You are on page 1of 4

Project No.

DAILY REPORT
by Resident Lead Consultant
P O Box 1378 RUWI, Post Code 112 Telephone: 2460 1503 / 1509 / 1259 Fax: 24696066 e-mail: handp@omantel.net.om

11K5
Issue Date

AIRPORT TERMINAL BUILDINGS OXY Mukhaizna

08 April 2013

4 pages Ref.: attached photographs taken today Comments/Replies Arrivals bitumen painting of ground-crossbeams - backfill/compacting for longitudinal ground beams - blinding and rebar/formwork for ground beams Departure grids A-J - Formwork for columns starters - backfill/compaction in areas without u/g services Departure grids D-J de-shutter ground beams - application of bitumen paint - blinding slabs for column footings of covered walkway ERT rebar/formwork of remaining 7 column bases GSE shaded bays rebar/formwork for stub columns - concrete pour of stub columns Arrivals concrete pour of longitudinal ground beams Cargo area concrete pour of column bases Departure rebar/formwork of staircase at D-E/6-7 - backfill/compaction in areas without u/g services - rebar/formwork of column footings at covered walkway ERT concrete pour of outstanding 7 column bases Not yet issued, pending approval of Galfars offer for the Sheel&Core Contract Issued today: Galfar to include first-fix in slabs, columns and walls; offer to be revised accordingly. Prior to formal issue of W.I. 371 -Shell&Core-, Galfar is to complete all ground beams and backfill/compaction by 10/04/2013, then revised Construction Programme in accordance with W.I. 371 will be in place. Galfar to accept site instructions from authorized personnel only, to be nominated shortly.

Status on Site General Issues 1) Scheduled work 03-07/04/2013

2) Scheduled work today

Action completed complete complete completed ongoing completed completed completed completed completed completed Galfar

3) New Work Instruction No. 371 4) Work Pack Rev. D 5) Site Meeting 02/04/2013

OXY-HO Galfar Galfar

6) Chain of command

OXY, Huckle

Architectural 7) Sewage tank 8) Water tank Structural 9) Revisions MEP 10) X-ray scanning cable duct Prepared by:

Drawing with setting-out dimensions issued to OXY-HO for approval. Drawing with setting-out dimensions issued to OXY-HO for approval. Issued to OXY-HO for approval To be coordinated by MEP-first fix Contractor to be appointed by OXY-HO Herbert Krause HK Resident Lead Consultant Huckle and Partners LLC

OXY-HO OXY-HO

OXY-HO OXY-HO Date: 08 April 2013

Distribution: OXY-HO various, OXY-Muk various, Huckle-HO, Oman Designers, Hoehler-Partner, Galfar E&C various,

Site form

Project No.

DAILY REPORT
by Resident Lead Consultant
P O Box 1378 RUWI, Post Code 112 Telephone: 2460 1503 / 1509 / 1259 Fax: 24696066 e-mail: handp@omantel.net.om

11K5
Issue Date

AIRPORT TERMINAL BUILDINGS OXY Mukhaizna

08 April 2013

4 pages

Site form

Project No.

DAILY REPORT
by Resident Lead Consultant
P O Box 1378 RUWI, Post Code 112 Telephone: 2460 1503 / 1509 / 1259 Fax: 24696066 e-mail: handp@omantel.net.om

11K5
Issue Date

AIRPORT TERMINAL BUILDINGS OXY Mukhaizna

08 April 2013

4 pages

Site form

Project No.

DAILY REPORT
by Resident Lead Consultant
P O Box 1378 RUWI, Post Code 112 Telephone: 2460 1503 / 1509 / 1259 Fax: 24696066 e-mail: handp@omantel.net.om

11K5
Issue Date

AIRPORT TERMINAL BUILDINGS OXY Mukhaizna

08 April 2013

4 pages

Site form