucureti, 1997. Neville A.M. Concrete properties. Fourth edition. Editura Tehnica, 2003. Popa R., Popa E., Tehnologia lucrarilor de constructii. Prepararea betonului. ICB, 1986. Popa R., Teodorescu M., Tehnologia lucrarilor de constructii. ICB, 1984. Teodorescu M. Utilizarea cimenturilor o chestiune de professionalism. Antrepenorul 3/2003, pag. 20. Teodorescu M. Utilizarea cimenturilor in constructii o chestiune de professionalism (II). Antrepenorul 4/2003, pag. 37-38. Teodorescu M., Tsicura A., Ilinoiu G., Compozitia betonului. UTCB, 1997. Teodorescu M., Tsicura A, Ilinoiu G., ndrumator pentru examenul de licenta la disciplina Tehnologia lucrarilor de constructii UTCB, 1998. ENV 206, 1990. Concrete Performance, Production, Placing and Compliance Criteria. STAS 1275-1988. Tests of concrete. Tests of hardened concrete. Determination of mechanical strengths. STAS 9602-90. Reference Concrete. Specifications for manufacturing and testing. NE 012-1999. Practice code for the execution of concrete, reinforced concrete and prestressed concrete works, Part 1 Concrete and reinforced concrete. NE 13-2002. Practice code for the execution of prefabricated elements. STAS 10107/0-1990. Calculul si alcatuirea elementelor structurale din beton, beton armat si beton precomprmat. STAS 3622-86. Cement concretes. Classification. STAS 1759-88. Tests on concretes. Tests on fresh concrete. Determination of apparent density, consistence fine aggregates content and setting time. ISO 9812. Concrete consistency. Slump test. STAS 2414-91. Tests on concrete. Determination of density, compactness, and porosity of hardened concrete. STAS 3519-76. Tests on concretes. Inspection of waterproofness. ISO 7031. Tests on concrete watertightness. STAS 5479-88. Tests on concrete. Tests on fresh concrete. Determination of air content. STAS 2833-80. Tests on concrete. Determination of axial shrinkage of hardened concrete. STAS 3518-89. Tests on concretes. Strength determination at frost-thawing. SR EN 196-4/95. Methods of testing cement. Quantity determination of constituents EN 196-2. Methods of testing cement. Chemical analysis of cement. SR 6232-96. Cements, mineral admixtures and additives. Vocabulary. SR 388-95. Portland cement. SR 1500-96. Usual composite cements, type II, III, IV and V. SR 3011-96. Limited hydration warmth cements and resistant to water damage with sulphates content. SR 7055-96. White Portland Cement. SR 227/2-98. Cements. Physical tests. Determination of grinding fineness. SR EN 196/6-94. Methods of testing cement. Determination of grinding fineness. SR 227/5- 96. Cements. Physical tests. Determination of hydration heat. SR EN 196/3-97. Methods of testing cement. Determination of setting time and soundness. SR 227/4-86. Cements. Physical tests. Setting time determination. SR EN 196/1-95. Methods of testing cement. Determination of strength. STAS 1275-1988. Tests of concrete. Tests of hardened concrete. Determination of mechanical strengths. STAS 1667-76. Heavy aggregates for concrete and mortars with mineral binder. STAS 2386-79. Lightweight mineral aggregates. General technical requirements for quality. STAS 4606-80. Natural heavy weight aggregate for concrete and mortars with mineral binding material. Testing method. STAS 1667-76. Natural heavy weight aggregate for concrete and mortars with mineral binding material. STAS 8625-90. Mixed plasticized additive for concretes. STAS 8573-78. Waterproofing additive cement mortars. STAS 790-84. Water for concretes and mortars. STAS 1799-88. Concrete reinforced and prestressed concrete buildings. Type and frequency checks of materials and concrete quality used for civil engineering execution. STAS 6657/3-89. Concrete, reinforced concrete and prestressed concrete elements procedures, instrumentation and devices for characteristic geometry checks. STAS 9602-90. Reference Concrete. Specifications for manufacturing and testing.

24

Construction Project Engineering

CHAPTER 2. RATE OF CONCRETE PLACEMENT ROUGH ESTIMATE


2.1. GENERAL CONSIDERATIONS
The rate of concrete placement (pour) depends on a multitude of factors that influence the process, such as: - concrete characteristics (i.e. w/c ratio, consistency, workability etc.); - structural member characteristics (i.e. dimensions); - site organization (i.e. type of equipment used to prepare, transport, distribute and compact the concrete, labor/ crews); - type of distributing equipment: when using a concrete pump, because it normally delivers concrete continuously, only the capacity of the pump need be considered in the calculation of the rate of pour; when using a crane with buckets, the rate of pour depends on the total time that it takes for one cycle of the crane to pick up a bucket, unload it and return it to the ground. - type of concreting procedure adopted (i.e. concreting in predetermined lifts or whole heights of members); - environmental conditions (i.e. humidity, temperature), etc.

2.2. EXAMPLE 1
Calculate the rate of concrete placement, rough estimate, for a section of a wall (wall height 2,62 m, wall thickness 250 mm and wall length 30,5m), of a high-rise building, located at 16,5 m from ground level, using a tower crane and a concrete bucket with the capacity of 1 m3. Crane characteristics: rate of travel of 30 m/min up, 25 m/min rate of travel down, pickup time 20 sec dump time is 3 min. (Andres C., Smith R., 1998, 2003) Cycle time calculation: Rate of pour calculations: 16,5m = 0,55 min Volume of concrete to be poured: Time to travel up 30m / min 250 16,5m x 30,5 = 19,98 m3 = 0,66 min V = H x l x L = 2,62 x Time to travel down 1000 25m / min Time required to pour 19,98 m3 of concrete: 20s Pickup time = 0,33 min V 19,98 60s t= = = 1,52 hr R 13,16 Dump time 3,00 min 3 Total: 4,54 min = 0,076 hr Rate of pour in m /hr: H wall 2,62 3 = 1,72 m/hr = r = Rate of concrete delivery in m /hr: 1,52 t 1m 3 3 = 13,16 m3/hr R = V/t (m /hr) = 0,076hr

2.3. EXAMPLE 2
Calculate the rate of concrete placement, rough estimate, for a section of a wall located on the ground floor, using a concrete pump with the rate of delivery of 25 m3/hr (product specifications). Pour conditions: wall height 2,62 m, wall thickness 350 mm and wall length 10,30m. (Andres C., Smith R., 1998, 2003) 350 x 10,30 = 9,45m3 Volume of concrete to be poured: V = H x l x L = 2,62 x 1000

25

Construction Project Engineering


Time required to pour 9,45 m3 of concrete: t = Rate of pour in m3/hr: r =
H
wall

V 9,45 = 0,38 hr = 25 R

2,62 = 6,98 m/hr 0,38

REFERENCES
2-1 2-2 2-3 2-4 2-5 2-6 Andres C., Smith R. Principles and Practices of Heavy Construction. Prentice Hall, USA, 1998. Andres C., Smith R. Principles and Practices of Commercial Construction. Prentice Hall, USA, 2003. Ilinoiu G., Construction Engineering. Conspress, Bucharest 2003. La Londe W., Janes M., Concrete Engineering handbook. McGraw-Hill Company Inc., 1961 Peurifoy R., Oberlender G., Formwork for concrete structures. McGraw-Hill, 1996. APA. The Engineering Wood Association, 1999. Concrete forming. Design and Construction Guide.

26

Construction Project Engineering

CHAPTER 3. CONCRETE FORMWORK DESIGN


3.1. GENERAL CONSIDERATIONS
If concrete is to be poured, in place-monolithically, on the job site some means of support, known as formwork, is necessary to shape, to position it precisely (level and location) and to retain it until it sets. In other words, it is a temporary mould into which fresh concrete and reinforcement are placed to form a particular reinforced concrete element with a predetermined strength.

3.2. MODULAR PLYWOOD FORMWORK


Plywood is a sheathing product made of several wood veneers with their grain lying (normal to one another) at right angles and firmly glued together under pressure, producing a panel that has uniform properties in both directions, an advantage regarding increased bending, shear, and deflection properties. The usual format consists of framed panels on a timber studwork principle with a plywood-facing sheet screwed to the studs so that it can be easily removed and reversed to obtain the maximum number of uses. The modular plywood formwork consists of standard framed panels tied together over their backs with horizontal members called walings. The wales provide resistance to the horizontal force of wet concrete, supporting the studs and facilitating panel alignment. The wales are usually double square pipes (40 x 40 x 3,5; 45 x 45 x 4 or 55 x 55 x 4 mm). They are usually doubled so to allow the placing of tension ties, without any supplementary works regarding drilling of wales.
Figure 3-1. Typical plywood panel

Caption: 1. Plywood sheathing; 2. Batten (Stud); 3. Brace; 4. Transverse frame: e = 8; 15 mm, d = 92; 85 mm, c = 48 mm, i = 68 mm, f = 38 mm. Source: Popa R., 1978.
Table 3-1. Panel nominal dimensions
Type of panel P1 P2 P3 P4 P5 P6 P7 P8 Size Length (mm) Width (mm) 2400 300 2400 400 2400 600 1200 300 1200 400 1200 600 600 300 600 400 No. of studs 2 3 3 2 3 3 2 3 Components No. of traverse frames 2 2 2 2 2 2 2 2 No. of braces 3 6 6 1 2 2 Thickness of panel

100 mm

27

Construction Project Engineering

Figure 3-2 (a). Plywood panel formwork Caption: 1. Plywood sheathing; 2. Wooden wedges; 3. Wale; 4. Plate washer; 5. Bolt/Nut - Latch; 6. Tie rod; 7. Pipe spacer; 8. Plastic cone; 9. Shoe; 10. Clamp; 11. Wedge; 12. Concrete kicker. Source: Popa R., Teodorescu M., 1978.

Figure 3-2 (b). a,b,c and d- panel accessories

Caption: a. PVC pipe spacer; b. Plastic cone; c. Latch; d. Clamp

A standard procedure for site formwork assembly is as follows: Forms shall conform to the shape and dimensions shown on the drawings and shall be accurately set to line and grade. All sheathing in contact with concrete surfaces shall be sized to uniform thickness and free from wane, warp, splits, loose knots or other defects which will prevent obtaining a smooth, tight form. Forms shall be erected one side of the wall formwork, ensuring its correct alignment, plumbing, and/or strutting. Forms shall be tightened by means of slotted wedge that passes through the lower end of the slot. Joints in the lining shall be filled with patching plaster or other plastic filler. Lining material may be re-used if it is in satisfactory condition, well cleaned and re-oiled

28

Construction Project Engineering Insertion and positioning of steel reinforcement cage before the formwork for the other side is erected and fixed. - Correct spacing of forms at specified distance from one another by using plastic spacer tubes in which ties are inserted. - Positioning of horizontal members (wales) to increase the overall rigidity of the formwork panels and to align them. - The spacing of wales varies form minimum at the bottom of the pour to a maximum uniform spacing at the top. The spacing depending on the maximum allowable span of the studs. - Insertion of ties between wales, covering them at the outside with plate washers to ensure that the loads are evenly distributed over the wales. - The size and spacing of the ties depend on the load on the wales. - Forms for walls, etc., shall have large cleanout openings at their lowest points, which shall not be closed until just before placing concrete. All forms shall be thoroughly cleaned and soaked with water immediately before filling. General requirements for slab forming design: 1. The panels preferred for use will be those that have the maximum size 600 x 2400 mm. 2. On every direction of the formwork design a panel removal (strike off) joint will be positioned with the size of 50 or 100 mm in accordance to the modular span of the slab. 3. The positioning of removal joints will be continuous, and will be placed towards the middle of the formwork paneling. 4. Removal joints can be adopted with the thickness of 150 or 200 mm, when these are the only solutions to complete the formwork. 5. On a slab formwork if the standard size panels cannot close the entire area, a filler panel can be used (square or rectangular wooden lumber plank) with the maximum size of 500 x 500 mm. 6. The filler panel is recommended to be positioned at the intersection of the removal joints. 7. All slabs will be formed in two variants, respecting the main directions of form disposition. From the two the economical one will be chosen in regard of the minimum number of joists that are used. In case of equality of joists between the two variants, the one with the minimum number of panel forms will be chosen 8. Every panel will be supported at two sides by two joists. These will not be positioned on adjoining sides or a side in console. 9. The joists will be positioned in accordance with a main direction of form placement for every slab. 10. A minimum number of reuses for panels should be assured. We are not allowed to cut or deteriorate them (10 reuses). General requirements for wall forming design: 1. The panels preferred for use will be those that have the maximum size 600 x 2400 mm. 2. On the vertical face of the wall formwork a panel removal (strike off) joint will be positioned with the size of 50 or 100 mm in accordance to the modular span of the wall. 3. The removal joints will be continuous on the height of the wall, and will be put one in front of the other in the thickness of the wall, and will be positioned at the middle of the formwork paneling. 4. The forming paneling should begin from the interior of the building; more precisely form the intersection of walls, towards the middle. 5. A minimum number of reuses for panels should be assured. We are not allowed to cut or deteriorate them. -

29

Construction Project Engineering

3.3. SHORING MEMBERS


Shoring members support formwork and their contents, bearing loads and limiting their deflections. They can be divided into two major categories according to type and shape of concrete member that will be formed: a. Horizontal shores (telescopic joists) range from small units 1,8 m, to large members 9,0 m, used to carry much heavier loads. Telescopic joists known also as centers present the following characteristics: - They are manufactured from wood or high-tensile steel. - Load bearing capacity according to span. - Possibility of precambering to compensate any deflections when loaded. - Requirement of propping and bracing. - Lightweight so that it can be carried by one-two workers.

Figure 3-3. Typical steel telescopic joists. Source: Chudley R., 1999.

Table 3-2. Allowable spans d (m) between joists in accordance with span and load
Load of panel and concrete N/m2 d (m) 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 Telescopic joist 1,83,0 m Source: Teodorescu M.; Tsicura A.; Ilinoiu G., 1997 Span of joist D in accordance with d distance between joists
2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000

2.97 2.77 2.60 2.46 2.34 2.24 2.15 2.07

2.82 2.62 2.46 2.33 2.21 2.12 2.03 1.96

2.69 2.50 2.34 2.21 2.10 2.01 1.93 1.86

2.58 2.39 2.24 2.12 2.01 1.92 1.84

2.39 2.30 2.15 2.03 1.93 1.84

2.34 2.21 2.07 1.96 1.86

2.31 2.14 2.00 1.89

2.24 2.07 1.94 1.83

2.18 2.01 1.88

2.17 1.96 1.83

2.06 1.91

2.01 1.86

1.96 1.82

1.92

1.80

30

Construction Project Engineering


Telescopic joist 3,05,0 m Source: Teodorescu M.; Tsicura A.; Ilinoiu G., 1997 d (m) 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 d (m) 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 5.00 4.83 4.51 4.23 4.04 3.85 3.69 3.55 6.00 5.98 5.59 5.27 4.99 4.76 4.56 4.38 4.93 4.68 4.47 4.29 4.55 4.32 4.13 3.96 4.25 4.04 3.85 3.69 4.01 3.80 3.63 3.47 3.80 3.61 3.44 3.29 3.63 3.44 3.28 3.14 3.47 3.29 3.14 3.34 3.16 Telescopic joist 3,66,0 m 6.00 5.64 5.27 4.96 4.70 4.48 4.29 4.12 5.80 5.35 4.99 4.70 4.46 4.25 4.07 3.91 5.54 5.11 4.76 4.48 4.24 4.05 3.87 3.72 5.31 4.89 4.56 4.29 4.07 3.87 3.71 4.13 3.80 3.55 3.34 3.17 3.02 3.98 3.67 3.42 3.22 3.05 3.85 3.55 3.31 3.11 3.74 3.44 3.21 3.02 3.63 3.34 3.11 3.53 3.25 3.03 3.44 3.17 3.36 3.09 3.28 3.02 3.21

Source: Teodorescu M.; Tsicura A.; Ilinoiu G., 1997 5.11 4.70 4.38 4.12 3.91 3.72 4.92 4.53 4.23 3.97 3.76 4.76 4.38 4.08 3.84 3.64 4.62 4.25 3.96 3.72 4.48 4.12 3.84 3.61 4.36 4.01 3.73 4.25 3.91 3.64 4.14 3.81 4.05 3.72 3.96 3.64

b. Vertical shores (also known as props) are those that support the horizontal shores (joists) from a firm base below. They may be manufactured of wood or steel, with various shapes, depending on the particular scope. Vertical wood shores may be single wood posts, with wedges to adjust the height, double wood posts, two-piece adjustable posts, or T head shores. Vertical metal shores may be adjustable pipe shores or shores made up of prefabricated steel tubing. Scaffold-type shoring, is usually assembled into towers by combining a number of units into a single shoring structure.

Figure 3-4. Typical adjustable steel pipe shore (prop) Source: Teodorescu M.; Tsicura A.; Ilinoiu G., 1997.

