OWNER

TN1 PROJECT

Document Title:
Date: 26-04-2012

LOAD ANALYSIS CALCULATION

Document No: CAL-00-E-0001


EQUIPMENT
THIT BI

LOAD
ABSORBED
FACTO
LOAD
R

Rev: 1

kW=A/D

Continuous
DESCRIPTION
M T

ITEM No.

AREA
(m)

KVA/m

[A]
KVA

[C]
in dec.

Power
distribution
KVA

Hng m,c chnh

Vn phng

792

0.120

95.04

1.00

95

Nh n

135

0.100

13.50

1.00

14

Kho nguyn liu

4,080

0.015

61.20

1.00

61

Kho thnh phm

2,550

0.015

38.25

1.00

38

Kho x

2,791

0.015

41.87

1.00

42

Nh bm

24

0.040

0.96

1.00

Nh in

88

0.040

3.52

1.00

Nh rc

60

0.040

2.40

1.00

Nh v sinh cng nhn

33

0.040

1.32

1.00

10

Lighting outside

30.00

1.00

30

11

Water supply

1.00

12

Fire fighting

70.0

1.00

70

VI

Spare (15%)

100

Tng

7/5/201312:34 AM

1.00
0.80

100
374

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

TN1 PROJECT
BNG CHN MY BIN P / TRANSFORMER SELECTION

No

Description

1 MSB 1
Tx1
2 Generator

7/5/201312:34 AM

Power demand
(Kva)

372.00

Power factor
Befor correction After correction
0.8

0.92

Capactitor selection
Capacity of
Compensation (kVAr)
840

Capacity bank
(Kvar)
70

Steps
Q'Ty
12

Transformer selection
Capactity
Efficiency
(Kva)
(%)
1

2000

85%

1750

155899910.xls.ms_office

TN1 PROJECT
MDB ( LOCATED AT LV ROOM)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10

TYPE OF LOAD

Symbol

Maximum
Demand
Load (KW)

LP1
LP2
LP3
LP4
DB-OFF
DB-CA
DB-GH
DB-P
DB-LV
Spare

FACTOR
COS
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

Maximum
Demand Load
(kVA)
46.43
37.40
94.99
43.92
67.45
21.90
33.20
9.00
11.10
100.00

DIVERSITY
FACTOR
1
1
1
1
1
1
1
1
1
1

Total Estimated Load (kVA)


Group Diversity Factor (if any - fill in your assumed figure)
Estimated Maximum Demand Load (kVA)
Please state if Three phase or Single Phase (enter values as 1 or 3)
Design Current (Amperes) at MDB Busbar 1

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

ESTIMATED
DEMAND (kVA)
46.43
37.40
94.99
43.92
67.45
21.90
33.20
9.00
11.10
100.00
465.38
0.80
372.00
3
565.20

565.20 (A)
630 (A)

calculated cross section cable select


Method of installattion: Conduit ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

7/5/201312:34 AM

0.94
0.88
0.8272
If = In/K =

762 (A)

155899910.xls.ms_office

TN1 PROJECT
DB-GH ( LOCATED AT GUARD HOUSE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10
11

TYPE OF LOAD
Lighting 1
Lighting 2
Lighting 3
Lighting 4
Lighting 5
Door motor
OU-2-01
Sockt 1
Spare 1
Spare 2
Spare 3

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
DIVERSITY
Demand Load
FACTOR
(kVA)
L1
0.8
4.69
1
L2
0.8
3.75
1
L3
0.8
4.06
1
L4
0.8
1.56
1
L5
0.8
1.56
1
M1
0.8
2.75
1
0.8
1.88
1
S1
0.8
2.50
1
0.8
6.25
1
0.8
6.25
1
0.8
6.25
1
Total Estimated Load (kVA)
Group Diversity Factor (if any - fill in your assumed figure)
Estimated Maximum Demand Load (kVA)
Please state if Three phase or Single Phase (enter values as 1 or 3)
Design Current (Amperes) at LP1-1 Busbar 1

Symbol

Maximum
Demand
Load (KW)
3.75
3
3.25
1.25
1.25
2.2
1.5
2
5
5
5

FACTOR
COS

ESTIMATED
DEMAND (kVA)
4.69
3.75
4.06
1.56
1.56
2.75
1.88
2.50
6.25
6.25
6.25
41.50
0.80
33.20
3
50.44

50.44 (A)
63 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

1
1
1

If = In/K =
63 (A)
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 35 mm2-Cu/PVC/PVC have max Load current
T l d phng I%

