You are on page 1of 10

Julius Berger Foundation - TID - HO Abuja

Subsoil Exploration Project: BUA Sugar Dome , Port Harcourt Geotechnical Design, CFA Piles - Amendment

BUA Sugar Dome


Port Harcourt

Geotechnical Design

CFA Pile Foundation

November 2012

JBF_Structural Design

Rev.: 1.0_28.06.2012

1 of 7

Julius Berger Foundation - TID - HO Abuja


Subsoil Exploration Project: BUA Sugar Dome , Port Harcourt Geotechnical Design, CFA Piles - Amendment

TABLE OF CONTENTS

1 2 3 4

Introduction ........................................................................................................... 3 Basic Data............................................................................................................. 4 Additional pile installation ...................................................................................... 6 ATTACHMENTS ................................................................................................... 7 4.1 ATTACHMENT A: Pile Layout .......................................................................... 7 4.2 ATTACHMENT B: Single >Pile Capacity Calculation ....................................... 7

JBF_Structural Design

Rev.: 1.0_28.06.2012

2 of 7

Julius Berger Foundation - TID - HO Abuja


Subsoil Exploration Project: BUA Sugar Dome , Port Harcourt Geotechnical Design, CFA Piles - Amendment

INTRODUCTION
BUA Inetrnational Ltd. Intends to build in the city of Port Hartcourt a new sugar storage facility Sugar Dome and in its vecinity a new Sugar Refinery Building. The Sugar Dome will have a circular shape, being approximately 55m in diameter and with a storage capacity of 63,000 tons. The Sugar Building will have a shape of 45.50m x 32.00m and will be located ca. 100m southeast of the Sugar Dome. According to the ground conditions encountered and the results of the geotechnical parameters obtained for the construction, a deep pile foundation CFA (Continuous Flight Auger) piles - was identified by the consultant of the site owner to be the most suitable solution. For the Sugar Dome, a total of 285 Nos CFA piles and for the Sugar Building a total of 105 piles 780 mm diameter and up to 22m in length are to be installed during the main piling operations on the BUA Sugar Dome site in Port Hartcourt. All bored piles on this project will be installed using CFA piling technique according to design requirements. The CFA piles will be constructed according to the European Standard EN 1536:2010 - Bored Piles and the JBF standard works procedure for CFA pile installation During piling work a Nos of 9 CFA piles have been installed 2 m above the scheduled pile toe at -22m below existing ground level. This amendment to the site owners geotechnical design deals with the necessary additional verification for axial pile capacity.

JBF_Structural Design

Rev.: 1.0_28.06.2012

3 of 7

Julius Berger Foundation - TID - HO Abuja


Subsoil Exploration Project: BUA Sugar Dome , Port Harcourt Geotechnical Design, CFA Piles - Amendment

BASIC DATA
DRAWINGS Drawings refer to the latest revision of construction drawings, BUA International Ltd., Project Team PHC (ISSUED FOR CONSTRUCTION, Date: none, Scale: N.T.S.): (1) (2) (3) (4) (5) General Site Layout, 1:110 Sugar Dome, Piles Layout, DRG-No. BDP-01-REV.-1, Sheet 1 Sugar Dome, Pile Details, DRG-No. BDP-05-REV.-1, Sheet 5 Sugar Building, Pile Location, DRG-No. BSP-01-REV.-1, Sheet 1 Sugar Building, Pile Details, DRG-No. BSP-02-REV.-1, Sheet 2

SOIL INVESTIGATION (6) Nobaj Engineering Ltd., Lagos BUA International Ltd. / Proposed mixed use development at railway premises Port-Hartcourt, River State. Report on subsoil Investigations, March 2009 STANDARDS EN 1536:2010 Bored Piles EN 791:1996 Drill rigs Safety EN 996:2010 Piling Equipment Safety requirements DIN 1054:2005 Subsoil - Verification of the safety in earthworks and foundations ADDITIONAL CODES OF PRACTICE EA-Pfhle (Recommendations on Pile Foundatons) Published by the German Geotechnical Society (DGGT), 2nd Edition 2012

JBF_Structural Design

Rev.: 1.0_28.06.2012

4 of 7

Julius Berger Foundation - TID - HO Abuja


Subsoil Exploration Project: BUA Sugar Dome , Port Harcourt Geotechnical Design, CFA Piles - Amendment

