You are on page 1of 30

[Type text]

Financial Data Migration 8.8 to 9.0


Technical Design Documentation

[Type text]

Revision History Date 11th Aug 2011 Version 1 Description Initial Document Author Ravichandan Kumar Reviewed By

[Type text]

1. OVERVIEW................................................................................................................................................4

1.1 Functional Requirement.............................................................................................4 1.2 Design Overview.......................................................................................................4


2. DATA FLOW DIAGRAM.........................................................................................................................4 3. IMPACTED OBJECTS.............................................................................................................................5

3.1 Objects List ...........................................................................................................5 3.2 Functionality..........................................................................................................5 3.3 Rules for migration ................................................................................................7 3.4 Utilities.....................................................................................................................8 3.5 Technical Details.................................................................................................10 3.6 Report Layout......................................................................................................29
4. ISSUES AND ASSUMPTIONS...........................................................................................................29

[Type text]

1. OVERVIEW
1.1 Functional Requirement
After the iGATE-Patni Merger, as both iGATE and Patni uses PS Financial System for their internal operations, there is a need to integrate both the systems to create one single internal system to be used. As such, all the data residing in iGATE PS Financial systems need to be migrated to Patni PS Financial system.

1.2 Design Overview


As per the functionality, we need to use some data migration strategies and tools to migrate the data between the systems for the PS objects to achieve the requirements for the business to work. This design document will capture the very common data migration details including the migration tools and conditions for migration of data. We will have the specific design documents, for any major changes to the functionality or a new functionality addition. This document is divided into sections, where in each migration tool and development effort will be captured with the individual technical details.

2. DATA FLOW DIAGRAM

[Type text]

3. IMPACTED OBJECTS
3.1 Objects List
SLNo Object Name Object Type New/Update

3.2 Functionality
3.2.1 Migrate the Project Costing Details to Patni
As part of the data migration from the source 8.8 PS system to target 9.0 PS systems, the project details being maintained in the PS 8.8 system has to be migrated over to PS 9.0 system. This includes the Projects, activities, transaction, project team, project roles information also.

3.2.1.1 Navigation
Module Data Element PC Integration Template Source System Main Menu > Set Up Financials/Supply Chain > Product Related > Project Costing > Project Options > Integration Templates Main Menu > Set Up Financials/Supply Chain > Product Related > Project Costing > Project Options >Project Types Main Menu > Set Up Financials/Supply Chain > Product Related > Project Costing > Project Options >Status Types Main Menu > Set Up Financials/Supply Chain > Product Related > Project Costing > Project Options >Project Roles Main Menu > Set Up Financials/Supply Chain > Product Target System

PC

Project Types

PC

Status Types

PC

Project Roles

PC

Activity Types

[Type text]

PC

Employee Rates

PC PC PC PC PC

Projects Team Organization Status Activities

Related > Project Costing > Activity Options > Activity Types Main Menu > Set Up Financials/Supply Chain > Product Related > Project Costing > Pricing Structure > Rates by Employee Main Menu > Project Costing > Project Definition > General Information Main Menu > Project Costing> Project Definition> Team Main Menu > Project Costing > Project Definition> Organization Main Menu > Project Costing > Project Definition > Status Main Menu > Project Costing > Activity Definition > General Information

3.2.1.2 Component(s)
The following data elements from PS 8.8 system will be moved to PS 9.0 system using the component interface extraction and loading. Module PC PC PC PC PC PC Data Element Projects Organization Team Status Activities Transactions Source System PROJECT_GENERAL PSA_ORGPRJ_DEFN PROJECT_TEAM1 PC_PRJ_STATUS_PNLG PROJECT_ACTIVITY INTFC_PROJ_EXPRESS Target System

3.2.1.3 Component Interface(s)


The following component interfaces will be used for extracting data from PS 8.8 system that will be moved to PS 9.0 system. Module Data Element PC Projects PC Organization Source System Target System PROJECT_GENERAL PROJECT_INTFC_PROJ FO_PSA_DEFN FO_PSA_DEFN

[Type text]

PC PC

Activities Transactions

PROJECT_ACTIVITY PROJECT_INTFC_ACT PROJECT_STG_RESOURCES

3.2.1.4 Record(s)
The following data elements from PS 8.8 system will be moved to PS 9.0 system using the sql based data extraction and loading. Module Data Element PC Project Types PC PC PC PC Activity Types Project Roles Employee Rates Integration Template Source System PROJ_TYPE_TBL,PROJ _TYPE_RATE, PROJ_TYPE_LANG PROJ_ACT_TBL, PROJ_ACT_LANG PROJ_ROLE, PROJ_ROLE_LANG PC_RATE_EMPL PC_INT_TMPL;PC_INT_ TMPL_LNG;PC_INT_T MPL_GL; PC_INTMPL_GL_LG; Target System PROJ_TYPE_TBL,PROJ _TYPE_RATE, PROJ_TYPE_LANG PROJ_ACT_TBL, PROJ_ACT_LANG PROJ_ROLE, PROJ_ROLE_LANG PC_RATE_EMPL PC_INT_TMPL;PC_INT_ TMPL_LNG;PC_INT_T MPL_GL; PC_INTMPL_GL_LG;

3.3 Rules for migration


1. Only Active Projects to be migrated to INDIA business unit of 9.0. The project effective status should be either 'A' or if the end date of the project >= 1st Nov 2011. 2. Project Opportunity details to be loaded into the custom place holders in 9.0. 3. The project organization chartfield values to be moved are: business_unit_gl, department, operating unit, end customer and service operation. End Customer and Service Operation to be derived. 4. Only Active Activities for the above active projects to be moved. CONSULTING activity map to PROJECT PLAN. The bill plan details will be used to create project milestone activities. Percent Complete to be derived from Budgeting. 5. Project transactions for billing worksheet data needs to be migrated with the condition of transaction status being not distributed for invoice generation. 6. Other project transactions marked as billable however Final Invoice is not generated. 7. All team members in the above active projects. 8. While moving the team members, map the Project Manager to the PM role, all other members will be moved with a default project role being used in PS 9.0. 9. Project security details are migrated to contract support team tables in PS 9.0.

