The document shall be completed with recommended tests to be performed at site after erection and before voltage application

Project name PO no. Requisition no. & Issue Doc. title Issue no Issue date

CTE 720 MW UTE PECEM 7500013313 M006-NN-MR-21-IS02 INSPECTION TESTS LIST AND PROCEDURE (IN WORKSHOP) 02 24 / 03 / 2010 DRY POWER TRANSFORMERS 10BFT01 to 10BFT06 20BFT01 to 20BFT06 90BHT01 to 90BHT05

Equipment name Equipment ID no. / Tag no. Client / End user doc. no. CREA Number
02 01
ISSUE

Revised According To Comments First Issue


DESCRIPTION

Walmir Walmir
ISSUED BY

Arago Arago
CHECKED

Roberto Roberto
APPROVED

24/03/2010 25/02/2010
DATE

Contractor ID.Code / _Is. Doc. Code Status Checked / Signature

M006-NN-VD-021-0021 Department Date

Doc. Status Code: 1 Accepted 2 Accepted as noted 3 Not accepted Mabes acceptance of this document does in no way relieve the supplier of his contractual obligations.
This document is MABEs property, and cannot be used by others for any purpose, without prior written consent

REVIEWED WITH COMMENTS

PLAN INSPECTIONS AND TESTS


LOW VOLTAGE DRY TRANSFORMERS - MODEL TAM

ITENS
1. ROUTINE TESTS

STANDARD

1.1. Material and accessories reports 1.2. Visual inspection 1.3. Painting check (color and thickness), where applicable 1.4. Dimensional inspection 1.5. Insulation resistance measurement between windings and each windings and earth 1.6. Measurement of winding resistance 1.7. Measurement of voltage ratio and check of phase displacement 1.8. Measurement of short-circuit impedance and load loss 1.9. Measurement of no-load loss and current 1.10. Separate-source voltage withstand test 1.11. Induced AC withstand voltage test 1.12. Partial discharge Measurement 1.13. Measurement of sound level 1.14. Operation accessories check

Aplicable standards Approved drawings Painting procedure Approved drawings 2,5 kV for 60 IEC 60076-1 Par.10.2 IEC 60076-1 Par.10.3 IEC 60076-1 Par.10.4 IEC 60076-1 Par.10.5 IEC 60076-11 Par.19 IEC 60076-3 Par.11 IEC 60076-11 Par.20 IEC 60076-3 Par.12.2.1 IEC 60076-11 Par. 22 IEC 60270 IEC 60076-3 Ann. A IEC 60076-10 Approved drawings

2. TYPE TESTS (PERFORMED ON ONE SAMPLE EACH RATING)


2.1. Lighting impulse test: full wave 2.2. Temperature rise test IEC 60076-11 Par.21 IEC 60076-3 Par.13 IEC 60072-11 Par.23 IEC 60076-2

3. SPECIAL TESTS
3.1. Measurement of the harmonics on the no-load current IEC 60076-1

4. REPORT OF TESTS Elaborate by: Walmir Pazini Date: 25/03/2010.

ZILMER INELTEC CONSTRUES ELTRICAS LTDA. Rua So Joo Clmaco, 315 - So Joo Clmaco - So Paulo - SP - CEP 04255-000 PABX (011) 2148-7121 / Fax (011) 2148-7111 zilmer@zilmer.com.br / www.zilmer.com.br

REVIEWED WITH COMMENTS

FINAL TESTING OF TRANSFORMERS PROCEDURE

RECORD REVIEWS:

2 1 Rev.

25/03/2010 24/02/2010 Date

Revised According To Comments First Issue Description

Walmir Walmir Issued By

Arago Arago Approved

Code PQZ - 010

Review 2

Date 25/03/2010

Page 1 de 7

This document is the property of Zilmer Ineltec Construction Electrical Ltda., Reproduction is prohibited without our prior permission. Copy valid only in electronic format. Printed copies of this document are only valid with the stamp "Copy Controlled".

