You are on page 1of 36

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

Sec.
I

BH-T2 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF
Reference

Qu Ap 0.5DN Pd Nq KPdi tanAsi CAS


i 1

Length of Pile below Ground Level


Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
2
m Depth t/m3
t/m
3.40
4
4
0.850
0.78
I
1
5
0.780
1.95
I
2.5
7.5 0.780
4.80
I
6
13.5 0.800
2.76
II
3
16.5 0.920
1.38
II
1.5
18
0.920
2.40
III
3
21
0.800
7.14
IV
7
28
1.020
3.06
IV
3
31
1.020
0.41
V
0.5
31.5 0.820

L
D

Nq
N
Ap
k
Pdi
Pd

Pdi
2

t/m
1.70
3.79
5.16
8.53
12.31
14.38
15.07
15.07
15.07
15.07

As
2

m
15.08
3.77
9.42
22.62
11.31
5.65
11.31
26.39
11.31
1.88

31.5
1.2
0.820
35.00
37.77
0
1.1310
1
15
15.1

=
=
=
=
=
=
=
=
=
=
=
=

15.1
33.00

tan

0
0
0
0
0
0
0
33
0
33

0
0
0
0
0
0
0
33
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

617.55
276.71
0
161.31
617.55
438.02
1055.57
2.5
422.23

(As per IS2911 Part I/Sec 2)

m
m
3

t/m

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
258.26
0.00
18.45
276.71

(As per GIR)

x C x As

0
0
2.2
2.2
6
6
6
0
13

0
0
0.7
0.7
0.4
0.4
0.4
0
0.3

0.00
0.00
14.51
34.83
27.14
13.57
27.14
0.00
44.11
0.00
161.31

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

2.00
2.00
9.00
9.00
9.00
20.00

%
T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
29.0 m

RAIL VIKAS NIGAM LIMITED

Project

Calculations for

Decipline
Cal. By
Chkd. By

VERTICAL CAPACITY OF PILE SUMMARY SHEET

MGC File CAL 104 / Rev D-1


22/03/13
AKD Date
22/03/13
MSP Date

Sec.
Table: 1

PILE DIA.

1.2 m

COL =
6

2.5 m bgl

10

Pier No.

Nearest
Influencing
Boreholes

Critical
Borehole

Ground
Level (m)

Pile Tip
Level (m)

P 01

ABH-1

ABH-1

P 02

ABH-1

ABH-1

P 03

ABH-1, BH-T2

BH-T2

+ 4.46

- 27.04

31.50

29.00

-40.00

8.50

422

P 04

BH-T2

BH-T2

+ 4.46

- 27.04

31.50

29.00

-40.00

8.50

422

P 05

BH-T1

BH-T1

+ 3.90

- 21.60

25.50

23.00

-28.00

2.50

403

P 06

BH-T1

BH-T1

+ 3.90

- 21.60

25.50

23.00

-28.00

2.50

403

P 07

BH-T1, ABH-2

P 08

ABH-2, ABH-3

ABH-2

P 09

ABH-3

ABH-3

P 10

ABH-3, BH-T3

BH-T3

+ 3.30

- 27.20

30.50

28.00

-33.50

3.00

428

P 11

BH-T3

BH-T3

+ 3.30

- 27.20

30.50

28.00

-33.50

3.00

428

P 12

BH-T3, BH-T4

BH-T4

P 13

BH-T4

BH-T4

+ 3.42

- 26.58

30.00

27.50

-50.00

20.00

481

P 14

BH-T4

BH-T4

+ 3.42

- 26.58

30.00

27.50

-50.00

20.00

481

P 15

ABH-4

ABH-4

P 16

ABH-4

ABH-4

P 17

ABH-5

ABH-5

P 18

ABH-5, ABH-6

ABH-5

P 19

ABH-6

ABH-6

P 20

ABH-6, BH-T5

P 21

BH-T5

BH-T5

+ 5.69

- 27.81

33.50

31.00

-50.00

16.50

428

P 22

BH-T5, ABH-7

BH-T5

+ 5.69

- 27.81

33.50

31.00

-50.00

16.50

428

P 23

ABH-7

ABH-7

P 24

ABH-7

ABH-7

P 25

ABH-8

ABH-8

P 26

ABH-8

ABH-8

P 27

ABH-8

ABH-8

P 28

BH-T6

BH-T6

+ 6.54

- 23.47

30.00

27.50

-50.00

20.00

447

P 29

BH-T6

BH-T6

+ 6.54

- 23.47

30.00

27.50

-50.00

20.00

447

P 30

BH-T6

BH-T6

+ 6.54

- 23.47

30.00

27.50

-50.00

20.00

447

P 31

ABH-9

ABH-9

P 32

ABH-9

ABH-9

P 33

ABH-10

ABH-10

P 34

ABH-10

ABH-10

11

End of
Available
Pile
Pile
Sand Layer
Sand
Working
Recommended
termination termination
/ Clay Layer
layer
Load
Vertical Working
depth below depth below
Start Level below Pile Capacity (t)
Load (t)
EGL, (m)
COL, (m)
(m)
Toe (m)

Borehole Investigation in Progress

400.00

400.00

Borehole Investigation in Progress

400.00

Borehole Investigation in Progress


400.00

Borehole Investigation in Progress

400.00

Borehole Investigation in Progress

400.00

Borehole Investigation in Progress

RAIL VIKAS NIGAM LIMITED

Project

Calculations for

Decipline
Cal. By
Chkd. By

VERTICAL CAPACITY OF PILE SUMMARY SHEET

MGC File CAL 104 / Rev D-1


22/03/13
AKD Date
22/03/13
MSP Date

Sec.
Table: 1

PILE DIA.