[Type text]

3.4 Utilities
3.4.1 Excel to CI Utility

3.4.1.1 Connection Information


Source System Target System

3.4.1.2 CI Name
Source System Target System

3.4.1.3 Data File


3.4.2 Data Mover Scripts

3.4.2.1 DMS File 3.4.2.2 DAT File

3.4.3 File Layouts

3.4.3.1 Record Names


Source System Record Details
Name New/Updated Record Type : : New : SQL table

Target System

Sl No. Field Name

Type

Length Edit

Key

3.4.4 Application Engine


Create the application engine IGS_DM_PRJAE which will be used to extract the data from the following component interfaces described in the source system columns: Projects refer: 3.2.1.3 Activities refer: 3.2.1.3

[Type text]

Transactions refer: 3.2.1.3 Organization refer: 3.2.1.3 Create the application engine PAT_DM_PRJAE which will be used to extract the data from the target records of ETL into the interface tables of 9.0 using the following component interfaces described in the target system columns. Projects refer: 3.2.1.3 Activities refer: 3.2.1.3 Transactions refer: 3.2.1.3 Organization refer: 3.2.1.3

3.4.4.1 State Record(s)


Record Name Record Details
Name New/Updated Record Type : : New : SQL table

Sl No. Field Name

Type

Length Edit

Key

3.4.4.2 Temporary Record(s)


Record Name Record Details
Name New/Updated Record Type : : New : SQL table

Sl No. Field Name

Type

Length Edit

Key

3.4.5 SQL scripts for ETL


Project Data Migration SQLs for ETL.docx

3.4.6 Third Party Application

3.4.6.1 Integration Broker


Message Source System Target System

[Type text]

Service Operation Source System

Target System

External Node Details Source System

Target System

WSDL File Source System

Target System

3.5 Technical Details


Source System
1. Application engine to be created as described in section 3.4.4 above. 2. Logic for the application engine: Extract the projects data using the project CI described in 3.2.1.3 above. Logic should be written to extract project which are either active or whose end date is greater than or equal to 01-nov-2011. The percent complete data for all the projects to be overridden with the data provided by support. Also the Project Manager data from 8.8 should be moved into the PROJECT_MANAGER field in 9.0 CI. Once the projects are loaded, update the Opportunity details in the following custom place holders: Extract all the team members from the project team. The project manager should be moved using the project manager role PM DEL. Extract the organization details for projects and add additional chartfield values of End Customer being derived from contract project association and Service Offering provided by Delivery. Extract the activities for the above projects using the activity CI described in 3.2.1.3 above. Also if the project activity is associated to a contract line, which has milestone events associated, those milestones will become activities as follows: a. Two additional levels of activities will be created. At the second level we have to create activity id 'BILLING_MIL' below the 'Project plan' activity.

[Type text]

b. Below the BILLING_MIL' activity, all the milestones will be created as activities having the activity id in the format of 'MILESTONE_1', 'MILESTONE_2' and so on, with the same description. The end date for these activities will be the 'EVENT DATE' defined for the milestone in the bill plan. c. The milestones marked as completed will all be consolidated into one single activity, with the activity end date of 31-dec-2011 and start date being the minimum of the milestone event date. As the activity structure is changed from 8.8 to 9.0, derive the level numbers and WBS ID for the activities and associate them with the relevant field in the CI. Additional activity should be created for all the projects with activity ID and description of TRASH_ACTIVITY. Transactions to be moved using the criteria: o Project transactions for billing worksheet data needs to be migrated with the condition of transaction status being not distributed for invoice generation. ANALYSIS_TYPE in BIL,BWK; BI_DISTRIB_STATUS in W,N; EX_DOC_TYPE = 'B'; PM_REVIEW_FLAG = 'Y'. o Other project transactions marked as billable however Final Invoice is not generated should also be migrated. ANALYSIS_TYPE in BIL; BI_DISTRIB_STATUS in W,N; PM_REVIEW_FLAG = 'Y'. Project security details are migrated to contract support team tables in PS 9.0. Support team members should be moved according to the mapping of the support team roles.

Source to Target record field mapping Projects


Target Field Name INTFC_ID INTFC_LINE_NUM BUSINESS_UNIT PROJECT_ID INTEGRATION_TMPL Type Number Number Character Character Character Description Batch interface identifier. Unique batch line identifier. Prompts from the SP_BU_PC_NONVW table. Unique project identifier. Must be a value from the Integration Template table (PC_INT_TMPL). Default value is INTEGRATION_TMPL.OPR_DEF_TBL_PC if not provided in the source file. Project description up to 30 characters. Prompts from the PROJ_TYPE_TBL table. Note. The default value of the rate set or rate plan is based on the project type if you associate a predefined rate set or rate plan with the project type and include the project type in the source file. Project description up to 254 characters. PROJECT PROJECT PROJECT Source Record Source Field Name 99999 Calculated value BUSINESS_UNIT PROJECT_ID INTEGRATION_TMPL