REVIEWED WITH COMMENTS

1. OBJECTIVE
This policy document provides a systematic method for conducting the tests carried out with electrical transformers, describing the sequence of activities and issuing the reports apply.

2. ADDITIONAL DOCUMENTS
2.1. PQZ - 001 Control of Non Conformities and Non Conforming Products 2.2. IEC 60076-1 2.3. IEC 60076-11 2.4. IEC 60076-3 2.5. IEC 60270 2.6. IEC 60076-10

3. DEFINITIONS
3.1. Not applicable

4. RESPONSIBILITIES
4.1. Sector Electrical Testing a) Testing the electrical equipment manufactured and preparation of reports; b) Maintain equipment properly identified as to the status of inspection and testing; c) Notify the Quality Control non conformities occurred; 4.2. Sector Engineering a) Check and approve test reports carried out electrical; b) Check the values obtained for the test, the guaranteed values (where applicable). 4.3. General a) For the tests described in this procedure, the measuring instruments and tests used must be calibrated as the Program Calibration Instruments. b) Where non-compliances must be requested from Quality Control to issue a RNC - Non Conformity report according with PQZ - 001 Control of Non Conformities and Non Conforming Products. c) During the execution of tests, access to industry tests should be closed and the transformer under test properly grounded in order to avoid accidents. d) The tests required are specified in ODF - Order Manufacturing. e) Type tests should be performed only after the completion of test reports, and compliance.

Code PQZ - 010

Review 2

Date 25/03/2010

Page 2 de 7

This document is the property of Zilmer Ineltec Construction Electrical Ltda., Reproduction is prohibited without our prior permission. Copy valid only in electronic format. Printed copies of this document are only valid with the stamp "Copy Controlled".

REVIEWED WITH COMMENTS

5. ROUTINE TESTS
5.1. Insulation resistance (item 1.5) For this test should be used a Mega-Ohmmeter of at least 1000 V. Shorting to the terminals of each winding of the transformer under test (H1 H2 H3 and X1 X2 X3) is due to make the following measurements: a) High voltage and low voltage against earth; b) Low voltage from high voltage and earth; c) High voltage low voltage. The values found and the temperature of the test shall be recorded in the Report. 5.2. Electrical resistance of the windings (item 1.6) The measurement is performed by the method of the Wheatstone bridge where the winding resistance is less than 1 OHM, it is higher, the measurement of electrical windings is performed by the method voltmeter, ammeter. Measurements made: H1-H2 / H1-H3 / H2-H3 - X1-X2 / X1-X3 / X2-X3 You must record the temperature of the winding. 5.3. Value transformation (item 1.7) For this test, we use a specially built equipment, which incorporates a variable ratio transformer and an indicator of stress. The range of equipment (TTR) indicates the stress ratio when the voltage indicator indicates zero deflection. Measurements made: H1H3 - X1X0 / H2H1 - X2X0 / H3H2 - X3X0 - for transformer connection with Yo with DYn1. Using this device, there is also the polarity and the angular displacement. Note: The first letters of each sequence are the polarities 5.4. Short-circuit impedance and Load losses (item 1.8) To perform this test, it connects one of the windings of the transformer short-circuit (preferably the low voltage). Then applied to the other winding, a voltage at rated frequency and amount sufficient to circulate rated current. This is the transformer short-circuit of winding. The drivers used for short-circuit the transformer section shall be equal to or superior to their terminals and short as possible. Measurements should be performed as soon as possible, so no elevations in temperature of the windings, with consequent errors in reading. It is the simultaneous readings of current, voltage and power absorbed by the transformer short circuit. You must record the temperature of the winding during the test.

Code PQZ - 010

Review 2

Date 25/03/2010

Page 3 de 7

This document is the property of Zilmer Ineltec Construction Electrical Ltda., Reproduction is prohibited without our prior permission. Copy valid only in electronic format. Printed copies of this document are only valid with the stamp "Copy Controlled".