1.2 m

COL =
6

2.5 m bgl

10

11

Pier No.

Nearest
Influencing
Boreholes

Critical
Borehole

Ground
Level (m)

Pile Tip
Level (m)

P 35

BH-T13

BH-T13

+ 7.98

- 37.02

45.00

42.50

-50.45

5.45

437

P 36

BH-T13, ABH-11

BH-T13

+ 7.98

- 37.02

45.00

42.50

-50.45

5.45

437

P 37

ABH-11

ABH-11

P 38

ABH-11

ABH-11

P 39

ABH-12

ABH-12

P 40

ABH-12

ABH-12

P 41

ABH-13

ABH-13

P 42

ABH-13

ABH-13

P 43

ABH-14

ABH-14

P 44

ABH-14

ABH-14

P 45

ABH-14, ABH-15

P 46

ABH-15

ABH-15

P 47

ABH-15

ABH-15

P 48

ABH-16

ABH-16

P 49

ABH-16

ABH-16

P 50

ABH-16

ABH-16

P 51

ABH-16, BH-C18

P 52

BH-C18

BH-C18

+ 8.20

- 24.80

33.00

30.50

-36.00

3.00

405

P 53

BH-C18

BH-C18

+ 8.20

- 24.80

33.00

30.50

-36.00

3.00

405

P 54

BH-C18, ABH-17

P 55

BH-C18, ABH-17

ABH-17

P 56

ABH-17

ABH-17

P 57

ABH-17

ABH-17

P 58

ABH-17, BH-C17

P 59

BH-C17

BH-C17

4.50

411

400.00

P 60

BH-C17, ABH-18

P 61

ABH-18

ABH-18

P 62

BH-C16

BH-C16

3.10

435

400.00

P 63

BH-C16, ABH-19

P 64

ABH-19

ABH-19

P 65

ABH-19, ABH-20

P 66

ABH-20

ABH-20

P 67

ABH-20, ABH-21

P 68

ABH-21

ABH-21

P 69

ABH-21,BH-C15

BH-C15

+ 11.80

- 34.70

46.50

44.00

-50.10

3.60

430

P 70

BH-C15

BH-C15

+ 11.80

- 34.70

46.50

44.00

-50.10

3.60

430

P 71

BH-C14, BH-C15

BH-C15

+ 11.80

- 34.70

46.50

44.00

-50.10

3.60

430

P 72

BH-C14

BH-C14

+ 10.40

- 34.10

44.50

42.00

-47.00

2.50

461

P 73

BH-C14

BH-C14

+ 10.40

- 34.10

44.50

42.00

-47.00

2.50

461

P 74

ABH-22

ABH-22

P 75

BH-C13, ABH-22

End of
Available
Pile
Pile
Sand Layer
Sand
Working
Recommended
termination termination
/ Clay Layer
layer
Load
Vertical Working
depth below depth below
Start Level below Pile Capacity (t)
Load (t)
EGL, (m)
COL, (m)
(m)
Toe (m)

400.00

Borehole Investigation in Progress

400.00

Borehole Investigation in Progress

+ 9.40

- 32.60

42.00

39.50

-46.50

Borehole Investigation in Progress


+ 11.30

- 35.70

47.00

44.50

-50.10

Borehole Investigation in Progress

400.00

400.00

Borehole Investigation in Progress

RAIL VIKAS NIGAM LIMITED

Project

Calculations for

Decipline
Cal. By
Chkd. By

VERTICAL CAPACITY OF PILE SUMMARY SHEET

MGC File CAL 104 / Rev D-1


22/03/13
AKD Date
22/03/13
MSP Date

Sec.
Table: 1

PILE DIA.

1.2 m

COL =
6

2.5 m bgl

10

11

Pier No.

Nearest
Influencing
Boreholes

Critical
Borehole

Ground
Level (m)

Pile Tip
Level (m)