31

Construction Project Engineering


Table 3-3. Allowable axial load P (daN) on shore in accordance with length.
Item name Steel shore PE 3100R Steel shore PE 5100R 5100 3100 18000 45000 Steel shore with spatial base PES 3100R 3100 1700 2000 45000 Steel shore with spatial base PES 5100R 5100 3100 18000 45000 Light steel telescopic shore PU 3100 3100 1700 6000 12000 Light steel telescopic shore PU 1200R 1220 232 3000 45000

Hmax (mm) Hmin (mm) Load (N)

min max

3100 1700 20000 45000

3.4. FORMWORK PRINCIPLES


The principles behind good formwork are based on the same basic frame theories used in the design and construction of structural frames. Formwork must be able to withstand construction forces that, in many respects, can be more severe than those experienced by the completed structure. It is imperative that each component of the formwork be erected according to the formwork drawings to ensure that all construction loads are safely supported. Although formwork is temporary in nature, the methods used in building formwork must adhere to the code specifications that apply to the particular material being used. Each component of the form must be able to support its load from two points of view: (1) strength, based on the physical properties of the material used; (2) serviceability, the ability of the selected sections to resist the anticipated loads without exceeding deflection limits.
3.4.1. FORMWORK LOADS

The basic consideration in form design is strength-the forms ability to support, without excessive deflections, all loads, and forces imposed during construction. Two types of problems arise in formwork design: Horizontal forms support gravity loads e.g. mass of the concrete and reinforcement, construction crew and equipment, weight of the formwork itself and the vibrating effect of the concrete compaction. Vertical forms must primarily resist lateral pressures due to a particular height of plastic concrete (e.g. static load from lateral pressures due to a particular height of plastic concrete, dynamic load from lateral pressures due to impact of falling concrete during placement, and wind forces on wall forms. The individual form panels and members may be limited to bending, shear, bearing, or deflection and all four should be checked against the allowable values prescribed by norms and specifications. Two types of loads are considered in the design calculations: vertical loads and horizontal loads.
3.4.2. FORMWORK PRESSURES

The pressure exerted by concrete on formwork is determined primarily by the following factors: rate of concrete placement, concrete temperature, weight of concrete, method of concrete vibration and depth of placement. The lateral pressure exerted by plastic concrete on vertical formwork is rather complex in nature and is affected by several factors. The freshly placed concrete initially acts as a liquid, exerting fluid or hydrostatic pressure against the vertical form. Because hydrostatic pressure at any point in a liquid is the result of the weight of the fluid above, the density of the concrete mix influences the magnitude of the force acting on the form. Nevertheless, because fresh concrete is a composite material rather than a true

32

Construction Project Engineering liquid, the laws of hydrostatic pressure apply only approximately and only before the concrete begins to set. The rate of placement also affects lateral pressure. The greater the height to which concrete is placed while the whole mass remains in the liquid stage, the greater the lateral pressure at the bottom of the form. The temperatures of concrete and atmosphere affect the pressure because they affect the setting time. When these temperatures are low, greater heights can be placed before the concrete at the bottom begins to stiffen, and greater lateral pressures are therefore built up. Vibration increases lateral pressures because the concrete is consolidated and acts as a fluid for the full depth of vibration. This may cause increases of up to 20% in pressures over those incurred by spading. Other factors that influence lateral pressure include the consistency or fluidity of the mix, the maximum aggregate size and the amount and location of reinforcement. Norm C11-1974 specifies the following loads for formwork design: (1) VERTICAL LOADS, include: a). Weight of the formwork itself and the scaffold: - lumber in panels 7500 N/m3 - lumber in shoring elements 6000 N/m3 - plywood 8500 N/m3 b) Weight of fresh concrete: - normal weight (heavy) concrete: plain 24000 N/m3 reinforced 25000 N/m3 - lightweight concrete 7000 19000 N/m3 c). Uniform distributed load of runways for concrete transport and impact loads of the crowding of crewmen: - panel design 2500 N/m2 - horizontal shoring (joists) of panels 1500 N/m2 - vertical shoring elements (props, columns etc.) 1000 N/m2 d). Concentrated load form weight of work crews and transport equipment: - one crew member that carries loads 1300 N - wheel barrow concrete transport 2800 N e) Load from the vibrating effect of the concrete compaction: 1200 N/m2
(2) HORIZONTAL LOADS, include: f) Static load from lateral pressures due to a particular height of plastic concrete (placed and compacted) according to the rate of placement (see Figure 3-5) on the panels surface.

Figure 3-5. Lateral pressure on wall form according to rate of concrete placement Source: Teodorescu M., Tsicura A, and Ilinoiu G., 1998.

33

Construction Project Engineering Two factors that affect the maximum effective horizontal pressure are seen to be: rate of rise of the concrete in the forms and rate of setting (loss of fluidity). The first depends on the size of form or forms being filled vs. the rate at which the concrete is placed. The second depends on a number of factors, of which the most significant is the temperature. The time of setting for concrete according with NE 012-99 is when the temperature of concrete is 10o30o C is 3540 min and for t < 10o C is 5070 min according to the grade of cement used (32,5 or 42,5). The effect of pressure in compacting the lower fluid layers by forcing out mixing water (bleeding) has led to the belief that for very rapid rates of rise there is a maximum pressure which cannot be exceeded. It will usually be more economical to control the rate of rise that to try to provide form strength to resist such high pressures. The rate of placement the relation between the height of the form H and the time period needed for the casting of the whole element. The rate of pour is expressed in meters of concrete poured per hour. The hydrostatic lateral pressure is given by the following equation: p = x H Where: p lateral pressure [N/m2] b unit weight of fresh concrete [N/m2] H height of plastic concrete [m]
Table 3-4. Characteristics of concrete pressure on formwork
Characteristics 1 2 3 Rate of pour 4 (m/hour) 6 8 10 1 14 Workability of concrete, 59 slump (cm) 1015 15 15 Minimum section 1654 of element (cm) 55 5 Concrete 624 o temperature ( C) 25 1 0.55 0.65 0.75 0.85 0.90 0.95 1.00 0.85 0.95 1.00 1.05 1.10 0.90 0.95 1.00 1.00 0.95 0.90 2 3 4

Source: Teodorescu M., Tsicura A, and Ilinoiu G., 1998.

The position of the maximum pressure is determined with the following equation: h p = 1 xH

Where: 1 has the value according to table 3-4. The value of the maximum pressure Pmax is determined with the following equation: Pmax = 1 x 2 x 3 x 4 xHx b (N/m2) Where: H the height of the poured concrete (m); b density of fresh concrete (kg/m3). The minimum pressure Pinf is determined with the following equation: Pinf = xPmax (N/m2) Where: - has the value according to table 3-5.

34

Construction Project Engineering


Table 3-5. Coefficient according to rate of concrete placement.
Rate of placement (m/hour) <1 0 2 0.25 3 0.45 4 0.70 6 0.80 8 0.90 10 1.00

Source: Teodorescu M., Tsicura A, and Ilinoiu G., 1998.

g) Dynamic load from lateral pressures due to impact of falling concrete during placement: - for a capacity of the transport equipment: 0,2 m3 ...........................2000 N/m2 0,2...0,7 m3....................4000 N/m2 0,7 m3............................6000 N/m2 - for placement with chutes and hoppers: 2000 N/m2 - for placement with concrete pumps: 6000 N/m2 h) Wind forces on wall forms that will be taken into account only for bracings, scaffolds, and centers. 7000 N/m2 For the design of the size and deflections of component elements of the formwork, the loads will be taken into account differently, according to the table 3-6.
Table 3-6. Combination of loads according to member
Item name Slab and arch forms and horizontal props (beams) Vertical props for floors Column forms with the maximum face of 30 cm and walls of maximum 10 cm thickness Column forms and walls with bigger values Lateral faces of forms for beams and arches Bottom of beams Centers and scaffolds < 6 m Centers and scaffolds > 6 m Loads Strength a+b+c+d a+b+c f+g f f a+b+e a + b + c (e) a + b + c (e) + h Deflection a+b a+b f f f a+b a+b a+b

Source: Teodorescu M., Tsicura A, and Ilinoiu G., 1998 and C 11-74

The design of formwork components will be made according to the following characteristics: type of material used, nature of the load, number of reuses, moisture conditions and deflection limitations.
3.4.3. FORM MATERIAL PROPERTIES

Materials used for forms include lumber, plywood, plastics, steel, aluminum etc. Additional materials that are used include: nails, bolts, screws, ties, anchors etc. Properties of form material - Allowable bending stress of lumber (a) 12 N/mm2 - Allowable bending stress of plywood (a) - When the face grain is parallel to the span 13 N/mm2 - When the face grain is perpendicular to the span 5 N/mm2 - Allowable bending stress of steel (a) 210 N/mm2 - Modulus of elasticity (E) lumber 10.000 N/mm2 plywood 7.000 N/mm2 steel 210.000 N/mm2 - Allowable bending deflection limitations for the various modular panels are usually: (L maximum clear span)/300 for concrete surfaces exposed to view; (L maximum clear span)/200 for concrete surfaces with finishing. - Allowable tolerances for panels: - for length and width of panel + 2 mm; - for thickness of panel - 5 mm; - for length of diagonals of panel 5 mm.

35

Construction Project Engineering

3.5. WALL, SLAB FORMWORK AND SHORING SYSTEMS DESIGN


Y-Y b
Figure 3-6. Symbols for cross section of rectangular beam

d X-X y b d

Table 3-7. Nomenclature of symbols

Meaning Neutral axes: A line through a member (beam or column) under flexural stress, on which there is neither tension nor compression. It is the middepth of the member and perpendicular to the loading of the member, B [mm] Width of beam face on which load or force is applied H [mm] Depth or height of beam face parallel to the direction inn which the load or force is applied [mm] Plywood thickness h slab [mm] Thickness of slab M [Nmm] Bending moment I = bh3/12 [mm4] Moment of inertia of the cross section of a beam is the (for a rectangular sum of the products of each if its elementary areas times beam) the square of the distance from the neutral axes of the section to the areas, multiplied by the square of their distance from the neutral axes. y [mm] Distance from neutral axes to most distant fiber of beam [N/mm2] Applied bending stress e [N/mm2] Allowable bending design stress a 2 W = I/y = bh /6 [mm3] Section modulus of the cross-section is the moment of (for a rectangular inertia of the section divided by the distance from the beam) neutral axes to the most distant, fiber of the section. E [N/mm2] Modulus of elasticity P [N] Concentrated load do to work crews and transport equipment q [Nml] Uniformly distributed load pre unit length (ml) 3.5.1. SLAB FORMWORK AND SHORING SYSTEM DESIGN

List of symbols X-X or Y-Y

U.M.

Formwork must be checked to ensure that they withstand bending and shear and that deflection will not exceed 1.5 mm.
INITIAL DESIGN DATA

Thickness of slab h slab, Clear span of slab. Story height H story.

36

Construction Project Engineering


EVALUATION OF LOADS

panel x 8500 = a. Weight of 8 (15) mm panel sheathing: b. Weight of fresh concrete (h slab): h slab x 25000 = c. Uniform distributed load of runways for concrete transport and impact loads of the crowding of crewmembers: d. Concentrated load weight of work crews and transport equipment: e. Load from the vibrating effect of the concrete consolidation;

.. N/m2 .. N/m2 .. N/m2 .. N .. N/m2

Note 1: The loads on plywood are usually considered as being uniformly distributed over the entire surface of the plywood. The concentrated load d can by transformed in a uniform distributed load, by dividing it to the span l. Note 2: This design recommends three basic span conditions for computing the uniform load capacity of plywood panels. The span may be single span, two-spans or three span according to the panels width.

PLYWOOD PANEL DESIGN

Recommended thickness of plywood (panel) is 8 or 15 mm. When calculating the allowable pressure of concrete on plywood as limited by the allowable unit stress deflection of the plywood, use the clear span between supports.
a. For 30 cm width panel:
q l/2 l = 25.2 cm q (daN/m)

q l/2

Reactions for a simple beam with a uniformly distributed load Verification for deflection: Verification for bending stress: The calculation is made for a width of b=1m. The calculation is made for a width of b=1m. q = (a + b) x 1.00 m (N/ml) q = (a + b + c) x 1.00 + d/l (N/ml) Where: l = span between supports (25.2 cm) For a rectangular beam subjected to bending The maximum bending moment that will the applied deflection f can be calculated occur at the center of the beam, will be form the following equation: calculated as follows: 5 qxl 4 2 = f x e M = ql /8 384 ExI The applied bending stress must not exceed The applied deflection must not exceed the the allowable bending design stress: allowable design deflection: e a fe fa Where: e = applied bending stress; Where: f e = applied deflection; a = allowable bending design stress. f a = allowable design deflection. y M l 5 qxl 4 e = M = a fa = fe = x I W 384 ExI 200 M = q x l2/8; 3 4 I = bxh /12 (mm ) W= b x h2/6 h = 8 or 15 mm h = 8 or 15 mm E = 7000 (N/mm2) b. For 60 cm width panel: q (daN/m)
l = 27.6 cm l = 27.6 cm

Reactions for a simple beam with a uniformly distributed load spanning over three or more equally spaced supports
37

Construction Project Engineering

Verification for bending stress: The calculation is made for a width of b=1m. q = (a + b + c) x 1.00 + d/l (N/ml) Where: l = span between supports (27,6 cm) The maximum bending moment that will occur at the center of the beam, will be calculated as follows: M = ql2/10 The applied bending stress must not exceed the allowable bending design stress: e a Where: e = applied bending stress; a = allowable bending design stress. y M e = M = a I W M = q x l2/10; W= b x h2/6 h = 8 or 15 mm

Verification for deflection: The calculation is made for a width of b=1m. q = (a + b) x 1.00 m (N/ml) For a rectangular beam subjected to bending the applied deflection f can be calculated form the following equation: qxl 4 f e = 0.005 x ExI The applied deflection must not exceed the allowable design deflection: fe fa Where: f e = applied deflection; f a = allowable design deflection.

f e = 0.005 x

qxl 4 l fa = 200 ExI 3 4 I = bxh /12 (mm ) h = 8 or 15 mm E = 7000 (N/mm2)

HORIZONTAL STEEL TELESCOPIC JOIST DESIGN


q

15

Joist

Shore (prop)

Requirement: Spacing of joists under paneling d (m). Loads: q = a + b (N/m2) From table 3-2, according to the type of joist used, the load q and the span of the joist D the spacing d of joists under paneling is given. Technical note: If the value d is not a common measure of the standard panel length, the joists will be placed at equidistance, but not more than dmax for the table.

15

Figure 3-7. Typical view of joist and prop

BATTEN (STUD) DESIGN The design will be made in the most least favorable situation, this will be the design of the central stud of the 60 cm width plywood panel. Loads: For verification for bending stress: q = (a + b + c) x l.00 + d/l (N/ml) For verification of deflection: q = (a + b) x 1.00 m (N/ml)

38

Construction Project Engineering


P q (daN/m)

a. For panel with L = 1.20 m and spacing between joists d = 1.20 m

L = 1.20 m b=48

h=85 or 92

Verification for deflection: Verification for bending stress: M 5 qxl 4 l e = x a = 12 N/mm2 fa = fe = x W 384 ExI 200 2 3 qxL PxL bxh ; M= + (mm4) I= 8 4 12 b=48 mm, h = 85 mm bxh 2 4,8x8,5 2 = W= E = 10000 (N/mm2) 6 6 h = thickness of stud 85 or 92 mm P P b. For panel with L = 2.40 m and spacing q (daN/m) between joists d = 1.20 m
L = 1.20 m L = 1.20 m

Verification for bending stress: M e = a = 12 N/mm2 W qxL2 PxL ; M= + 0,203 x 8 4 bxh 2 4,8x8,5 2 = W= 6 6 h = thickness of stud 85 or 92 mm
P

Verification for deflection: qxl 4 l fa = f e = 0,005 x 200 ExI 3 bxh (mm4) I= 12 b=48 mm, h = 85 mm E = 10000 (N/mm2)
P q (daN/m) P

c. For panel with L = 2.40 m and spacing between joists d < 1.20 m

Verification for bending stress: M e = a = 12 N/mm2 W qxL2 PxL ; M= + 0,175 x 8 4 bxh 2 4,8x8,5 2 W= = 6 6 h = thickness of stud 85 or 92 mm

Verification for deflection: qxl 4 l fa = f e = 0,007 x 200 ExI 3 bxh I= (cm4) 12 b=48 mm, h = 85 mm E = 10000 (N/mm2)

39

Construction Project Engineering STEEL PIPE SHORE DESIGN


P

Figure 3-8. Schematic view of prop (shore)

15

The design will be made for the most loaded shore. D P = (a + b + c )xdx (daN) 2 Where: d spacing of joists support under the paneling (m); D span of telescopic steel joist (m). The steel pipe shore will be chosen according to the equation: P Pmin x(H story H ) Pa = Pmax max P (daN) (H max H min )

15

3.5.2. WALL AND COLUMN FORMWORK DESIGN INITIAL DESIGN DATA



Technical note: The design will be made for a wall Member dimensions. with a thickness grater that 10 cm and respectively a Technology of concrete placement. column with the edge grater that 30 cm. Rate of concrete placement. Temperature of concrete. Workability of concrete (consistency). Story height H story. Thickness of slab hslab.

LOADS f) Static load from lateral pressures due to a particular height of plastic concrete (placed and compacted) according to the rate of placement on the panels surface. Pmax = 1 x 2 x 3 x 4 xHx b (N/m2) Pinf = xPmax (N/m2) h p = 1 xH Where: 1 coefficient according to work conditions. H the height of the poured concrete (level) (m). b unit weight of fresh concrete (2400 kg/m3). - coefficient according to rate of pour.
Figure 3-9. Pressure distribution of lateral face of panel
Technical note: The design will be made for a plywood sheet of 30 respectively 60 cm width. If in the design just one of the above panels is used then the design will be made for that one.

The design will be made for a width of panel b = 1,00 m The load is considered uniformly distributed, with the value of: p + p inf q = fx1,00 = max x1,00m (N/ml) 2

40

Construction Project Engineering PLYWOOD SHEATHING DESIGN Verification of plywood panel a. For 30 cm width panel:
l = 25.2 cm q (daN/m)

Verification for bending stress: M e = a = 13 N/mm2 W M = q x l2/8; W = b x h2/6 b= 100 cm h = 8 or 15 mm b. For 60 cm width panel:

Verification for deflection: l 5 qxl 4 fe = x fa = 384 ExI 200 3 bxh I= (mm4) 12 b=1.00m, h = 15 mm E = 7000 (N/mm2)
q (daN/m)

l = 27.6 cm

l = 27.6 cm

Verification for bending stress: M e = a =13 N/mm2 W M = q x l2/10; W = b x h2/6 h = 15 mm

Verification for deflection: qxl 4 l f e = 0.005 x fa = ExI 200 3 bxh I= (mm4); 12 b=1.00m, h = 8 or 15 mm E = 7000 (N/mm2) STUD DESIGN (DISTANCES BETWEEN WALES) The design will be made in the most least favorable situation, that is the design of the central stud of the 60 cm width plywood panel. The load is uniform distributed, with the value: p + p inf q = fx 0,276 = max x 0,276m N/ml 2 Verification for deflection: qxD 4 D ExI D = 3 f e f a 0.007 x 1,4 xq ExI 200
I=

40 cm D3

pmax

D2 B D1 A

pmin

15 cm

Figure 3-10. Pressure of concrete on wall form

Verification for bending stress:


10 x a xW qxD 2 / 8 e a a D = W q a = 12 (N/mm2) W = b x h2 / 6; b = 48 mm; h = 85 mm

bxh 3 (mm4) 12 b=1.0 m; h = 15 mm. E = 10.000 (N/mm2) The values will be chosen as follows: D1=Dmax, like the minimum value for D calculated for the verification of resistance and deformation, but not more that 60 cm. The values for D2 and D3 will be 40% and respectively 60% of the remaining distance B-D (where B-D = H story D1 0,15 0,40 cm).

41

Construction Project Engineering

SPACING BETWEEN WALES (DISTANCES BETWEEN TIES)


pD q (daN/ml) pC 60 cm d d pmax D2 B D1 pA pmin A 15 cm C D3 D 40 cm

Where:d distance between ties; D distances between wales (vertical).


Figure 3-11. Spacing between ties

pB

The wall formwork design will be made according to the lateral pressure of fresh concrete; this may use the calculation to determine the spacing of wales. It will be assumed that the first tie will be as close to the bottom of the form as is practical, within 150200 mm, and that the top tie will be at or near the top. The values for pA, pB, pC (N/m2) will be calculated according to the known values pmax and pinf (N/ml). The wale most stressed will be calculated (wale most near to the highest pressure point point B), with the following equations: (0,15 + D1) (N/ml) qA = pA x 2 (q + 2xq B + q C ) (D1 + D2) (N/ml) qB = pBx (N/ml) q= A 2 4 (D2 + D3) (N/ml) qC = pC x 2 Verification for bending stress: 10 x a xW qxd 2 / 10 d= e a a Example of wale (square shape W q pipe): 40 x 40 x 3,5 (W=5,73x103 mm3; I=11,50 x104 mm4) 45 x 45 x 4 (W=8,25 x103 mm3; I=18,60 x104 mm4) 55 x 55 x 4 (W=12.9 x103 mm3; I=35,60 x104 mm4) Verification of deflection: qxd 4 d ExI d =3 Where: = 210 (N/mm2) f e f a 0.007 x 200 1,4 xq ExI E = 210.000 (N/mm2)
Technical note: dmax will be chosen as the minimum value resulted for both the verification of resistance and deflection. The distance d dmax, will be adopted according to the formwork design plan, knowing that the tie will be put only between panels.

