08-WP-003-1A

TECHNICAL QUERIES ELECTRICAL


(Department)

Req. No. Job No.

IRAN TRANSFO FD530-0000-EL-MR-1001 Rev. D0 Bidder 27-10-10 M182-D2/D3 9534 Date Issued Offer No./Dt. Foroozan Development Operations & Bidder's Sign Bidder's Company Seal Project Prpd. Chkd. Production Enhancement & Date Customer IOEC / PEDCO MOK DBS Item FZ-A-TR-411A/B & FY-A-TR-411 Sl No. Queries & Clarifications Bidder's Reply GENERAL Please confirm that the offer complies with the requisition 1 documents FD530-0000-MR-1001. 2 Bidder to confirm compliance with all attachments of MR.

3 4 5 6 7 8 9

Bidder to furnish Deviation List in attached format as enclosed with this TQ. Bidder to furnish Weight data in attached format as enclosed with this TQ. Bidder to note & confirm that Project specifications shall be applicable wherever available. Bidder to furnish List of Start up & Commissioning spare parts. Bidder to furnish list of 2 years operational spare parts as optional. Bidder to furnish Manufacturing Delivery Schedule. Bidder to furnish Quality system manual. Bidder to confirm that all documents as per RFD shall be submitted. All document shall be in English language and meteric unit. Bidder shall follow document numbering as per document numbering procedure (which will be provided by Purchaser later) Bidder to note & confirm that All inspection & Test Plan including complete inspection, QA/QC and testing requirement shall be as per Spec. & RFI for Power Transformer. Bidder to furnish Reference List of similar item supplied. Bidder to note that Local Sub vendors are NOT acceptable & it shall be as per Company approved Vendor list. Painting for all material shall be as per Project painting specification FD520-0000-MW-SP-1027. Bidder to note & confirm that the design life of supplied equipments shall be not less than 25 year. Bidder to furnish the type test report and certificates of similar transformers. Bidder to note & confirm that the 6 % Short circuit impedence shall be without any negative tolerance. Bidder to note & confirm that minimum degree of protection for main terminal boxes and marshalling/auxiliary boxes shall be IP55. Bidder to note & confirm that transformer thermal ability to withstand symetrical short circuit current (63KA) shall be 2 Seconds.

10

11 12 13 14 15 16 17 18

19 20 21 22
Notes:

1. Bidder to confirm compliance to all the requirements in this Technical Queries (TQ). If Bidder is unable to meet some requirements, Bidder shall provide sufficient reasoning for not complying with the requirement. Bidder to provide official stamp and initial on every page of the response to this clarification. 2. Bidder shall use this format only. Any other form is not acceptable. 3. Use extra sheets wherever required.

Document Number
Excel
Saipem Triune Engineering Pvt. Ltd., New Delhi

Rev. 00

TECHNICAL QUERIES FOR POWER TRANSFORMER

FD530-0000-EL-MR-1001TQ-02 Sheet 1 of 3

08-WP-003-1A

TECHNICAL QUERIES ELECTRICAL


(Department)

Req. No. Job No.

IRAN TRANSFO FD530-0000-EL-MR-1001 Rev. D0 Bidder 27-10-10 M182-D2/D3 9534 Date Issued Offer No./Dt. Foroozan Development Operations & Bidder's Sign Bidder's Company Seal Project Prpd. Chkd. Production Enhancement & Date Customer IOEC / PEDCO MOK DBS Item FZ-A-TR-411A/B & FY-A-TR-411 Sl No. Queries & Clarifications Bidder's Reply FY-A-TR-411 6.6/0.42 KV, ONAN/ONAF, 1600/2250 KVA, Dyn11 Bidder to note that rating of FY-A-TR-411 transformer ONAN/ONAF rating is revised to 1600/2250 KVA. Bidder to 1 confirm the compliance of this change and change in rating of auxiliaries equipments like CT, fan etc due to change of transformer rating. Bidder to submit the revised data sheet & General 2 Arrangement drawing. Any deviation from data sheet shall be indicated in list of deviation. Bidder to note & confirm the tank type shall be Sealed 3 corrugated type. Bidder to note & confirm the color scheme for transformer 4 shall be RAL 7035. Bidder to confirm the number of tap regulation range shall be 5 as per technical data sheet, -5, -2.5, 0, +2.5, +5.