P 76

BH-C13

BH-C13

+ 8.80

- 31.20

40.00

37.50

-46.50

6.50

458

P 77

BH-C13

BH-C13

+ 8.80

- 31.20

40.00

37.50

-46.50

6.50

458

P 78

BH-C12

BH-C12

+ 9.00

- 30.50

39.50

37.00

-42.00

2.50

416

P 79

BH-C10

BH-C10

P 80

BH-C10

BH-C10

P 81

BH-C9

BH-C9

P 82

BH-C9

BH-C9

P 83

BH-C6

BH-C6

P 84

BH-C6

BH-C6

P 85

BH-C4, BH-C5

BH-C4

+ 5.00

- 25.00

30.00

27.50

-33.50

3.50

436

P 86

BH-C4

BH-C4

+ 5.00

- 25.00

30.00

27.50

-33.50

3.50

436

P 87

ABH-23, BH-C4

ABH-23

P 88

ABH-23

ABH-23

P 89

BH-C3

BH-C3

+ 5.70

- 24.30

30.00

27.50

-33.00

3.00

408

P 90

BH-C3

BH-C3

+ 5.70

- 24.30

30.00

27.50

-33.00

3.00

408

P 91

BH-C3, ABH-24

ABH-24

P 92

ABH-24

ABH-24

P 93

BH-C19, ABH-24

P 94

BH-C19, BH-C2

BH-C19

+ 4.60

- 25.40

30.00

27.50

3.00

443

400.00

P 95

BH-C2

BH-C2

+ 5.50

- 24.50

30.00

27.50

-33.00

3.00

457

400.00

P 96

BH-C1, BH-C2

BH-C1

+ 4.60

- 24.40

29.00

26.50

-35.50

6.50

410

P 97

BH-C1

BH-C1

+ 4.60

- 24.40

29.00

26.50

-35.50

6.50

410

P 98

BH-C1

BH-C1

+ 4.60

- 24.40

29.00

26.50

-35.50

6.50

410

P 99

BH-C1

BH-C1

+ 4.60

- 24.40

29.00

26.50

-35.50

6.50

410

P 100

BH-20, BH-C1

BH-C1

+ 4.60

- 24.40

29.00

26.50

-35.50

6.50

410

P 101

BH-C20

BH-C20

P 102

BH-C20

BH-C20

P 103

BH-C20, ABH-25

P 104

ABH-25

ABH-25

P 105

ABH-25

ABH-25

P 106

ABH-25, BH-C21

P 107

BH-C21

BH-C21

P 108

BH-C21

BH-C21

P 109

BH-C21, ABH-26

P 110

ABH-26

ABH-26

P 111

ABH-26

ABH-26

P 112

ABH-26, ABH-27

P 113

ABH-27

ABH-27

End of
Available
Pile
Pile
Sand Layer
Sand
Working
Recommended
termination termination
/ Clay Layer
layer
Load
Vertical Working
depth below depth below
Start Level below Pile Capacity (t)
Load (t)
EGL, (m)
COL, (m)
(m)
Toe (m)

400.00

400.00

Bridge

Bridge

Bridge

400.00

Borehole Investigation in Progress

400.00

Borehole Investigation in Progress

-33.00

Borehole Investigation in Progress

400.00

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-T1 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N25.5q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
2
m Depth t/m3
t/m
4.10
5
5
0.820
1.23
I
1.5
6.5 0.820
2.00
II
2.5
9
0.800
2.55
II
3
12
0.850
2.76
III
3
15
0.920
2.88
III
3
18
0.960
0.48
III
0.5
18.5 0.960
5.95
IV
7
25.5 0.850

Nq
N
Ap
k
Pdi
Pd

Pdi
2

t/m
2.05
4.72
6.33
8.61
11.26
14.08
15.52
15.52

As
2

m
18.85
5.65
9.42
11.31
11.31
11.31
1.88
26.39

0.850
35.00
37.77
0
1.1310
1
15
15.5

=
=
=
=
=
=
=
=
=
=

15.5
33.00

tan

0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

636.13
265.97
0
106.09
636.13
372.07
1008.20
2.5
403.28

(As per IS2911 Part I/Sec 2)

t/m

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
265.97
265.97

(As per GIR)

x C x As

0
2.25
1.8
1.8
5.8
5.8
5.8

0
0.7
0.7
0.7
0.5
0.5
0.5

0.00
8.91
11.88
14.25
32.80
32.80
5.47
0.00
106.09

Corrected N
Value
(As per ODC Clause - 7.17a )

2.00
2.00
2.00
7.00
7.00
7.00

(As per ODC Clause - 7.17a )

%
T
T
T
T
T
T
T
T

2.5 m
23.0 m

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-T2 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N31.5q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
2
m Depth t/m3
t/m
3.40
4
4
0.850
0.78
I
1
5
0.780
1.95
I
2.5
7.5 0.780
4.80
I
6
13.5 0.800
2.76
II
3
16.5 0.920
1.38
II
1.5
18
0.920
2.40
III
3
21
0.800
7.14
IV
7
28
1.020
3.06
IV
3
31
1.020
0.41
V
0.5
31.5 0.820

Nq
N
Ap
k
Pdi
Pd

Pdi
2

t/m
1.70
3.79
5.16
8.53
12.31
14.38
15.07
15.07
15.07
15.07

As
2

m
15.08
3.77
9.42
22.62
11.31
5.65
11.31
26.39
11.31
1.88

0.820
35.00
37.77
0
1.1310
1
15
15.1

=
=
=
=
=
=
=
=
=
=

15.1
33.00

tan

0
0
0
0
0
0
0
33
0
33

0
0
0
0
0
0
0
33
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

617.55
276.71
0
161.31
617.55
438.02
1055.57
2.5
422.23

(As per IS2911 Part I/Sec 2)

t/m

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
258.26
0.00
18.45
276.71

(As per GIR)

x C x As

0
0
2.2
2.2
6
6
6
0
13

0
0
0.7
0.7
0.4
0.4
0.4
0
0.3

0.00
0.00
14.51
34.83
27.14
13.57
27.14
0.00
44.11
0.00
161.31

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

2.00
2.00
9.00
9.00
9.00
20.00

%
T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
29.0 m

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-T3 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N30.5q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
2
m Depth t/m3
t/m
1.20
1.5
1.5 0.800
2.80
I
3.5
5
0.800
1.17
I
1.5
6.5 0.780
2.34
I
3
9.5 0.780
2.46
I
3
12.5 0.820
4.29
II
5.5
18
0.780
2.85
II
3
21
0.950
5.23
III
5.5
26.5 0.950
3.36
IV
4
30.5 0.840

Nq
N
Ap
k
Pdi
Pd

Pdi
2

t/m
0.60
2.60
4.59
6.34
8.74
12.12
14.26
14.26
14.26

As
2

m
5.65
13.19
5.65
11.31
11.31
20.73
11.31
20.73
15.08

0.840
35.00
37.77
0
1.1310
1
15
14.3

=
=
=
=
=
=
=
=
=
=

14.3
33.00

tan

0
0
0
0
0
31
31
0
33

0
0
0
0
0
31
31
0
33

0.00
0.00
0.00
0.00
0.00
0.60
0.60
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

586.00
387.49
0
95.28
586.00
482.77
1068.77
2.5
427.51

(As per IS2911 Part I/Sec 2)

t/m

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
150.94
96.90
0.00
139.65
387.49