7/5/201312:34 AM

103 A
63.49%

155899910.xls.ms_office

TN1 PROJECT
LP1 (LOCATED PRODUCT WAREHOUSE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Lighting - 6
Lighting - 7
Lighting - 8
Lighting - 9
Lighting - 10
Lighting - 11
Lighting - 12
Lighting - 13
Lighting - 14
Lighting - 15
Socket 1
Socket 2
Door motor 1
Door motor 2
Door motor 3
LP-1-1
Spare 1
Spare 2

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
DIVERSITY
Demand Load
FACTOR
(kVA)
L1
0.8
0.13
1
L2
0.8
0.94
1
L3
0.8
0.94
1
L4
0.8
0.94
1
L5
0.8
0.94
1
L6
0.8
0.94
1
L7
0.8
0.94
1
L8
0.8
0.94
1
L9
0.8
0.94
1
L10
0.8
0.94
1
L11
0.8
0.94
1
L12
0.8
0.94
1
L13
0.8
0.94
1
L14
0.8
0.94
1
L15
0.8
0.63
1
S1
0.8
2.50
1
S2
0.8
2.50
1
M1
0.8
2.50
1
M2
0.8
2.50
1
M3
0.8
2.50
1
0.8
22.60
1
0.8
5.00
1
0.8
5.00
1
Total Estimated Load (kVA)
Group Diversity Factor (if any - fill in your assumed figure)
Estimated Maximum Demand Load (kVA)
Please state if Three phase or Single Phase (enter values as 1 or 3)
Design Current (Amperes) at LP1 Busbar 1

Symbol

Maximum
Demand
Load (KW)
0.1
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.5
2
2
2
2
2

FACTOR
COS

ESTIMATED
DEMAND (kVA)
0.13
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.63
2.50
2.50
2.50
2.50
2.50
22.60
5.00
5.00
58.04
0.80
46.43
3
70.54

70.54 (A)
80 (A)

(lc ny ny Ib ~ In)

calculated cross section cable select


Method of installattion: Cable tray ( Method A2)

Ambient temperature factor k1 (35C) :

0.94

Number of circuits factor k2 ( 1 group) :


Adjustment factor

K = k1 x k2

0.94

Load current (include adjestment K1,K2))

If = In/K =

85 (A)

a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 25 mm2-Cu/PVC/PVC have max Load current

110 A

T l d phng I%

29.25%

LP1-1 (LOCATED PRODUCT WAREHOUSE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10

7/5/201312:34 AM

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Lighting - 6
Lighting - 7
Lighting - 8
Lighting - 9
Lighting - 10

Symbol
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10

Maximum
Demand
Load (KW)
0.1
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

FACTOR
COS
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

Maximum
Demand Load
(kVA)
0.13
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94

DIVERSITY
FACTOR
1
1
1
1
1
1
1
1
1
1

ESTIMATED
DEMAND (kVA)
0.13
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94
0.94

155899910.xls.ms_office

11
12
13
14
15
16
17
18

Lighting - 11
Socket 1
Socket 2
Door motor 1
Door motor 2
Door motor 3
Spare 1
Spare 2

L11
S1
S2
M1
M2
M3

0.75
2
2
2
2
2

0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

0.94
2.50
2.50
2.50
2.50
2.50
2.00
5.00

1
1
1
1
0.85
0.85
1
1

0.94
2.50
2.50
2.50
2.13
2.13
2.00
5.00

Total Estimated Load (kVA)


Group Diversity Factor (if any - fill in your assumed figure)
Estimated Maximum Demand Load (kVA)
Please state if Three phase or Single Phase (enter values as 1 or 3)
Design Current (Amperes) at LP1-1 Busbar 1
Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

28.25
0.80
22.60
3
34.34

34.34 (A)
40 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method B2)

Ambient temperature factor k1 (35C) :

0.94

Number of circuits factor k2 ( 1 group) :


Adjustment factor

K = k1 x k2

Load current (include adjestment K1,K2))

0.94
If = In/K =

43 (A)

a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 10 mm2-Cu/PVC/PVC have max Load current
T l d phng I%

7/5/201312:34 AM

58 A
36.30%

155899910.xls.ms_office

37.144

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

TN1 PROJECT
LP2 ( LOCATED AT RAW MARTEIAL WAREHOUSE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10
11
12

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Lighting - 6
Lighting - 7
Socket - 1
LP2-1
LP5
Spare 1
Spare 2