GROUND CONDITIONS The ground appears to be even terrain with an average elevation of about +11.200 m LCD (Lagos Chart Datum). The main reference datum for construction (Plant) has been laid down with 0.00 m = +11.272 m LCD. The piling platform level (PPL) was set at +0.60 m over Plant level (0.00 m). Soil conditions typically encountered on site (BH 04, BH 05 and BH 08, see section 2(6), consist of of TOPSOIL over sandy CLAY (firm, brownish grey, lateritic sandy clay). Underneath the clay, a medium dense to dense, yellowwish brown SAND has been encountered. A typical layer sequence from the surface down to 30 m below ground level appears to be as follows: 0.00m to 0.75m depth 0.75m to 15.75m TOPSOIL, dark grey silty sand CLAY, soft, brownish/reddish grey, lateritic sandy clay with concretionary gravels SAND, medium dense to dense, yellowish brown becoming light brown, with gravel at depth.

15.75m to 30.00m

According to section 2(6), the ground water level is about -15.00m to -18.50m below existing terrain level (about -3.72 m below LCD to -7.23 m below LCD). The pile base of the single CFA piles is intended to be set into the medium dense to dense sand strata starting approximately at -15.75 m below existing ground level.

JBF_Structural Design

Rev.: 1.0_28.06.2012

5 of 7

Julius Berger Foundation - TID - HO Abuja


Subsoil Exploration Project: BUA Sugar Dome , Port Harcourt Geotechnical Design, CFA Piles - Amendment

ADDITIONAL PILE INSTALLATION


The table below shows the deviation from the planned pile capacity of single CFA piles due to pile installation 2m above the scheduled pile toe.

Pile No

Planned Pile Toe [m]

Installed Pile Toe [m] -20.00 -20.00 -20.00 -20.00 -20.00 -20.00 -20.00 -20.00 -20.00

Planned Pile Capacity [kN] 2322.00 2322.00 2322.00 2322.00 2322.00 2322.00 2322.00 2322.00 2322.00 20,898.00

Installed Pile Capacity [kN] 2028.00 2028.00 2028.00 2028.00 2028.00 2028.00 2028.00 2028.00 2028.00 18,252.00

Pile Capacity shortfall [kN] -294.00 -294.00 -294.00 -294.00 -294.00 -294.00 -294.00 -294.00 -294.00 -2646.00

1 2 3 4 5 6 7 8 9 Sum

4 5 6 49 50 90 91 129 130 9

-22.00 -22.00 -22.00 -22.00 -22.00 -22.00 -22.00 -22.00 -22.00

In order to accomplish the planned single pile capacity, three additional CFA piles dia. 780mm and to a depth of -20m shall be installed. The additional single piles to be installed namely Pile Nos. P49a, P90a and P129a (see Annex 4.1) shall be assessed with an additional pile capacity of 3x2028 kN = 6084 kN (see Annex 4.2)

Abuja, 07 November 2012 JULIUS BERGER NIGERIA PLC TID /JBF

Dr. Rodrigo Carrasco Geotechnical Engineer

JBF_Structural Design

Rev.: 1.0_28.06.2012

6 of 7

Julius Berger Foundation - TID - HO Abuja


Subsoil Exploration Project: BUA Sugar Dome , Port Harcourt Geotechnical Design, CFA Piles - Amendment

ATTACHMENTS

4.1

ATTACHMENT A: Pile Layout BDP-02-REV.2 SHEET 2 With indication of position of 3 additional piles CFA Dia. 780mm, L=20m

4.2

ATTACHMENT B: Single Pile Capacity Calculation Ressistance-settlement line for pile lengths 19m/20m/21m/22m

JBF_Structural Design

Rev.: 1.0_28.06.2012

7 of 7

System

Basis for calculations: BH5 (NOBAJ) Bored pile Ratio (min., max.) = 0.00 Skin friction interpolation: For q c < 7.5 MN/m Deactivated For cu,k < 60 kN/m Deactivated Pile diameter = 0.780 m
0.00

Pile toe diameter = 0.780 m Toe height/diameter = 0.780 Sicherheit = 2.00 Allow. V settlement

D = 0.78 m

0.5 2.0 3.5 5.0 6.5 8.0 9.5 11.0 12.5 14.0 15.5 17.0 18.5
q c = 17.0 MN/m cu,k = 90.0 kN/m Lateritic sandy clay

Soil

qc cu,k qb,k02 q b,k03 [MN/m] [kN/m] [MN/m] [MN/m] 0.0 90.0 0.000 0.000 17.0 0.0 1.190 1.530 20.0 0.0 1.400 1.800

qb,k10 qs,k Designation [MN/m] [MN/m] 0.000 0.0367 Lateritic sandy clay 3.200 0.1100 Sand, md 3.500 0.1175 Sand, d