(As per GIR)

x C x As

0
0
2.3
2.3
2.3
0
0
8

0
0
0.7
0.7
0.7
0
0
0.3

0.00
0.00
9.10
18.21
18.21
0.00
0.00
49.76
0.00
95.28

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

3.00
3.00
3.00

21.00

%
T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
28 m

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-T4 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N30.0q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
2
m Depth t/m3
t/m
0.60
0.75 0.75 0.800
3.40
I
4.25
5
0.800
3.12
I
4
9
0.780
3.74
I
4.5
13.5 0.830
3.74
II
4.5
18
0.830
10.08
II
12
30
0.840

Nq
N
Ap
k
Pdi
Pd

Pdi
2

t/m
0.30
2.30
5.56
8.99
12.72
14.59

As
2

m
2.83
16.02
15.08
16.96
16.96
45.24

0.840
35.00
37.77
0
1.1310
1
15
14.6

=
=
=
=
=
=
=
=
=
=

14.6
33.00

tan

0
0
0
0
30
33

0
0
0
0
30
33

0.00
0.00
0.00
0.00
0.58
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

599.06
553.24
0
49.67
599.06
602.91
1201.97
2.5
480.79

(As per IS2911 Part I/Sec 2)

t/m

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
124.61
428.63
553.24

(As per GIR)

x C x As

0
0
3.1
3.1
0
0

0
0
0.5
0.5
0
0

0.00
0.00
23.37
26.30
0.00
0.00
49.67

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

4.00
4.00

%
T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
27.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

Sec.
I

BH-T5 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF
Reference

Qu Ap 0.5DN Pd Nq KPdi tanAsi CAS


i 1

Length of Pile below Ground Level


Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
0.00
2.5
2.5 0.000
2.05
I
2.5
5
0.820
2.46
I
3
8
0.820
2.46
I
3
11 0.820
3.28
II
4
15 0.820
2.85
III
3
18 0.950
2.76
III
3
21 0.920
9.13
IV
11
32 0.830

L
D

Nq
N
Ap
k

Pdi
Pd

Pdi

As

t/m
0.00
1.03
3.28
5.74
8.61
11.68
13.10
13.10

m
9.42
9.42
11.31
11.31
15.08
11.31
11.31
41.47

32.0
1.2
0.830
35.00
37.77
0
1.1310
1
15
13.1

=
=
=
=
=
=
=
=
=
=
=
=

0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
33

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

m
m

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
13.1 t/m2
33.00 deg
K x Pdi x
tan
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
352.79
0.65
352.79

539.82
352.79
0
177.19
539.82
529.97
1069.80
2.5
427.92

(As per IS2911 Part I/Sec 2)

(As per GIR)

x C x As

Corrected N
Value

0
0
3.3
3.3
10
10
9

0
0
0.5
0.5
0.5
0.3
0.3

0.00
0.00
18.66
18.66
75.40
33.93
30.54
0.00
177.19

4.00
4.00
4.00
14.00
14.00

(As per ODC Clause - 7.17a )


(As per ODC Clause - 7.17a )

%
T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
29.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-T6 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N30.0q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
2
m Depth t/m3
t/m
4.10
5
5
0.820
0.81
I
1
6
0.810
3.69
II
4.5
10.5 0.820
2.46
II
3
13.5 0.820
2.05
II
2.5
16
0.820
0.91
II
0.5
16.5 1.820
1.32
II
1.5
18
0.880
0.88
II
1
19
0.880
9.90
III
11
30
0.900

Nq
N
Ap
k
Pdi
Pdi

Pdi
2

t/m
2.05
4.51
6.76
9.83
12.09
13.57
13.77
15.34
15.34

As
2

m
18.85
3.77
16.96
11.31
9.42
1.88
5.65
3.77
41.47

0.900
35.00
37.77
0
1.1310
1
15
15.3

=
=
=
=
=
=
=
=
=
=

15.3
33.00

tan

0
0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

630.29
413.11
0
73.32
630.29
486.44
1116.72
2.5
446.69

(As per IS2911 Part I/Sec 2)

t/m

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
413.11
413.11
%
T
T
T
T
T
T
T
T

2.5 m
27.5 m

(As per GIR)

x C x As

0
3.5
2.3
2.3
2.3
6.5
6.5
2.5
0

0
0.5
0.5
0.5
0.5
0.4
0.4
0.4
0

0.00
6.60
19.51
13.01
10.84
4.90
14.70
3.77
0.00
73.32

Corrected N
Value
(As per ODC Clause - 7.17a )

4.00
4.00
4.00
4.00
11.00
11.00
11.00

(As per ODC Clause - 7.17a )

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-T13 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N45.0q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
2.80
3.5
3.5 0.800
1.22
I
1.5
5
0.810
0.82
I
1
6
0.820
2.46
I
3
9
0.820
2.40
I
3
12
0.800
1.60
I
2
14
0.800
3.44
II
4
18
0.860
25.22
II
26
44
0.970
0.82
II
1
45
0.820

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
1.40
3.41
4.43
6.07
8.50
10.50
13.02
14.74
14.74

m2
13.19
5.65
3.77
11.31
11.31
7.54
15.08
98.02
3.77

0.820
35.00
37.77
0
1.1310
1
15
14.7

=
=
=
=
=
=
=
=
=
=

14.7
33.00

tan

0
0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

604.29
36.07
0
452.28
604.29
488.35
1092.64
2.5
437.06

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.07
36.07

(As per GIR)

x C x As

0
0
3.7
3.7
3.7
3.7
5.5
12.4
0

0
0
0.5
0.5
0.5
0.5
0.3
0.3
0

0.00
0.00
6.97
20.92
20.92
13.95
24.88
364.63
0.00
452.28

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

4.00
4.00
4.00
4.00
13.00
13.00

%
T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
42.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-C1 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N29.0q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
3.81
4.5
4.5 0.846
0.31
I
0.5
5
0.629
4.40
II
7
12
0.629
3.88
IIIA
4
16
0.969
1.89
IIIB
2
18
0.946
2.96
IIIB
3
21
0.986
7.24
IV
7.5
28.5 0.965
0.51
IV
0.5
29
1.020

