DUTIES AND RESPONSIBILITIES

CONSTRUCTION Project Manager / Consultant. A person or entity who is hired by the project owner, to act in the owners behalf concerning supervision and monitoring of all matters related to the overall execution of a construction project.

Construction Safety and Health Officer

Any employee / worker trained and, in addition to regular duties and responsibilities, tasked by the employer to implement occupational safety and health program in accordance with the provisions of the occupational safety and health standards (OSHS)

General Constructors

Any contractors who as general supervision over other constructor in the execution of the project and who directly receives instruction from the owner or construction manager.

Project Manager

The overall technical of the general contractor and / or the subcontractor in charge of the actual execution of a construction project.

Resident Engineer

A duly licensed engineer who shall be task to be present at the construction site at all times, whenever work is being undertaken, and shall have the responsibility of assuring the technical conformance of all designs, materials processes, work procedures rendered for the execution of the construction project, including safety and health of all persons within the construction site.

WORK PROCEDURE ADMIN


1.TEMPORARY WORKS: - INSTALLATION OF TEMPORARY WALL - RELOCATION OF EXISTING UTILITIES - DRAINAGE LINE - FIRE HYDRANT / CABINET - AIRCON 2.EARTHWORKS: HAULING OF EXCAVATION MATERIALS 3.CONCRETING FOUNDATION:

4.CONCRETING OF PEDESTAL: 5.MANSORY WORKS: - CHB LAYING - PLASTERING 6.STRUCTURAL STEEL WOKS: - HIP TRUSS / PURLINS - CONNECTION PURLINS TO EXISTING - CONNECT PURLINS - PROVIDE PROTECTION BEFORE RIDGE ROLL 7. ROOFING WORKS: 8.FINISHING AND CLEARING:

WORK PROCEDURE MIXING AREA 1


1. RELOCATION OF EXISTING UTILITIES: PIPE ROCK

DRAINAGE LINE ELECTRICAL MANHOLE SEVER MANHOLE ACCU AND DUCTINGS FIRE HYDRANT AN CABINET

2. INSTALLATION OF TEMPORARY WALL 3. EXCAVATION: SLOPE PROTECTION SAND BAGGING HAULING OF EXCAVATED MATERIALS

4. INSTALLATION OF REBARS: FORMS CONCRETING

5. INSTALLATION OF PEDESTAL: FORMS CONCRETING

6. BACKFILLING BASE COARSE

7. CONCRETING OF COLUMN TO 2ND FLOOR: PROPPING 2ND FLOOR SLAB

8. CONCRETING OF 2ND FLOOR SLAB 9. CONCRETING OF 3RD FLOOR SLAB: 10. PROPPING FOR 2ND FLOOR SLAB

CONCRETING OF 3RD FLOOR SLAB:

11.

DISMANTILLING OF PROPPING FOR 2ND FLOOR SLAB ON FILL PREPARATION CONCRETING OF SLAB ON FILL

MANSORY WORKS: DISMANTILLING OF PROPPING FOR 3RD FLOOR.

12.

STRUCTURAL STEEL WORKS:

WORK PROCEDURE MIXING AREA 2

1. TEMPORARY WORKS: - INSTALLATION OF TEMPORARY WALL - INSTALLATION OF EXAUST / IN TAKE AIR - INTALLATION OF WATER PUMP - DISMANTILLING OF EXISTING UTILITIES - TEMPORARY LIGTHINGS 2. DEMOLITION OF SLAB: - HAULING OF DEBRIS 3. EXCAVATION: - SLOPE PROTECTION - SAND BAGGING - HAULING OF EXCAVATED MATERIALS 4. INSTALLATION OF REBARS:

- FORMS - CONCRETING 5. INSTALLATION OF PEDESTAL - FORMS - CONCRETING 6. RESTORATION OF SLAB: 7. COLUMN ERECTION: - JIB POLE - CHAIN BLOCK - SPLICING AND CONNECTION 8. CHB ZOCALO WALL: - INSIDE WORK AREA 9. OPENING OF EXISTING ROOFING: - FLASHING ALL CORNERS OF OPENING 10. CONTINUE STRUCTURAL STEEL WORKS ABOVE ROOFING: 11. ROOFING WORKS: 12. FINISHING AND CLEARING: