Variable name
Description
Project location
Classifies the projects based on geographcal location Classifies the projects based on the Tier of the city in which the project is located Classifies the projects in two categories - those in metros and those in non-metros Measures the total built up area of the projetct Classifies projects based on the type of development viz. townships, apartments etc. Classifies residential projects based on amenities, pricing and other facilities
Project characteristics
Project segment
Investment mode
Classifies private equity investment into two categories depending on the mode of investing Classifies the investor into two categories depending on their origin Classifies the investor into two categories depending on the fund type Measures the net amount of money invested by the private equity investor
Investor origin
Net investment
Developer characteristics
Years of experience
Measures the expertize level of the developer based on the number of years it has spent in the real estate industry
Measures the level of corruption in the city Measures the competitiveness score of cities based on Porter criteria
Purchasing
Type
Hypothesis
The location preferences may Dummy variable. Takes values 1 through 5 or may not exist, depending for the five regions - North, East, West, on the type of promoter and South, Central respectively investor
Dummy variable. Takes values 1 through 3 for three types of cities - Tier -1, 2 and 3 Dummy variable. Takes values 1 or 0 depending on whether the project city is a metro or not Continuous variable measured in square meters Dummy variable. Takes values 1 through 7 depending on the type of end use Dummy variable. Takes values 1 through 3 depending on the project segment - Luxury, Mid-segment and low-budget
Dummy variable. Takes values 1 or O depending on whether the mode of investment is project or entity Dummy variable. Takes values 1 or O depending on whether the investor is of foreign origin or domestic Dummy variable. Takes values 1 or O depending on whether the fund is dedicated or general purpose Continuous variable measured in US $ million. All values are adjusted for the 2012 as the base year.
Continuous variable based on the index scores developed as a part of corruption perception index Continuous variable based on the index scores developed in India competitiveness report 2012
Feature Mean investment (US $ M) - investment mode Project mode Med Count Entity mode Med Count Mean investment (US $ M) - Geographical location North Med Count East Med Count West Med Count South Med Count Central Med Count Mean investment (US $ M) - Tier of city Tier - 1 Med Count Tier - 2 Med Count Tier - 3 Med Count Mean investment (US $ M) - Metro status Metro Med Count
Domestic
Foreign
47.3 25 141 38 25 40
84 50 65 110 74 47
40.1 32.7 35 18.1 17.6 4 60.4 25.3 49 43.5 22.7 47 14.7 14.7 2
42.5 25.3 91
79.3 39 36
Non - metro Med Count Mean competitiveness score of city Mean corruption perception index Mean Purchasing power of the city Mean experience of developer (yrs) Mean built up area of project ( in 1000 sqm) Mean built up area to land area ratio
Mean investment (US $ M) - Project segment Luxury Med Count Mid-segment Med Count Low-budget Med Count 14.4 11 7 50.6 24 52 32.7 36.4 3 36.9 18 37 99.1 38 21 49.5 36 15
Mean comparison
-4 0.0001
3.33 0.0009
-2.69 0.007
-2.7 0.007
Feature Mean investment (US $ M) - investment mode Project mode Med Count Entity mode Med Count Mean investment (US $ M) - Geographical location North Med Count East Med Count West Med Count South Med Count Central Med Count Mean investment (US $ M) - Tier of city Tier - 1 Med Count Tier - 2 Med Count Tier - 3 Med Count Mean investment (US $ M) - Tier of city Metro Med Count
Dedicated
Diversified
61.6 36 87 90.7 50 52
53.4 34.7 74
53 36 52
Non - metro Med Count Mean competitiveness score of city Average corruption perception index Mean Purchasing power of the city Average experience of developer (yrs) Mean built up area of project (10000 sqm) Mean built up area to land area ratio