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
1.90
3.96
6.32
10.46
13.35
14.29
14.29
14.29

m2
16.96
1.88
26.39
15.08
7.54
11.31
28.27
1.88

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity
Pile Cut Off level from GL
Length of Pile below Cut-off Level Level

1.020
35.00
37.77
0
1.1310
1
15
14.3

=
=
=
=
=
=
=
=
=
=

14.3
33.00

tan

0
0
0
0
0
0
33
33

0
0
0
0
0
0
33
33

0.00
0.00
0.00
0.00
0.00
0.00
0.65
0.65

=
=
=
=
=
=
=
=
=
=
=

591.90
279.93
0
153.44
591.90
433.36
1025.26
2.5
410.10

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
262.43
17.50
279.93

(As per GIR)

x C x As

0
0
2.2
9
7.5
10.5
0
0

0
0
0.5
0.4
0.4
0.4
0
0

0.00
0.00
29.03
54.29
22.62
47.50
0.00
0.00
153.44

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

5.00
12.00
13.00
13.00

T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
26.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-C2 Rev. D-1


3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N30q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
2.00
2.5
2.5 0.800
2.11
I
2.5
5
0.843
0.84
I
1
6
0.843
2.93
II
4.5
10.5 0.650
2.62
IIIA
3
13.5 0.872
1.47
IIIA
1.5
15
0.978
2.42
IIIB
3
18
0.805
6.04
IIIB
7.5
25.5 0.805
4.34
IV
4.5
30
0.965

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
1.00
3.05
4.53
6.41
9.18
11.23
13.17
14.37
14.37

m2
9.42
9.42
3.77
16.96
11.31
5.65
11.31
28.27
16.96

0.965
35.00
37.77
0
1.1310
1
15
14.4

=
=
=
=
=
=
=
=
=
=

14.4
33.00

tan

0
0
0
0
0
0
30
30
33

0
0
0
0
0
0
30
30
33

0.00
0.00
0.00
0.00
0.00
0.00
0.58
0.58
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

593.69
478.96
0
69.25
593.69
548.21
1141.91
2.5
456.76

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
85.97
234.64
158.35
478.96
%
T
T
T
T
T
T
T
T

2.5 m
27.5 m

(As per GIR)

x C x As

0
0
2.9
2.2
6.65
6.65
0
0
0

0
0
0.5
0.5
0.4
0.4
0
0
0

0.00
0.00
5.47
18.66
30.08
15.04
0.00
0.00
0.00
69.25

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

4.00
4.00
11.00
11.00

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-C3 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N30.0q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
2.00
2.5
2.5 0.800
2.10
I
2.5
5
0.840
1.68
I
2
7
0.840
3.98
II
5.5
12.5 0.723
3.76
IIIA
4
16.5 0.940
1.44
IIIB
1.5
18
0.960
2.88
IIIB
3
21
0.960
4.64
IIIB
4.5
25.5 1.030
4.59
IV
4.5
30
1.020

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
1.00
3.05
4.94
7.77
11.64
14.24
14.96
14.96
14.96

m2
9.42
9.42
7.54
20.73
15.08
5.65
11.31
16.96
16.96

1.020
35.00
37.77
0
1.1310
1
15
15.0

=
=
=
=
=
=
=
=
=
=

15.0
33.00

tan

0
0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

618.18
164.77
0
237.17
618.18
401.94
1020.12
2.5
408.05

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
164.77
164.77

(As per GIR)

x C x As

0
0
2.9
2.6
6.6
8.5
8.5
15
0

0
0
0.5
0.5
0.4
0.4
0.4
0.4
0

0.00
0.00
10.93
26.95
39.81
19.23
38.45
101.79
0.00
237.17

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

4.00
4.00
8.00
11.00
11.00
11.00

%
T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
27.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-C4 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N30.0q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
2.00
2.5
2.5 0.800
2.10
I
2.5
5
0.840
0.84
I
1
6
0.840
5.07
II
7
13
0.724
3.35
IIIA
3.5
16.5 0.958
1.43
IIIB
1.5
18
0.950
1.43
IIIB
1.5
19.5 0.950
1.55
IIIB
1.5
21
1.030
9.09
IV
9
30
1.010

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
1.00
3.05
4.52
7.47
11.68
14.07
14.79
14.79
14.79

m2
9.42
9.42
3.77
26.39
13.19
5.65
5.65
5.65
33.93

1.010
35.00
37.77
0
1.1310
1
15
14.8

=
=
=
=
=
=
=
=
=
=

14.8
33.00

tan

0
0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

611.18
325.79
0
152.98
611.18
478.78
1089.95
2.5
435.98

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
325.79
325.79

(As per GIR)

x C x As

0
0
2.9
2.5
8
8
8
15
0

0
0
0.7
0.5
0.4
0.4
0.4
0.4
0

0.00
0.00
7.65
32.99
42.22
18.10
18.10
33.93
0.00
152.98

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

3.00
5.00
11.00
12.00
12.00
12.00

%
T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
27.5 m

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-C12 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N39.0q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
2.40
3
3
0.800
1.71
I
2
5
0.853
5.12
II
6
11
0.853
3.31
IIIA
5
16
0.661
1.85
IIIA
2
18
0.927
11.12
IIIB
12
30
0.927
1.46
IIIB
1.5
31.5 0.970
4.64
IIIB
4.5
36
1.030
3.03
IV
3
39
1.010

