- --Processl Location:

ULT Cor oration Pte Ltd Installationof 8akau Pile Jimmy Goo (Project Manager) ~'" 7 June 2013

Conducted by: (Names, designations) (Date) Last Review Date: 6 June 2014
RISK CONTROL

HAZARD IDENTIFICATION

RISK EVALUATION

SIN

Work Activities I Job Steps Place the safe guide at exact position of pile

Potential Hazards Workers working in the vicinity of the pile location

Possible Accidents I III Health & Persons at Risk Struck by safe guide and excavator bucket resulting in injury/death

Existing Risk Control I Preventive Measures 1) Ensure workers move away from pile location before placing the safe guide at the pile position Ensure that all workers in the path of travel of safe guide keeps clear and they do not stand below the suspended load Appoint Rigger man and Signalman for the bakau pile installation and extraction operation Positioning of the safe guide to be carried out with the guidance of Signalman Special care and attention to be given to workers working below the excavation bucket and safe guide Ensure workers move away from bakau pile location before commencement of installation

't:I 0 0

Ci)
..J

Cl)

> Q)

:5
'iii

Cl)

..-:
:::i
R

o!!!

..-:
M

Additional Risk Control I Preventive Measures 1) Daily tool box meeting on safety precautions, SWP and RA on installation of bakau pile and the use of safe guide and excavator. 2) Use of whistle to warn workers in the vicinity of the movement of safe guide and excavator bucket

Z' O\:: Cl) > Cl)


Cl)

:5
Ci)

"C 0 0

Ci)
..J
Cl)

>

0::

..-:
R

..-:

::::i

III

ii:

Action Officer I Designation I Follow-up Date Site supervisor, Excavator Operator, Safety Supervisor, Signalman, Riggerman

Ma

Ma

2)

3)

Slot in the bakau pile inside the safe guide

Workers working below the excavator bucket and safe guide while positioning the pile in position

Struck by safe guide and excavator bucket resulting in injury/death

1)

Ma

2)

Daily toolbox meeting on safety precautions, SWP and RA on installation of bakau pile and the use of safe guide and excavator.

Ma

Site supervisor, Excavator Operator, Safety Supervisor, Signalman, Riggerman

Install the bakau pile by the excavator

Workers working below the excavator bucket and safe guide while positioning the pile in position

Struck by safe guide and excavator bucket resulting in injury/death

1)

Ma

1)

2)

Daily tool box meeting on safety precautions, SWP and RA on use of safe guide and excavator Use of whistle to warn workers working below the excavator bucket and safe guide on the commencement of installation work

Ma

Site supervisor, Excavator Operator, Safety Supervisor, Signalman, Riggerman

Page1 of 2

----- -- Processl Location: --

ULT Cor orationPte Ltd Installationof BakauPile JimmyGoo (ProjectManager)\ 7 June 2013

Conductedby: (Names, designations) (Date) Last Review Date: 6 June 2014


RISK CONTROL

HAZARD IDENTIFICATION

RISK EVALUATION

SIN 4

Work Activities I Job Steps Remove the safe guide and place it on the next pile position

Potential Hazards Workers working in the vicinity of the pile locations

Possible Accidents I III Health & Persons at Risk Struck by safe guide and excavator bucket resulting in injury/death

Existing Risk Control I Preventive Measures 1) Ensure that no personnel are within the working area of the bakau pile before signaling to raise up the safe guide further Ensure workers move away from pile location before placing the safe guide at the pile position Ensure that all workers in the path of travel of safe guide keeps clear and they do not stand below the suspended load

.t:''::: Cl)
Cl)

"0

o 0 :5
(jj

(jj

....I

...:
:::::i

...:
UI

> Cl!

Additional Risk Control I Preventive Measures 1) Daily tool box meeting on safety precautions, SWP and RA on installation of bakau pile and the use of safe guide and excavator, Use of whistle to warn workers in the vicinity of the movement of safe guide and excavator bucket

Ci2 M

~ ~ Cl)
Cl)

"0 0 0 (jj

(jj

:5

~ ....I

...:
:::::i

...:
Ci2
UI

Action Officer I Designation I Follow-up Date Site supervisor, Excavator Operator, Safety Supervisor, Signalman, Riggerman

Ma

Ma

2)

2)

3)

External HazardBad weather/ lightning/rain

Strike by lightning resulting in injury/death

Stop work during bad weather

Ma

Workers to remain sheltered for 30 minutes after the last thunder before resuming bakau pile installation work.

Ma

Site supervisor, Excavator Operator, Safety Supervisor, Signalman, Riggerman

Remote R Medium Low Risk Low Risk

Page 2 of 2