You are on page 1of 5

FOR INFORMATATION

PROJECT

NGHI SON 1 THERMAL POWER PLANT CONSTRUCTION PROJECT (CONTRACT NO. 010610/NS1-EVN-MC)
OWNER

VIETNAM ELECTRICITY
CONSULTANT

J-POWER / AF-COLENCO and PECC3


CONTRACTOR

MARUBENI CORPORATION
PROJECT CONTROL NO.

NS1-18EA-M-TNJ-5181

REV. NO. 0 CO., LTD.

CODE 0920050 PREPARED H.HAYASHIDA Title:

DWG. No. 0920050A-781103-1511 CHECKED T.ANDO APPROVED K.OKAZAKI

REV. No. 0 DATE 2011.11.25

COAL CONVEYOR SYSTEM ERECTION INSTRUCTION MANUAL


Rev.: 0 Date: 25 Nov. 2011

Document No.: 781103-1511


0 Rev. First Issue Description P.L. By C.J. App. 25 Nov. 11 Date

Total

173 pages (With cover)

HSING SHENG ENGINEERING CO., LTD.

______________________________________

_________________________________

Erection Instruction Manuals for Coal Conveyor System of Nghi Son 1 Thermal Power Plate Construction Project will be separately issued as follows.

PART PART PART PART

No. I II III

Application For General & Conveyor For Special Equipment For Electrical Construction

* Part II & Part III will be issued later.

___________________________________________

HSING SHENG ENGINEERING


II

______________________________________

_________________________________

ERECTION INSTRUCTION MANUAL

PART I

___________________________________________

HSING SHENG ENGINEERING


III

______________________________________

_________________________________

CONTENTS
1. 2. 2.1. 2.2 3. 3.1. 3.2. 3.3. 3.4. 4. 4.1. 4.2. 4.3. 4.4. 4.5. 5. 6. 7. 8. 8.1. 8.2. 8.2.1. 8.2.2. General Preparation of Installation Network for Conveyor Installation Procedures Provision for Installation Work Packing and Storage Appearances of Package Care Mark Storage of Equipment Erection Drawings Foundation Checking of Foundation Marking of Foundation Tolerance of Foundation Padding Grouting Site Wilding Execution and Control Manual of High-Strength Bolts Painting Assembling and Installing Structures General Assembling and Installing of Frames Stringer Frame Truss Frame and Gallery Frames

___________________________________________

HSING SHENG ENGINEERING


IV

______________________________________

_________________________________

8.3. 8.4. 8.5. 8.6. 8.7. 9. 9.1. 9.2. 9.3. 9.4. 9.5. 9.6. 10. 11. 11.1 11.2 12. 12.1 12.2 13. 14.

Assembling and Installing of Bents Assembling and Installing of Tower Installing of Frame at Both Ends Installing of Chutes and Skirts Dimensional Tolerances Assembling and Installing of Mechanical Units and Parts General Pulley Drive Unit Tension Unit Idler Dimensional Tolerances Weight List for Conveyor GA Drawings Conveyors Towers Connection & Site Welding Plan Conveyor (Typical) Tower (Typical) Joint of Truss Frame BC-1A/B Gallery Frame Assembly & Lifting Procedure

___________________________________________

HSING SHENG ENGINEERING


V