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
DIVERSITY
Demand Load
FACTOR
(kVA)
L1
0.8
0.25
1
L2
0.8
0.94
1
L3
0.8
0.94
1
L4
0.8
0.94
1
L5
0.8
0.94
1
L6
0.8
0.94
1
L7
0.8
0.31
1
S1
0.8
2.50
1
0.8
21.50
1
5.00
1
5
0.8
6.25
1
5
0.8
6.25
1
Total Estimated Load (kVA)
Group Diversity Factor (if any - fill in your assumed figure)
Estimated Maximum Demand Load (kVA)
Please state if Three phase or Single Phase (enter values as 1 or 3)
Design Current (Amperes) at LP2 Busbar 1

Symbol

Maximum
Demand
Load (KW)
0.2
0.75
0.75
0.75
0.75
0.75
0.25
2

FACTOR
COS

56.82 (A)
63 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method B2)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
0.88
0.8272

If = In/K =
76 (A)
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 16 mm2-Cu/PVC/PVC have max Load current

85

T l d phng I%

11.61%

LP2-1 ( LOCATED AT RAW MARTEIAL WAREHOUSE))

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Lighting - 6
Lighting - 7
Lighting - 8
Lighting - 9
Lighting - 10
Lighting - 11
Lighting - 12
Socket - 1
Spare - 1
Spare - 2

Symbol
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
S1

Maximum
Demand
Load (KW)
0.75
0.5
0.5
0.75
0.75
0.75
1
1
1
1
1
0.5
2
5
5

FACTOR
COS
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

Maximum
Demand Load
(kVA)
0.94
0.63
0.63
0.94
0.94
0.94
1.25
1.25
1.25
1.25
1.25
0.63
2.50
6.25
6.25

DIVERSITY
FACTOR
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Total Estimated Load (kVA)


Group Diversity Factor (if any - fill in your assumed figure)
Estimated Maximum Demand Load (kVA)
Please state if Three phase or Single Phase (enter values as 1 or 3)
Design Current (Amperes) at LP2-1 Busbar 1
Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

32.67 (A)
32 (A)

calculated cross section cable select

7/5/201312:34 AM

155899910.xls.ms_office

Method of installattion: Cable tray ( Method B2)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
0.94
0.8836

If = In/K =
36 (A)
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 6 mm2-Cu/PVC/PVC have max Load current
T l d phng I%

7/5/201312:34 AM

48
32.54%

155899910.xls.ms_office

LOCATED AT RAW MARTEIAL WAREHOUSE)


ESTIMATED
DEMAND (kVA)
0.25
0.94
0.94
0.94
0.94
0.94
0.31
2.50
21.50
5.00
6.25
6.25
46.75
0.80
37.40
3
56.82

1 ( LOCATED AT RAW MARTEIAL WAREHOUSE))


ESTIMATED
DEMAND (kVA)
0.94
0.63
0.63
0.94
0.94
0.94
1.25
1.25
1.25
1.25
1.25
0.63
2.50
6.25
6.25
26.88
0.80
21.50
3
32.67

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

TN1 PROJECT
LP3 ( LOCATED AT RAW MATERIAL WAREHOUSE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
8
9
10
11
12
13

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Lighting - 6
Lighting - 7
Socket 1
Socket 2
Socket 3
OU-3-1
OU-3-2
OU-3-3
LP3-1
LP3-2
LP3-3
LP3-4
LP3-5
Spare 1

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
0.8
0.63
1
0.63
L2
0.8
1.25
1
1.25
L3
0.8
1.25
1
1.25
L4
0.8
0.45
1
0.45
L5
0.8
0.68
1
0.68
L6
0.8
0.70
1
0.70
L7
0.8
0.70
1
0.70
S1
0.8
1.88
1
1.88
S2
0.8
1.88
1
1.88
S3
0.8
1.88
1
1.88
AC1
0.8
3.84
1
3.84
AC2
0.8
5.99
1
5.99
AC3
0.8
3.25
1
3.25
5.56
1
5.56
5.56
1
5.56
18.84
1
18.84
21.00
1
21.00
27.00
1
27.00
20.00
1
20.00
Total Estimated Load (kVA)
118.74
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
94.99
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at LP3 Busbar 1
144.32

Symbol

Maximum
Demand
Load (KW)
0.5
1
1
0.36
0.54
0.56
0.56
1.5
1.5
1.5
3.07
4.79
2.6

FACTOR
COS

144.32 (A)
160 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
0.88
0.8272
If = In/K =

LP3-1 ( LOCATED AT RAW MATERIAL WAREHOUSE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5

TYPE OF LOAD
Lighting - 1
Lighting - 2
Socket 1
Spare 1
Spare 2

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

193 (A)

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
0.8
0.63
1
0.63
L2
0.8
0.70
1
0.70
S1
0.8
1.88
1
1.88
0.8
1.88
1
1.88
0.8
1.88
1
1.88
Total Estimated Load (kVA)
6.95
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
5.56
Please state if Three phase or Single Phase (enter values as 1 or 3)
1
Design Current (Amperes) at LP3-1 Busbar 1
24.17