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
1.20
3.25
6.67
10.88
13.46
14.38
14.38
14.38
14.38

m2
11.31
7.54
22.62
18.85
7.54
45.24
5.65
16.96
11.31

1.010
35.00
37.77
0
1.1310
1
15
14.4

=
=
=
=
=
=
=
=
=
=

14.4
33.00

tan

0
0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

595.22
105.64
0
338.16
595.22
443.80
1039.02
2.5
415.61

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
105.64
105.64
%
T
T
T
T
T
T
T
T

2.5 m
36.5 m

(As per GIR)

x C x As

0
0
3.4
2.2
5.9
5.9
9.5
15
0

0
0
0.5
0.5
0.5
0.5
0.4
0.4
0

0.00
0.00
38.45
20.73
22.24
133.45
21.49
101.79
0.00
338.16

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

4.00
4.00
4.00
4.00
10.00
10.00

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-C13 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N40.0q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
3.60
4.5
4.5 0.800
0.44
I
0.5
5
0.870
3.05
I
3.5
8.5 0.870
2.21
I
2.5
11
0.885
2.15
II
3
14
0.715
3.84
IIIA
4
18
0.959
12.95
IIIA 13.5 31.5 0.959
4.34
IIIB
4.5
36
0.965
1.55
IIIB
1.5
37.5 1.030
2.50
IV
2.5
40
1.000

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
1.80
3.82
5.56
8.19
10.37
13.36
15.27
15.27
15.27
15.27

m2
16.96
1.88
13.19
9.42
11.31
15.08
50.89
16.96
5.65
9.42

1.000
35.00
37.77
0
1.1310
1
15
15.3

=
=
=
=
=
=
=
=
=
=

15.3
33.00

tan

0
0
0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
0
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

630.22
93.48
0
421.48
630.22
514.96
1145.18
2.5
458.07

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
93.48
93.48
%
T
T
T
T
T
T
T
T

2.5 m
37.5 m

(As per GIR)

x C x As

0
0
4.2
4.2
2.6
7.6
7.6
12
12
0

0
0
0.5
0.5
0.5
0.5
0.5
0.4
0.4
0

0.00
0.00
27.71
19.79
14.70
57.30
193.40
81.43
27.14
0.00
421.48

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

6.00
7.00
5.00
6.00
6.00
9.00
9.00

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

BH-C14 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N42.5q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
4.80
6
6
0.800
2.52
I
3
9
0.839
2.71
I
3
12
0.902
2.10
II
3
15
0.700
2.63
IIIA
3
18
0.877
3.07
IIIA
3.5
21.5 0.877
9.72
IIIA 10.5
32
0.926
2.87
IIIA
3
35
0.956
2.88
IIIB
3
38
0.959
1.55
IIIB
1.5
39.5 1.030
2.94
IV
3
42.5 0.980

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
2.40
6.06
8.67
11.07
13.44
14.75
14.75
14.75
14.75
14.75
14.75

m2
22.62
11.31
11.31
11.31
11.31
13.19
39.58
11.31
11.31
5.65
11.31

0.980
35.00
37.77
0
1.1310
1
15
14.8

=
=
=
=
=
=
=
=
=
=

14.8
33.00

tan

0
0
0
0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
0
0
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity

=
=
=
=
=
=
=
=
=
=

Pile Cut Off level from GL


Length of Pile below Cut-off Level Level

=
=

609.14
108.36
0
434.11
609.14
542.47
1151.61
2.5
460.64

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
108.36
108.36

(As per GIR)

x C x As

0
3.8
3.8
2
3.8
8.5
8.5
8.5
12
12
0

0
0.5
0.5
0.7
0.5
0.5
0.5
0.5
0.4
0.4
0

0.00
21.49
21.49
15.83
21.49
56.08
168.23
48.07
54.29
27.14
0.00
434.11

Corrected N
Value
(As per ODC Clause - 7.17a )

5.00
7.00
3.00
7.00
7.00
7.00
7.00
9.00
9.00

(As per ODC Clause - 7.17a )

%
T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
40.0 m

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
BPH
MSP

FILE NO.
DATE
DATE

Sec.
I

BH-C15 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF
Reference

Q Ap 0.5DN Pd Nq KPdi tanAsi CAS


i 1

u Level
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
2.40
3
3
0.800
1.67
I
2
5
0.833
3.33
I
4
9
0.833
5.38
I
6
15 0.896
2.15
II
3
18 0.716
1.07
II
1.5
19.5 0.716
5.66
IIIA
6
25.5 0.943
13.08
IIIA 13.5
39 0.969
4.32
IIIB
4.5
43.5 0.960
1.55
IIIB
1.5
45 1.030
1.47
IV
1.5
46.5 0.980

L
D

Nq
N
Ap
k

Pdi
Pd

Pdi

As

t/m
1.20
3.23
5.73
10.09
13.85
14.92
14.92
14.92
14.92
14.92
14.92

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity
Pile Cut Off level from GL
Length of Pile below Cut-off Level Level

m
11.31
7.54
15.08
22.62
11.31
5.65
22.62
50.89
16.96
5.65
5.65

46.5
1.2
0.980
35.00
37.77
0
1.1310
1
15
14.9

=
=
=
=
=
=
=
=
=
=
=
=

0
0
0
0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
0
0
0
33

=
=
=
=
=
=
=
=
=
=
=

(As per IS2911 Part I/Sec 2)

m
m

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

t/m
14.9 t/m2
33.00 deg
K x Pdi x
tan
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.80
0.65
54.80
615.79 T
54.80 T
0 T
405.44 T
615.79 T
460.23 T
1076.02 T
2.5
430.41 T
2.5 m
44.0 m