TIE DESIGN
Only the most loaded tie will be calculated, that is the one placed nearest to point B (see figure). The tensile stress on the tie is: T = q x d (N) Where: d- correct distance between ties, according to formwork design plan. T Aa = ; Ra = 2100 (N/mm2) Ra
e nec The diameter of the tie will be chosen according to Aa Aa

42

Construction Project Engineering

3.6. EXAMPLE WORKING DRAWINGS


Typical Floor Level Plan Sc.: 1:100

43

Construction Project Engineering

Wall Formwork Plan Sc.: 1:100


P2 P1 P3 P3 P3 P1 P1 P1 P1 P3 P3 P2 P1 P3 P3 P3 P1 P1 P1 P1 P3 P2 P2 P1 P1 P2 P3 P3 P3 P3 P1 P1 P1 P1 P3 P2 P2 P1 P1
P1 P1 P1 P1

P2 P1 P3 P3 P3 P1 P1 P1 P1 P3 P3 P2 P3
P1 P1 P1 P1

P1 P3 P3 P3 P1 P1 P1 P1 P3 P3 P3 P3 P3
P1 P1 P1

P1 P3 P3 P3 P1 P1 P1 P1 P3 P3 P2 P1

P3

P3 P1 P3

P1 P1 P1

P2 P2 P2 P2 P2 P3 P3 P3 P1 P1 P1 P1 P3 P2 P2 P1 P1 P2

P3P1

P1 P1

P3

P1 P1 P1 P1

P3 P3 P3 P1 P1 P1 P1 P3 P2 P2 P1 P1

44

Construction Project Engineering

Slab Formwork Plan Sc.: 1:100

P1 P2 P2 P6 P6 P6 P6

P7 P8 P8 P5 P5 P6 P6

P1 P2 P2 P6 P6

P7 P8 P8 P8 P6 P5

P3 P3

P3

P3

P2 P2

P3 P3

P3

P3

P3 P2

45

Construction Project Engineering

Typical Transverse Cross Section of Shored and Formed Level Sc.: 1:100

Caption: 1. Plywood panel, 2. Strike off joint, 3. Steel joist, 4. Brace, 5. Steel prop, 6. Longitudinal cross bracing, 7. Transverse cross bracing, 8. Upper horizontal brace, 9. Lower horizontal brace, 10. Prop base plate, 11. Plate washer, 12. Steel wale, 13. Tie rod, 14. Spacer, 15. Nut, 16. Reinforced concrete wall, 17. Slab, 18. Beam.

46

Construction Project Engineering

Typical Longitudinal Cross Section of Shored and Formed Level Sc.: 1:100

Caption: 1. Reinforced slab. 2. Plywood panel, 3. Reinforced wall, 4. Spacer, 5. Tie rod, 6. Wale, 7. Plate washer, 8. Nut, 9. Lumber plank, 10. Prop base plate, 11. Steel pipe shore, 12. Steel Joist, 13. Transverse cross bracing, 14. Longitudinal cross bracing, 15. Upper horizontal bracing, 16. Lower horizontal bracing, 17. Prop head, 18. Brace.

47

Construction Project Engineering

Details of Beam Formwork

a. Girder form details. 1. Girder; 2. Panel end support; b. Spandrel beam form details. 1. Stud; 2. Tie 3. Stringer; 4. Prop; 5. Ledger; 6. Brace; 7. Prop; 8. back; 3. Plywood sheet; 4. Ledger; 5. Joist; 6. Slab for sheathing; 7. Tie; 8. Wales; 9. Brace; Shore head; 9. Panel sheathing. 10. Ledger; 11. Shore head; 12. Double shores. Source: Andres C., 1998.
Source: Andres C., 1998.

c. Spandrel beam form details. 1. Concrete slab, 2. Decking, 3. Joist, 4. Ledger, 5. Stud, 6. Kicker, 7. T head, 8. Brace, 9. Scab, 10. Wale, 11. Brace, 12. Stud, 13. Brace, 14. Prop. Source: Peurifoy R., 1996.

48

Construction Project Engineering

3.7. STEEL MODULAR PANEL FORMWORK


3.7.1. GENERAL CONSIDERATIONS
Modular steel panel forms provide several ways to form columns of various shapes and sizes; they can be combined to form square or rectangular columns. Generally modular steel panels provide a fast and more accurate column form than job-built forms. The length of the steel column form is determined be subtracting the thickness of the bottom of the girder form that the column is to carry from the column height indicated on the plans or in the column schedule. Once the column forms are in place, they must be plumbed, braced, and made ready to support the ends of the girder and the beam forms that will be built to them.

3.7.2. MODULAR STEEL COLUMN FORMWORK


The steel form consists of four panels, of various widths and lengths that are fastened together at each corner. Yokes, wedge bolts, clips and clamps are used to secure the corners of the forms. When positioning the yokes it will be assumed that the first one will be at the bottom of the form, and that the top yoke will be at top. Steel column forms as shown in Figures 310, being available for maximum forming height of 7,20 m and maximum edge of column 95 cm; 2,0 mm steel sheathing produces the finishing of concrete. This type of formwork is available in three variants according to the area formed, respectively Type A 150 m2, Type B 300 m2 and Type C 300 m2.

Figure 3-12. Typical assembly of steel modular panels Source: IPC, 1977.

49

Construction Project Engineering


Table 3-8. Modular steel formwork components Item Symbol l L Width Length (mm) (mm) P1 Panel Panel Panel Panel Short lower yoke * Long lower yoke ** Short middle yoke * Long middle yoke ** Short upper yoke * Long upper yoke **

H Height (mm) 1190

Q Weight (kg) 23,52

50
o o o o o o o o o o o o o

P2 P3 P4
Cb1

590 70 500 290 100 750 1250 750 70 1250 750 1250 5 5 10 10 5 5

12,44 6,92 3,75 3,39 5,05 3,39 10,12 3,39 5,05


o o o o o o o o o o o o

Cb2 Cm1 Cm2 Cs1 Cs2

Clips Clips

CL1 CL2

0,28 0,28

Clamps

K S1 S2 min. 1700 (3000) max. 3000 (5550) 1000 (1500) 1000 (1500) nx 750

0,30 11,10

Inclined braces

Scaffold type

E75

Note 1: *Short yokes will always be used forming columns with widths of max. 500 mm. **Long yokes will always be used for forming columns with widths of 500 to 950 mm. Note 2: When the edge of the column is smaller than 500 mm, one single width panel will be used for forming that particular face of the column; When the edge of the column is smaller than 950 mm, two panels by width will be used for forming that particular face of the column.

50

Construction Project Engineering

Figure 3-13. Typical E75 scaffold, view and assembly phases a, b and c Source: Plesca A., 1998.

Figure 3-14. Assembly phases of steel modular column formwork a to g Source: IPC, 1977.

51

Construction Project Engineering

3.7.3. EXAMPLE OF WORKING DRAWING Steel Modular Column Formwork Erection Plan (Elevation and Cross section)

P1 - 500 x 1190 P1

P1

P1

P1

P1

P1

REFERENCES
3-1 3-2 3-3 3-4 3-5 3-6 3-7 3-8 3-9 3-10 3-11 3-12 Andres C., Smith R.: Principles and Practices of Heavy Construction. Prentice Hall, USA, 1998. Andres C., Smith R., Principles and Practices of Commercial Construction. Prentice Hall, USA, 2003. APA. The Engineering Wood Association, 1999. Concrete forming. Design and Construction Guide. Chudley R., Building site works, substructure and plant. Longman Scientific and Technical, 1988. Chudley R., Advanced Construction Technology. Pearson Education Ltd., England. 1999. Ilinoiu G., Construction Engineering. Conspress, Bucharest 2003. IPC. Catalog Cofraj metallic stlpi CMS. 1977. Technical Specification. IPC, Steel Modular Column Formwork, 1977. Peurifoy R., Oberlender G., Formwork for concrete structures. McGraw-Hill, 1996. Plesca A. Manualul dulgherului. Editura Tehnica, 1998. Popa R., Teodorescu M.: Cofraje modulate de lemn. ICB, Bucuresti, 1978. Teodorescu M., Tsicura A, Ilinoiu G., ndrumator pentru examenul de licenta la disciplina Tehnologia lucrarilor de constructii UTCB, 1998. 3-13 C11-74. Instructiuni tehnice privind alcatuirea si folosirea in constructii a panourilor din placaj.

52

Construction Project Engineering

CHAPTER 4. CONCRETE MATURITY


4.1. GENERAL CONSIDERATIONS REGARDING CONCRETE MATURITY
Poor curing practices affect the desirable properties of concrete. Proper curing of concrete is essential to obtain maximum durability, especially if the concrete is exposed to severe environmental conditions where the surface will be subjected to excessive wear, aggressive solutions, or severe exposure conditions (such as cyclic freezing and thawing). Likewise, proper curing is necessary to assure that design strengths are attained. In-situ concrete curing is perhaps the most critical factor in the concrete construction process. Sufficient curing is essential if the concrete is to perform its intended function over the life of the structure. The key word here is sufficient, because contractors are sensitive to the time value of money. Excessive curing time can add to the construction cost of a project and cause unnecessary delay.

4.2. MATURITY INDEX METHOD


The standard method of evaluating the concrete strength in cast concrete members is to test specimens for compressive strengths. The main disadvantages are that the results are not obtained immediately; the concrete in specimens may differ from that in the actual structure because of different curing and compaction conditions; and that the strength properties of concrete specimens depend on its size and shape. An alternative is using the concrete maturity index determination that provides a very important link in the chain of testing and evaluating in-situ cast concrete. The maturity method accounts for the effects of temperature on strength development. It is necessary to understand the temperature sensitivity of the rate of strength development of different concrete mixtures in order to use this method to account for the effects of temperature on the minimum required curing duration. The maturity method is a viable method for determining curing durations under different temperature conditions. Several studies have shown that the maturity method can be used to estimate strength gain during concrete curing. The advantage of the studied maturity method is the fact that the strength determination does not involve destructive stresses, and because it can be used to estimate the rate of hardening and strength development of concrete in the early stages in the scope of determining: Stripping of forms and the application of load as construction proceeds. A minimum temperature to prevent freezing during winter concreting operations (to assure a minimum rate of hydration so that the properties may develop over a reasonably short time). Minimum concrete strength required for handling, transport and storage of precast members. Minimum concrete strength required for prestressing force release for inducing precompression.

4.3. MINIMUM DURATION FOR CONCRETE STRENGTH ATTAINMENT


The minimum duration for concrete strength attainment is influenced primarily by the mix design, environmental, exposure and curing conditions. The minimum duration of curing is based on the concrete reaching a specified maturity. Once the specified value is defined, empirical relationships between time, cement type, water-cement ratio, temperature and concrete grade are used to estimate the minimum curing duration. Cementitious addition materials have slower reaction of hydration rates than Portland cement, needing longer curing periods (Table 4-1 and 4-2). 53

Construction Project Engineering


Table 4-1 Recommended critical cold weather maturity level for concrete (Mk) Critical maturity index for concrete (MK) [h O C], (at +20 O C), for different w/c ratio w/c ratio 0,4 0,5 0,6 0,7

CEM II A-S 32.5 CEM I 32.5

850 750

1 100 1 000

1 400 1 270

1 620 1 500

Where:

MK - critical maturity index necessary for obtaining a quality concrete before its complete freezing [hro C]; w/c ratio water : cement ratio; CEM II A - S 32.5 Composite Portland cement CEM I 32.5 - Ordinary Portland cement

Table 4-2. Recommended striking off maturity level for concrete (M) Striking off maturity level of concrete (M) [hOC], (at +20 O C), for = [%] 10 20 30 40 50 60 70 80 90 Hardening level (%) CEM II A - S 32,5 600 880 1290 1880 2760 4050 5930 8700 12700 CEMI 32.5 520 740 1150 1690 2510 3720 5520 8200 12100

M - maturity index necessary for striking off formwork [hro C]; - rate of concrete hardening, percentage value according to the concrete grade. Figure 4-1 indicates the concrete thermal regime. It represents two characteristic variants, by discreet separation of the time variable in its steps, Figure 4-1.a., shows the standard concrete temperature which is varying on a straight line from i-1 value at the beginning to i at the end and the second, Figure 4-1.b., for a concrete that has its freeze temperature artificially lowered through additives. Where:
Temperature [oC] Temperature [oC]

+40 +30 +20 +10 0 -10 t i-1 tI t I+1 tk tn i-1 M i i I+1 Time [hr]

+40 +30 +20 +10 0 -10 t i-1 tI t I+1 tk tn

i-1 i I+1 Time [hr]

(a) Normal Concrete

(b) With Additives

For both graphs, the lower datum temperature was considered as 10oC and the upper datum temperature as +30oC.

Figure 4-1. Temperature variation of concrete for different ages and freezing temperatures

4.4. CRITICAL CONCRETE HARDENING LEVEL


The deviation from the normal step of temperature, is defined by two limits. The minimum temperature bmin = +1 oC, that represents positive values, and the maximum temperature bmax = +30 oC, that is obtained according to the cement composition. Beyond these limits, a series of physical and chemical phenomena appear. These phenomena have disadvantageous effects on the concrete structure and implicit on the final strengths that will remain inferiors to those obtained in normal environmental conditions. 54

Construction Project Engineering If a minimum concrete strength is developed between these limits known as critical rate of hardening (K), in cold weather, the concrete will not be damaged, for this value being defined the critical maturity index MK. The attainment of the critical rate of hardening (K), depends on certain factors such as concrete mix design, type of cement, voids volume, water quantity and entrapped air do to compaction.

4.5. RATE OF CONCRETE HARDENING IN ACCORDANCE WITH ITS THERMAL HISTORY


The concept of maturity establishes correlations between the rate of hardening, , and the maturity index, M, at normal temperature ij, but especially for different cement types used in the concrete mix. The maturity index M [hoC], is defined by the content area between the concrete temperature variation curve and the 10 oC ordinate (datum temperature - theoretical adopted value for which the chemical reactions stop), on the t duration (hr). The method accuracy regarding the correlation of determination, - M for the usual cements, highlight the fact that the method accuracy decreases if the concrete temperature has great variations in comparison with the environmental temperature . However, the accuracy is improved by the application of k method, which establishes correlations between the concrete hardening level at different temperature steps and the maturity index M. M = M K Ki - rate constant involving the maturity index assessed at 'i and that assessed at the standard laboratory temperature of +20 O C; M is the maturity strike off index at a specific temperature (see table 4-3). The concrete maturity index, for time ti will be calculated as follows: M = i' + 10 K t i [hroC] Considering a straight-line variation between i-1 and i temperatures, for i: +i o i' = i 1 [ C] 2 The maturity index shall be estimated using the relationships:

N M = M ' i ki = ( i '+10)t i k M respectivelyM kN [hroC] i =1 i =1

Where: MN and MNk are the required maturity index needed for striking off formwork respectively critical cold weather index. Example of concrete maturity achieved in normal environmental conditions (+20 oC, 28 days): M 28 = (20 + 10 ) * 28 * 24 * 1,00 = 2016 [hroC]

4.6. CONCRETE CURING MINIMUM DURATION


Concrete elements should normally be cured for a period not less than that given in Table 4-4. Depending on the type of cement, the environmental conditions and the temperature of the concrete, the appropriate period is taken from Table 4-1 and 4-2 or calculated from the last column of that table. During this period, no part of the surface should fall below a temperature of 5 C. The surface temperature depends upon several factors, including the size and shape of the section, the cement content of the concrete, the insulation provided by the formwork or other covering, the temperature of the concrete at the time of placing and the temperature and

55

Construction Project Engineering movement of the surrounding air. If not measured or calculated, the surface temperature should be assumed equal to the temperature of the surrounding air. The maturity function, with a datum temperature of -10 C, is used to establish the minimum duration of the curing period for surface temperatures between 1 C and 30 C. Thus the numbers columns of Table 4-3 represent temperature-time factors in Ch. These temperature-time factors depend on the cementitious system and the exposure conditions. The duration of protection against freezing may be calculated from the maturity of the concrete. Alternately protection is no longer needed if a compressive strength of 5 N/mm2 is obtained.
Table 4-3. Values of coefficient ki of equivalency Values of coefficient ki of equivalency for the maturity level assessed at 'i temperature and that assessed at the standard temperature of +20 oC 1...5 6...10 11...15 16...20 21...25 26...30 i Ki i Ki i Ki i Ki i Ki i Ki 1 0,270 6 0,800 11 0,912 16 0,968 21 1,020 26 1,136 2 0,420 7 0,840 12 0,924 17 0,976 22 1,040 27 1,172 3 0,560 8 0,868 13 0,936 18 0,984 23 1,060 28 1,208 4 0,660 9 0,884 14 0,948 19 0,992 24 1,080 29 1,244 5 0,760 10 0,900 15 0,960 20 1,000 25 1,100 30 1,280

A special attention should be given, after form removal, to the structural member because it will bear the whole design load. The following values of hardening level () are recommended for striking off: 2,5 N/mm2 for the lateral parts of the formwork; 70% of the concrete grade for the bottom formwork parts of slabs and beams, with spans 6,0 m; 85% of the concrete class for the bottom formwork parts of slabs and beams, with a span > 6,0 m. The safety props will be removed when the following values of concrete strength percentage is achieved: 95 % for reinforced concrete members with spans 6,00 m; 112 % for reinforced concrete members with spans between 6,0.... 12,0 m; 115 % for reinforced concrete members with spans > 12,0 m.
Table 4-4. Striking time for concrete formwork Minimum duration before striking forms for given surfaces according to temperature of concrete Temperature of concrete 10+5oC +5+15oC +15+30oC 2 days 1 day 1 day 2 days 1 days 1 day 5 days 5 days 3 days 6 days 5 days 4 days 6 days 5 days 4 days 10 days 8 days 6 days 10 days 8 days 5 days 18 days 14 days 9 days 14 days 11 days 7 days 21 days 18 days 12 days 28 days 21 days 14 days 36 days 28 days 18 days

Type of concrete surfaces

Cement type
CEMIIAS32,5 CEMI 32,5 CEMIIAS32,5 CEMI 32,5 CEMIIAS32,5 CEMI 32,5 CEMIIAS32,5 CEMI 32,5 CEMIIAS32,5 CEMI32,5 CEMIIAS32,5 CEMI 32,5

Vertical surfaces to columns, walls and beams Soffits to slabs and beams smaller than 6 m length Soffits to slabs and beams grater than 6 m length Props to beams and slabs smaller than 6 m length Props to beams and slabs between 612 m length Props to beams and slabs grater than 12 m length

56

Construction Project Engineering

4.7. EXAMPLE
Assume a reinforced concrete slab, with the span of 6 m, concrete grade C 15/12 batched with the following: cement type CEM II A S 32,5, water: cement ratio w/c=0,50. Calculate: (a). after how many days the slab formwork can be removed, and (b) if the concrete will freeze, in the second day after casting, in the possibility of a cold weather front arriving. The temperature variation of the concrete in this time interval is as follows:
Day Time of temperature reading [h] Temperature [OC] 7 12 1 12 19 18 20 21 18 8 12 2 15 21 20 18 7 11 3 14 18 18 17 8 12 4 15 20 21 17 Table 4-5. Control chart for calculating the concrete maturity index Day Time of Time Concrete temperature k i M i xki [hroC] o no. temperature interval ( C) reading between Simple Cumulus Measured i Mean i readings ti [h] 1 7 oclock 12 15.5 0.964 5 123 123 12 19 19.5 0.996 6 176 299 18 20 19 0.992 3 86 385 21 18 15 0.960 11 264 649 2 8 12 16.5 0.972 7 180 829 15 21 19.5 0.996 5 147 976 20 18 14.5 0.954 11 257 1233 3 7 11 14.5 0.954 7 164 1397 14 18 17.5 0.980 4 108 1505 18 17 14.5 0.954 14 327 1832 4 8 12 16.0 0.968 7 176 2008 15 20 18.5 0.988 6 169 2177

57

Construction Project Engineering


21 17

t k = t = 86 hours
i =1

a. The maturity index required for formwork removal will be attained at 2008 [hOC]. According to cement type (II A S 32,5) and the desired hardening level = 40 %, results the maturity index of minimum M = 1880 hoC. The maturity index corresponding to the hardening degree level = 40 %, will be achieved in the 4 th day, and it will have the following value: Mef = 2008 [hoC] > M = 1880 [hoC]. b. In the second day after casting, in the possibility of a cold weather front arriving, the concrete will not be deteriorated do to freezing, because Mef = 1233 [hoC] > Mk = 1100 [hoC].