DESCR PROJECT_TYPE

Character Character

PROJECT PROJECT

DESCR PROJECT_TYPE

DESCR254

Character

PROJECT_DESCR

DESCR254

[Type text]

TEAM_MEMBER PROJ_ROLE EMAILID MANAGER_EFFDT

Character Character Character Date

Must be a value from the PROJ_TEAM_VW table. Project team member's project role. Prompts from the Project Role table (PROJ_ROLE). Project team member's email ID. MANAGER_EFFDT and MANAGER_START_DT must have the same date and must both be between the project start and end dates; otherwise, an error message appears. MANAGER_EFFDT, if left blank, is populated with the current date. If PROJECT_MANAGER is populated, PROJ_ROLE, MANAGER_START_DT, and MANAGER_END_DT are required to save the page; otherwise, an error message appears. Project team member's role type. If PROJECT_MANAGER is populated, this field is required to save the page. MANAGER_EFFDT and MANAGER_START_DT must have the same date and must both be between the project start and end dates; otherwise, an error message appears. If PROJECT_MANAGER is populated, this field is required to save the page. Project's status effective date. Populated with %Date (current server date) if not provided in the source file. Must be a value from the PROJ_STATUS_TBL table If a project status is provided in the source file, it must be previously defined against a processing status in the PROJ_STATUS_TBL table. If a project status is not provided, the default is based on the PC_STAT_DEFAULT table. Project team member's start date. Project team member's end date. Percent project is completed. User-definable field. User-definable field. User-definable field. User-definable field. User-definable field. User-definable field. User-definable field. User-definable field. Prompts from the CURRENCY_CD_TBL table. User-definable field. User-definable field.

PROJ_TEAM_SCHED PROJ_TEAM_SCHED PROJ_TEAM_SCHED

TEAM_MEMBER PROJ_ROLE EMAILID EFFDT

PROJECT_MGR
PROJECT_MANAGER

PROJECT_MANAGER

Character

PROJECT_MGR
ROLE_TYPE

ROLE_TYPE MANAGER_START_DT

Character Date

PROJECT_MGR
START_DT

PROJECT_MGR
END_DT

MANAGER_END_DT STATUS_EFFDT PROJECT_STATUS

Date Date Character

PROJECT_MGR PROJ_STATUS_ TBL


EFFDT PROJECT_STATUS

PROJ_STATUS_ TBL
PROJ_TEAM_SCHED PROJ_TEAM_SCHED PROJECT PROJECT PROJECT PROJECT PROJECT PROJECT PROJECT PROJECT PROJECT PROJECT PROJECT START_DT END_DT PERCENT_COMPLETE PROJECT_USER1 PROJECT_USER2 PROJECT_USER3 PROJECT_USER4 PROJECT_USER5 PROJECT_USER_DT6 PROJECT_USER_DT2 PC_USER_CURRENCY PROJECT_USERAMT1 PROJECT_USERAMT2

START_DT END_DT PERCENT_COMPLETE PROJECT_USER1 PROJECT_USER2 PROJECT_USER3 PROJECT_USER4 PROJECT_USER5 PROJECT_USER_DT6 PROJECT_USER_DT2 PC_USER_CURRENCY PROJECT_USERAMT1 PROJECT_USERAMT2

Date Date Number Character Character Character Character Character Date Date Character Sign Sign

[Type text]

PROJECT_USERAMT1 SET_OVERRIDE

Sign Character

EARLY_START_DT EARLY_FINISH_DT ACTUAL_START_DT ACTUAL_FINISH_DT BASELINE_START_DT BASELINE_FINISH_DT LATE_START_DT LATE_FINISH_DT PC_SCH_PRODUCT

Date Date Date Date Date Date Date Date Character

User-definable field. Populated from the SP_SETID_NONVW table. General ledger uses this setID for prompting and the Journal Edit process. The field is required if PeopleSoft General Ledger is installed or you use Projects Budgeting. Early start date. Early finish date. Actual start date. Actual finish date. Baseline start date. Baseline finish date. Late start date. Late finish date. Third-party product code is a text field with no edit. The field is used for informational purposes only and can help reference the source system for the transaction. Third-party project ID. If you import from a thirdparty product, this field is used to store the project ID that is from the third-party product. Third-party project description up to 40 characters. Flag that designates if the project is a summary or a detail project. Default value is N (no). Identifies the enforce project team option, such as PeopleSoft Expenses only, PeopleSoft Time and Labor only, Expenses and Time and Labor, or do not enforce. Default value is BUS_UNIT_OPT_PC.ENFORCE. Identifies the enforce project and activity team option, such as project and activity team, project team only, decide at the project level, or do not enforce. Default value is BUS_UNIT_OPT_PC.ENFORCE_TYPE. Provide a processing status value of A (active), I (inactive), or P (pending). If the source file does not contain a processing status, the default value is based on the Processing Status field on the Project Status Defaults page. Project request ID. Project request version. Schedule method, such as fixed units, duration, and work. Default value is BUS_UNIT_OPT_PC.PGM_SCHED_METHOD. Percent complete date and time. Holiday calendar. Default value is BUS_UNIT_OPT_PC.HOLIDAY_LIST_ID. Planned start date.