6 i. ii. iii. iv. v. 7

Bidder to furnish the following: Transformer direct current content. No Load current at primary side (the indicated data is not clearly visible). Core temperature rise (the indicated data is not clearly visible). Positive/Zero Sequence reactance & X/R Ratio Stray Load losses Bidder to note & confirm that the primary winding cable box shall be suitable for cable size of 3C X 150 sq mm. Bidder to note & confirm that the secondary winding cable box shall be suitable for cable size of 8 runs of 1C185 sq mm per phase (total 24 cables of 1C185 sq mm for power) and 4 x 1C185 for neutral (4 cables of 1C185 sq mm). Bidder to note & confirm that a separate marshalling cabinet shall be provided for the auxiliaries supply of fans, space heater (if any) CTs, pressure switch, temperature switch etc. All connection shall be wired upto the terminal of marshalling box for external connection. For cooling fans and space heater (if any) one point 230V supply shall be provided. Further distribution to various fans shall be in vendor's scope. Bidder to note & confirmt that DGPT2 (Detection of gas, pressure & temperature) for transformer shall be provided. Bidder to note that the space on the platform is limited, So bidder to keep the weight & size of transformer as minimum as possible. Bidder to note that FY-A crane capacity is of 5 Ton, hence the weight of transformer shall be with in capacity of crane. Bidder to note & confirm that tropiclization of transformer suitable for marine environment shall be provided.

10

11

12 13

Document Number Rev.


Excel
Saipem Triune Engineering Pvt. Ltd., New Delhi

TECHNICAL QUERIES FOR POWER TRANSFORMER

FD530-0000-EL-MR-1001TQ-02 Sheet 2 of 3

00

08-WP-003-1A

TECHNICAL QUERIES ELECTRICAL


(Department)

IRAN TRANSFO FD530-0000-EL-MR-1001 Rev. D0 Bidder 27-10-10 M182-D2/D3 9534 Date Issued Offer No./Dt. Foroozan Development Operations & Bidder's Bidder's Company Seal Project Prpd. Chkd. Production Enhancement Sign & Date Customer IOEC / PEDCO MOK DBS Item FZ-A-TR-411A/B & FY-A-TR-411 Sl No. Queries & Clarifications Bidder's Reply FZ-A-TR-411 A/B 6.6/0.42 KV, ONAN/ONAF, 2000/2800 KVA, Dyn11 Bidder to note & confirm that 2 nos 6.6/0.42 KV, ONAN/ONAF, 2000/2800 KVA, Dyn11 type transformers, 1 shall be supplied for FZ-A Platforms. Bidder to fill the data sheet completely and any deviation from 2 data sheet shall be indicated in list of deviation. Bidder to note & confirm the tank type shall be Sealed 3 corrugated type. Bidder to note & confirm the color scheme for transformer 4 shall be RAL 7035. Bidder to confirm the number of tap regulation range shall be 5 as per technical data sheet, -5, -2.5, 0, +2.5, +5.

Req. No. Job No.

6 i. ii. iii. iv. v. 7

Bidder to furnish the following: System Voltage variation (Vdc) Transformer direct current content. No Load current at primary side (the indicated data is not clearly visible). Core temperature rise (the indicated data is not clearly visible). Stray Load losses Bidder to note & confirm that the primary winding cable box shall be suitable for cable size of 3C X 150 sq mm. Bidder to note & confirm that the secondary winding cable box shall be suitable for cable size of 8 runs of 1C240 sq mm per phase (total 24 cables of 1C240 sq mm for power) and 4 x 1C240 for neutral (4 cables of 1C240 sq mm). Bidder to note & confirm that a separate marshalling cabinet shall be provided for the auxiliaries supply of fans, space heater (if any) CTs, pressure switch, temperature switch etc. All connection shall be wired upto the terminal of marshalling box for external connection. For cooling fans and space heater (if any) one point 230V supply shall be provided. Further distribution to various fans shall be in vendor's scope. Bodder to note & confirmt that DGPT2 (Detection of gas, pressure & temperature) for transformer shall be provided. Bidder to note that the space on the platform is limited, So bidder to keep the weight & size of transformer as minimum. Bidder to note & confirm that tropiclization of transformer shall be required.

10 11 12 13 14 15 16

Document Number Rev.


Excel
Saipem Triune Engineering Pvt. Ltd., New Delhi

TECHNICAL QUERIES FOR POWER TRANSFORMER

FD530-0000-EL-MR-1001TQ-02 Sheet 3 of 3