REFERENCES
4-1 4-2 4-3 4-4 4-5 4-6 4-7 4-8 4-9 4-10 4-11 4-12 4-13 4-14 4-15 Ilinoiu G., Testing hardened concrete using the maturity concept. Dimensi Teknik Sipil, Indonesia. Research Center of Petra Christian University. Vol. 5, no. 1, March 2003. Ilinoiu G., Noi concepte in studiul si cercetarea maturitii betonului. Construcii Civile i Industriale. Anul V, Nr. 49, Ianuarie - Februarie 2004, pag. 9-11. Ilinoiu G., Budan Ctin, Potorac B., Concrete maturity index determination. SELC XV Piatra Neamt October 2003, pp. 8-12. Ilinoiu G., Construction Engineering. Conspress, Bucharest 2003. Fiorato A. E., Burg R. G. and Gaynor R. D., Effects of Conditioning on Measured Compressive Strength of Concrete Cores. Concrete Technology Today. No. 3, Vol. 21, 2000; Meeks K.W., Carino N.J., Curing of High-Performance Concrete: Report of the State-of-the-Art. NISTIR 6295, U.S. Dept. of Commerce, March 1999. Swenson E.G., Durability of concrete under winter conditions. CBD-116. Teodorescu, M., Ilinoiu G., Concrete maturity. Technical University of Civil Engineering of Bucharest, 1997. Trelea A. Mathematics modeling of the concrete thermal regime, Proceedings International Symposium 15-16 Oct. Cluj-Napoca Romania. Vol. 1. 1993. ENV 206, 1990., Concrete Performance, Production, Placing and Compliance Criteria. European Committee for Standardization. C 16-1984. Normativ pentru realizarea pe timp friguros a lucrrilor de construcii i a instalaiilor aferente; STAS 1275-1988. Tests of concrete. Tests of hardened concrete. Determination of mechanical strengths. STAS 9602-90. Reference Concrete. Specifications for manufacturing and testing. U 6-78. Normativ privind lucrul utilajelor de constructii pe timp friguros. NE 012-1999. Practice code for the execution of concrete, reinforced concrete and prestressed concrete works, Part 1 Concrete and reinforced concrete.

58

Construction Project Engineering

CHAPTER 5. ESTIMATES
This chapter establishes uniform guidance in describing methods, procedures, and formats for the preparation of construction cost estimates construction projects from planning phases through modification estimates during concrete construction.

5.1. GENERAL CONSIDERATIONS


Estimating is a process that begins in the early stages of a project and ends when the project is turned over to the owner. Each estimate should be developed as accurately as possible, in as much detail as can be assumed, and be based upon the best information available regarding actual costs of construction. This objective is to be maintained so that, at all stages of the project design and during construction, the cost estimate will in all aspects represent the "fair and reasonable" cost to the owner guiding him in design decisions.

5.2. TYPES OF ESTIMATES


The main types of estimating concrete structures are: rough estimating and detailed estimating divided into estimating during design stage and estimating during construction stage.
5.2.1. ROUGH ESTIMATING

During the design stage, very little is known about the actual project, to estimate such projects only on descriptions and conceptual sketches rough estimating is used. The variants of this type of estimating are (LaLonde, Janes): 1. Square meter of floor-area estimates / Cubic meter of volume estimates. 2. Average-component estimates. 3. Use-unit estimates. It should be mentioned that rough estimating is usually used in the conceptual stages of a project, when very little is known about specifics. The advantage is that it can be calculated very quickly, the disadvantage being its accuracy of plus or minus 15 to 20%. 1. Square meter of floor-area method / Cubic meter of volume method, calculates the number of square meters (cubic meters) of floor area or building volumes after which and a unit cost per square meter (cubic meters) is used as a multiplying factor. This unit cost may be for the entire structure including the basement and roof or only for those floors that are essentially similar, after which a separate unit price would be assigned to the nonconforming areas. When deciding on what this unit price shall be, the estimator has several alternatives: Take into consideration the actual as-built cost figures for past projects. With a notation that new factors should be anticipated such as: used of new technologies, marketplace demand on material and labor, quantities of materials, bargaining agreements, level of quality and even requirements for completion. Take into consideration cost data published or announced for other like structures. Some publications such as the Norme de Consum Orientative pe Articole de Deviz pentru Lucrri de Construcii (Item tabulations of material consumption and labor costs for construction works) publish cost indices and recent percentage figures on price trends. But sometime they can be misleading, or incomplete and should be studied with considerable care, do to the fact that costs can change rapidly during periods of inflation and deflation. 2. Average-component method, calculates unit costs for sections of work, such as bays or even spans, after which the calculated cost is applied to every other similar section. The advantage of this method is the fact that it allows economies do to construction repetitious 59

Construction Project Engineering and increased volume of works. This method is usually used for buildings, apartments, office buildings, warehouses, and the flat-slab type of construction. 3. Use-unit method is applicable to stadiums, theatres, apartment houses, and office buildings. This method considers that groups of seats, single rooms, or entire suites of rooms are repetitive. Which means that when taking into consideration two identical structures as function, but different as size, the cost per room/suite/seat/ bed for a hospital/ pupil for a school etc., for the larger structure will be for example with 20 per cent or 25 per cent more. Very often rough estimates are made before detailed plans or specifications have been prepared. The greatest use of such rough estimates should be primarily as guide figures to be given to an owner or to an architect to help them decide whether a job should be commenced. These rough estimates will also indicate to them the necessity of trimming certain items to fit the available money or show the possibility of including additional features which had previously been ruled out as being beyond their financial limit. Furthermore, as a rough estimate will also help pick up any gross errors in a detailed estimate.
5.2.2. DETAILED ESTIMATE

Once all design documents are completed, companies interested in performing the work price the project. This estimate is the most detailed and the most important. The main five major divisions are incorporated in a detailed estimate for a reinforcedconcrete structure, are: formwork, concrete, reinforcing steel, finishing and administration (LaLonde, Janes).
Table 5-1. Estimate schedule
Item no. Item Dimensions No. Quantity Unit Unit cost Labor 1.0. Foundations 2.0. Substructure 3.0. Superstructure 3.1 Columns 3.2 Bearing walls Material Total cost Labor Material % of SubTotal

m3

3.3 Slabs 3.4 Beams 4.0. Exterior closure 5.0. Roofing 6.0. Interior construction 7.0. Conveying 8.0. Mechanical 9.0. Electrical 10.0. Special construction 11.0. Site work
Sub-total Contractor fees

The quantity take-off is made from the plans either by tallying dimensions (preferable) or by direct scaling. The most common mistakes to be avoided are the repetition of something previously included and the failure to multiply identical elements by the correct total number of such elements.

60

Construction Project Engineering When starting an estimate all plans and technical specifications must be carefully studied so that the estimator is thoroughly familiar with the particular job. At all times, the estimator must keep a mental image of the completed structure so that he may visualize structural details, materials used or reused, for maximum economy. The entries in tabulated of each item (Table 5-1) will be properly identified so that changes of addition or deletion may be easily accomplished at a later date. Checking for completeness will also be facilitated. All dimensions should be listed in a uniform sequence such as length, width, and height in all entries so that no time is devoted to attempted recognition of what certain figures mean.
BASICS FOR PREPARATION OF ESTIMATES

Estimate preparation will be made in a normal sequence of events as works commence. Construction cost estimates consist of: 1. Descriptions of work elements to be accomplished (tasks). 2. A quantity of work required for each task. 3. A cost for each task quantity (price sources). A unit cost for each task is developed to increase the accuracy of the estimating procedure and should provide a reference comparison to historic experience. Degree of Detail. All cost estimates will be prepared on the basis of calculated quantities and unit prices that are commensurate with the degree of detail of the design known or assumed. This is accomplished by separating construction into its incremental parts. These parts are commonly referred to as construction tasks and are the line-by-line listings of every estimate. Each task is then defined and priced as accurately as possible. Tasks are seldom spelled out in the contract documents, but are necessary for evaluating the requirements and developing their cost. At the most detailed level, each task is usually related to and performed by a crew. The cost engineer develops the task description by defining the type of effort or item to be constructed. Task descriptions should be as complete and accurate as possible to lend credibility to the estimate and aid in later review and analysis. Quantities. The quantity take-off is an important part of the cost estimate. It must be as accurate as possible, and should be based on all available engineering and design data. After the scope has been analyzed and broken down into the construction tasks, each task must be quantified prior to pricing. Equal emphasis should be placed on both accurate quantity calculation and accurate pricing. Quantities should be shown in standard units of measure and should be consistent with design units (kg, m, m2, m3, t). The detail to which the quantities are prepared for each task is dependent on the level of design detail. Quantity calculations beyond design details are often necessary to determine a reasonable price to complete the overall scope of work for the cost estimate. Formwork is usually estimated by assigning a unit price per square meter of contact area of forms against concrete. The unit price may be such that only the material is involved and the erection is covered separately, or it may include the actual cost of purchasing the material, fabrication of forms, cost of erection, bracing, staging, nails, bolts, ties, wires, oiling for release and stripping. In arriving at the final figure, it must be kept in mind that reuse of forms is feasible in most cases. A good proportion of the lumber, plywood etc. may still be reused and will have a marketable value. Concrete. Dividing the work into items, such as: foundations, walls, columns and beams will help you conveniently estimate the concrete. In addition, it is well to list the different items in each division in the approximate order in which they will be constructed. 61

Construction Project Engineering Each different mixture of concrete will have a different cost per cubic meter, making it desirable to keep each strength under a separate heading. The cost per cubic meter may be determined by requesting bids from the various supply sources. The cubic meter method usually estimates concrete. Normally, no deductions are made for holes or inserts unless the cross-sectional area of the material to be deducted is a substantial figure. Reinforcing Steel. If the structural design is complete and all details of bends, dimensions, and hooks are shown, then estimates are made on that basis. Reinforcing steel is priced per kilogram or ton of steel. The take off sheet must show the total number of linear meters of each bar size and its type, description, and location the structure. It must clearly distinguish among straight and bent bars and spirals. The unit cost will include the freight costs of shipping, storage on the job, manner of bundling, length, order of use (so as to keep storage coats down), cost of wire brushing, costs of cutting, bending, and placing of rods and tying at every intersection, finally positioning, and testing of selected samples to ensure correct supplying by the mill.

5.3. EXAMPLE OF PROJECT ESTIMATES


5.3.1. ESTIMATE QUANTITY OF MATERIALS, LABOR AND COST FOR CONCRETE, REINFORCEMENT AND FORMWORK
B1 B2 30 2,25 30 30 30 15 hslab 8,20

B3

B4

5,25 30 25

B1 25 3,80 25 8,60

B2 4,05

INITIAL DATA:

H level = 2.85 m h slab = 12 cm h beam = 30 cm

BUILT AREA S built area = A level built

S slab builtarea

= 3,8 x 2,25 + 4,05 x 2,25 + 3,8 x 5,25 + 4,05 x 5,25 = = 8,55 + 9,11 + 19,95 + 21,26 = 58,87 m2
2 S slab builtarea =58,87 m

62

Construction Project Engineering


wall S builtarea

= 2 x 8,20 x 0,25 + 4 x 0,15 x 0,20 + 8,10 x 0,30 + 0,30 x 0,25 = = 4,1 + 0,12 + 2,43 + 0,075 = 6,725 m2.
wall S builtarea =6,725 m2

S column builtarea S beam builtarea S built area

= 2 x 0,40 x 0,20 = 0,16 m2


2 S column builtarea = 0,16 m

= 2 x 3,8 x 0,3 + 2x 4,05 x 0,3 + 1,95 x 0,25 + 4,95 x 0,25 == 6,44 m2 =

= 58,87 mp + 6,725 mp + 0,16 mp + 6,44 mp = 72,19 m2 S built area = 72,19 m2 V


slab concrete

2 S beam builtarea = 6,44 m


nivel constr .

wall column beam = S slab builtarea + S builtarea + S builtarea + S builtarea =

=S

slab builtarea

CONCRETE VOLUME x h pl = 58,87 x 0,12 = 7,06 m3 concrete

slab V concrete =7,06 m3 concrete

wall wall V concrete = S builtarea x H level = 6,73 x 2,85 = 19,18 m3 concrete


wall V concrete = 19,18m3 concrete

3 beam V concrete = S beam builtarea x h beam = 6,44 x 0,30 = 1,93 m concrete 3 column V column concrete = S builtarea x H level = 0,16 x 2,85 = 0.45 m concrete
total V concrete = 7,06 + 19,18 + 1,93 + 0,45 = 28,63 m3 concrete

3 V beam concrete =1,93 m concrete 3 V column concrete =0.45 m concrete

total V beton = 28,63 m3 concrete

CONCRETE ESTIMATE: I concrete =

Vconcrete Sbuilt area

(m3. concrete / m2 built area)

28,63 Vconcrete = = 0,396 (m3 concrete / m2 built area) Abuiltarea. 72,19 I concrete = 0,396 (m3. concrete / m2 built area) Wre inf orcement REINFORCEMENT ESTIMATE: I reinforcement = (kg/m2 built area) Sbuilt area Wre inf orcement _ columns [kg / m2 built area] I reinforcement columns = Columns Sbuilt area Wre inf orcement _ columns [kg / m3. concrete] I reinforcement columns = Vconcrete _ columns Wre inf orcement _ beams [kg / m2 built area] Beams I reinforcement beams = Sbuilt area Wre inf orcement _ beams [kg / m3. concrete] I reinforcement beams = Vconcrete _ beams Wre inf orcement _ slabs [kg / m2 built area] Slabs I reinforcement slabs = Sbuilt area Wre inf orcement _ slabs [kg / m3. concrete] I reinforcement slabs = Vconcrete _ slabs Wre inf orcement _ walls [kg / m2 built area] Walls I reinforcement walls = Sbuilt area I concrete =

63

Construction Project Engineering Wre inf orcement _ walls [kg / m3. concrete] Vconcrete _ walls I total reinforcement = I reinforcement columns + I reinforcement beams + I reinforcement slabs + I reinforcement walls Sformwork (m2. formwork / m2 built area) FORMWORK ESTIMATE: I formwork = Sbuilt area. I formwork = I column formwork + I beam formwork + I slab formwork + I wall formwork Sformwork S columnt + S beam + S slab + S wall = (m3 concrete / m2 built area) I formwork = Sbuiltarea S builtarea S columns = 4 x 0,40 x 2,85 + 4x 0,20 x 2,85 = = 4,56 + 2,28 = 6,84 m2 S columns = 6,84 m2 column form S beams 2 x G1 = 4 x 0,30 x 3,80 + 2 x 0,20 x 3,80 = 6,08 2 x G2 = 4 x 3,30 x 4,05 + 2 x 0,20 x 4,05 = 6,48 1 x G3 = 2 x 0,30 x 2,25 + 1 x 0,25 x 2,25 = 1,91 1 x G4 = 2 x 0,30 x 5,25 + 1 x 0,25 x 2,25 = 3,71 S beams = 18,18 m2 beam form S beams = 6,08 + 6,48 + 1,91 + 3,71 = 18,18 m2 Slab 1 = 25 x 3,8 = 8,55 Slab 2 = 2,25 x 4,05 = 9,11 Slab 3 = 3,8 x 5,25 = 19,95 Slab 4 = 4,05 x 5,25 = 21,26 S slab = 8,55 + 9,11 + 19,95 + 21,26 = 58,87 m2 S slab = 58,87 m2 slab form S wall = 4 x 7,80 x 2,85 + 4 x 0,25 x 2,85 + 8 x 0,15 x 2,85 + 4 x 0,20 x 2,85 + + 2 x 8,10 x 2,85 + 4 x 2,85 x 0,30 + 2 x 2,85 x 0,25 = = 88,92 + 2,85 + 3,42 + 2,28 + 46,17 + 3,42 + 1,43 = = 148,48 m2 wall form S wall = 148,48 m2 wall form I formwork = I formwork columns + I formwork beams + I formwork slabs + +I formwork walls S S beams + S slabs + S walls + Sformwork = columns I formwork = (m2. formwork/ m2. built area) S built Sbuilt area. I reinforcement walls =
area

6,84 Sformwork _ columns = = 0,095 Sbuilt area. 72,19 Sformwork _ beams 18,18 = = 0,252 I formwork beams = Sbuilt area. 72,19 58,87 Sformwork _ slabs = = 0,815 I formwork slabs = Sbuilt area. 72,19 Sformwork _ walls 148,48 = = 2,056 I formwork walls = Sbuilt area. 72,19 I total formwork = 3,22 m2. formwork / m2 built area I formwork columns =
5.3.2. ESTIMATE CALCULATION OF LABOR CONSUMPTION FOR CONCRETE, REINFORCEMENT AND FORMWORK PLACEMENT CONCRETE (class C 20/15 - Cod C) Cod C Total labor hours required for placing concrete in slabs, beams, columns for constructions with heights of maximum 35 m - 7.8 hr / m3. concrete. I concrete = 0,4356 (m3 concrete / m2 built area) x (7,8) h/ mc = 3.397 man h./m2 built area I concrete = 3,4 man h/ sq. m built area