Symbol

Maximum
Demand
Load (KW)
0.5
0.56
1.5
1.5
1.5

FACTOR
COS

24.17 (A)
32 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

7/5/201312:34 AM

0.94
0.88
0.8272
If = In/K =

39 (A)

155899910.xls.ms_office

LP3-2 ( LOCATED AT RAW MATERIAL WAREHOUSE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5

TYPE OF LOAD
Lighting - 1
Lighting - 2
Socket 1
Socket 2
Spare 2

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
0.8
0.63
1
0.63
L2
0.8
0.70
1
0.70
S1
0.8
1.88
1
1.88
S2
0.8
1.88
1
1.88
0.8
1.88
1
1.88
Total Estimated Load (kVA)
6.95
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
5.56
Please state if Three phase or Single Phase (enter values as 1 or 3)
1
Design Current (Amperes) at LP3-2 Busbar 1
24.17

Symbol

Maximum
Demand
Load (KW)
0.5
0.56
1.5
1.5
1.5

FACTOR
COS

24.17 (A)
32 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
0.88
0.8272
If = In/K =

LP3-3( LOCATED AT RAW MATERIAL WAREHOUSE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10
11

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Socket 1
Socket 2
Socket 3
Socket 4
Spare 1
Spare 2

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

39 (A)

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
0.8
1.00
1
1.00
L2
0.8
0.38
1
0.38
L3
0.8
1.20
1
1.20
L4
0.8
1.20
1
1.20
L5
0.8
1.05
1
1.05
S1
0.8
2.50
1
2.50
S2
0.8
2.50
1
2.50
S3
0.8
2.50
1
2.50
S4
0.8
2.50
1
2.50
0.8
6.25
1
6.25
0.8
6.25
1
6.25
Total Estimated Load (kVA)
23.55
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
18.84
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at LP3-3 Busbar 1
28.62

Symbol

Maximum
Demand
Load (KW)
0.8
0.3
0.96
0.96
0.84
2
2
2
2
5
5

FACTOR
COS

28.62 (A)
32 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

LOAD ANALYSIS FOR (State DB or area) :-

7/5/201312:34 AM

0.94
0.88
0.8272
If = In/K =

39 (A)

LP3-4( LOCATED AT RAW MATERIAL WAREHOUSE)

155899910.xls.ms_office

ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Lighting - 6
Lighting - 7
Lighting - 8
Lighting - 9
Socket 1
Door motor 1
Door motor 2
Spare 1
Spare 2

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
0.8
0.63
1
0.63
L2
0.8
1.25
1
1.25
L3
0.8
1.25
1
1.25
L4
0.8
1.25
1
1.25
L5
0.8
1.25
1
1.25
L6
0.8
1.25
1
1.25
L7
0.8
1.25
1
1.25
L8
0.8
1.25
1
1.25
L9
0.8
1.25
1
1.25
S1
0.8
2.50
1
2.50
M1
0.8
2.50
1
2.50
M2
0.8
2.50
1
2.50
0.8
6.25
1
6.25
0.8
6.25
1
6.25
Total Estimated Load (kVA)
26.25
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
21.00
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at LP3-4 Busbar 1
31.91

Symbol

Maximum
Demand
Load (KW)
0.5
1
1
1
1
1
1
1
1
2
2
2
5
5

FACTOR
COS

31.91 (A)
40 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
0.88
0.8272
If = In/K =

LP3-5( LOCATED AT RAW MATERIAL WAREHOUSE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Lighting - 6
Lighting - 7
Lighting - 8
Lighting - 9
Lighting - 10
Lighting - 11
Socket 1
Socket 2
Door motor 1
Door motor 2
Door motor 3
Spare 1
Spare 2

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

48 (A)

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
0.8
1.25
1
1.25
L2
0.8
1.25
1
1.25
L3
0.8
1.25
1
1.25
L4
0.8
1.25
1
1.25
L5
0.8
1.25
1
1.25
L6
0.8
1.25
1
1.25
L7
0.8
1.25
1
1.25
L8
0.8
1.25
1
1.25
L9
0.8
1.25
1
1.25
L10
0.8
1.25
1
1.25
L11
0.8
1.25
1
1.25
S1
0.8
2.50
1
2.50
S2
0.8
2.50
1
2.50
M1
0.8
2.50
1
2.50
M2
0.8
2.50
1
2.50
M3
0.8
2.50
1
2.50
0.8
6.25
1
6.25
0.8
6.25
1
6.25
Total Estimated Load (kVA)
33.75
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
27.00
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at LP3-5 Busbar 1
41.02