Mean investment (US $ M) - Project segment Luxury Med Count Mid-segment Med Count Low-budget Med Count 15.0 11.8 4 62.4 33.7 23 27.2 26 6 47.4 18.5 21 71.6 30.6 49 30.5 18 31
Mean comparison
-1.26 0.207
0.71 0.477
-0.63 0.529
-1.33 0.183
Feature Mean investment (US $ M) across project segment Med Count Net Average experience of developer (yrs) Count
62.3 60
61 94
Location of projects across cities Based on Tier of the city % of projects in Tier - 1 % of projects in Tier - 2 % of projects in Tier - 3 Based on metro status % of projects in metros % of projects in non-metros Mean built up area (1000 sqm) Mean built up / land area ratio Luxury 75% 23% 2% Mid - segment 55% 43% 2%
60
94
1.37 0.17
0.07 0.944
61.7 13
-0.92 0.357
13
Feature Mean investment (US $ M) across project end-use type Med Count Net Average experience of developer (yrs) Count
59.5 46
62.4 114
Location of projects across cities Based on Tier of the city % of projects in Tier - 1 % of projects in Tier - 2 % of projects in Tier - 3 Based on metro status % of projects in metros % of projects in non-metros Mean built up area (1000 sqm) Mean built up / land area ratio
39% 59% 2%
72% 27% 1%
46
114
-4.52 0
-3.18 0.001
3.09 0.002
Feature Mean investment (US $ M) - investment mode Project mode Med Count Entity mode Med Count Z score P value Mean investment (US $ M) - Tier of city Tier - 1 Med Count Tier - 2 Med Count Z score P value Mean investment (US $ M) - Metro status Metro Med Count Non - metro Med Count Z score P value Mean investment (US $ M) - Project segment Luxury Med Count Mid-segment Med Count
Domestic
Foreign
36.9 18 37 50.6 24 52
49.5 36 15 99.1 38 21
Z score P value
0.81 0.417
1.35 0.177
Feature Mean investment (US $ M) - investment mode Project mode Med Count Entity mode Med Count Z score P value Mean investment (US $ M) - Tier of city Tier - 1 Med Count Tier - 2 Med Count Z score P value Mean investment (US $ M) - Tier of city Metro Med Count Non - metro Med Count Z score P value Mean investment (US $ M) - Project segment Luxury Med Count Mid-segment Med Count
Dedicated
Z score P value
0.64 0.522
Diversified
1.8 0.071
Investor origin [D= 1 for domestic and 0 otherwise] Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value -33.23 -2.307 0.022 -36.52 -2.910 0.005 -32.4 -2.27 0.024
Investor origin [D= 1 for dedicated and 0 otherwise] Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value 4.16 0.306 0.760 4.07 0.297 0.767 1.44 0.116 0.908
Ratio of the projects built-up to land area Net PE Investment (US $ M) -10.94
t - stat p value Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value -10.08
-2.363 0.020 -29.68 -2.218 0.029 -4.92 -1.058 0.293 -9.15 -2.018 0.047 -25.88 -1.922 0.058 -25.62 -1.993 0.049 -2.217 0.029
MULTIVARIATE REGRESSION Regression Statistics Multiple R R Square Adjusted R Square Standard Error Observations 0.54 0.29 0.18 52.82 92
Coefficients Intercept FOR/DOM (Inv origin) ENT/PRO (Inv mode) DED/DIV Built up area Dummy N Dummy E Dummy W Dummy S Metro status Project end use Dummy Luxury Dummy Mid-Segmet 30.0 -40.0 -27.0 24.5 2.4E-05 48.6 38.7 59.6 47.2 3.3 -35.5 13.0 18.3
Standard Error 46.2 14.7 23.7 14.0 0.0 34.9 52.4 36.2 35.5 14.1 15.9 25.9 26.6
Built up area (in sqm) Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value 3.86E-05 3.837 0.000 Net PE Investment (US $ M) t - stat p value
Built up area (in sqm) Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value 3.63E-05 3.455 0.001 Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value
Project end use type [D=1 for townships and 0 for apartments]
t Stat 0.7 -2.7 -1.1 1.7 1.9 1.4 0.7 1.6 1.3 0.2 -2.2 0.5 0.7
P-value 0.517 0.008 0.258 0.085 0.056 0.168 0.462 0.103 0.188 0.814 0.028 0.617 0.493
Corruption index
PPI
Project end use type [D=1 for townships and 0 for apartments] 57.17 4.239 0.000
Project end use type [D=1 for townships and 0 for apartments]
t - stat p value Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value Net PE Investment (US $ M) t - stat p value 6.13E-06