PROJECT PROJECT

PROJECT_USERAMT1 SET_OVERRIDE

PROJECT PROJECT PROJECT PROJECT PROJECT PROJECT PROJECT PROJECT

EARLY_START_DT EARLY_FINISH_DT ACTUAL_START_DT ACTUAL_FINISH_DT BASELINE_START_DT BASELINE_FINISH_DT LATE_START_DT LATE_FINISH_DT FS 8.8

PC_SCH_FIELD1

Character

PROJECT

PROJECT_ID

PC_SCH_FIELD2 SUMMARY_PRJ ENFORCE

Character Character Character

PROJECT PROJECT PROJECT

DESCR SUMMARY_PRJ ENFORCE

ENFORCE_TYPE

Character

PROJECT

ENFORCE_TYPE

PC_PROCESS_STATUS

Character

PROJ_REQUEST_ID PPK_PROJ_VERSION PGM_SCHED_METHOD

Character Character Character

PROJECT PROJECT PROJECT

PROJ_REQUEST_ID PPK_PROJ_VERSION PGM_SCHED_METHOD

PC_PERCENT_DTTM HOLIDAY_LIST_ID PLAN_STARTDT

Date/Time Character Date

PROJECT PROJECT PROJ_TEAM_SCHED

PC_PERCENT_DTTM HOLIDAY_LIST_ID PLAN_STARTDT

[Type text]

PLAN_ENDDT PLAN_PROJROLE PC_CALCULATE_SW

Date Character Character

Planned end date. Primary project role. Prompts from Project Role table (PROJ_ROLE). Calculate manually, delay calculations until save, or calculate in real time. Default value is BUS_UNIT_OPT_PC.PC_CALCULATE_SW. The level of WBS activities that are available for charging, such as all detail activities, level 1, level 2, and level 3. Default value is from BUS_UNIT_OPT_PC.CHARGING_LEVEL.

PROJ_TEAM_SCHED PROJ_TEAM_SCHED PROJECT

PLAN_ENDDT PLAN_PROJROLE PC_CALCULATE_SW

CHARGING_LEVEL

Character

PROJECT

CHARGING_LEVEL

Activities
Target Field Name INTFC_ID INTFC_LINE_NUM BUSINESS_UNIT PROJECT_ID Type Number Number Character Character Description Batch interface identifier. Unique batch line identifier. Prompts from the SP_BU_PC_NONVW table. You can bulk load projects and use the system's autonumber functionality to generate the next PROJECT_ID. In this case PROJECT_IDs are not required. However, if you perform update to projects, or incrementally add activities to projects, PROJECT_IDs are required and are validated against the PROJECT table. Activity IDs are to be moved as is. Only the CONSULTING activity ID will be mapped to PROJECT_PLAN activity. Mapping will be done in ETL. Also milestone activities will be derived and moved. Source Record Source Field Name 88888 Calculated value BUSINESS_UNIT PROJECT_ID

PROJ_ACTIVITY PROJ_ACTIVITY

ACTIVITY_ID

Character

PROJ_ACTIVITY

ACTIVITY_ID

ACTIVITY_DESCR ACTIVITY_TYPE PERCENT_COMPLETE EARLY_START_DT LATE_START_DT ACTUAL_START_DT EARLY_FINISH_DT LATE_FINISH_DT ACTUAL_FINISH_DT

Character Character Number Date Date Date Date Date Date

Activity description up to 30 characters. Prompts from the PROJ_ACT_TBL table. Default value is CODE. Schedule status percent complete. Early start date. Late start date. Actual start date. Early finish date. Late finish date. Actual finish date.

PROJ_ACTIVITY PROJ_ACTIVITY

ACTIVITY_DESCR ACTIVITY_TYPE Calculated value

PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY

EARLY_START_DT LATE_START_DT ACTUAL_START_DT EARLY_FINISH_DT LATE_FINISH_DT ACTUAL_FINISH_DT

[Type text]

BASELINE_FINISH_DT BASELINE_START_DT ACTIVITY_USER1 ACTIVITY_USER2 ACTIVITY_USER3 ACTIVITY_USER4 ACTIVITY_USER5 PC_ACT_USER_DT1 PC_ACT_USER_DT2 PC_USER_CURRENCY PC_ACT_USERAMT1 PC_ACT_USERAMT2 PC_ACT_USERAMT3 DESCR254 ACTIVITY_STATUS

Date Date Character Character Character Character Character Date Date Character Sign Sign Sign Character Character

Baseline finish date. Baseline start date. User-definable field. User-definable field. User-definable field. User-definable field. User-definable field. User-definable field. User-definable field. User-definable field. Prompts from the CURRENCY_CD_TBL table. User-definable field. User-definable field. User-definable field. Activity description up to 254 characters. Activity status. Prompts from the PROJ_STATUS_TBL table. Latest effective status. Activity status effective date. Populated with %Date (current server date) if not provided in the source file. Latest status effective date. Activity start date. Activity end date. Activity priority. Activity percentage complete. Indicates if activity is a milestone. Allows interest calculations for this project activity. Duration. Identifies the enforce project team option, such as PeopleSoft Expenses only, PeopleSoft Time and Labor only, Expenses and Time and Labor, or do not enforce. Enables change control. Default value is PROJECT.PC_CHC_SW.

PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACT_DESCR PROJ_ACT_STATUS

BASELINE_FINISH_DT BASELINE_START_DT ACTIVITY_USER1 ACTIVITY_USER2 ACTIVITY_USER3 ACTIVITY_USER4 ACTIVITY_USER5 PC_ACT_USER_DT1 PC_ACT_USER_DT2 PC_USER_CURRENCY PC_ACT_USERAMT1 PC_ACT_USERAMT2 PC_ACT_USERAMT3 DESCR254 ACTIVITY_STATUS

ACT_STATUS_EFFDT

Date

PROJ_ACT_STATUS

EFFDT

START_DT END_DT ACTIVITY_PRIORITY ACT_PCT_COMPLETE PC_MILESTONE_FLG AFUDC_ACT_SW PC_DURATION ENFORCE

Date Date Number Number Character Character Number Character

PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY

START_DT END_DT ACTIVITY_PRIORITY ACT_PCT_COMPLETE PC_MILESTONE_FLG AFUDC_ACT_SW PC_DURATION ENFORCE

PC_CHC_ACT_SW

Character

PROJ_ACTIVITY

PC_CHC_ACT_SW

[Type text]

PGM_SCHED_METHOD

Character

Schedule method, such as fixed units, duration, and work. Default value is PROJECT.PGM_SCHED_METHOD. Coded hierarchy identifier for each activity. Hierarchy grid subrecord.

PROJ_ACTIVITY

PGM_SCHED_METHOD

WBS_ID HGRID_LEVEL_SBR LEVEL1 LEVEL2 LEVEL3 LEVEL4 LEVEL5 LEVEL6 LEVEL7 LEVEL8 LEVEL9 LEVEL_NUM DEADLINE_DT CONSTRAINT_DT CONSTRAINT_TYPE COSTING_ACT_SW PC_ACT_OWNER CURRENCY_CD PC_ACT_DEF_CALC_MT

Character Subrecord Number Number Number Number Number Number Number Number Number Number Date Date Character Character Character Character Character

Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated DEADLINE_DT CONSTRAINT_DT CONSTRAINT_TYPE COSTING_ACT_SW PC_ACT_OWNER CURRENCY_CD PC_ACT_DEF_CALC_MT

Deadline date. Constraint date. Constraint type. Activity costing flag. Indicates whether an activity is available for charging. Activity owner. Prompts from PC_TEAM_PROM_VW table. Default value is PROJECT.CURRENCY_CD. Activity calculation method. Default value is PROJECT.PC_ACT_DEF_CALC_MT.

PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY PROJ_ACTIVITY

Transactions
Target Field Name INTFC_ID INTFC_LINE_NUM PC_RES_INTF_SBR BUSINESS_UNIT Type Number Number Subrecord Character Prompts from the SP_BU_PC_NONVW table. PROJ_RESOURCE BUSINESS_UNIT Description Batch interface identifier. Unique batch line identifier. Source Record Source Field 77777 Calculated

[Type text]

PROJECT_ID

Character

Prompts from the SP_PROJ_NONVW table. Prompts from the PROJ_ACT_VW table.

PROJ_RESOURCE

PROJECT_ID

ACTIVITY_ID

Character

PROJ_RESOURCE

ACTIVITY_ID

RESOURCE_ID

Character

Resource ID.

PROJ_RESOURCE

RESOURCE_ID

RESOURCE_ID_FROM

Character

Resource ID from.

PROJ_RESOURCE

RESOURCE_ID_FROM

BUSINESS_UNIT_GL

Character

Prompts from the SP_BUPCIT_NONVW table. Project business unit.

PROJ_RESOURCE

BUSINESS_UNIT_GL

BUSINESS_UNIT_PC

Character

PROJ_RESOURCE

BUSINESS_UNIT

JOURNAL_ID

Character

Journal ID.

PROJ_RESOURCE

JOURNAL_ID

JOURNAL_DATE

Date

Journal date.

PROJ_RESOURCE

JOURNAL_DATE

UNPOST_SEQ

Number

Unpost sequence.

PROJ_RESOURCE

UNPOST_SEQ

JOURNAL_LINE

Number

General ledger journal line number.

PROJ_RESOURCE

JOURNAL_LINE

FISCAL_YEAR

Number

Fiscal year.

PROJ_RESOURCE

FISCAL_YEAR

ACCOUNTING_PERIOD

Number

Accounting period.

PROJ_RESOURCE

ACCOUNTING_PERIOD

[Type text]

ACCOUNT

Character

Prompts from the GL_ACCT_BUGL_VW table. Prompts from the ALT_BUGL_VW table.

PROJ_RESOURCE

ACCOUNT

ALTACCT

Character

Derived

DEPTID

Character

Prompts from the DEPTID_BUGL_VW table. ChartField subrecord.

PROJ_RESOURCE

DEPTID

CF16_AN_SBR

Character

OPERATING_UNIT

Character

Prompts from the OPERUNT_BUGL_VW table. Prompts from the PRODUCT_BUGL_VW table. Prompts from the FUND_BUGL_VW table. Prompts from the CLASSCF_BUGL_VW table. Prompts from the PROGRAM_BUGL_VW table. Prompts from the BUD_REF_BUGL_VW table. Prompts from the AFFILIATE_VW table. Intraunit affiliate 1.

PROJ_RESOURCE

OPERATING_UNIT

PRODUCT

Character

Derived

FUND_CODE

Character

Derived

CLASS_FLD

Character

Derived

PROGRAM_CODE

Character

Derived

BUDGET_REF

Character

Derived

AFFILIATE

Character

PROJ_RESOURCE

AFFILIATE_INTRA1

Character

Derived

AFFILIATE_INTRA2

Character

Intraunit affiliate 2.

Derived

CHARTFIELD1

Character

Prompts from the CF1_BUGL_VW table. Prompts from the CF2_BUGL_VW table.