Symbol

Maximum
Demand
Load (KW)
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
5
5

FACTOR
COS

41.02 (A)
50 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :

7/5/201312:34 AM

0.94
0.88

155899910.xls.ms_office

Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

7/5/201312:34 AM

0.8272
If = In/K =

60 (A)

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

TN1 PROJECT
LP4 ( LOCATED AT RAW MATERIAL WAREHOUSE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Lighting - 6
Lighting - 7
LP4-2
LP4-3
LP4-4
LP4-5
LP4-6
LP4-7
LP4-8
Spare 1
Spare 2

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
Demand Load
(kVA)
L1
0.8
0.63
L2
0.8
0.70
L3
0.8
0.80
L4
0.8
0.80
L5
0.8
0.80
L6
0.8
0.80
L7
0.8
0.80
0.8
3.75
0.8
3.75
0.8
3.75
0.8
3.75
0.8
3.75
0.8
3.75
0.8
3.75
0.8
8.75
0.8
8.75
Total Estimated Load (kVA)
Group Diversity Factor (if any - fill in your assumed figure)
Estimated Maximum Demand Load (kVA)
Please state if Three phase or Single Phase (enter values as 1 or 3)
Design Current (Amperes) at LP4 Busbar 1

Symbol

Maximum
Demand
Load (KW)
0.5
0.56
0.64
0.64
0.64
0.64
0.64
3
3
3
3
3
3
3
7
7

FACTOR
COS

66.73 (A)
80 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
0.88
0.8272

If = In/K =
97 (A)
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 25 mm2-Cu/PVC/PVC have max Load current
T l d phng I%

LOCATED AT RAW MATERIAL WAREHOUSE)


DIVERSITY
FACTOR

ESTIMATED
DEMAND (kVA)

1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
Total Estimated Load (kVA)
f any - fill in your assumed figure)
ted Maximum Demand Load (kVA)
ngle Phase (enter values as 1 or 3)
urrent (Amperes) at LP4 Busbar 1

138 A
42.69%

0.63
0.70
0.80
0.80
0.80
0.80
0.80
3.75
3.75
3.75
3.75
3.75
3.75
3.75
17.50
8.75
54.90
0.80
43.92
3
66.73

TN1 PROJECT
DB-OFF ( LOCATED AT OFFICE)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Lighting - 6
Lighting - 7
Lighting - 8
Lighting - 9
Lighting - 10
Socket - 1
Socket - 2
Socket - 3
Socket - 4
Socket - 5
Socket - 6
Socket - 7
SEAF-6-01
FAF-6-01
EAF-6-01
IU-6-1~2
IU-6-3~4
IU-6-5~9
CDU-6-1
CDU-6-2
Spare 1
Spare 2

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
1
0.20
1
0.20
L2
1
0.30
1
0.30
L3
1
1.10
1
1.10
L4
1
0.20
1
0.20
L5
1
0.72
1
0.72
L6
1
0.72
1
0.72
L7
1
0.72
1
0.72
L8
1
0.72
1
0.72
L9
1
0.72
1
0.72
L10
1
0.72
1
0.72
S1
0.8
1.88
1
1.88
S2
0.8
1.88
1
1.88
S3
0.8
1.88
1
1.88
S4
0.8
1.88
1
1.88
S5
0.8
1.88
1
1.88
S6
0.8
1.88
1
1.88
S7
0.8
1.88
1
1.88
F1
0.75
0.08
1
0.08
F2
0.75
0.08
1
0.08
F3
0.75
0.03
1
0.03
AC1
0.8
0.25
1
0.25
AC2
0.8
0.25
1
0.25
AC3
0.8
0.75
1
0.75
CDU1
0.8
35.50
1
35.50
CDU2
0.8
3.13
1
3.13
0.8
12.50
1
12.50
0.8
12.50
1
12.50
Total Estimated Load (kVA)
84.31
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
67.45
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at DB-OFF Busbar 1
102.47

Symbol

Maximum
Demand
Load (KW)
0.2
0.3
1.1
0.2
0.72
0.72
0.72
0.72
0.72
0.72
1.5
1.5
1.5
1.5
1.5
1.5
1.5
0.06
0.06
0.02
0.2
0.2
0.6
28.4
2.5
10
10

FACTOR
COS

102.47 (A)
125 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 1 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
1
0.94

If = In/K =
133 (A)
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 50 mm2-Cu/PVC/PVC have max Load current
T l d phng I%