(As per ODC Clause - 7.17a )

(As per GIR)

x C x As

Corrected N
Value

0
0
3.8
3.8
2.5
2.5
7.3
7.3
12
12
0

0
0
0.5
0.5
0.5
0.5
0.5
0.4
0.3
0.3
0

0.00
0.00
28.65
42.98
14.14
7.07
82.56
148.61
61.07
20.36
0.00
405.44

4.00
6.00
5.00
5.00
6.00
6.00
9.00
9.00

(As per ODC Clause - 7.17a )


(As per ODC Clause - 7.17a )

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
BPH
MSP

FILE NO.
DATE
DATE

BH-C16 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N47.5q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
6.00
7.5
7.5 0.800
5.11
I
6
13.5 0.851
1.42
I
1.5
15
0.944
2.25
II
3
18
0.750
1.88
II
2.5
20.5 0.750
1.78
IIIA
2
22.5 0.890
11.47
IIIA
12
34.5 0.956
5.88
IIIA
6
40.5 0.980
6.18
IIIB
6
46.5 1.030
0.92
IV
1
47.5 0.920

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
3.00
8.55
11.81
13.65
14.77
14.77
14.77
14.77
14.77
14.77

m2
28.27
22.62
5.65
11.31
9.42
7.54
45.24
22.62
22.62
3.77

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity
Pile Cut Off level from GL
Length of Pile below Cut-off Level Level

0.920
35.00
37.77
0
1.1310
1
15
14.8

=
=
=
=
=
=
=
=
=
=

14.8
33.00

tan

0
0
0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
0
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65

=
=
=
=
=
=
=
=
=
=
=
=

608.32
36.16
0
444.10
608.32
480.26
1088.58
2.5
435.43

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36.16
36.16

(As per GIR)

x C x As

0
5.3
5.3
2.8
2.8
11.2
11.2
11.2
15
0

0
0.4
0.4
0.5
0.5
0.3
0.3
0.3
0.3
0.3

0.00
47.95
11.99
15.83
13.19
25.33
152.00
76.00
101.79
0.00
444.10

Corrected N
Value
(As per ODC Clause - 7.17a )

7.00
7.00
4.00
4.00
9.00
9.00
9.00
22.00

%
T
T
T
T
T
T
T
(As per IS2911 Part I/Sec 2)

2.5 m
45.0 m

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
BPH
MSP

FILE NO.
DATE
DATE

BH-C17 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N42.0q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
3.60
4.5
4.5 0.800
0.41
I
0.5
5
0.821
4.52
I
5.5
10.5 0.821
4.06
I
4.5
15
0.903
2.29
II
3
18
0.762
8.43
IIIA
9
27
0.937
5.84
IIIA
6
33
0.973
7.58
IIIB
7.5
40.5 1.011
1.50
IV
1.5
42
1.000

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
1.80
3.81
6.27
10.56
13.73
14.88
14.88
14.88
14.88

m2
16.96
1.88
20.73
16.96
11.31
33.93
22.62
28.27
5.65

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity
Pile Cut Off level from GL
Length of Pile below Cut-off Level Level

1.000
35.00
37.77
0
1.1310
1
15
14.9

=
=
=
=
=
=
=
=
=
=

14.9
33.00

tan

0
0
0
0
0
0
0
0
33

0
0
0
0
0
0
0
0
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.65

=
=
=
=
=
=
=
=
=
=
=
=

614.46
54.63
0
357.39
614.46
412.02
1026.48
2.5
410.59

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
54.63
54.63

(As per GIR)

x C x As

0
0
3.6
3.6
2.8
7.6
7.6
12
0

0
0
0.5
0.5
0.5
0.4
0.4
0.3
0

0.00
0.00
37.32
30.54
15.83
103.14
68.76
101.79
0.00
357.39

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

4.00
4.00
4.00
7.00
7.00
9.00

%
T
T
T
T
T
T
T
T

2.5 m
39.5 m
(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
BPH
MSP

FILE NO.
DATE
DATE

BH-C18 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N33.5q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
2.40
3
3
0.800
1.68
I
2
5
0.839
3.36
I
4
9
0.839
2.77
I
3
12
0.922
3.06
II
4
16
0.766
1.82
IIIA
2
18
0.911
0.91
IIIA
1
19
0.911
1.92
IIIA
2
21
0.961
7.45
IIIB
7.5
28.5 0.993
4.50
IV
5
33.5 0.900

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
1.20
3.24
5.76
8.82
11.73
14.18
15.09
15.09
15.09
15.09

m2
11.31
7.54
15.08
11.31
15.08
7.54
3.77
7.54
28.27
18.85

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity
Pile Cut Off level from GL
Length of Pile below Cut-off Level Level