4.219 0.000 49.08 3.583 0.000 4.16E-06 2.525 0.013 4.82E-06 3.045 0.003 42.42 3.189 0.002 3.402 0.001
Project segment [ D 1 = 1 for luxury, 0 otherwise and D 2 = 1 for mid segemt and 0 otherwise]
Feature Geographical location North Count East Count West Count South Count Central Count City tier Tier - 1 Count Tier - 2 Count Tier - 3 Count Metro status Metro Count Non - metro Count Project segment Luxury Count Mid-segment Count Low-budget Count Project end use type Township Count Apartments Count
196.7 85 121.5 67
Mean comparison Project location Based on Tier of the city % of projects in Tier - 1 % of projects in Tier - 2 % of projects in Tier - 3 Based on metro status % of projects in metros % of projects in non-metros Total projects Average built up area (sqm) Average land area (sqm) 0.952 Average Built up area / Land area
Luxury
54% 42% 4%
0.06
Apartments Project location 0.99 0.322 Based on Tier of the city % of projects in Tier - 1 % of projects in Tier - 2 % of projects in Tier - 3 Based on metro status % of projects in metros % of projects in non-metros Based on geographical location % of projects North % of projects East % of projects West % of projects South % of projects Central Total projects Average built up area (sqm) Average land area (sqm) Average Built up area / Land area 81405 113923 2.71 62% 34% 4%
0.6 0.548
38% 62%
-3.25 0.002
Mid - Budget
Low-budget
58% 37% 5%
70% 9% 22%
South Count Central Count City tier Tier - 1 Count 2.42 Count Tier - 3 Count Tier - 2
Townships Metro status Metro 43% 42% 15% Count Non - metro Count
57% 43%
172028 93 86651 68
Gives an idea of the real option in the project. Since not all PE deal are at the land acquistion level, an investor may be inclined to invest in projects wehre the FAR is higher since the total saleable area goes up. Explored some papers which have used this.
Without PE investment Mean project cost (Rs. Crore) Built-up to land-area ratio Construction cost to land cost ratio Land acquistion cost (Crore Rs. Per acre) Non-metro Metro Overall Total projects 951 1.35 1.78
Probit model - 1
Variable B_L PROJECT_COST__RS__CRORE_ METRO_STATUS CC_LC C McFadden R-squared S.D. dependent var Akaike info criterion Schwarz criterion Hannan-Quinn criter. Restr. deviance LR statistic Prob(LR statistic) Obs with Dep=0 Obs with Dep=1 Probit model - 2 Variable
Coefficient 0.3531800 0.0000238 0.0504130 -0.0909970 -0.8528140 0.181 0.495 1.212 1.341 1.264 137.141 24.760 0.000 59 42
Std. Error 0.10 0.00 0.28 0.08 0.28 Mean dependent var S.E. of regression Sum squared resid Log likelihood Deviance Restr. log likelihood Avg. log likelihood
Total obs
Coefficient
Std. Error
METRO_STATUS B_L C R-squared Adjusted R-squared S.E. of regression Sum squared resid Log likelihood F-statistic Prob(F-statistic) Probit model - 3 Variable B_L END_USE C R-squared Adjusted R-squared S.E. of regression Sum squared resid Log likelihood F-statistic Prob(F-statistic) Coefficient
0.041572 0.010113 0.356547 0.060432 0.041257 0.484999 23.05198 -68.70567 3.151616 0.047151
0.097833 0.004253 0.070432 Mean dependent var S.D. dependent var Akaike info criterion Schwarz criterion Hannan-Quinn criter. Durbin-Watson stat
Std. Error 0.01016 0.049557 0.342369 0.061 0.042 0.485 23.045 -68.691 3.166 0.047 0.004 0.109 0.092 Mean dependent var S.D. dependent var Akaike info criterion Schwarz criterion Hannan-Quinn criter. Durbin-Watson stat
Project cost
-2.29 0.011 -4.05 0.001 -1.37 0.085 -2.16 0.0154 -1.13 0.129 -2.48 0.006
2000 1500 1000 500 0 Without PE investment With PE investment
Prob. 0.001 0.777 0.855 0.240 0.003 0.416 0.448 19.302 -56.190 112.380 -68.570 -0.556
1.35
1.78
Without PE investment
With PE investment
101
t-Statistic
Prob.
0.00
Without PE investment
With PE investment
Prob. 0.018 0.649 0.000 0.416 0.495 1.420 1.497 1.451 1.828
Project cost
t structure
1.86
With PE investment
Land acquistion cost (Crore Rs. Per acre) Tier - 1 only Land acq. cost Tier 2 & 3 Land acq. costs
PE investment
PE investment