7/5/201312:34 AM

167 A
25.58%

155899910.xls.ms_office

DB-OFF2 ( LOCATED AT 2nd F.L of OFFICE

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Lighting - 5
Lighting - 6
Socket - 1
Socket - 2
Socket - 3
Socket - 4
Socket - 5
Fan
OU-201
OU-202
OU-203
OU-204
OU-205
OU-206
Spare 1
Spare 2

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
0.8
0.13
1
0.13
L2
0.8
0.38
1
0.38
L3
0.8
0.75
1
0.75
L4
0.8
0.75
1
0.75
L5
0.8
0.75
1
0.75
L6
0.8
0.75
1
0.75
S1
0.8
1.88
1
1.88
S2
0.8
1.88
1
1.88
S3
0.8
1.88
1
1.88
S4
0.8
1.88
1
1.88
S5
0.8
1.88
1
1.88
F1
0.8
0.11
1
0.11
AC1
0.8
3.25
1
3.25
AC2
0.8
3.25
1
3.25
AC3
0.8
3.25
1
3.25
AC4
0.8
3.25
1
3.25
AC5
0.8
3.25
1
3.25
AC6
0.8
3.25
1
3.25
0.8
2.50
1
2.50
0.8
6.25
1
6.25
Total Estimated Load (kVA)
41.24
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
32.99
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at DB-OFF2 Busbar 1
50.12

Symbol

Maximum
Demand
Load (KW)
0.1
0.3
0.6
0.6
0.6
0.6
1.5
1.5
1.5
1.5
1.5
0.09
2.6
2.6
2.6
2.6
2.6
2.6
2
5

FACTOR
COS

50.12 (A)
63 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 1 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
1
0.94

If = In/K =
67 (A)
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 16 mm2-Cu/PVC/PVC have max Load current
T l d phng I%

7/5/201312:34 AM

94 A
40.25%

155899910.xls.ms_office

DB-OFF3 ( LOCATED AT 3rd F.L of OFFICE

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
2
3
4
5
5
7
8
8
10
11
11

TYPE OF LOAD
Lighting - 1
Lighting - 2
Lighting - 3
Lighting - 4
Socket - 1
Socket - 2
Socket - 3
OU-3-01~02
OU-3-03~04
OU-3-05~06
Spare 1
Spare 2
Spare 3

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
0.8
0.13
1
0.13
L2
0.8
0.38
1
0.38
L3
0.8
0.75
1
0.75
L4
0.8
0.75
1
0.75
S1
0.8
1.88
1
1.88
S2
0.8
1.88
1
1.88
S3
0.8
1.88
1
1.88
AC1
0.8
5.25
1
5.25
AC2
0.8
5.25
1
5.25
AC3
0.8
5.25
1
5.25
0.8
2.50
1
2.50
0.8
2.50
1
2.50
0.8
2.50
1
2.50
Total Estimated Load (kVA)
30.88
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
24.70
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at DB-OFF3 Busbar 1
37.53

Symbol

Maximum
Demand
Load (KW)
0.1
0.3
0.6
0.6
1.5
1.5
1.5
4.2
4.2
4.2
2
2
2

FACTOR
COS

37.53 (A)
50 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 1 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
1
0.94

If = In/K =
53 (A)
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 10mm2-Cu/PVC/PVC have max Load current
T l d phng I%

7/5/201312:34 AM

63 A
18.44%

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

TN1 PROJECT
DB-LV ( LOCATED AT LV ROOM)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5

TYPE OF LOAD
Lighting - 1
Socket 1
Socket 2
Spare
Spare

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
0.8
0.13
1
0.13
S1
0.8
0.63
1
0.63
S2
0.8
0.63
1
0.63
0.8
6.25
1
6.25
0.8
6.25
1
6.25
Total Estimated Load (kVA)
13.88
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
11.10
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at DB-LV Busbar 1
16.86

Symbol

Load currentIb= S(KVA)/Voltage(KV)=


Seclect MCCB
In=

Maximum
Demand
Load (KW)
0.1
0.5
0.5
5
5

FACTOR
COS

11.10 (A)
25 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 1 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
1
0.94

If = In/K =
27 (A)
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 4 mm2-Cu/PVC/PVC have max Load current
T l d phng I%

7/5/201312:34 AM

32 A
20.32%

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

TN1 PROJECT
DB-CA ( LOCATED AT CANTEEN)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4
5
6
7
8

TYPE OF LOAD
Lighting - 1
Lighting - 2
Fan 1
Fan 2
Socket - 1
Socket - 2
Spare 1
Spare 2