0.900
32.00
35.22
0
1.1310
1
15
15.1

=
=
=
=
=
=
=
=
=
=

15.1
32.50

tan

0
0
0
0
0
0
0
0
0
32.5

0
0
0
0
0
0
0
0
0
32.5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.64

=
=
=
=
=
=
=
=
=
=
=
=

567.49
181.16
0
262.76
567.49
443.92
1011.41
2.5
404.56

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
181.16
181.16

(As per GIR)

x C x As

0
0
4.4
4.4
2.9
7
7
7
11.5
0

0
0
0.5
0.5
0.5
0.4
0.4
0.4
0.4
0

0.00
0.00
33.18
24.88
21.87
21.11
10.56
21.11
130.06
0.00
262.76

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

6.00
6.00
4.00
8.00
8.00
8.00
10.00

%
T
T
T
T
T
T
T
T

2.5 m
31.0 m

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

VERTICAL CAPACITY OF PILES

Checked By

MGC
BPH
MSP

FILE NO.
DATE
DATE

BH-C19 Rev.D-1
3/22/2013
SHEET
3/22/2013
OF

Sec.
I

Reference

Q A 0.5DNL
Pd N30.0q m KPdi tanAsi CAS
=
i 1
1.2 m

D
=
n

u Level
p
Length of Pile below Ground
Dia of Pile
Effective Unit weight of soil at Pile Tip
Bearing Capacity Factor
Bearing Capacity Factor
Depth of Pile Cap
Area of Pile
Earth Pressure Coefficient
Overburden Considered for a depth of
Overburden
Overburden
Angle of Internal Friction at toe
d*sub
Depth Overal sub
layer
m Depth t/m3
t/m2
2.40
3
3
0.800
1.70
I
2
5
0.851
2.13
I
2.5
7.5 0.851
2.70
II
4.5
12
0.600
3.64
IIIA
4
16
0.909
1.91
IIIB
2
18
0.953
0.95
IIIB
1
19
0.953
0.93
IV
1
20
0.927
3.80
IV
4
24
0.950
6.00
IV
6
30
1.000

Nq
N
Ap
k
Pdi
Pd

Pdi

As

t/m2
1.20
3.25
5.17
7.58
10.75
13.52
14.47
14.47
14.47
14.47

m2
11.31
7.54
9.42
16.96
15.08
7.54
3.77
3.77
15.08
22.62

End Bearing Component for Sand layer


Friction Bearing Component for Sand layer
End Bearing Resistance for Clay Layer
Friction Bearing Resistance for Clay Layer
Total End Bearing Resistance
Total Friction Bearing Resistance
Total Bearing Resistance including both cohessive & granular soils
Factor of safety
Safe Bearing Capacity
Pile Cut Off level from GL
Length of Pile below Cut-off Level Level

1.000
35.00
37.77
0
1.1310
1
15
14.5

=
=
=
=
=
=
=
=
=
=

14.5
33.00

tan

0
0
0
0
0
0
0
31
33
33

0
0
0
0
0
0
0
31
33
33

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.60
0.65
0.65

=
=
=
=
=
=
=
=
=
=
=
=

598.47
387.07
0
121.66
598.47
508.73
1107.20
2.5
442.88

(As per IS2911 Part I/Sec 2)

t/m3

m
m2
(As per ODC Clause - 7.17a )

times the dia of pile

(As per ODC Clause - 7.17a )

t/m
t/m2
deg
K x Pdi x
tan () x Asi
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.78
141.72
212.58
387.07

(As per GIR)

x C x As

0
0
2.6
2.4
5.1
8.3
8.3
0
0
0

0
0
0.7
0.7
0.5
0.4
0.4
0
0
0

0.00
0.00
17.15
28.50
38.45
25.03
12.52
0.00
0.00
0.00
121.66

Corrected N
Value
(As per ODC Clause - 7.17a )
(As per ODC Clause - 7.17a )

4.00
4.00
6.00
10.00
10.00

%
T
T
T
T
T
T
T
T

2.5 m
27.5 m

(As per IS2911 Part I/Sec 2)

RAIL VIKAS NIGAM LIMITED

PROJECT
CALCULATIONS FOR

Design & Construction of Viaduct and Stations (Extension of North South Corridor) from Naupura to Dakshineswar.
Description
Cal By

LATERAL CAPACITY OF PILES

Checked By

MGC
AKD
MSP

FILE NO.
DATE
DATE

Sec.
II

3/22/2013
3/22/2013

SHEET
OF

Reference
fck
fy
d
E
I

Grade of Concrete of Pile


Grade of Steel of Pile
Dia of Pile
Young's Modulus of Pile Material
Moment of Inertia of Pile Cross Section
UNCONFINED COMPRESSIVE STRENGTH

Depth of Fixity
For Piles Embedded in Dense Sand

R4

Free Length of Pile in Soil

EI
K2

For Free Head Piles


Hence, Length of Fixity for a free head pile
For Fixed Head Piles
Hence, Length of Fixity for a fixed head pile

Pile Head Deflection/Lateral Capacity of Pile


Lateral Capacity of Pile (load in kg reqd for 0.5cm deflection)
For a free head pile
For a fixed head pile

Y
Y

QL1 L f
3EI
Q L1 L f
12 EI

35
500
1.2
295804.0
10178760
0.61

N/mm2
N/mm2
m

K2

=
=
=
=
=
=
=

569.72 cm

L1
L1
R
Lf
R
Lf

=
=

0 cm
0.00

kg/cm2
cm4

28.58 kg/cm2

1.6

911.56 cm

Lf
R
Lf

1.95

1110.96 cm

0.5 cm

Q (free head)

Q (fixed head)

5.96 T

13.18 T

The K2 value has been considered from table 2 ,


Appendix C of IS 2911 Part 1 Sec 2 1979.
The code is silent for K2 value at UCS = 0.40 to 1
hence linear interpretation has been done

(From Table-2 of IS:2911


(Part-1/Sec-2))

From Fig. 2 of Appendix-C of


IS:2911 (Part-1 / Sec-2)

ANNEXURE - 1
SOIL REPORT BORE HOLE DAT

ANNEXURE - 4
TEST PILE DESIGN

ANNEXURE - 2
GEOTECH PROFILE
OF BORELOGS

ANNEXURE - 5
GA & RC DRAWING OF TEST PILE

CAPACITY CALCULATIONS

ANNEXURE - 3
TYPICAL LOAD ON PILE
CALCULATION

You might also like