64

Construction Project Engineering


FORMWORK Cod D - Total labor hours required for erection of reusable plywood panels with sheathing of 15 mm thickness for placing concrete in partition walls and bearing walls for constructions up to 20 m height - 0,95 hr / m2. panel; Cod E - Total labor hours required for erection of reusable plywood panels with sheathing of 15 mm thickness for placing concrete in slabs and beams for constructions up to 20 m height - 1,1 hr / m2. panel; Cod F - Total labor hours required for erection of reusable plywood panels with sheathing of 15 mm thickness for placing concrete in columns and frames for constructions up to 20 m 1,25 ore / m2. panel;

I formwork = I formwork columns x 1,25 + I formwork beams x 1,1 + I formwork slabs x 1,1 + I formwork walls x 0,95 = 0,095 x 1,25 + 0,252 x 1,1 + 0,815 x 1,1 +2,056 x 0,95 = = 0,118 + 0,277 + 0,896 + 1,953 = = 3,244 h/ m2 built area I formwork = 3,244 man hour/ m2 built area If rate of progress is needed to be calculated, it will be computed according to crew size (number workers) and time (man hours), using the following equation: x(m 2 ) Rate..of .. progress = y (manhr )

5.4. ITEM TABULATIONS OF MATERIAL CONSUMPTION AND LABOR COSTS FOR CONSTRUCTION WORKS
Table 5-2. Concrete
Concrete placed in slabs, beams, columns for structures with heights up to 35 m. A mix and placement of concrete class C8/10; B ditto, class C 12/15; C ditto, class C 16/20; D ditto, class C 18/22,5; E ditto, class C 25/30; F placement of concrete class (1) in slabs, beams and columns. Measured in cubic meter. Item unit Quantity A B C D Materials 1,03 1,03 1,03 1,03 Concrete class 1) m3 283 330 376 422 Cement 2) kg 0,67 0,66 0,65 0,64 Graded sand unwashed m3 0,62 0,61 0,6 0,59 Coarse aggregate sieved, m3 washed and graded 0,28 0,29 0,3 0,31 Water m3 5 5 5 5 Small size materials % (lumber planks, nails) Labor 5,07 5,07 5,07 5,07 Skilled worker hr 2,73 2,73 2,73 2,73 Unskilled worker hr 7,8 7,8 7,8 7,8 Total hr Equipment 0,7 0,7 0,7 0,7 Poker vibrator hr 0,325 0,325 0,325 0,325 Concrete mix truck 250l hr 0,3 0,3 0,3 0,3 Crane 3) hr Corrections 01. heights greater than 35 m. Increase:

E
1,03 469 0,63 0,58 0,32 5 1,03 0,1 5

5,07 2,73 7,8 0,7 0,325 0,3

3,72 2,73 6,45 0,7 0,3

65

Construction Project Engineering


Item unit A Labor Skilled worker hr Unskilled worker hr Equipment Poker vibrator hr Crane 3) hr 02. concrete without finishing Increase: Item unit
0,6 0,4 0,15 0,05 0,6 0,4 0,15 0,05

Quantity B
0,6 0,4 0,15 0,05

C
0,6 0,4

D
0,6 0,4 0,15 0,05

E
0,6 0,4 0,15 0,05

0,15 0,05

Quantity A B C

D E F Labor 1,3 1,3 1,3 1,3 1,3 1,3 Skilled worker hr Equipment 0,7 0,7 0,7 0,7 0,7 0,7 Poker vibrator hr 1) the concrete class will be specified; 2) the cement grade will be specified; 3) the type of crane will be specified. Concrete placed in walls of any kind up to the height of 35 m A mix and placement of concrete class C8/10; B ditto, class C 12/15; C ditto, class C 16/20; D ditto, class C 18/22,5; E mix and placement of concrete class (1) in walls of any kind; F mix and placement in round walls, cylindrical reservoirs, cylindrical tanks, water towers, etc. C12/15; G ditto, class C 16/20; H ditto, class C 18/22,5; I ditto, class C 25/30; J placement concrete class 1) in circular walls, cylindrical reservoir walls, cylindrical tanks, water towers, etc.; Measured in cubic meter. Item unit Quantity A B C D E F G H I J Materials 1,03 1,03 1,03 1,03 1,03 1,03 1,03 1,03 1,03 Concrete class1) m3 1,03

Cement 2) Graded sand unwashed Coarse aggregate sieved, washed and graded Water Small size materials (lumber planks, nails) Labor Skilled worker Unskilled worker Total Poker vibrator Concrete mix truck 250l Crane 3)

kg m3 m3

283 0,67 0,62

330 0,66 0,61

376 0,65 0,6

422 0,64 0,59

330 0,66 0,61

376 0,65 0,6

422 0,64 0,59

469 0,63 0,58

m3 %

0,28 5

0,29 5

0,3 5

0,31 5

0,1 5

0,29 5

0,3 5

0,31 5

0,3 5

0,1 5

hr hr hr hr hr hr

4,55 2,45 7 0,6 0,325 0,3

4,55 2,45 7 0,6 0,325 0,3

4,55 2,45 7 0,6 0,325 0,3

4,55 2,45 7

3,2 2,45 5,56 0,6 0,3

5,2 2,8 8 0,6 0,325 0,3

5,2 2,8 8 0,6 0,325 0,3

5,2 2,8 8 0,6 0,325 0,3

5,2 2,8 8 0,6 0,325 0,3

3,85 2,8 6,65 0,6 0,3

Equipment
0,6 0,325 0,3

66

Construction Project Engineering


Corrections 01. heights greater than 35 m. Increase: Item unit A Labor 0,6 Skilled worker hr 0,4 Unskilled worker hr Equipment 0,15 Poker vibrator hr 0,05 Crane 3) hr 02. for concrete without finishing. Increase: Item unit A Labor 1,1 Skilled worker hr Equipment 0,7 Poker vibrator hr 1) the concrete class will be specified; 2) the cement grade will be specified; 3) the type of crane will be specified. B
0,6 0,4 0,15 0,05

C
0,6 0,4 0,15 0,05

D
0,6 0,4 0,15 0,05

Quantity E F
0,6 0,4 0,15 0,05 0,6 0,4 0,15 0,05

G
0,6 0,4 0,15 0,05

H
0,6 0,4 0,15 0,05

I
0,6 0,4 0,15 0,05

J
0,6 0,4 0,15 0,05

B
1,1 0,7

C
1,1 0,7

D
1,1 0,7

Quantity E F
1,3 0,7 1,3 0,7

G
1,3 0,7

H
1,3 0,7

I
1,3 0,7

J
1,3 0,7

Table 5-3. Formwork


Reusable 15 mm thickness plywood forms for placing concrete in: A pedestals, cup-shaped and machinery footings, and bracings; B straight wall elevations up to 6 m height; C - curb wall elevations up to 6 m height; D partition walls and bearing walls up to 20 m height ; E slabs and beams for constructions up to 20 m height; F columns and frames for constructions up to 20 m height; G aqueducts, channels and annexes; H joints between wall panels; I the extremities of members that are supported by columns, beams, arches, trusses etc., and for the concreting of the extremities of prefabricated beams; J exterior tie beams. Measured in cubic meters. Item uni Quantity t A B C D E F G H I J Materials 0,11 0,11 0,11 0,13 0,15 0,09 0,18 Plywood panel with m2 0,09 sheathing of 15 mm thickness 0,001 0,001 0,001 0,001 0,0015 0,0005 0,002 0,004 0,001 Lumber planks m3 0,00035 0,0015 0,0017 0,0015 0,007 Round wood m3 0,0005 sections 0,001 0,002 0,001 0,001 0,001 0,002 0,002 0,002 0,001 Base plate m3 0,12 0,12 0,12 0,12 0,12 0,12 0,12 0,12 0,12 0,12 Release agents kg 0,08 Column formwork kg steel yokes 0,0025 0,004 0,0005 Plywood veneer type m3 P 15 mm thickness 8 8 9 8 3 13 8 9 15 6 Accessories % Labor 1 0,8 1,52 0,77 0,94 1 1,32 1,5 1,88 1,28 Carpenter hr 0,1 0,15 0,18 0,18 0,16 0,25 0,18 0,1 0,12 0,17 Unskilled worker hr 1,1 0,95 1,7 0,95 1,1 1,25 1,5 1,6 2 1,45 hr TOTAL Equipment 0,02 0,02 0,02 0,002 0,002 0,02 Crane 1) hr

67

Construction Project Engineering


Corrections 01. structures with heights of H = 20-35 m. Increase: Item unit Quantity A B C D E F G H I J Labor 0,03 0,04 0,05 0,05 Carpenter hr Equipment 0,02 0,002 0,002 0,002 0,002 Crane 1) hr 02. for constructions with heights of H = 35 60 m. Increase: Item unit Quantity A B C D E F G H I J Labor 0,05 0,06 0,06 0,06 Carpenter hr Equipment 0,0025 0,0025 0,0025 0,0025 0,0025 Crane 1) hr 03. for constructions with heights of H = 6080 m. Increase: Item unit Quantity A B C D E F G H I J Labor 0,07 0,08 0,08 0,08 Carpenter hr Equipment 0,003 0,003 0,003 0,003 0,003 Crane 1) hr 1) the characteristics of machinery will be specified. Shores (props) for telescopic steel joists used for casting isolated beams, for slabs with monolithic beams and for normal slabs with total loads on formwork of maximum 5000 daN /mp (500 kgf/mp), shores for structures with heights up to 20 m including beams supported on steel props positioned at 1,0 m. A telescopic joists GE 1 (3-5 m); B - telescopic joists GE 2 (4-6 m); C - telescopic joists GE 3 (6-9 m). Other types of props are included separately. Measured on m2 of slab. Item unit Quantity A B C Materials m3 0,0001 0,0001 0,0001 Wooden battens kg 0,07 Telescopic steel joist GE 1 (3-5 m) kg 0,09 Telescopic steel joist GE 1 (4-6 m) kg 0,1 Telescopic steel joist GE 1 (6-9 m) Labor 0,52 0,42 0,3 Carpenter hr 0,10 0,13 0,1 Unskilled worker hr 0,7 0,55 0,4 hr Total Equipment 0,01 0,008 0,005 carne 1) ore 01. When telescopic steel beams are supported directly on walls or form panels for walls. Decrees: Item unit Quantity A B C Labor 0,15 0,12 0,1 Carpenter hr 02. Structures with heights of 20-35 m. Increase: Item unit Quantity A B C Labor

68

Construction Project Engineering


Carpenter Equipment Crane 1) 03. Structures with heights of 35 - 60 m. Increase: Item
Labor Carpenter Equipment Crane 1) 04. Structures with heights of 60 80 m. Increase: Item

hr hr

0,03 0,005

0,02 0,004

0,02 0,003

unit A

Quantity B
0,04 0,006 0,03 0,004

hr hr

0,06 0,008

unit A

C Labor 0,11 0,09 0,06 Carpenter hr Equipment 0,01 0,008 0,006 Crane 1) hr Shores with telescopic props, used for erection of prefabricated slabs with and without loops, for precast cast in place slabs, for casting monolitical slabs with precast slabs A type PE 3100R; B type PE 5100 R. Measured in units. Item unit Quantity A B Materials 0,25 Steel prop PE 3100 R hr 0,41 Steel prop PE 5100 R hr 0,0005 0,0005 Wooden battens m3 Labor 0,3 0,38 Carpenter hr 0,15 0,2 Unskilled worker hr 0,45 0,58 Total hr

Quantity B

Table 5-4. Reinforcement


Fabrication and erection of steel reinforcement in structural members: A walls, bent bars with diameters up to 8 mm inclusive; B ditto, with diameters over 8 mm; C beams and columns, bend bars with diameters up to 8 mm inclusive; D ditto, with diameters over 8 mm; E slabs, bent bars with diameters up to 8 mm inclusive; F - ditto, with diameters over 8 mm; G special constructions (reservoirs, water towers, bins, barrel vault structures, trusses, bent bars with diameters up to 8 mm inclusive; H ditto, with diameters over 8 mm; I creating monolitical continuance for linear members (beams, columns, frames, etc.); J aqueducts, channels and annexes. Measured in kilograms. Item unit Quantity A B C D E F G Materials 1,03 1,03 1,03 1,03 1,03 1,03 Steel type 1) kg 1,03 0,1 0,1 0,1 0,1 0,1 0,1 Normal wire D=1,25mm kg 0,1 0,3 0,3 0,3 0,3 0,3 0,25 Spacers 2) no. 0,3 Labor 0,085 0,07 0,09 0,065 0,075 0,06 0,11 Ironworker hr 0,1 0,1 0,1 0,1 0,1 0,1 0,1 Unskilled worker hr 0,095 0,08 0,1 0,075 0,085 0,07 0,12 Total hr Equipment 0,001 0,001 0,001 0,001 0,001 0,001 0,001 Crane 3) hr

thin plated roofs, etc.)

H
1,03 0,1 0,25 0,09 0,1 0,1 0,001

I
1,03 0,1 0,25 0,215 0,1 0,23 0,001

J
1,03 0,1 0,25 0,075 0,1 0,085 -

69

Construction Project Engineering


type of steel, type of spacer (plastic or mortar) and crane characteristics will be specified. Welded mesh reinforcement for constructions up to 35 m, placed in: A partition walls and bearing walls; B slabs; C special constructions. Measured in kilograms Item unit Quantity A B C Materials kg 1 1 1 Wire meshes for reinforcing concrete 3) kg 0,01 0,01 0,01 Wire D=1,25 mm no. 0,3 0,3 0,3 Spacers 2) kg 0,01 0,01 0,01 Steel type 1) Labor hr 0,035 0,03 0,045 Iron worker hr 0,005 0,005 0,005 Unskilled worker 0,04 0,035 0,05 Total Equipment hr 0,001 0,001 0,001 Crane 4) type of steel (> 8 mm), type of spacer (plastic or mortar), type of steel and diameter of main mesh bars and crane characteristics will be specified.

REFERENCES
5-1 5-2 5-3 5-4 5-5 5-6 5-7 Gould F., Joyce N. Construction Project Management. Second Edition. Prentice Hall, 2003. La Londe W., Janes M., Concrete Engineering handbook. McGraw-Hill Company Inc., 1961. Nunnally S.W. Construction Methods and Management. Sixth Edition. Prentice Hall, 2003. Mueller fr., Integrated cost and schedule control for construction projects. Van Nostrand Reinhold Company, 1986. Ridloff R., A practical guide to construction lending. Van Nostrand Reinhold Company, 1986. US Army Corps of Engineers. Directorate of Military Programs Engineering Division. Architectural and engineering instructions for cost control during design (Design-to-Cost), 1996. US Army Corps of Engineers. Directorate of Military Programs Engineering Division. Engineering Instructions. Construction Cost Estimates. EI 01D010, 1997.

70

Construction Project Engineering

CHAPTER 6. CONCRETE WAREHOUSE STRUCTURAL FRAME ERECTION


6.1. GENERAL CONSIDERATIONS
Precast-concrete construction is based upon good practical planning along with massproduction methods. A successful design is one that uses a minimum number of assembly elements, having least erection weight and the greatest strength per unit weight of framing. It requires a complete design of connection details and an investigation of stresses involved in the sequence of erection, which will influence the framing and design of the elements. Generally, it is essential that the number of various shapes and sizes of the precast elements be kept to a minimum. This allows maximum reuse of the moulds and reduces forming, casting, and handling costs. The layout of the frames and enclosures is controlled by the available handling and erection equipment. While lifting capacity is always a factor, the maneuverability of the equipment within the building area may be facilitated by changes in column spacing, direction of main framing, or erection sequences. Advantages of precast-concrete construction: speed of construction, optimum use of materials, controlled production conditions, and economy do to the fact that the materials can be better utilized and wastage can be kept to a minimum. Limitations of precast-concrete construction: lack of flexibility and if precast units are small in quantity, the construction cost will be high, while storage and transportation of precast units can also be a problem for construction sites located in congested urban areas.

Figure 6-1. Transverse girder beam warehouse Caption: 1. Cup foundation, 2. Edge column with corbel to support bridge beam, 3. Central column with or without corbel, 4. Edge column without corbel, 5. Foundation beam, 6. Bridge beam, 7. Transverse girder beam L= 12, 15, 18, 21 and 24 m span, 8. Roof slabs (1,5x6 m), 9. External cladding ACC or sandwich prefabricated panel (polystyrene and ACC), 10. ACC blocks, 11. Mineral wool plates/ ACC plates, 12. Mineral wool plates, 13. Heavy traffic concrete plates, 14. Pedestrian concrete plates. Source: MACON S.A.

71

Construction Project Engineering

Figure 6-2. Longitudinal girder beam warehouse. Caption: 1. Cup foundation, 2. Edge column with corbel to support bridge beam, 3. Central column with or without corbel, 4. Edge column without corbel, 5. Foundation beam, 6. Bridge beam, 7. Eave beam, 8. Longitudinal girder beam G6T (central or edge), 9. Central longitudinal girder beam G615, 10. Central longitudinal girder beam G6-118, 11. Longitudinal girder beam G12, 12. Roof slab ECP 1,5x9, 13. Roof slab 1,5x12, 14. Roof slab 1,5x15, 15. Roof slab 1,5x18, 16. ACC blocks, 17. External cladding ACC or sandwich prefabricated panel (polystyrene and ACC), 18. Mineral wool plates, 19. Polystyrene plates, 20. Pedestrian concrete plates, 21. Heavy traffic concrete plates Source: MACON S.A.