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
L1
0.8
0.13
1
0.13
L6
0.8
1.00
1
1.00
F1
0.8
1.25
1
1.25
F2
0.8
1.25
1
1.25
S1
0.8
1.88
1
1.88
S3
0.8
1.88
1
1.88
0.8
10.00
1
10.00
0.8
10.00
1
10.00
Total Estimated Load (kVA)
27.38
Group Diversity Factor (if any - fill in your assumed figure)
0.80
Estimated Maximum Demand Load (kVA)
21.90
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at DB-EQ Busbar 1
33.27

Symbol

Load currentIb= S(KVA)/Voltage(KV)=


Seclect MCCB
In=

Maximum
Demand
Load (KW)
0.1
0.8
1
1
1.5
1.5
8
8

FACTOR
COS

33.27 (A)
40 (A)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
0.88
0.8272

If = In/K =
48 (A)
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 10 mm2-Cu/PVC/PVC have max Load current
T l d phng I%

7/5/201312:34 AM

68 A
40.62%

155899910.xls.ms_office

7/5/201312:34 AM

155899910.xls.ms_office

TN1 PROJECT
DB-P ( LOCATED AT PUMP ROOM)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
2
3
4

TYPE OF LOAD
PUMP WATER SUPPLY
Lighting & socket
Car parking
Spare 1

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

Maximum
DIVERSITY
ESTIMATED
Demand Load
FACTOR
DEMAND (kVA)
(kVA)
2
0.8
10.00
1
10.00
1
0.8
0.63
1
0.63
1
0.8
0.63
1
0.63
1
0.8
1.25
1
1.25
Total Estimated Load (kVA)
12.50
Group Diversity Factor (if any - fill in your assumed figure)
0.70
Estimated Maximum Demand Load (kVA)
9.00
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at DB-P Busbar 1
13.67
Q.TY

Maximum
Demand
Load (KW)
4
0.5
0.5
1

FACTOR
COS

13.67 (A)
25 (A)

(lc ny ny Ib ~ In)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

0.94
0.88
0.8272

If = In/K =
30 (A)
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 16 mm2-Cu/PVC/PVC have max Load current
T l d phng I%

7/5/201312:34 AM

68 A
125.00%

155899910.xls.ms_office

TN1 PROJECT
DB-FP ( LOCATED AT PUMP ROOM)

LOAD ANALYSIS FOR (State DB or area) :-

ITEM
1
3

TYPE OF LOAD
PUMP FIRE 1
BOOSTER PUMP
Spare 1

Load current

Ib= S(KVA)/Voltage(KV)=

Seclect MCCB

In=

ESTIMAT
DIVERSIT
ED
Q.TY
Y
DEMAND
FACTOR
(kVA)
2
45
0.8
112.50
1
112.50
1
1
0.8
1.25
1
1.25
1
2
0.8
2.50
1
2.50
Total Estimated Load (kVA)
116.25
Group Diversity Factor (if any - fill in your assumed figure)
0.60
Estimated Maximum Demand Load (kVA)
70.00
Please state if Three phase or Single Phase (enter values as 1 or 3)
3
Design Current (Amperes) at DB-FP Busbar 1
106.35
Maximum
Demand Load
(KW)

FACTOR
COS

Maximum Demand
Load (kVA)

106.35 (A)
160 (A)

(lc ny ny Ib ~ In)

calculated cross section cable select


Method of installattion: Cable tray ( Method C)

Ambient temperature factor k1 (35C) :


Number of circuits factor k2 ( 2 group) :
Adjustment factor
K = k1 x k2
Load current (include adjestment K1,K2))

If = In/K =
a.1/ Figure Fig.G21a - Pg G16 - Schneider =>Cable 95 mm2-Cu/FR have max Load current
T l d phng I%

7/5/201312:34 AM

0.94
0.88
0.8272
193 (A)
212 A
9.60%

155899910.xls.ms_office

ABBO

Project

141 NGUYEN VAN THU

Part of structure

DIST 1
HCM

Date of Issue
Rev. No.

Job ref.

TN 1 PROJECT

Sheet no.
0

Number of Cores( n x 1)

Cable Size Cal mm2

Cable Size mm2 (


P1,P2,P3) or Busduct
Rating

Cable Size mm2 ( PE) or


Busduct Rating

Write "C" for Cable

Type (XLPE for Cable & CU


/ AL for Busduct)

Operating Voltage (V)

Length ( Mt)

MD in KVA

Power Factor

ACB/ MCCB Rating

Voltage Drop/A/M (mV)

% Voltage Drop Allowed


(%)

Max. Voltage Drop allowed


(V)

Load Current A

Act. Voltage Drop (v)

Act. % Voltage Drop (%)

Cable/ Busduct
Derating Factor

Voltage drop within limit?

