Parsons International Ltd.

SUB-Consultant

DAILY SITE DIARY

Contract :

DOT/C/LT/148/10
AL Ras Al Akhdar and Baynoonah Street upgrading and Traffic Improvement - Package 1 & 2

REF :-0456

Project :.

MACE
ON SITE STAFF & LABOUR RECORD No. 1 2 3 4 5 6 7 8 9 Trade Project Manager Dy. Project Manager Site Engineer Superintendent PRO QA/QC Planning Eng. Material Eng. Secretary
1 1 1 1 1 1 1

& PROGRESS REPORT


DATE: 29/10/2012 Working Hours - 7:00am - 5:00pm
WEATHER: Sunny Cloudy Rainy Windy Dusty

MACE Contractor Co. Ltd.


ON SITE PLANT & EQUIPMENT RECORD No. 1 2 3 4 CATEGORY Pump 12" (SOP) Pump 13" (SOP) Pump 6" (SOP) Pump 225 WM excavate. Jetting Pump 4" Electric pump 6" Excavator Shovel 0 0 0 5 1 1 0 2 No. No. CATEGORY

Form No. 0181

No.
1

No.

Trade

No.
1 1

No.
0 0

17 Surveyor 18 Chainman 19 Mechanic 20 Steel Fixer 21 Mason 22 Laminator 23 Carpenter 24 Pipe wrapper 25 Welder 26 Diver 27 Watchman 28 Charge hand 29 Operator 30 Office-Boy

17 Compactor Roller 18 Compactor Plate 19 Asphalt Cutter 20 Jack Hammer 21 Water Tanker 22 Jetting Tanker 23 2XL Truck 24 Rock breaker 25 Vibrator 26 Welding Machine 27 Low Bed 28 Bus (55 seat) 29 Drill Excavator 30 Bob-cat 31 Mini-bus 32 Geo Pump 6"

5 6
DELIVERY OF MATERIALS

7 Qty Unit 8 9

No.
1

MATERIAL (29-10-2012)

1 2 3 4 5 6 7 8
ACTIVITY OF 29 October 2012

10 Timekeeper 11 CAD Technician 12 Foreman 13 Technician 14 Supervisor 15 Safety Officer 16 Store keeper

10 JCB 11 Crane 12 Compressor 13 Generator 14 Car(Salon) 15 Pick-up(Double Cabin) 16 Pick-up(3 -ton)


LOCATION

1 1 2 1 1

1 1

31 Driver 32 Labourers

ACTIVITY OF 28 October 2012

Manpower & Equipment

1 2 3 4 5 6 7

Break MH 727 & MH 726A done. On hold by ANNCG. Break MH F121/12A done. On hold by ANNCG. MH F91A completed. MH F91A to MH F91A/1 Pipe line completed. Backfilling completed. MH 726A & MH 727. On hold by ANNCG. lamination complected mh F/80/8/10ready for handing over lamination complected mh F/80/8/11 ready for handing over MH F91A/2 to MH F91A/2/1 pipe line completed. Excavator shifted to excavation F91A MH F91A/2/1 to Existing Line - Excavation and pipe laying completed. Backfilling 6th layer completed. Manhole relocation as per Drawing ANNCG/DOT/GEN/0955. Blinded on 26 Sep 2012. Base casted on 27 Sep 2012. Wall casted. Connection done. Preparation for handing over of NDM Line. MH F92 - MH F80/8/11 - MH F80/8/10 MH F91A/2 to MH F91A/2/1 pipe line completed. Backfilling in progress. MH F91A EXCAVATION AND EXISTING MANHOLE REMOVEING FOR DIRECT CONNECTION manhole cover adjusting as per new level

1 2 3 4 5 6 7

Engineer Safety Officer Crane & TBM Operator Welder TBM Welding Machine Gas Cutting set

0 0 0 0 0 0 0

Drawing Anncg/dot/gen/0955 complected upto wall , cover slab remains Existing manhole rebenching and lamination on goingF/92&lamination complected sealing plate placeing

Crane

Noted:- Signed by Project Manager