Agenda
Introduction
9-Aug-12
Page 2
Introduction
Subsea7, has over 35 years experience, of World Wide Hyperbaric Welding Operations. Present day Subsea 7 have performed: Over 700 Hyperbaric Welds on pipelines, 35 platform repairs 7 Hot Taps (Weld Induction Heating), in varying water depths and locations around the World.
Subsea7 Hyperbaric Welding capabilities encompass: Standard, Pipeline/Spool/Riser-Structure Tie Ins. Emergency Pipeline Repair, as well as, design, supply and operate for Clients, an on standby, Emergency Pipeline Repair System , EPRS. Hot Tap, utilizing Induction Heating. Structural Repairs.
9-Aug-12
Page 3
Conoco Phillips
There are three projects under the Ekofisk area Norway Capital Projects umbrella all involving Hyperbaric welding: Ekofisk VB Eldfisk
B11
9-Aug-12
Page 4
9-Aug-12
Page 5
Tie-in welds
Depth 70m Installation and tie-in of 24" oil and 30" gas Wye structures downstream 2/7B platform (Hyperbaric welding on 30 Gas pipeline) Tie-in of 24 and 30 pipelines going from 2/7S riser to Wye Structure downstream 2/7B platform. Subsea re-routing of Embla pipeline P2040 to 2/7S platform The tie-ins for the WYEs are scheduled for the field shutdown during june 2013 Fabrication of 28 off spools (30,24 and 14).
9-Aug-12
Page 6
B11 By-Pass
Background
The Norpipe gas pipeline designated P2028N is a 36" natural gas pipeline which transports gas from the Ekofisk Area , Draupner and Valhall Fields to Norsea Gas Terminal at Emden in Germany. Norpipe and the Emden Plant have been in operation since 1977 exporting gas from Ekofisk and other Norwegian fields to continental Europe. The pipeline and receiving terminal are operated by Gassco
9-Aug-12
Page 7
9-Aug-12
Page 8
9-Aug-12
Page 10
9-Aug-12
Page 11
9-Aug-12
Page 12
9-Aug-12
Page 14
9-Aug-12
Page 15
Assets
Seven Atlantic
Delivery: 2009 Owner: Subsea 7 L:142m, B: 26m Deck Area: 1200m2 Crane: 120Te SWL Dive System: 24 man, twin bell (port, starboard) 2x 18 men HRV ROV: 2x Obs-ROV Options for WROW Operation area: North Sea (UK & Norway)
The Seven Atlantic has been a great success and has been working since 23rd March 2010 and completed over 1,100 dives
9-Aug-12
Page 17
Seven Havila
Delivery: 2011 Owner: Subsea 7 & Havila 50/50
L:120m, B: 23m
Deck Area: 1050m2 Crane: 250Te SWL Dive System: 24 man, twin bell (port, starboard) 2x 24 men HRV ROV: 1x Obs-ROV Options for WROW Acc: 120 persons Operation area: North Sea (UK/Norway/DK)
9-Aug-12 Page 18
9-Aug-12
Page 19
Seven Pelican
Built: 1985 Owner: Subsea 7 L:94m, B: 18m Deck Area: 670m2 Crane SWL: Hydralift 120Te SWL (HC), 400m reach Dive System: 18 man, twin bell (port, starboard) 2x16 men HRV ROV: 1xObs- ROV Acc: 105 persons Operation area: North Sea (UK/ Norway/DK)
9-Aug-12 Page 20
Acergy Osprey
Built: 1984 Owner: Subsea 7
L:102m, B: 20m
Deck Area: 1100m2 Crane SWL: 150Te SWL Dive System: 18 man, twin bell system 1x18man HRV ROV: 1xObs-ROV ACC: 102 persons Operation area: North Sea (UK/Norway/DK)
9-Aug-12
Page 21
9-Aug-12
Page 22
Rockwater 1 Built: 1982 Owner: Subsea 7 L:98m, B: 18m Deck Area: 550m2
Rockwater 2 Built: 1983 Owner: Subsea 7 L:119m, B: 22m Deck Area: 1150m2 Crane SWL: 300Te SWL, 1000m reach Crane SWL: 100Te, 300m Dive System: 16 man, single bell 1x16 man HRV ROV: 1xWROV ACC: 106 persons
Discovery Built: 1990 Owner: Subsea 7 L:125m, B: 20m Deck Area: 1200m2
Acergy Harrier Built: 1985 Owner: Subsea 7 L:83m, B: 19m Deck Area: 1000m2
Owner: Subsea 7
L:138m, B: 20m Deck Area: 1200m2 Crane SWL: 250Te SWL Dive System: 16 man, twin bell system 1x18man HRV ROV: 2xWROV ACC: 114 persons Operation area: UK/DK (WW)
Crane SWL: Hydralift 120Te SWL, knuckle boom, 500m reach Dive System: 18 man, single bell 1x18 man HRV ROV: 1x Obs-ROV ACC: 106 persons Operation area: UK/DK and WW
ACC: 97 persons
Operation area: UK/DK/WW
ACC: 86 persons
Operation area: Brasil (WW)
9-Aug-12
Page 23
Subsea7 own and operate 3, Hyperbaric Welding Systems. Each system consists of a Habitat, services umbilicals, welding umbilical, hydraulic umbilicals hydraulic power units, hot water machines, containerised Habitat/Weld Control, workshops, equipment stores, pre heating systems, (induction heating invertors for SH2), general stores, consumables and stand alone, electrical generators, as and when required. Finally, each system has 3 x hydraulically powered, pipe handling frames, PHFs , which facilitate up/down, left/right movements of pipeline or spool piece, one of the PHFs, has push/pull capability, for spool piece installation and final welding fit up. All three systems can accommodate pipes, ranging in diameter , from 6/ 153mm to 42/1067mm. The systems are operated in Saturation Diving mode (Heliox) , and can work in water depths ranging from -15msw to -300msw, (CHAS -200msw). However, the vast majority of Client, Hyperbaric Welding Projects, have taken place in water depth ranges, -20msw to -185msw. 2 x Seahorse, Habitat Pipeline Welding Systems, Seahorse 1 and 2 can perform standard tie ins and Emergency Pipeline Repairs and are rated to -300msw working depth.
9-Aug-12
Page 24
9-Aug-12
Page 25
Hyperbaric Welding
9-Aug-12
Page 26
Seahorse
Max 42 OD
9-Aug-12
Page 27
North Sea, UK, 2007. Structure 30yrs Service. Brace parted, @ -45msw, 1.2dia x 50mm wt. Project Specific Habitat
9-Aug-12
Page 28
Dolphin Energy, Qatar. Subsea7 design and to build 1219mm dia, (48), Seahorse, Hyperbaric Habitat, EPRS capability. Ongoing.
9-Aug-12
Page 29
9-Aug-12
Page 30
SH2, Hot Tap Habitat, with Top Hat for B/V Assembly Stowage
9-Aug-12
Page 31
Hyperbaric welding-Methodology
Lift and shift of the south section to perform the second weld:
9-Aug-12
Page 32
Hyperbaric welding-Methodology
9-Aug-12
Page 33
seabed-to-surface
www.subsea7.com