6.2. JOB PLANNING


The construction of a precast-concrete structure requires considerable planning and development of details. All planning, from working drawings to the completed structure, must be completed in the early stages. The erection planning of structure will consist of methods and details regarding: 1. Preliminary execution of works that will consist of the following steps: - Transport, yard casting and storage of precast units. - Inspection of units after transport and storage. - Unit preparation before erection. - Selection of lifting devices and equipment. - Materials and labor scheduling. - Necessary requirements for health, safety and fire assurance. 2. Erection of precast elements, will consist of the following steps: - Erection method. - Sequence, schemes and procedures for unit erection. - Sequence of member erection. - Ground location and position layout of precast units before erection. - Routs and work stations for cranes. - Routs and stops for trailers. 72

Construction Project Engineering Unit installation detailing sequences. Preliminary positioning of units. Inspection of erection execution in provisory position and correction of dimensional tolerances. 3. Final connections between elements. Prefab member Table 6-1. Erection characteristics table Prefab characteristics Characteristics lifting device Prefab. type Type lifting device Load (tone max) Distance between lifting inserts (m) Qp (tones) Qd (tone) Hp (m) Hd (m) Erection characteristics Qt (tones) Rap (m) Ht (m) Crane characteristics Type crane Qtf (tones)

H (m)

R (m)

EC (SM) CC (SC) GB (GP) BB (GR) RS (EA)

6.3. PRELIMINARY EXECUTION WORKS


The details and planning of erection will materially affect the earlier phases of casting, storage, and handling.
6.3.1. STANDARDIZED PREFABRICATED REINFORCED AND PRESTRESSED CONCRETE MEMBERS

The selection of standardized prefabricated reinforced and prestressed concrete members shall be base on: geometrical and surface characteristics, type of structure designed, load bearing capacity, execution and environment conditions.
Table 6-2. Typical prefabricated ground floor warehouse concrete members Item L l W V Concrete Height Leng Widt Weight Volume Class (cm) 3 2 th h (kg) (m ) (N/mm ) H h (cm) (cm) max min Longitudinal Girder Beam (Source: IPCT, 1988) Distance between inserts (cm) Bay (m)

G6T G 6 T pp1 G 6 6 - pp G 6-15 G 6-15 pp G 6-18


1

595 595 595 595 595 595

45 45 35 70 70 70

55 55 50 65 65 70

45 45 40 55 55 60

2250 2250 1414 3420 3420 3620

0,900 0,900 1,566 1,368 1,368 1,448

C 40/32 C 30/25 C 30/25 C 40/32 C 40/32 C 40/32

545 545 545 555 555 555

6x18 6x15 6x12 6x18 6x15 6x12 6x6 6x15 6x15 6x18

abv. pp - partially prestressed

73

F (m)

Construction Project Engineering


G 6-18 pp G12-12-1 /pp G12-12-2 /pp G 12-15/pp G 12-18/pp G 12 24 -1/2 G 9-2 Gm-9 595 1195 1195 1195 1195 1195 870 870 70 60 (70) 60 (70) 70 70 60 (70) 70 50 70 80 80 99 104 80 103 80 60 75 75 85 70 75 90 67 3620 7000 (7400) 7000 (7400) 8640 9060 7000 (7400) 6160 3860 1,448 2,800 (2,960) 2,800 (2,960) 3,456 2,80 (2,90) 2,463 1,544 C 40/32 C 40/32 C 50/40 C 40/32 C 50/40 C 40/32 C 40/32 C 50/40 C 50/40 C50/40 555 1135 1135 1135 1100 1135 810 810 6x18 12x18 12x15 12x12 12x12 12x15 12x18 12x24 9x12 9x15 9x18 18x6 12x6 12x6 18x6 12x12 12x12 12x12 12x6 15x6 18x6 12x12 12x9 15x12 15x9 18x12 18x9 21x6 21x9 21x12 24x6 24x9 24x12

Longitudinal Girder Beam used in the Food Industry (Source: IPCT, 1988) 575 70 70 70 3858 1,543 C 40/32 535 G A6-18 G cA - 6 595 2963 1,185 555 45 55 55 C 40/32 575 (2863) (1,145) (525) 555 2454 0,982 G mA-6 595 C 40/32 45 55 55 (525) 2372 0,949 575 G A 12-12 1195 70 110 110 9079 3,632 C 40/32 1135 G mA -12-12 1175 70 110 110 8972 3,589 C 40/32 1125 GR 12-T 1192 60 123 125 9854 3,942 C 40/32 1132 Transverse Girder Beam (Source: IPCT, 1988) G 12-6 /T 1195 35 80 40 3235 1,294 C 40/32 1145 1180 32 95 45 3325 1,330 G 15-6 /T 1495 95 50 5270 2,108 40 C 40/32 1445 1480 113 60 5690 2,276 G 18-6 /T 1795 43 110 55 7120 2,848 C 40/32 1455 1780 40 125 66 7290 2,915 G 12-4 1180 40 105 55 4560 1,824 C 40/32 1095

G 15-4 G 18-4 G 21-1

1480 1780 2080

50 50 60 60 70

138 145 147 150

86 86 90 90

8200 10360 15200 17700

3,280 4,143 6,08 7,08

C 40/32 C 40/32 C 50/40 C 40/32 C 50/40 C 40/32 C 40/32

1300 1600 1770 2200 2200

G 24-1 /pp G 24 -12- 2 GR 6-100 GR 6-80 GR 6-60 GRP 9-100 GRP 12-85 GRP 12 -125 ECP (G) 9x1,5

2380 2370 592 592 592 892 1195 1192 890

ECP12x1,5 /pp

1190

175 105 26700 10,667 Bridge Beams (Source: IPCT, 1988) 100 5040 2,013 55 80 3670 1,468 60 2960 1,185 55 100 6000 2,30 60 85 7,35 2,94 60 125 10,30 3,95 Roof Slabs (Source: IPCT, 1988) 2743 1,097 149 40 20 2778 1,111 2813 1,125 149 50 23 3930 1,57

C 22,5/18 C 40/32 C 40/32 C 40/32 C 40/32 C 40/32

390 792 1055 1055 850 1105

Span 12 30 m

74

Construction Project Engineering


ECP 15x1,5 /pp ECP 18x1,5 ECPG 12x1,5 ECPG 15x1,5 ECPG 18x1,5 ECP 9x1,5 ECP 12x1,5 /pp ECP 15x1,5 ECP 18x1,5 EP 6x1,5 C 12x1,5 1465 1765 1190 1465 1765 890 1190 1465 1765 593 149 149 149 149 149 65 75 50 65 75 40 50 65 75 24 25 30 23 25 30 20 23 25 30 5930 6830 4075 5930 6970 2743 3930 5510 5830 1500 2,372 2,789 1,63 2,372 C 40/32 C 30/25 C 40/32 C 40/32 C 40/32 C 30/25 C 40/32 C 50/40 C 50/40 C 50/40 C 50/40 C 30/25 C 40/32 C 30/25 C 30/25 1380 1665 1105 1380

2,789 1665 1,097 850 1,570 1105 149 2,204 1380 2,731 1665 149 0,600 513 2,916 1190 149 50 24 4180 1105 1,672 1190 299 7290 2,916 1105 12x3,0 ACC Plates (Source: IPCT, 1988) 153 0,212 TB 0,6x3,0 12,5 GB 35 293 59,7 15 185 1,258 TB 0,6x0,6 590 620 0,86 59,7 25 GB 35 598 630 0,875 Cup shaped foundations for warehouses without bridge cranes (Source: IPCT, 1988) Lp H Weight Class bp Bp lg1 lp1 Lp1 lg2 lp2 2 (kg) PF1 20 28 51 91 98 51 91 98 70 1200 PF2 25 33,5 61 111 119 61 111 119 80 2000 PF3 3300 30 39 76 136 145 76 136 145 90

Volume 0,48 0,80 1,32

PG1R 30 39 76 136 145 66 126 135 90 3150 1,26 C PG2R 35 44 86 156 165 66 136 145 95 4175 15/10 1,67 PG3R 35 44 86 156 165 76 146 155 95 4375 1,75 PG2 30 38,5 66 126 134 66 126 134 80 2625 1,05 PG3 35 44 76 146 155 76 146 155 90 3946 1,58 2,61 PG4 45 54,5 86 176 185 86 176 186 100 6530 Figure 6-3. Standardized catalog prefabricated reinforced and prestressed concrete members Cup shaped foundations (Source: IPCT, 1988)

75

Construction Project Engineering


Longitudinal Girder Beam (Source: IPCT, 1988)

76

Construction Project Engineering

77

Construction Project Engineering

78

Construction Project Engineering

79

Construction Project Engineering

80

Construction Project Engineering

81

Construction Project Engineering


Transverse Girder Beam (Source: IPCT, 1988)

82

Construction Project Engineering

83

Construction Project Engineering

84

Construction Project Engineering

Bridge Beams (Source: IPCT, 1988)

85

Construction Project Engineering

Roof Slabs (Source: IPCT, 1988)

86

Construction Project Engineering

87

Construction Project Engineering

88

Construction Project Engineering

89

Construction Project Engineering


6.3.2. MANUFACTURING, TRANSPORT AND STORAGE OF PRECAST UNITS

Precast-concrete elements are cast or manufactured in: permanent factories, temporary factories, off-site casting yards, or supplied from a combination of these facilities. Transport of units is normally provided from these facilities to the site by trucks, only after a very careful examination of the following: shape, dimensions, and weights of prefabricated units, financial comparison of estimated site-produced castings and factoryproduced and delivered castings, type and capacity of transport means, space available on the job site and correct position for transport of member, availability, and quality of roads etc. Trucks can be classified in: - Straight or articulated trailers (a straight truck is one in which all axles are attached to a single frame while an articulated truck is one that consists of two or more separate frames connected by suitable couplings). - Truck tractor that are designed primarily for pulling and carrying part of the weight and load of a semi trailer. Other types include: full trailer, deck trailer, flat bed trailer, lorry trailer, single axle trailer, heavy duty trailer, low-bed trailer etc. of 8-20 tones.

Figure 6-4 Typical trailers

Source: Suman R., 1989.

90

Construction Project Engineering Storage and transportation of precast units can be a problem for construction sites located in congested urban areas. Storage represents an intermediate faze between the prefabricated production and there transport to the site for assembly. The storage yard can be located in the prefabricated manufacturing shop or on the job-site. If it is located on the job-site, it will be as close as possible located near the crane but protected against other construction activities and erection of castings without interference with the erected framework or with the erection equipment. Precast units will be stored, raised off the ground, in such a manner as to avoid contact with dirt, oil, and grease, to reduce any kind of degradation, and to identify each type of unit as easy as possible.

Source: SC SOMACO SA, 2003

Figure 6-5. Typical storage of reinforced and prestressed concrete members

Source: Prefabricate Vest

Figure 6-6. Typical prefabricated cup shaped foundations Source: Preconstructa AEBTE,2003

91

Construction Project Engineering


6.3.3. INSPECTION OF UNITS AFTER TRANSPORT AND STORAGE

The precast elements shall be visually checked for defects (cracks, voids etc.) when the forms are removed off the trailer, when the strands are cut, or when they are placed in temporary or permanent storage. Any significant defect should be reported immediately with the description of its size, type, and location. The Engineer will decide if the defect needs further inspection, what type of repair, or if it is needed
6.3.4. UNIT PREPARATION

Unit Preparation Before Erection - during lifting, storage and transport of precast units it is possible that the elements will be exposed to dirt, mud, oil, and grease. They will be cleaned through washing them with water, and by wirer brushing.
6.3.5. LIFTING DEVICES

The planning of erection (lifting) devices and details for their attachment to the elements must be completed. It is obvious that changes in methods or details of any phase of the construction may be difficult after actual commencement of that part of the work. A lifting device consists of two main parts: the anchorage element embedded in the precast unit and the attachment element, which is attached to the anchorage to fasten the lifting line to the component. To provide adequate strength, the anchorage should bear against the reinforcement. A simple and common device is to embed several steel loops in the concrete, leaving the loop exposed for attachment of the crane hook. Selection of proper anchors for lifting precast concrete products requires consideration of a number of factors including the type of load, type of lift, concrete shape and weight, configuration, thickness, and strength of the precast component, concrete compressive strength at time of initial lift, number of lifting points and type of rigging to be used, direction of pull (cable or sling angle), reinforcement, ease of attachment to product, compliance with safety requirements and ease of use during final installation and cost. The location of lifting devices in the components should be carefully considered, taking full account of the special loading that will be imposed on the concrete as a result of tilting, lifting, or moving the component, including an allowance for impact. For example, raising a horizontally cast precast panel to a vertical position (e.g. columns cast on site) may induce stresses in the concrete that exceed any loading that may be imposed on the panel after it has been installed in a structure.

Spreader beam for lifting precast beams in two points of pickup

Spreader beam for lifting precast roof slabs with four wire cables in four points of pickup

Spreader beam for lifting precast beams with two wire cables in two points of pickup

Figure 6-7. Typical lifting devices for precast concrete members Source: Ilinoiu G., 2003; Suman R., 1989, Trelea A., 1997.

Selection of the lifting device and its location should be based on the manufacturers recommendation and an engineering analysis of the proposed installation. The locations and details of lifting and handling devices should be shown on the shop drawings.

92

Construction Project Engineering A spreader beam is used in transmitting vertical loads from the two surface inserts to a single point at the lifting hook. Large or heavy panels are often lifted with a four-point pickup with sheaves on the spreader for load equalization.
6.3.4.1. TYPICAL LIFTING DEVICES

These shall include: type, height, bearing capacity, length between lifting cables.
Table 6-3. Lifting devices for columns

Source: Popa R., Teodorescu M., 1992.

Qd (kgf) 150

Item U 119 Hd (mm) Qmaxpref 3290 7,0 tf

Qd (kgf) 50

Item U 186 Hd (mm) Qmaxpref 1960 4,0 tf

Qd (kgf) 460

Item U 312 Hd (mm) Qmaxpref 5630 10,0 tf

Qd (kgf) 993

Item U 313 Hd (mm) Qmaxpref 4300 10,017,00 tf

93

Construction Project Engineering

Qd (kgf) 1300

Item U 314 Hd (mm) Qmaxpref 3500 17,025,00tf

Table 6-4. Lifting devices for beams

Source: Popa R., Teodorescu M., 1992.

Qd (kgf) 763

Item U 272 Hd Qmaxpref (mm) 3120 6,0tf

Item U 273 Qd Hd Qmaxpref (kgf) (mm) 2030 3190 16tf

94

Construction Project Engineering

Qd (kgf) 1980

Item U 300 Hd Qmaxpref (mm) 2890 10,0tf

Table 6-5. Lifting devices for beams and roof slabs

Source: Popa R., Teodorescu M., 1992.

Qd (kgf) 510

Item U 316 Hd Qmaxpref (mm) 4130 3,0tf

Qd (kgf) 1736

Item U 317 Hd Qmaxpref (mm) 3427 8,0tf

95

Construction Project Engineering

Qd (kgf) 2763

Item U 318 Hd Qmaxpref (mm) 4587 14,0tf

Qd (kgf) 2000

Item U 319 Hd Qmaxpref (mm) 5200 19,0tf

Qd (kgf) 2887

Item U 329 Hd Qmaxpref (mm) 4700 19,0tf

96

Construction Project Engineering

Qd (kgf) 4458

Item U 330 Hd Qmaxpref (mm) 4870 18,0tf

Item U 203A Qd Hd Qmaxpref (kgf) (mm) 493 2246 4,5tf

97

Construction Project Engineering

Item U 203B Qd Hd Qmaxpref (kgf) (mm) 630 3115 4,5tf

Table 6-6. Universal lifting devices

Source: Popa R., Teodorescu M., 1992.

Qd (kgf) 22 28 45

Item U 196 Hd (mm) 1300 1600 1800

Qmaxpref (tf) 1,0 3,2 6,4

Qd (kgf) 143

Item GRU Hd (mm) Qmaxpref (tf) 4500 6,4tf

98

Construction Project Engineering

6.3.6. SELECTION OF LIFTING EQUIPMENT


A crane may be defined as a machine for lifting loads by means of a cable. The use of cranes has greatly increased in the construction industry due mainly to the need to raise the large and heavy prefabricated components. A crane consists primarily of a power unit mounted on a carrier with a hoist, a boom, and control cables for raising and lowering the load and boom. The boom can be a welded steel lattice or a hydraulic boom made of 1 articulated base element and several telescopic sections, that are extended and retracted hydraulically (from 5 to 30 m) allowing the crane to be completely self-contained. A jib, an extension to the end of the boom, is used for extending the height to which loads can be lifted; it can be added to a lattice boom or a hydraulic boom. A jib decreases the lifting capacity of the crane and should be used with caution. Two basic jib formats for this type of crane are available, namely the folding lattice jib and the telescopic jib. Outriggers are hydraulic telescoping supports (4-6 suspension cylinders, individually controlled in both horizontal and vertical directions from the frame). Three basic types of cranes are commonly used in warehouse erection, they are: trackmounted cranes, lorry-mounted cranes and self-propelled cranes. There are several variations of each type, and each is available in a wide range of lifting capacities and boom lengths, thus providing the contractor with a generous selection of options. The track-mounted cranes (crawler crane) come in a wide variety of designs and capacities, generally with a 360 rotation or slewing circle, a low pivot, and jib. Advantages: - Mobility on the job site with load on hook. - It can lift relatively heavy loads (10900 kN) without the use of outriggers. - Capacities ranges similar to the lorry mounted cranes, height capacities 60 m; Limitations: slow speeds and large bulk, the crane cannot move from one site to another without some disassembly and the use of 10 tone trailers to transport it between sites. Characteristics: The jib is of lattice construction with additional sections and fly; jibs to obtain the various lengths and capacities required.
Figure 6-8. Track-mounted crane Caption: 1. Hook; 2. Jib; 3. Cab; 4. Boom suspension rope; 5. Hoist rope; 6. Pendant rope. Source: Chudley R., 1999.

99

Construction Project Engineering

Lorry-mounted cranes come in a wide variety of designs and capacities, generally with a 360 rotation or slewing circle, a low pivot, and jib. To improve the mobility of the crane from one site to another lorry-mounted cranes have rubber tires and an additional cab were a driver drives the crane from site to site on public roads. Characteristics: The crane is operated by a separate crane engine and controls. The capacity of lorry-mounted cranes ranges up to 2000 kN in the freestanding position but this can be increased by using the jack outriggers. Their height capacity range to 100 m. Mobile lorry cranes can travel between sites at speeds of up to 48 km/h, which makes them very mobile, but to be fully efficient they need a firm and level surface from which to operate.
Figure 6-9. Lorry mounted crane Caption: 1. Hook; 2. Pendant ropes; 3. Hoist ropes; 4. Engine; 5. Jib. Source: Chudley R., 1999.

Self Propelled Cranes (also referred to as a crane truck) is a portable boom crane mounted on an industrial truck. They can be distinguished from other mobile cranes by the fact that the driver has only one cab position for both driving and operating the crane. Characteristics: They are small capacity machines having a fixed boom or jib length, with small radii and low lifting capacities 10 t. They are extremely mobile but to be efficient they usually require a hard level surface from which to work. Road speeds obtained are in the region of 30 km/h.
Figure 6-10. Self propelled crane Caption: 1. Hook; 2. Boom; 3. Cabin; 4. Chassis; 5. Outriggers; 6. Boom suspension ropes; 7. Hoist ropes; 8. Pendant ropes. Source: Chudley R., 1999.

Crane selection criteria shall include: capacities cranes, reaches of cranes and clearness required for movement of the equipment and prefabricates without interference with previously erected framing members.

100

Construction Project Engineering The range of cranes available is very wide and therefore actual choice must be made on a basis of sound reasoning, overall economics and technical capabilities: of cranes under consideration, prevailing site conditions and the anticipated utilization of other erection equipment.

Figure 6-11. Crane clearances Caption: a. boom angle; b. maximum clearance height of cabin; c. maximum radius of tail swing; d. center of rotation to boom foot pin; e. height from ground to boom foot pin; f. distance from centre of boom point sheave to bottom of hook; g. clearance radius of boom; h. length of boom. Source: Andres C., 1998.