Derived

CHARTFIELD2

Character

Derived

[Type text]

CHARTFIELD3

Character

Prompts from the CF3_BUGL_VW table. Prompts from the Integration Template General Ledger table (PC_INT_TMPL_GL). Prompts from the Currency Codes table (CURRENCY_CD_TBL). Prompts from the STAT_BUGL_VW table. PROJ_RESOURCE

Derived

BUS_UNIT_GL_FROM

Character

BUS_UNIT_GL_FROM

CURRENCY_CD

Character

PROJ_RESOURCE

CURRENCY_CD

STATISTICS_CODE

Character

PROJ_RESOURCE

STATISTICS_CODE

LEDGER_GROUP

Character

Prompts from the SP_LEDGPC_NONVW table. Analysis type.

PROJ_RESOURCE

LEDGER_GROUP

ANALYSIS_TYPE

Character

PROJ_RESOURCE

ANALYSIS_TYPE

RESOURCE_TYPE

Character

Prompts from the Project Resource Type table (PROJ_RES_TYPE). Category.

PROJ_RESOURCE

RESOURCE_TYPE

RESOURCE_CATEGORY

Character

PROJ_RESOURCE

RESOURCE_CATEGORY

RESOURCE_SUB_CAT

Character

Subcategory.

PROJ_RESOURCE

RESOURCE_SUB_CAT

RES_USER1

Character

Transaction user 1.

PROJ_RESOURCE

RES_USER1

RES_USER2

Character

Transaction user 2.

PROJ_RESOURCE

RES_USER2

RES_USER3

Character

Transaction user 3.

PROJ_RESOURCE

RES_USER3

[Type text]

RES_USER4

Character

Transaction user 4.

PROJ_RESOURCE

RES_USER4

RES_USER5

Character

Transaction user 5.

PROJ_RESOURCE

RES_USER5

TRANS_DT

Date

Transaction date.

PROJ_RESOURCE

TRANS_DT

ACCOUNTING_DT

Date

Accounting date.

PROJ_RESOURCE

ACCOUNTING_DT

JRNL_LN_REF

Character

Journal line reference.

PROJ_RESOURCE

JRNL_LN_REF

OPEN_ITEM_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

OPEN_ITEM_STATUS

LINE_DESCR

Character

Journal line description.

PROJ_RESOURCE

LINE_DESCR

JRNL_LINE_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

JRNL_LINE_STATUS

JOURNAL_LINE_DATE

Date

Journal line date.

PROJ_RESOURCE

JOURNAL_LINE_DATE

FOREIGN_CURRENCY

Character

Prompts from the FRGN_CURR_VW table. Prompts from the Market Rate Data Types table (RT_TYPE_TBL). Foreign amount.

PROJ_RESOURCE

FOREIGN_CURRENCY

RT_TYPE

Character

PROJ_RESOURCE

RT_TYPE

FOREIGN_AMOUNT

Sign

PROJ_RESOURCE

FOREIGN_AMOUNT

[Type text]

RATE_MULT

Sign

Rate multiplier.

PROJ_RESOURCE

RATE_MULT

RATE_DIV

Number

Rate divisor.

PROJ_RESOURCE

RATE_DIV

CUR_EFFDT

Date

Currency effective date.

PROJ_RESOURCE

CUR_EFFDT

PC_DISTRIB_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

PC_DISTRIB_STATUS

GL_DISTRIB_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

GL_DISTRIB_STATUS

PROJ_TRANS_TYPE

Character

Prompts from the Project Transaction Types table (PROJ_TRANS_TYPE). Prompts from the Project Transaction Codes table (PROJ_TRANS_CODE). Transaction status.

PROJ_RESOURCE

PROJ_TRANS_TYPE

PROJ_TRANS_CODE

Character

PROJ_RESOURCE

PROJ_TRANS_CODE

RESOURCE_STATUS

Character

PROJ_RESOURCE

RESOURCE_STATUS

DESCR

Character

Description.

PROJ_RESOURCE

DESCR

UNIT_OF_MEASURE

Character

Prompts from the Units of Measure table (UNITS_TBL). Prompts from the PROJ_TEAM_VW table.

PROJ_RESOURCE

UNIT_OF_MEASURE

EMPLID

Character

PROJ_RESOURCE

EMPLID

EMPL_RCD

Number

Employee record number.

PROJ_RESOURCE

EMPL_RCD

[Type text]

SEQ_NBR

Number

Sequence number.

PROJ_RESOURCE

SEQ_NBR

TIME_RPTG_CD

Character

Time reporting code.

PROJ_RESOURCE

TIME_RPTG_CD

JOBCODE

Character

Job code.

PROJ_RESOURCE

JOBCODE

COMPANY

Character

Company.

PROJ_RESOURCE

COMPANY

BUSINESS_UNIT_AP

Character

Prompts from the SP_BU_AP_NONVW table. Prompts from the PROJ_VENDOR_VW table. Voucher ID.

PROJ_RESOURCE

BUSINESS_UNIT_AP

VENDOR_ID

Character

PROJ_RESOURCE

VENDOR_ID

VOUCHER_ID

Character

PROJ_RESOURCE

VOUCHER_ID

VOUCHER_LINE_NUM

Number

Voucher line number.

PROJ_RESOURCE

VOUCHER_LINE_NUM

APPL_JRNL_ID

Character

Prompts from the Journal Generator template table (JRNLGEN_APPL_ID). Payments.

PROJ_RESOURCE

APPL_JRNL_ID

PYMNT_CNT

Number

PROJ_RESOURCE

PYMNT_CNT

DST_ACCT_TYPE

Character

Prompts from the field's translate values.

PROJ_RESOURCE

DST_ACCT_TYPE

PO_DISTRIB_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

PO_DISTRIB_STATUS

[Type text]

BUSINESS_UNIT_PO

Character

Prompts from the SP_BU_PM_NONVW table. Requisition ID.

