3. Economizer (H Module). Rotate the economizer into vertical and lower between the stack and the evaporator. Move the economizer forward and bolt to the G Module. Install anchor nuts to finger tight only. 4. Outlet Transition and Expansion Joint (I Module) While in the horizontal position, set the expansion joint, EJ2, on the outlet transition and bolt together. Do not remove the compressed shipping braces from the expansion joint at this point. Rotate the transition / expansion joint into the vertical position. Set in place between Module H and J and bolt to H. Remove the shipping braces from the expansion joint to allow the joint to expand up to the stack and bolt to the breach. 5. SCR and Steam Drum Support (Module F) While in the horizontal position with the module on its inlet face, install the AIG legs into the receiving flanges on the bottom of the module so that the elbows are pointing downstream. Do this by placing a 3 150RF gasket over each leg before sliding it into position and into the receiver on the floor. Use specified stud bolts to fasten to flanges on the roof. Install a flex hose at each AIG leg, securing with proper gaskets and bolting and attached these to the AIG header. Using a crane, lower the two AIG diverter panels into the SCR with the diverter vanes opening up in the downstream direction. Locate as per drawing D-128111-10X1A, secure with Ubolts. Once the U-bolts are tightened they should be prevented from backing off by peening or welding. Bolt the steam drum support steel, MK F1 to the module. Lift, rotate, and set the SCR / Steam Drum Support module, bolting it on the downstream end to Module G. Install the anchor bolt nuts on the outlet columns to 200 ft-lbs of torque. Install the anchor bolt nuts on the inlet columns to finger-tight only. 6. Evaporator 1 (Module E) Rotate and set evaporator 1, handling in the same manner as Evaporator 2. Bolt to SCR Module F. Install foundation nuts to finger tight only. 7. Inlet Transition (Module D) Rotate and set transition, keeping the module on the crance hook until it is bolted securely to the E Module (downstream). Install foundation nuts to finger tight only. 8. Duct Burner (Module C) With the module in the horizontal position sitting on the its outlet face, set and install the inlet expansion joint, EJ1. Do not remove shipping braces. Lift and set the Duct Burner Module
with burner nozzles facing downstream. Bolt to Module D. Install foundation nuts to finger tight only. 9. Bypass Damper (Module B)
Lift and set Bypass damper. Position up to the turbine exhaust and bolt together. With the inlet set, remove shipping braces on EJ1 and pull towards the outlet flange of the damper. Secure with bolts. Install necessary support steel for bypass stack and install bypass stack at the damper branch connection as necessary. 10. Bolting / Grouting Grout as required at all columns. Foundation washers and nuts are supplied by others. B. Steam Drum, Skids, and Piping 1. Steam Drum Lift and set Steam Drum, bolting fixed end to structure and leaving sliding end loose. 2. Skids Lift and set BMS Skid and AFCU Skids in their prescribed locations and grout. 3. Piping Install piping supports as indicated on drawing D-128111-10X1A. Install Riser, Downcomer, Crossover, and Steam Piping in accordance with drawing D-128111-10XP. Refer to piping isometric drawings for details and field welds. Follow QC requirements for ASME on code piping. Install interconnecting ammonia injection spool between AFCU skid and AIG header. Fabricate and install interconnecting piping between BMS skid and duct burner, BFW supply and Economizer, and blowdown from Steam Drum and Evaporators to Blowdown Drum. This piping is routed and provided by others. C. Ladders and Platforms The ladders and platforms may be installed by referring to EKI drawing D-128111-10XL. D. Instrument and Electrical Installation 1. Those instruments mounted on the BMS skid have been electrically terminated in the BMS control panel. 2. Refer to electrical drawings, B-128111-40 though -44, B-128111-50 and -51 for field wiring of ship loose instrumentation. 3. Wire power to BMS control panel per plant design.
REFERENCES: D-128111-10X1 D-128111-10X1A D-128111-10XP D-128111-10XL D-128111-10A1 B-12811-40s D-128111-10Z1 CE-2011101-1-A Module assembly drawing Erection Sub-Assemblies Piping assembly drawing Ladder / Platform assembly drawing General Arrangement (Plan) Electrical and Instrumentation Loop drawings Foundation Loading Plan Clyde Bergemann D5E Rotary Soot Blower