The criteria by which to chose cranes is based on the following considerations: Maximum hook height (H). Extended / retracted boom length (f). The shallower the boom's angle, the less load it can lift. The longer the boom, the less load it can lift. (3) Clear radius of boom (R). Should the load be lifted at a grater radius, the angle of the boom be decreased, the load capacity of the crane is greatly decreased. (4) Lifting capacity (Q). To assure the cranes stability, it is necessary to respect the following restriction: 0,75 lifting capacity of crane tipping load of crane If not possible then the stability of the footing must be increased by leveling and completely supporting them by their outriggers, which must be fully extended and positioned firmly on stable ground. Depending on the circumstances under which a load is lifted, either of these can govern the safe lifting load of the crane. Loading charts are provided with each crane and must be adhered to religiously. Load charts should never be exceeded. (5) Traveling clearance for crane (S = min. 500 mm) given by maximum radius of tail swing, width of chassis or length of outriggers. (1) (2)

101

Construction Project Engineering

6.3.5.1. TYPICAL TYPES OF CRANES


Figure 6-12. AMT 950. Source: ECCON

Table 6-7. Lifting Capacities for Telescopic Boom AMT 950


Radius (m) 2,5 3,0 4,0 S,0 6,0 7,0 8.0 9,0 10.0 12,0 14,0 16.0 18,0 20,0 22.0 24.0 26,0 5,,6 18,7 14,5 9,2 40,0 32,0 27,0 21,0 17,0 12,6 25,0 25,0 22,0 19,3 16,6 133 10,1 8,1 Boom Length (m) 16,1 19,6 23,0 19,0 21,5 18,2 18,5 16,2 16,0 14,1 14,0 12,4 12,4 11,0 10,4 9,9 8,2 8,6 6,7 7,0 5,3 5,1 4,1 3,2 23,1 15,7 15,2 13,8 12,3 10,9 9,9 8,9 8,0 73 5.2 4,4 3,5 2,7 2,1 26,6 30,0

12,1 12,1 10.8 9,8 8,9 8.0 7.4 6,8 5,5 4.1 3,6 3.0 2,4 2,0 1,0

9,5 9,5 8,9 8.1 7,5 6,9 6,5 6,0 5,1 4,4 3,4 2,6 2,1 1,6 1,3 1.0

102

Construction Project Engineering


Figure 6-13. DST-0285. Source: BUMAR LABEDY S.A.

Table 6-8. Lifting Capacities for Telescopic Boom DST-0285


R (m) 3.2 3.5 4.0 4.5 5.0 6.0 6.5 7.0 8.0 8,5 9,0 10 28 26,5 24,0 21,5 19,1 14,6 12,7 10,9 8,2 7,0 15 20 24 Boom Length (m) R (m) 10 10 11 12 13 14 15 16 17 18 19 20 15 5,4 4,4 3,6 3,0 20 5,3 4,4 3,6 3,0 2,5 2,1 1,7 1,4 1,2 24 5,0 4,2 3,5 3,0 2,5 2,1 1,7 1,4 1,1 0,9 0,7

18,0 16,9 15,9 14,9 12,8 11,6 10,6 8,4 7,4 6,6

11,0 9,9 9,3 8,7 7,6 7,0 6,4

7,5 7,2 6,5 6,2 5,8

103

Construction Project Engineering


Figure 6-14. DST-0505. Source: BUMAR LABEDY S.A.

Table 6-9. Lifting Capacities for Telescopic Boom DST-0505


Radius (m) 3.0 4,0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 23.0 24.0 11,1 50.0 38.0 30.4 23.7 19.2 14.7 15,1 28.0 28.0 24.7 21.4 18.0 14.7 11.4 9.0 7.6 6.2 19,1 Boom Length (m) 23,1 27,1 31,1 35,1 11,1

25.5 22.7 20.0 17.2 14.5 11.7 9.5 7.7 5.9 4.9 4.2 3.5 2.8 2,1

21.0 19.1 17.1 15.2 13.3 11,3 9.4 7.5 6.0 5.1 4.2 3.7 3.2 2.7 23 1.8 1,3 0.8 15.0 15.0 13.5 1.9 10.4 8.8 7.3 5.8 4.7 4,2 3.7 3.2 2,7 2.2 1.9 1.6 1.3 1.0 0.7 12.0 11.0 9.9 8.9 7.8 6.8 5.8 5.0 4.3 3.6 2.9 2.5 2.2 1.9 1.6 1.3 1,0 0.7 0.4 9.0 8.3 7.7 7.0 6.3 5.6 5.0 4.3 3.7 32 2.7 2.2 1.9 1,6 1.3 1.0 0.9 0.7 4.0 3.0 2.0

11.6

4.8

104

Construction Project Engineering


Figure 6-15. DUT-0502. Source: BUMAR LABEDY S.A.

Table 6-10. Lifting Capacities for Telescopic Boom DUT-0502


Radius (m) 3.0 3.5 4.0 4.5 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 10.64 6.7 5.5 4.6 3.8 3.2 2.2 1.4 0.9 14.35 6.8 5.6 4,7 3.9 3.3 2.3 1.5 1.0 18.10 6.8 5.6 4.7 3.5 3.3 2.3 1.5 1.0 Boom Length (m) 10.64 14.35 18.10 11.0 11.9 11.9 10.8 10.5 10.9 9.9 10.0 9.9 9.1 9.2 9.1 4.0 3.0 8.4 3.0 2.3 7.2 2.0 1.7 6.0 4.7 4.8 4.9 3.7 3.8 2.9 2.9 2.2 2.3 1.7 1.7 1,3 0,5 1 0.64 21.1 16.0 12.5 10.0 8.1 5.5 3.9 2.7 14.35 20.6 15.4 12.3 10.0 8.3 5.9 4.1 2,9 2.0 1.3 18.10 19.0 14.9 11.9 9.8 8.1 5.8 4.2 3.0 2.1 1.4

0.5

0.5

0.9

105

Construction Project Engineering


Figure 6-16. TELEMAC HT 15. Source: UBEMAR

Table 6-11. Lifting Capacities for Telescopic Boom TELEMAC HT


RATED LIFTING CAPACITIES CRANE ON OUTRIGGERS FRONT Extended Telescoped Q [t] Angle [] R [m] Q [t] Angle [] R [m] Q [t]

Retracted Angle [] R [m]

60 50 40 30 20 10 0

2,20 3.05 3,90 4,55 5,05 5,35 5,45

12,500 12.500 12,500 11,060 7,725 6,000 5,400

60 50 40 30 20 10 0

3,60 4,98 6,18 7,15 7,86 8,30 8,45

8,200 8,200 5,550 4,550 4,050 3,825 3,750

60 50 40 30 20 10 0

5,10 6,91 8,48 9,75 10,68 11,25 11,45

5,800 5,325 3,675 2,925 2,512 2,250 2,175

CRANE ON TYRES FRONT Retracted 1/2 Extended Angle [] R [m] Q [t] Angle [] R [m] 60 2,20 7,000 50 3,05 7,000 40 3,90 5,625 60 3,60 30 4,55 4,385 50 4,98 20 5,05 3,675 40 6,18 10 5,35 3,450 30 ,715 0 5,45 3,150 20 7,86 10 8,30 0 8,45

Q [t]

4,250 4250 2,850 2,194 1,818 1,687 1,575

106

Construction Project Engineering


Figure 6-17. TELEMAC HTA -7. Source: UBEMAR S.A.

Table 6-12. Lifting Capacities for Telescopic Boom TELEMAC HTA -7


Radius (m) 1.2 2 2.5 3 3.5 4 4,5 5 5.5 6 6,5 7 7.5 B 8.5 9 9.5 10 10,5 11 5,87 Angle [] Q [t] 5,87-7.5 Angle [] Q [t] Boom Length (m) 7,5-9.2 9.2-10,8 Angle [] Q [t] Angle [] Q [t] 10.8-12.7 Angle [] Q [t]

62 56 49 43 35 25 8

7,0 7,0 7.0 6,5 5.5 4,5 4.0

68 64 60 55 50 45 40 33 25 8

6.5 6,5 6,0 5.6 5,2 4.8 4.0 3,2 2.8 2.5

69 66 62 58 55 51 47 42 37 32 25 8

4.5 4,5 4,0 4.0 3,6 3,6 3.2 2,9 2,5 2.2 2,0 1,8

67 64 61 58 55 51 48 44 40 36 31 26 19 8

4,0 3,8 3.5 3,5 3,2 3.0 2.5 2,0 1.7 1.6 1,5 1.2 1,1 1.0

65 63 60 57 55 52 49 46 43 40 36 32 27 22 8

3.8 3.4 3.0 2.6 2.3 2.0 1,7 1.5 1.4 1.1 1.0 1,0 0.9 0,8 0.8

107

Construction Project Engineering


Figure 6-18. LIEBHERR LHM 100. Source: LIEBHERR-Werk Nenzing Gmbh

108

Construction Project Engineering


Figure 6-19. LIEBHERR LHM 150. Source: LIEBHERR-Werk Nenzing Gmbh

109

Construction Project Engineering

Figure 6-20. LIEBHERR LHM 1060/2. Source: LIEBHERR-Werk Nenzing Gmbh

Table 6-13. Lifting Capacities for Telescopic Boom LIEBHERR LHM 1060/2
R (m) 2,5 3 3,5 4 4,5 5 6 7 8 9 10 12 Boom (m) 14.5 18 21,6 25,2 28,8 32.4 35,9 39,5 42 R 10.9 14.5 18 21,6 25,2 28,8 32.4 35,9 39,5 42 8.8 9.4 9.3 8.6 8.9 8.8 6.5 14 9.8 7.7 7.5 7.6 7.4 7.6 7,1 5,9 16 6.1 7.4 6,4 6,3 5,3 5,4 46,5 18 31 6.6 5,2 6,6 5.4 5.2 4,9 4,9 42,5 20 5,6 4,6 4.3 3,8 3.8 38.5 29.1 25.8 24.4 20 4,6 19.3 4,8 3,7 3.5 3,2 3.3 35 27,4 24.8 23.1 24 3.9 3.2 3.1 2,8 2.7 29.9 24.3 22.7 20,8 17,8 19.2 26 15,1 12.7 3.5 2.8 2.7 2,4 2.3 25.2 21,8 20,4 18,7 16,8 17,7 28 21.1 19,8 18.5 17,2 15.9 16.3 14.2 12.1 8,6 30 2,3 2 2 21,7 18.7 17 16,8 15.7 14.6 15 13.2 11.5 8.2 32 2 1.7 1,6 16 11.4 14.5 14,4 13.5 13.8 12.4 10.9 7.8 34 1.4 1.4 12,2 11.3 10.7 12 10.8 10.8 10,7 9.8 7.2 36 1.1 1.1 10.9 60 50 47 43 39 35,5 30,5 25,7

110

Construction Project Engineering

Figure 6-21. LIEBHERR LHM 1040/4. Source: LIEBHERR-Werk Nenzing Gmbh

Table 6-14. Lifting Capacities for Telescopic Boom LIEBHERR LHM 1040/4
Radius (m) 2.5 3 3,5 4 5 6 7 8 9 10 9.4 30 28,5 25,9 23.7 20.1 17,1 14,5 10,7 24,8 28,4 Boom Length (m) 30 R (m) 9.4 12 14 16 18 20 7,5 22 7.4 24 7.2 26 6,9 28 6,2 14,5 10,7 7.4 6,1 24,8 7,4 6 4,7 3.9 3.3 2.8 28,4 7 5,9 4,6 3,9 3,3 2,8 2,3 2 30 5,2 4,4 3.8 3.3 2.9 2,6 2.3 2

7,5

16.6 16,2 15,7 14,3 12.3 10.8 9,4

14,6 13,1 12.2 11,6 11,3 10.7 9.4

11.1 10.8 10,5 9.8 9,3 8,9 8,6 8.5 8.4 8,2 8,1 7,9 7.5

4,8

14,5

1.7

111

Construction Project Engineering


Figure 6-22. LIEBHERR LHM 1030. Source: LIEBHERR-Werk Nenzing Gmbh

Table 6-15. Lifting Capacities for Telescopic Boom LIEBHERR LHM 1030
Radius (m) 8,4 2.5 3 3,5 4 4.5 5 6 7 Boom Length (m) 14.3 m 14,3 20.1 24.2 26 R (m) 8 9 10 12 14 16 18 20 22 24 8,4 14,3 10,7 9.1 7.7 5.7 20.1 9,9 8,4 7,3 5,5 4,3 3.5 24.2 9,4 8,1 7 5,5 4,3 3,5 2.7 2.2 26 9.2 7.9 6.9 5.4 4.3 3.4 2.7 2.2 1.9 1.6

33 30

27,5 27.5 27.5 24,2 22 20,1 17.4

18,5 16 12,9

15,8 15,7 15.5 14,8 13,7 11,8

13,2 13 12.8 12,2 11,2 11.3 11.1 10,5

2,8

1.9

112

Construction Project Engineering


Figure 6-23. LIEBHERR LHM 1160. Source: LIEBHERR-Werk Nenzing Gmbh

Table 6-16. Lifting Capacities for Telescopic Boom LIEBHERR LHM 1160
R (m) 13.2 160 127 115 106 101 93 83 74 64 53 17.5 21,8 26,1 30,4 Boom Length (m) 34,7 39 43,3 47,6 52 56,3 60

3,5 4 4,5 5 6 7 8 9 10 12 14 16 18 20 22

118 106 97 92 84 77 71 66 60 49,5 37 99 91 86 78 71 64 59 54 46,5 40,5 34 26,7 86 81 77 68 62 57 54 50 44,5 40 33,5 28,2 24 20,2 70 67 62 56 51 46 42 35,5 31 27 24 21,4 19,2 55 53 49,5 46 42,5 39 33 28,4 25 22,2 20 18,1 46 43,5 41 38,5 35,5 31 26,9 23,6 20,9 18,8 16,9 37 35,5 33,5 31.5 27,7 24,4 21,6 19,3 17.4 15,8 30 28,8 27,4 24,6 22,2 20 18,2 16,6 15 24,4 23,4 21,3 19,4 17,6 16 14,7 13.5 19,5 18,5 17 15,6 14,4 13,2 12,2 15 14,3 13,3 12,3 11,4 10,5 9,8

113

Construction Project Engineering


24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 17,1 15,3 16,5 14,9 13,5 12,1 7.8 15,4 14,1 12,8 11.7 10,7 9,7 7,4 14,4 13,2 12,1 11.1 10,1 9,3 8,5 7,7 6,2 13,7 12,6 11,6 10.7 9,9 9,1 8,4 7,7 7.1 6,5 4,7 12,4 11,5 10,7 10 9,2 8,5 7.9 7,4 6.8 6,3 5,8 5,3 4,8 11,3 10,5 9,7 9,1 8,5 8 7,5 7,1 6,6 6,2 5.7 5,3 4.9 4,6 9,1 8,5 7,8 7.3 6,8 6,3 5,9 5,5 5 4,6 4,3 3,9 3,6 3.4 3,1 2.9

6.4. ERECTION OF PRECAST UNITS


Selection of erection method precast units is an important design decision. Each erection method has its special implications to project cost, construction schedules, traffic, towing system, positioning accuracy, and level of risks during construction. In many ways, the erection method will determine the: - size and configuration of the precast units; - construction procedure adopted, construction sequence, and schedule; - volume of works, plant and equipment etc. In general, a thorough evaluation should be made in the early stage of design to determine the effects of the erection methods, because the erection method and equipment to install precast units will affect the structural concept and layout, fabrication of precast components, and construction logistics. The method of erection will take into account the following: - Assurance of member stability in the structure, during the hole duration of erection execution. - Process flow and work procedures must create a working front, as fast as possible, for other processes that will commence afterwards (e.g. electrical installations etc.). - Assurance of complete use of erection equipment time. Methods of erection for prefabricated concrete elements can be planned after two models: - Sequence method - consisting of erecting all the members of the same size and type in the structure or in one construction faze, the crane having its own route for every member (columns, beams, roof slabs etc.). After the joints for a group of members of the same type are completed (after the grout concrete has reached the necessary strength) another group, which will be supported by the first, will be erected; - Complex method - consisting of erection organization, in normal sequence of erection (of all members) on a small area of the warehouse, most likely a bay (span-bay), the next phase being the erection of the next bay. 6.4.1. SEQUENCE, SCHEMES AND PROCEDURES FOR UNIT ERECTION
The efficiency obtained throughout all sequences of the construction will be determined by the degree of organization, planning, scheduling, and development of details completed before commencement of work at the site. Maximum efficiency in erection is obtained by placing the elements in their final position direct from transporting equipment or building storage in one operation. Erection 114

Construction Project Engineering procedures are planned to approach this objective. All other precasting operations are based upon the estimated erection schedule, and any delays in this schedule increase the storage area and dunnage required. Delays in completing connections of erected elements either interrupt the erection or increase the quantity of erection devices. Using additional erection devices to shorten the schedule is justified only when sufficient cured castings are available to ensure a continual operation. Planning includes a study of casting weights and sizes, capacities and reaches of lifting equipment, and clearances required for movement of the equipment and castings without interference with previously erected framing members. A plan detailing the erection procedure for all elements is drawn and checked to ensure conformance with the above limitations and is then rigidly followed. When choosing the erection scheme, we must take into consideration the following: - Size of bay and span of warehouse. - Height of erection. - Cranes characteristics (regarding the clearance characteristics: height, radius of tall swing, rotation of boom pin, height to boom pin, clearance radius of boom, length of boom). - Assurance of safety (guard) lanes. - Scheme adopted for precast units. Along side these we must respect the following conditions: - Assurance of member stability during erection. - Process flow and erection operations must create, in a short period, job fronts for jobs that will proceed. - Assurance of complete use of equipment job time. Schemes of precast unit erection must include the following: - Ground positioning of precast units before erection. - Order of precast unit erection in accordance with their types and sizes. - Routs and stops for cranes for every type and sizes of precast units. - Indication of members that will be mounted on every crane stop. - Sequences and stops for lorries if the mounting takes places from the lorries.

6.4.2. UNIT ERECTION DETAILING SEQUENCES


A grate deal of detailing work is necessary before a member can be erected. Each member is given an erection mark that it carries through the fabrication stage and subsequently is used on the job to identify the member and its position in the frame. The erection mark is usually placed on the left end of horizontal members to eliminate the possibility of trying to place the member end for end or upside down. When delivered to the site, the precast unit will be lifted by crane to the designed position, secured with temporary bracing, welded, and finally fixed into position by grout. The general procedure for installation is as follows: - Set precast concrete units, straight, level and square (P42-1971 - Norm for execution of constructions made of precast panels) to avoid non-cumulative erection tolerances. - Fasten units in place by welding or overlapping. - Provide temporary erection anchorage for welded anchorage system. - Clean field welds with wire brush. - Provide and install sufficient temporary bracing to brace precast units adequately, at all stages of construction, so that units will safely withstand loads to which they may be subjected. This temporary bracing shall remain in position until all connections have been completed. - Apply sealant and joint backing to exterior and interior joints to provide a complete weather tight installation. 115

Construction Project Engineering - Clean exposed face work by washing and brushing only, as precast is erected, if required.

6.5. ERECTION CHARACTERISTICS CALCULATION


These shall include: total weight to be lifted, total height to be lifted.
Figure 6-24. Erection characteristics of columns

Q total column = Qp column + Q d column H total column = H d lifting device column + H p column + H safety height

Figure 6-25. General view typical assembly procedure of columns Figure 6-26. Erection characteristics of bridge beams

Q total bridge beam = Qp bridge beam + Q d bridge beam H total bridge beam=Hd lifting device bridge beam+Hp bridge beam+Hsafety height+H1

116

Construction Project Engineering

Figure 6-27. Erection characteristics of girder beams

Q total girder beam = Qp girder beam + Q d girder beam Htotal girder beam=H d lifting device girder beam+H p girder beam+Hsafety height+H2
Figure 6-28. Erection characteristics of roof slabs

Q total roof slab = Qp roof slab + Q d roof slab H total roof slab = H d lifting device roof slab + H p roof slab + H safety height+HGB+H2

117

Construction Project Engineering


Figure 6-29. General view typical assembly procedure of roof slabs Source: Preconstructa AEBTE, 2003.

6.6. CONNECTIONS
Connections may be either: (a) temporary (also referred to as dry connections) are made by weld, shear anchors, inserts, additional reinforcing bars, posttensioning, or some combination of these can be used to provide this continuity. The temporary connection is usually provided until the permanent ones have been completed.

or (b) permanent (also referred to as wet connections) by concreting grout keys. When precast units are placed adjacent to each other, load transfer between adjacent members is often achieved through a grouted keyway. The keyway may or may not extend for the full depth of the member. The keyway is grouted with one of several different grouting materials (concrete, epoxy resins etc). Connections to tie precast units together, and to join precast segments into a monolith, are of paramount importance. Both temporary and permanent connections must be designed with careful attention to details and construction procedure to ensure the critical load paths and durability performance. Connections usually consist of dowels, plates/pads or angles embedded in the units ends that bear on similar plates embedded in the supporting section, the connections Figure 6-30. Typical warehouse are usually made by welding them together or by connections Source:Preconstructa AEBTE,2003 overlapping them, until the final concrete casting has been completed.

118

Construction Project Engineering

6.7. INSPECTION OF ERECTION AND CORRECTION OF DIMENSIONAL TOLERANCES


Many factors enter into the quality control of precast/prestressed concrete products. Some of the most important are: - Management commitment to a quality control program. - Qualified personnel for all stages of design and construction. - Testing and inspection of the various materials selected for use. - Clear and complete shop drawings (good production drawings translate documents into usable information for manufacture, handling, and erection of precast/prestressed units.). - Accurate stressing procedures. - Control of dimensions and tolerances. - Correct positioning of all embedded items. - Proportioning and adequate mixing of concrete. - Handling, placing, and consolidation of concrete. - Adequate curing. - Handling, storing, transporting, and erection of members. - Thorough documentation. Scope of inspection - in general, precast/prestressed concrete plant inspections should include the following: - Identification, examination, testing, and acceptance of materials. - Inspection and recording of tensioning. - Inspection of beds and forms before concreting. - Checking the dimensions of members, number, size and positions of tendons, reinforcing steel, other incorporated materials, openings, blockouts, etc. - Regular inspection of batching, mixing, conveying, placing, compacting, finishing, and curing of concrete. - Observation of test performances for slump, air content, and the preparation of concrete specimens for strength testing. - Inspection of operations of detensioning, product removal from beds, handling and storing. - Final inspection of finished product before shipment (i.e. monitoring dimensions, camber, blockouts, and adequate concrete cover and finishes). - General observation of plant equipment, working conditions, weather, and other items that may potentially affect the products. Deviations and dimensional tolerances (STAS 6657/3-89; C 156-89) Tolerance can be defined as the allowable range of deviation from design specifications expressed as a percentage of the nominal value (the allowable variations in the dimensions of members). Deviation - can be defined as the difference between the measured value and the expected value of a controlled variable. There will be inevitably differences between the specified dimensions and the actual dimensions of the components and final building. These deviations must be recognized and allowed for. Cast in place and precast concrete is generally manufactured with relatively small deviations but designers should take a realistic view of dimensional variability (inaccuracies). Particularly in large areas of small elements, minor variations are accumulative, and to neglect an allowance for tolerances will lead to difficulties during erection. Once permissible tolerances are established, they should be stipulated on the detail drawings. Frequent checks of the over-all dimensions of the completed castings and checks during erection will reveal variations, and corrective steps for adjustment should follow immediately.

119

Construction Project Engineering Tolerances must be evaluated on each structure and on the various elements in the structure. This reduction, of course, is not required or desired where the elements are separated by grout, calking, or expansion material. The plans and drawings for structures frequently specify the permissible variations for lines, grades, and dimensions that the contractor is expected to observe. The tolerances should be realistic, considering the nature of the structure. Tolerances that are more than rigid than justified will increase the cost of a structure unnecessarily.

6.8. CONSTRUCTION PROJECT PLANNING AND SCHEDULING


Materials and Labor Scheduling - the job planning required, however, is a sound investment. The basic nature of precast-concrete construction provides the contractor with close control over all labor and materials, with little effort. The continuous repetitious operations provide ideal opportunities for perfection of labor and equipment allocation and efficiency. The daily repetitive use of identical quantities of materials reduces waste. Close control and detailed and accurate records can be obtained on materials, labor, costs, and progress on all phases of the work. The application of basic precasting principles creates a neat and clean working area, both at the casting yard and throughout the construction area. This cleanliness, rarely obtainable in other methods of construction, eliminates waste, promotes efficiency, and discourages accidents. Proper scheduling will permit the installation of foundations and related work during the period that the casting yard is being constructed and put into operation. The elapsed time between storage and erection of the elements, at any specific portion of the building area, will be short. Each area becomes available to the mechanical and other trades immediately upon completion of the precast erection in that area. Therefore, exceptional continuity in the work of those trades can be maintained.

120

Construction Project Engineering

6.8.1. EXAMPLE BAR CHART SCHEDULE GANTT CHART AND LABOR SCHEDULE
ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Task Name Task 1. Excavation soil Task 2. Manual diging-Team 1 Task 2. Manual diging-Team 2 Task 3. Concrete casting leveling layer-Team 1 Task3. Concrete casting levelling layer-Team 2 Task 4. Concrete casting foundations-Team 1 Task 4. Concrete casting foundations-Team 2 Task 5. Spreading and compaction- Team 1 Task 5. Spreading and compaction- Team 2 Task 6. Delivery prefabricated mem bers Task 7. Column erection Task 8. Beam erection Task 8. Roof slab and roof lights erection Task 10. Cladding- Team 1 Task 10. Cladding -Team 2 Task 11. Flooring - Team 1 Task 11. Flooring- Team 2 Task 12. Roof covering - Team 1 Task 12. Roof covering - Team 2 Task 13. Partition - Team 1 Task 13. Partition - Team 2 Task 14. Finishings - Team 1 Task 14. Finishings - Team 2 Task 15. Comissioning 23 Nov '03 30 Nov '03 Duration S T T S M W F Labor 10 w orkers 1 day Labor 10 w orkers 2 days 2 days 3 days 2 days 3 days 2 days 4 days 3 days 20 days 5 days 10 days 10 days 10 days 10 days 6 days 5 days 5 days 5 days 6 days 4 days 12 days 10 days 2 days Labor 10 w orkers Labor 10 w orkers Labor 10 w orkers Labor 10 w orkers Labor 7 w orkers Lab Labor 5 w orkers Labor 10 w orkers Labor 10 w orkers Labor 10 w orkers Labor 10 w orkers Labor 10 w orkers Labor 10 w orkers 07 Dec '03 S T T 14 Dec '03 S M W F 21 Dec '03 S T T S 28 Dec '03 M W F 04 Jan '04 S T T S 11 Jan '04 M W F 18 J S

Labor 10 w orkers Labor 5 w orkers Labor 5 w orkers Labor 5 w orkers Labor 5 w orkers Labor 10 w orkers Labor 10 w orkers Labor 6 w orkers

121

Construction Project Engineering

6.8.2. EXAMPLE NETWORK SCHEDULES


CPM The Critical Path Method
AM 10 50 2 5 58 16 A 66 5 0 15 40 25 40 25 Sv 65 1 65 SM 66 2 SM 68 0 68 1 BE 69 2 66 1 BE 69 2 2 69 3 BF 72 2 68 3 BF 70 2 2 72 2 2 71 1 Ic 71 3 MS 74 6 74 1 Ic 75 3 75 1 MG 10 76 5 ME 10 81 5 T 96 0 SI 96
1 0

20 67

ST 0

0 0

C 0

25 0
25

F 25

15 0

3 72

76

81

10 96

SI 86 5

10 86

10 96

T 91
` 2

5 91

Caption: S start, C contracting works, F financing, A delivery materials, O site woks, SV clear and grub, SM manual digging, BE leveling concrete, BF concrete foundation, IC spreading and compaction, A delivery prefabricates, MS column erection, MG beam erection, ME roof slab erection, SI cladding, P flooring, T roof insulation, PE partition walls, F finishing, R commissioning.

1 0

PE 93 1

4 95

1 1

106 106 3 PE 4

P 94 2

5 95

1 4

105 109 2 S 0 R 2 F 10

F 96

10 98

1 0

1 3

123 123

121 121

111 111

122

Construction Project Engineering

6.9. HEALTH, SAFETY AND WELFARE REGULATIONS


These regulations detail the minimum requirements for lifting devices and equipment. In summary the main points include: - Examination of all forms of lifting devices to ensure sound construction, materials appropriate for the conditions of use, adequate strength for the intended task, retention in good order and inspection regularly at intervals depending on use and exposure as determined by a competent person. - Adequate support, strength, stability, anchoring, fixing and erection of lifting appliances to include an appropriate factor of safety against failure. - Traveling and slewing cranes require a 500 mm wide minimum clearance provided wherever practicable between the equipment and fixtures such as a building or access scaffold. If such a clearance cannot be provided, movement between the appliance and fixture should be prevented. - A cabin is required for the crane operator that must provide an unrestricted view for safe use of the equipment. The cabin must have adequate protection from the weather and harmful substances with a facility for ventilation and heating. - Equipment which can be adapted for various operating radii and other configurations must be clearly marked with corresponding safe working loads for these variables. - Brakes, controls, and safety devices must be clearly marked to prevent accidental operation or miss-use. - Safe means of access is to be provided for examination, repair, and servicing particularly where a person can fall more than 2,0 m. - Stability of lifting devices on soft ground, uneven surfaces and slopes must be considered. Cranes must be either anchored to the ground or to a foundation, or suitably counterweighted or stabilized to prevent overturning. - Rail mounted cranes to have a track laid and secured on a firm foundation to prevent risk of derailment. There must be provision for buffers, effective braking systems, and adequate maintenance of both track and equipment. - Measures must be taken to prevent a freely suspended load moving uncontrollably. Devices that could be fitted include multiple ropes. - Cranes must be erected under planned conditions and the supervision of a competent person. - If the operator cannot see the whole passage of a lift, an efficient signaling system must be used. A signaler must be capable of giving clear and distinct communications by hand. mechanical or electrical means. - Testing examination and inspections are required for all equipment. Chains, slings, ropes, hooks, shackles, eyebolts, and other small components are no less important than grabs and winches. All must be tested and thoroughly examined before being put into operation. - All cranes are clearly marked with their safe maximum working loads relevant lifting radius and maximum operating radius particularly when fitted with a derricking jib. Lifting equipment not designed for personnel must be clearly marked as such. - Jib cranes to be fitted with an automatic safe load indicator such as a warning; light for the operator and a warning bell for persons nearby. - Except for testing purposes, the safe working load must not be exceeded. - When loads are approaching the safe maximum load, the initial lift should be short. A check should then be made to establish safety and stability before proceeding to complete the lift.

123

Construction Project Engineering

6.10. EXAMPLE WORKING DRAWINGS


Plan Axes Sc. 1:200

124

Construction Project Engineering

Cross Section Warehouse Plan Sc. 1:100


GPT 12-4 EA 1.5x12
1,05

+12.85

0,44

+12.4 11.35 +10.7

0,55

1,9

GRP 9-125

0,3

0,4

0,6

1.25

+9.45

11,65

SM 40*55

SC 55*60

0,1

-0.20
0,40,5 1,15

0.00

0,6

0,1

0,4

0,1

12

125

0,1

Construction Project Engineering

Detail Plan Erection Procedure for Columns Sc.: 1:200 S1 S3 S5

C
M1 M2 M3

B
S2 S10 S9 S4 S8 S6 S7

A
M7 M6 M5 M4

126

Construction Project Engineering

Bay Detail Column Erection Sc.: 1:50


S1

12

M1

S2

12

127

Construction Project Engineering

Cross Section Erection Fazes Columns Sc. 1:100


12 7,5 6 12 3,13 19,23 4,3 2

11.35

II
16,1 12,8

+9.45

III
4,3

11,65

-0.20
1 0,40,5 0,4 2 1,15

0,6

128

Construction Project Engineering

Detail Plan Erection Procedure for Transverse Girder Beams Sc.: 1:200

GPT

C
6 4,5 6

12

7,5

24

Crane route

M1
6 7,5 6

T1

M2

T2

G11

G1

G3

G6

G8

G9

M3

T3

Trailer route

G10

12

4,5

12

12

12 56

12

12

129

G12

G2

G4

G5

G7

Construction Project Engineering

Bay Detail Transverse Girder Beams Erection Sc.: 1:50

Route trailer
prefabricat
11,95

T1

G3

M1

G1

G2

12 24

12

130

Construction Project Engineering

Cross Section Erection Transverse Girder Beams Sc. 1:100

III II
0.5 2.89 10.95

16.19

12

12

131

Construction Project Engineering

Detail Plan Erection Procedure for Roof Slab Sc.: 1:200


M12 M11 T22 M24 M23 T33 M22 T13 T14 M13 M14 M21 T32 T31 T19 T30 T29 T28 T27 T26 T25
11,02

EA1GR EA2 EA3 12 EA4 EA5 EA6

M10 T1 T2 M1 M9

T21 T20 T19 T18 T17 T16 T15 T14 T13


11,02

T34 T35 M25 M26 T36 T37 T38 T39 T40 T41 T42 T43 T44 M29 M30

11,02

T3 M8 T4 T5 M7 T6 T7 T8 T9 T10 T11

T15 M20 T16 T17 M19 T18 T19 T20 T21 T22 T23

24

M2 traseu macara

12

M3 M4

T12 M15 M16

T24 M27 M28

M5 M6

M17 M18

12

12

12 56

12

12

132

Construction Project Engineering

Bay Detail Roof Slab Erection Sc.: 1:50

EA3 EA4
12

EA5
3,56

EA6 M1
1,23

2 8.5 = R3
R R5 4=1 =9 1.0 .5 23 23

R2 =1 0

R
5,24

23 8.0 6=

R R8 7=1 =9 1.0 .5 23 23

M2

0= R1

R 5 7.8

23 8.0 9=

M3
4

133

.02 R1 1 =10 .18

EA2

1,5

EA1GR

Route trailer

T1

T2

T3 T4 T5 T6

traseu macara

Construction Project Engineering

Cross Section Erection Fazes Roof Slabs Sc. 1:100

III II
0.5 2.89 10.95

16.19

12

12

134

Construction Project Engineering

REFERENCES
6-1 6-2 6-3 6-4 6-5 6-6 6-7 6-8 6-9 6-10 6-11 6-12 6-13 6-14 6-15 6-16 6-17 6-18 6-19 6-20 6-21 6-22 Andres C., Smith R., Principles and Practices of Heavy Construction. Prentice Hall, USA, 1998. Commonwealth of Kentucky Transportation Cabinet, Department of Highways. Division of Materials Frankfort Kentucky. Precast/Prestressed Concrete Manual, USA, 2002. Doma J., Vescan V., Moga A., Tehnologia lucrrilor de construcii. Editura Institutului Politehnic ClujNapoca, 1988. Forster G.: Building organization and procedures. Longman Scientific and Technical, England, 1988. Fulletron R.L.: Construction Technology . Level 1. Oxford University Press, 1980. Ghibu M., Gheorghiu N., Otel A., Suman R., Tehnologii moderne. Editura Tehnic, 1989. Gould F., Joyce N. Construction Project Management. Second Edition. Prentice Hall, 2003. Ilinoiu G., Construction Engineering. Conspress, Bucharest 2003. IPCT, Nomenclator de elemente prefabricate din beton armat si beton precomprimat, vol. 1, 1988. Murphy R. W., Site engineering. Construction Press. Astros Printing Limited, 1983. Popa R., Teodorescu M., Montarea elementelor prefabricate de beton armat, beton precomprimat si metalice. ICB, 1992. Popa R., Teodorescu M., Tehnologia lucrarilor de constructii. Ed. ICB, Bucuresti, 1984. Suman R., Ghibu M., Gheorghiu N., Oara C., Otel A., Tehnologii moderne n construcii. Editura Tehnic, Bucureti, 1988. Suman R., Pop S., Execuia lucrrilor de construcii. Editura Tehnic Bucureti, 1989. Trelea A., Popa R., .a., Tehnologia construciilor.Vol.1. Editura Dacia, Cluj-Napoca, 1997. STAS 6657/3-89. Concrete, reinforced concrete and prestressed concrete elements procedures, instrumentation and devices for characteristic geometry checks. C 156-89. Handbook for the application of STAS 6657/3-89 prescriptions - Concrete, reinforced concrete and prestressed concrete elements procedures, instrumentation and devices for characteristic geometry checks. P 119-83. Instructiuni tehnice pentru proiectarea, executarea si exploatarea cailor de rulare pe grinzi de beton armat. Technical Specifications ECCON. Technical Specifications BUMAR LABEDY S.A. Technical Specifications LIEBHERR-Werk Nenzing Gmbh. Technical Specifications TELEMAC HTA.

ABBREVIATIONS AND SYMBOLS


mm m mm m2 m t no. hr km l % m/d
3 2

CONVERSION TABLE
1 in = 25,4 mm (exact value) 0,1 daN/cm2 = 1 MPa = 1 N/mm2 1 kgf = 9,80665 N (exact value) 1 kgf m = 9,80665 N m = 9,80665 J 1 kgf s/m2 = 9,80665 Pa s 1 kgfm / s = 9,80665 W 1 kgf / cm2 = 0,980665 bar (exact value) 1 kgf / cm2 = 1 at = 0,980665 x 10 5 bar 1 kgf / m2 = 1 mm H2O = 0,0980665 mbar = 9,80665 Pa 1 Torr = 1,333224 mbar 1 bar = 9,8 N/cm2 = 0,098 N/mm2 = 9,8 x 102 daN 1 mm Hg = 1 Torr = 1,333224 mbar = 133,3224 Pa 1oC = (1oF-32)x5/9 1 CP = 0,735499 kW Newton (N) = kg m/s2 = kilograms x 9.80665 Pascal (Pa) = N/m2

millimeter meter square millimeter square meter cubic meter kilogram tone (1000 kg) number hour kilometer liter per cent man day