PROJ_RESOURCE

BUSINESS_UNIT_PO

REQ_ID

Character

PROJ_RESOURCE

REQ_ID

REQ_LINE_NBR

Number

Requisition line number.

PROJ_RESOURCE

REQ_LINE_NBR

REQ_SCHED_NBR

Number

Requisition schedule number.

PROJ_RESOURCE

REQ_SCHED_NBR

REQ_DISTRIB_NBR

Number

Requisition distribution number.

PROJ_RESOURCE

REQ_DISTRIB_NBR

PO_ID

Character

Purchase order number.

PROJ_RESOURCE

PO_ID

DUE_DATE

Date

Delivery due date from.

PROJ_RESOURCE

DUE_DATE

LINE_NBR

Number

Line number.

PROJ_RESOURCE

LINE_NBR

SCHED_NBR

Number

Schedule number.

PROJ_RESOURCE

SCHED_NBR

DISTRIB_LINE_NUM

Number

Distribution line.

PROJ_RESOURCE

DISTRIB_LINE_NUM

AM_DISTRIB_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

AM_DISTRIB_STATUS

BUSINESS_UNIT_AM

Character

Prompts from the SP_BU_AM_NONVW table.

PROJ_RESOURCE

BUSINESS_UNIT_AM

[Type text]

ASSET_ID

Character

Prompts from the PROJ_ASSET_VW table. Prompts from the PROFILE_PCAM_VW table. Prompts from the Asset Cost Type Definition table (COST_TYPE_TBL). Asset book name.

PROJ_RESOURCE

ASSET_ID

PROFILE_ID

Character

PROJ_RESOURCE

PROFILE_ID

COST_TYPE

Character

PROJ_RESOURCE

COST_TYPE

BOOK

Character

PROJ_RESOURCE

BOOK

INCENTIVE_ID

Character

Prompts from the PC_PROJ_GNT_VW table. Milestone sequence.

PROJ_RESOURCE

INCENTIVE_ID

MSTONE_SEQ

Number

PROJ_RESOURCE

MSTONE_SEQ

CONTRACT_NUM

Character

Prompts from the CA_CONTRACT_VW table. Contract line number.

PROJ_RESOURCE

CONTRACT_NUM

CONTRACT_LINE_NUM

Number

PROJ_RESOURCE

CONTRACT_LINE_NUM

CONTRACT_PPD_SEQ

Number

Prepaid add sequence.

PROJ_RESOURCE

CONTRACT_PPD_SEQ

BI_DISTRIB_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

BI_DISTRIB_STATUS

BUSINESS_UNIT_BI

Character

Prompts from the SP_BU_BI_NONVW table. Billing date.

PROJ_RESOURCE

BUSINESS_UNIT_BI

BILLING_DATE

Date

PROJ_RESOURCE

BILLING_DATE

[Type text]

INVOICE

Character

Invoice.

PROJ_RESOURCE

INVOICE

REV_DISTRIB_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

REV_DISTRIB_STATUS

BUSINESS_UNIT_AR

Character

Prompts from the SP_BUARED_NONVW table. Prompts from the PROJ_CUST_VW table.

PROJ_RESOURCE

BUSINESS_UNIT_AR

CUST_ID

Character

PROJ_RESOURCE

CUST_ID

ITEM

Character

Prompts from the ITEM_OPEN_PC_VW table. Item line.

PROJ_RESOURCE

ITEM

ITEM_LINE

Number

PROJ_RESOURCE

ITEM_LINE

ITEM_SEQ_NUM

Number

Item sequence number.

PROJ_RESOURCE

ITEM_SEQ_NUM

DST_SEQ_NUM

Number

Distribution sequence.

PROJ_RESOURCE

DST_SEQ_NUM

EX_DOC_ID

Character

PeopleSoft Expenses document ID.

PROJ_RESOURCE

EX_DOC_ID

EX_DOC_TYPE

Character

Prompts from the field's translate values.

PROJ_RESOURCE

EX_DOC_TYPE

RESOURCE_QUANTITY

Sign

Quantity.

PROJ_RESOURCE

RESOURCE_QUANTITY

RESOURCE_AMOUNT

Sign

Project business unit amount.

PROJ_RESOURCE

RESOURCE_AMOUNT

[Type text]

BUDGET_HDR_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

BUDGET_HDR_STATUS

KK_AMOUNT_TYPE

Character

Prompts from the field's translate values.

PROJ_RESOURCE

KK_AMOUNT_TYPE

KK_TRAN_OVER_FLAG

Character

Override transaction.

PROJ_RESOURCE

KK_TRAN_OVER_FLAG

KK_TRAN_OVER_OPRID

Character

Override user ID.

PROJ_RESOURCE

KK_TRAN_OVER_OPRID

KK_TRAN_OVER_DTTM

DtTm

Override date.

PROJ_RESOURCE

KK_TRAN_OVER_DTTM

BUDGET_OVER_ALLOW

Character

Budget overrun allowed.

PROJ_RESOURCE

BUDGET_OVER_ALLOW

BUDGET_LINE_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

BUDGET_LINE_STATUS

BUDGET_DT

Date

Budget date.

PROJ_RESOURCE

BUDGET_DT

LEDGER

Character

Prompts from the SP_LEDPC_NONVW table. Prompts from the field's translate values.

PROJ_RESOURCE

LEDGER

BD_DISTRIB_STATUS

Character

PROJ_RESOURCE

BD_DISTRIB_STATUS

BUSINESS_UNIT_BD

Character

Prompts from the SP_BUPCBD_NONVW table. F&A status.

