POLITEKNIK TUANKU SULTANAH BAHIYAH COURSE OUTLINE Lecturer Course Prerequisite : : : Masalinda Binti Mansor CC301 Quantity Measurement

None E-mail Session Programme & Class : : : masalinda@ptsb.edu.my July 2011 DKA3C/3E

A) SYNOPSIS :

QUANTITY MEASUREMENT emphasizes the preliminary estimating methods in construction and the build up rate calculation in the estimating work. This course also gives knowledge about basic principles of measurement works and skills training in taking-off the quantity of the substructure works, superstructure and external works.
B) LEARNING OUTCOMES :

Upon completion of this course, students should be able to:-

1. 2. 3.

Acquire and practice the preliminary estimating method, the built up rate method and the quantity measurement method correctly [PLO1, PLO2, LD1, LD2] Demonstrate ability to problem solving in measurement quantity of substructure, superstructure and external work by using billing method [PLO1, PLO2, LD1, LD2]] Participate actively in discussion and contribute idea to complete quantity measurement tasks [PLO1, PLO2, LD1, LD2]]

C) ASSESSMENT : No 1 Types of assessment Continuous Assessment (CA) a. Quiz Q1 Q2 T1 T2 EOC1 EOC2 FE1 Topic 1 Topic 2 Topic 3 - 4 Topic 1 -2 Topic 3 - 4 Topic 1-2 Topic 3-4 Cover all topics Item Criteria % Total 50% 20%

b. Test c. 2 End of Chapter

40% 40% 50% 100%

Final Examination (FE) TOTAL CA + FE

1/8

D) REFERENCES :

Abdul Hamid Mar Iman (2006). An Introduction To Property Marketing. UTM, Skudai. D. Robertson (1983). Maintenance Audit, Technical Information Services. The Charted Institute Of Building. Lane, Denis (1982). Discounted Cash Flow Techniques A Nuts and Bolts Approach. The New Zealand Valuer, Jilid : 25, ms 455-464. Lee R (1987). Building Maintenance Management, 3rd Edition. Collins. Mohd Harith Bin Abdul Hamid (1991). The Internal Rate Of Return Method (IRR) in Estimating Returns From Property Investment. Monograf Fakulti Ukur Dan Harta Tanah, UTM. Mr John S C Loh (1991). Property Management: An Overview. Paper presented at the Conference on Property Management. Kuala Lumpur. Woodson R. Dodge (2006). Be A Successful Property Manager. McGraw-Hill, New York.
E) COURSE CONTENT :

1.0

THE PRELIMINARY ESTIMATING METHODS 1.1 Determine the preliminary estimating methods 1.1.1 Describe the definition and importance of preliminary estimate 1.1.2 Relate the uses of the preliminary estimating methods 1.1.3 Calculate unit valuation method 1.1.4 Calculate floor area method 1.1.5 Calculate cubic content method 1.1.6 Compare advantages and disadvantages of the above methods THE BUILD UP RATE METHOD 2.1 Understand the build up rate method 2.1.1 Analyze the requirement and uses of the price rates, schedule of rates, base of price rate calculation; materials, labours, plants, over- heads and profits, price rate calculation 2.1.2 Compare concrete works using concrete mixing machine and hand mixing 2.1.3 Differentiate excavation work rate calculation; using hands and excavators, brick work rates calculation and reinforcement work rates

2.0

3.0

THE QUANTITY MEASUREMENT METHOD 3.1 Determine the quantity measurement substructure 3.1.1 Describe the uses and importance of Bills of Quantities 3.1.2 Choose unit of quantity measurement 3.1.3 Recognize the structural drawings 3.1.4 Estimate earthwork a. Site clearing b. Remove unsuitable material c. Cut and fill 3.1.5 Produce taking off quantities of substructure: a. Piling work i. Concrete pile ii.Timber pile b. Work Below Lowest Level (concrete, formwork and reinforcement) i. Foundation ii. Column stump
2/8

iii.Ground beam iv.Ground slab


4.0 QUANTITY SURVEY

4.1

Making quantity survey using billing method: 4.1.1 Produce taking off quantities of superstructure: a. Building work (concrete, formwork and reinforcement) i. Column ii. Upper floor iii.Suspended beam v. Roof beam b. Brickwork c. Finishing work i. Floor ii. Internal and external walls iii. Ceiling iv. Roof covering 4.1.2 Estimate External works a. Sewerage drainage b. Manhole c. Surface water drainage d. Road and hard standing

3/8