REVIEWED WITH COMMENTS

5.5. No-load loss and excitation current (item 1.9) The no-load losses and excitation current are measured with voltage transformer, fed, preferably by low voltage, voltage and rated frequency. Simultaneously, it is the reading of power and average current, using a Wattmeter, Ammeter and Voltmeter of effective values respectively. It is also the reading of the voltmeter average. 5.6. Applied voltage (item 1.10) All external terminals of the winding under test shall be connected to the terminal of the test. All other external terminals of other windings, core and tank must be earthed. 5.7. Voltage induced (item 1.11) Should be applied to the terminals of the transformer windings, double the rated voltage for 7200 cycles with minimum frequency of 120 Hz and up to 480 Hz. 5.8. Partial Discharges (item 1.12) 5.8.1. The measurement of PD should be performed after the execution of all tests dielectrics. 5.8.2. The low voltage winding must be excited by a source or single-phase. 5.8.3. The voltage should be as sinusoidal as possible and frequency should be increased appropriately, on the face, to avoid excessive excitation current during the test. 5.8.4. For testing three-phase Transformers Windings for connection to systems solidly grounded or low impedance. Must be induced initially with phase to ground voltage equal to (excitation voltage): Where: A = maximum voltage winding for 10 seconds. Then, without interruption, decreases the voltage phase to ground equal to (voltage reading): For 3 minutes, during which it shall be measured the level of PD. 5.8.5. Windings for connection to the isolated or grounded through a high impedance, eg a reactor suspension arc. Should be induced initially a two-phase equal to 1.5 A for 30 sec. With a line terminal grounded. Then, without interruption, for phase-phase voltage equal to al, Lum for 3 min. they are to be measured the level of P.D. This test should be repeated with another line terminal grounded. 5.9. Test of Noise Level (Item 1.13) The test of noise level should not exceed the limits specified in the Standards IEC 60076-10. For the test to measure the level of ambient noise and immediately after you must put the voltage in the windings of the transformer empty. Always maintaining a distance of 1m., is performed to measure the noise level of the processor and keeping the device perpendicular to the face where you want the reading achievement of dB. Code PQZ - 010 Review 2 Date 25/03/2010 Page 4 de 7

This document is the property of Zilmer Ineltec Construction Electrical Ltda., Reproduction is prohibited without our prior permission. Copy valid only in electronic format. Printed copies of this document are only valid with the stamp "Copy Controlled".

REVIEWED WITH COMMENTS

6. TYPE TESTS
6.1. Lighting Impulse Test: Full Wave (item 2.1) In conformity with IEC 60076-11 Par.21 and IEC 60076-3 Par.13. 6.2. High Temperature of Windings (item 2.2) This test is to obtain the temperature of the windings on the temperature of the external cooling, referred to the voltage, current and rated frequency. Should be made for all the windings available. The test is performed by the method of excitation and load independent losses in order to obtain the temperature rises of the windings in two independent tests, one with application of load losses and another with the no-load losses. Identical procedures - items 5.5. and 5.4., respectively, until reaching the stabilization of the temperature of the transformer coils (indicated by thermal sensors installed for the test). After stabilizing the temperature, the transformer is switched off and is immediately performed to measure the ohmic resistance of the windings, according to item 5.2, noting the resistance value and time of each measurement (using as reference the time when the transformer was off).

7. TYPE TESTS
7.1. Measurement of the harmonics on the no-load current (item 3.1) In conformity with IEC 60076-1.

_________________

Code PQZ - 010

Review 2

Date 25/03/2010

Page 5 de 7

This document is the property of Zilmer Ineltec Construction Electrical Ltda., Reproduction is prohibited without our prior permission. Copy valid only in electronic format. Printed copies of this document are only valid with the stamp "Copy Controlled".

REVIEWED WITH COMMENTS

You might also like