PROJ_RESOURCE

BUSINESS_UNIT_BD

FA_STATUS

Character

PROJ_RESOURCE

FA_STATUS

[Type text]

TIME_SHEET_ID

Character

Time report ID.

PROJ_RESOURCE

TIME_SHEET_ID

SHEET_ID

Character

Report ID.

PROJ_RESOURCE

SHEET_ID

DT_TIMESTAMP

DtTm

Date timestamp.

PROJ_RESOURCE

DT_TIMESTAMP

VCHR_DIST_LINE_NUM

Number

Distribution line number.

PROJ_RESOURCE

VCHR_DIST_LINE_NUM

PM_REVIEWED

Character

Prompts from the field's translate values.

PROJ_RESOURCE

PM_REVIEWED

PRICED_RATE

Sign

Priced rate.

PROJ_RESOURCE

PRICED_RATE

ACTIVITY_ID_DETAIL

Character

Prompts from the Activity ID Detail Prompt table (PC_ACT_DETAIL). Prompts from the field's translate values.

PROJ_RESOURCE

ACTIVITY_ID_DETAIL

CST_DISTRIB_STATUS

Character

PROJ_RESOURCE

CST_DISTRIB_STATUS

TXN_LMT_TRANS_ID

Character

Transaction limit ID.

PROJ_RESOURCE

TXN_LMT_TRANS_ID

EVENT_NUM

Number

Event number.

PROJ_RESOURCE

EVENT_NUM

CA_FEE_STATUS

Character

Prompts from the field's translate values.

PROJ_RESOURCE

CA_FEE_STATUS

FMS_WHO_SBR

Subrecord

Date, time and operator subrecord.

PROJ_RESOURCE

[Type text]

FMS_DTTM_STAMP

DtTm

Date/time stamp.

PROJ_RESOURCE

FMS_DTTM_STAMP

FMS_OPRID

Character

Operator ID.

PROJ_RESOURCE

FMS_OPRID

FMS_LASTUPDDTTM

DtTm

Last update date/time.

PROJ_RESOURCE

FMS_LASTUPDDTTM

FMS_LASTUPDOPRID

Character

Last update user ID.

PROJ_RESOURCE

FMS_LASTUPDOPRID

PROJ_ROLE

Character

START_DATE END_DATE

Date Date

Project role. Prompts from the PROJ_ROLE_SECVW table. Start date for Gen Stand. End date.

PROJ_RESOURCE

PROJ_ROLE

PROJ_RESOURCE PROJ_RESOURCE

START_DATE END_DATE

ETL
Create the records listed and described in section 3.2.1.4 above, in the source and target data structure for ETL. Use the SQL scripts for ETL described in section 3.4.5 to migrate the data in the source records for ETL. Update the business unit to INDIA from 100 in the output. Map the CONSULTING activity ID to PROJECT_PLAN activity. Other project setup mapping details to be finalized. Once all the above activities are finished, load the data into the target structures for ETL. Move the setup data from the target structures of ETL into the destination 9.0 PS records for setups as described in the section 3.2.1.4 above.

Target System
Write an application engine described in section 3.4.4 above to extract all the data from the target ETL records into a csv file. Use the CI described in section 3.2.1.3 target system column (for projects and activities), to load the data present in the above csv files to the respective project and activity interface

[Type text]

tables. Update the interface ID to 99999 for projects and 88888 for activities and increment the interface line number starting with 1. Once the above application engine loads data into INTFC_PROJ_GEN and INTFC_ACT_GEN records, navigate to PROJECT COSTING > Third Party Integration > Load Project and Activities. Run the process providing appropriate run control ID and selecting the run control option: Both Projects and Activities and interface option All. Navigate to PROJECT COSTING > Third Party Integration > Review Project Details, and provide the interface id 99999 to find if any rows of data has gone into error. Navigate to PROJECT COSTING > Third Party Integration > Review Activity Details, and provide the interface id 88888 to find if any rows of data has gone into error. Once all the projects and activities are loaded successfully, use the CI described in section 3.2.1.3 for loading the project organization. Use the CI described in section 3.2.1.3 target system column (for transactions), to load the data present in the above csv files to the transaction interface table. Update the interface ID to 77777 and increment the interface line numbers starting with 1. Once the above application engine loads data into INTFC_PROJ_RES record, navigate to PROJECT COSTING > Third Party Integration > Load Transactions. Run the process providing appropriate run control ID and selecting the default run control options for all the fields. Navigate to PROJECT COSTING > Third Party Integration > Review Transaction Details, and provide the interface id 77777 to find if any rows of data has gone into error. Finally migrate the project delivery manager, engagement manager and field manager into the project support team of 9.0

3.6 Report Layout


N/A

4. ISSUES AND ASSUMPTIONS


Issues: 1. No movement of bench and management projects and their resources. They will be tracked using the cost codes in PS 9.0 system. 2. Business will provide the additional details for End Customer and Service offering and they will be moved as part of Organization structure for Projects. 3. Project Managers have to create the project plan; once the projects are moved into PS 9.0 from PS 8.8 including assigning team members to activities. 4. Communication for employee expenses transactions to be closed by December 2011 for projects ending earlier than 31-Oct-2011 as those projects will not be migrated to new environment. 5. By mid November, project managers are given training and demo instances to evaluate the effort required for managing projects in the new PS 9.0 system. 6. PS 8.8 finance support team to provide the percent completion numbers for migration.

[Type text]

7. Derive the region and rate for project resources using the project roles being maintained in PS 8.8. PS 8.8 finance support team to do the same and provide to data migration team. PS 9.0 team to provide the data structure to move the same.