Pile resistance Q [MN]


0.0 0.0 1.0 2.0 2.32 3.0 4.0 5.0 0.0 2.8 2.8

2.6
-15.75

2.6

1.0 1.21

1.0 2.4 1.2 2.4

20.0 21.5 23.0 24.5 26.0 27.5


q c = 20.0 MN/m

-19.00 -20.00 -21.00 -22.00

L L L L

= = = =

19.00 20.00 21.00 22.00

m m m m

Sand, md

-19.50

2.0

2.0

2.2

2.2

2.0 3.0 3.0 1.8


Sand, d

2.0

1.0

1.8

Pile settlement s [cm]

4.0

4.0 1.6 1.6

D [m]

D toe [m]

Length [m]

Allow. V [MN]

[-]

s [cm]

Allow. V [MN]

5.0

5.0

1.4

0.8

1.4

0.780

0.780

19.00

1.870

2.00

1.06

1.2 0.6 1.0

1.2

6.0

6.0

1.0

0.780

0.780

20.00

2.028

2.00

1.11

7.0

7.0

0.8 0.4 0.6

0.8

0.6

0.780

0.780

21.00

2.178

2.00

1.15

8.0

8.0 0.4 0.2 0.4

9.0

9.0 0.2 0.2 Qs Qr Q 10.0 0.0 18.3 18.8 19.3 19.8 20.3 20.8

0.780

0.780

22.00

2.322

2.00

1.21

Setzungen [cm]
21.3 21.8 22.3

10.0

0.0

Resistance-settlement line For pile length = 22.00 m

Pile length [m]

ENGINEERING

BOREHOLE LOG
Site: Type of Boring: Diameter of Hole (mm): Depth (m): Commenced on: Completed on: Water Struc. (m): SAMPLE NO DEPTH (m) LEGEND RAILWAY LINE AREA,PORT- HARCOURT. Shell & Auger - Percussion Boring Method 200mm & 150mm 30.0m 27/04/2008 28/04/2008 15.00m SPT 150 - 300mm 300 - 450mm SAMPLE TYPE 0 - 150mm Client: Contract No.: Borehole No.: Project Title: Ground Bed RL (m): Borehole Location: BUA INTERNATIONAL LIMITED BUA/001/PH BOREHOLE FIVE(5) PROPOSED MIXED DEVELOPMENT (SUGAR MILL FACTORY) FOR BUA INT. LTD,RAILWAY SITE PORT-HARCOURT, RIVERS STATE. FENCED SITE AREA. SPT Curve SOIL DESCRIPTION

0
TOPSOIL, DARK GREY SAND WITH SLIGHT CLAY. 0.75m

10

20

30

40

50

60

70

80

0.00 0.75 1.50 2.25 3.00 3.75 4.50 5.25 6.00 6.75 7.50 8.25 9.00 9.75 10.50 11.25 12.00 12.75 13.50 14.25 15.00 15.75 16.50 17.25 18.00 18.75 19.50 20.25 21.00 21.75 22.50 23.25 24.00 24.75 25.50 26.25 27.00 27.75 28.50 29.25

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

D D D D D D U100 D SPT D D D U100 D D D SPT D SPT D SPT D SPT D SPT D SPT D SPT D SPT D SPT D SPT D SPT D SPT D 13 19 22 41 12 18 22 40 12 16 20 36 11 16 19 35 10 15 19 34 9 15 18 33 7 14 18 32 6 13 15 28 8 12 16 28 7 11 14 25 6 10 12 22 6 9 12 21 5 7 8 5 10 10 20 5 7 7

20

SOFT TO FIRM,BROWN GREY LATERITIC SANDY CLAY WITH CONCRETIONARY GRAVELS.

21

22

25
15.75m

28

28

32

33

MEDIUM DENSE TO DENSE, GREYISH BROWN BECOMING LIGHT BROWN SAND (fmc) WITH FINE GRAVEL AT DEPTH.

34

35

36

40

41

30.00 41 SPT 13 19 23 42 BOREHOLE COMPLETED AT 30.00m Notes SPT 'N' is the blowcount value for 300mm penetration after initial seating drive of 150mm D is disturbed bag samples U- Undisturbed samples taken N/R- Sample not recovered or dropped Drawn by: ROTIMI Date: MAY Checked by: ENG. OBAJI Date: MAY