Cable or Busduct
Current Rating (A)

Load Current (A)

MCCB Rating (A)

Cable Derated Current (A)

MCCB rating within load


current?

Cable size can be reduced?

MSB

5.49

400

300

240

XLPE

400

15

2000

0.8

3200

0.185

0.5

2.0

2887

1.14

0.29

0.8

OK

728

2887

3200

582

OK

NO

Air

MSB

MDB

1.70

300

185

120

XLPE

380

20

372

0.8

630

0.260

1.0

3.8

565

1.47

0.39

0.8

OK

463

565

630

370

OK

NO

Air

MSB

DB-FP

0.41

70

70

35

FR

380

62

70

0.8

160

0.600

2.0

7.6

106

3.96

1.04

1.8

OK

215

106

160

387

OK

CHECK

Duct

MDB

LP1

0.57

35

50

25

XLPE

380

102

46

0.8

80

0.870

2.0

7.6

71

6.26

1.65

0.8

OK

175

71

80

140

OK

CHECK

Duct

MDB

LP2

0.45

25

50

25

XLPE

380

136

37

0.8

63

0.870

2.0

7.6

57

6.72

1.77

0.8

OK

175

57

63

140

OK

CHECK

Duct

MDB

LP3

0.20

70

70

35

XLPE

380

77

95

0.8

160

0.600

2.0

7.6

144

6.67

1.75

3.8

OK

215

144

160

817

OK

CHECK

Duct

MDB

LP4

0.67

35

35

16

XLPE

380

98

44

0.8

80

1.150

2.0

7.6

67

7.52

1.98

0.8

OK

150

67

80

120

OK

CHECK

Duct

MDB

DB-OFF

0.73

50

70

35

XLPE

380

105

67

0.8

125

0.600

2.0

7.6

102

6.46

1.70

0.8

OK

215

102

125

172

OK

CHECK

Duct

MDB

DB-CA

0.40

10

25

16

XLPE

380

146

22

0.8

40

1.650

3.0

11.4

33

8.02

2.11

0.8

OK

125

33

40

100

OK

CHECK

Duct

MDB

DB-GH

0.53

25

35

25

XLPE

380

172

33

0.8

63

1.150

3.0

11.4

50

9.98

2.63

0.8

OK

150

50

63

120

OK

CHECK

Duct

10

MDB

DB-P

1.08

#N/A

XLPE

380

62

0.8

25

6.800

2.0

7.6

14

5.77

1.52

0.8

OK

29

14

25

23

OK

NO

Duct

II

LP3

LP3

LP3-1

0.93

XLPE

220

35

0.8

32

6.800

2.0

4.4

15

3.47

1.58

0.8

OK

43

15

32

34

OK

NO

Air

LP3

LP3-2

0.67

10

10

PVC/PVC

220

64

0.8

32

4.000

2.0

4.4

15

3.74

1.70

0.8

OK

60

15

32

48

OK

CHECK

Air

LP3

LP3-3

0.67

10

10

PVC/PVC

380

64

19

0.8

32

4.000

2.0

7.6

29

7.33

1.93

0.8

OK

60

29

32

48

OK

CHECK

Air

LP3

LP3-4

0.51

10

16

16

PVC/PVC

380

88

21

0.8

40

2.500

2.0

7.6

32

7.02

1.85

0.8

OK

99

32

40

79

OK

CHECK

Air

LP3

LP3-5

0.48

16

25

16

PVC/PVC

380

154

27

0.8

50

1.650

4.0

15.2

41

10.42

2.74

0.8

OK

131

41

50

105

OK

CHECK

Air

Cable
Cable From

Connected To

Ref.

Tu MSB

Transformer
1

Single/ Three Phase

Number of Runs

VOLTAGE DROP CALCULATIONS

--

Ground

Air

Duct

Area of
Condr.

VD/A/M

Ground

Air

Duct

Bus bar
Ct. @
35oC

2.5
4

16.400
10.200

34
47

25
34

17.5
23

800
1000

6
10
16
25
35
50
70
95
120
150
185
240
300
400
500
630
800
1000

6.800
4.000
2.500
1.650
1.150
0.870
0.600
0.450
0.370
0.300
0.260
0.210
0.185
0.165
0.180
0.170
0.170
0.160

57
82
115
150
180
215
265
315
360
405
460
530
590
667
770
840
888
942

43
60
99
131
162
197
251
304
353
406
463
546
628
728
918
1027
1119
1214

29
39
94
125
150
175
215
260
300
335
380
440
495
570
620
670
692
735

1200
1350
1600
2000
2500
3000
3200
4000
5000

* Single Core Cables


Incomer Breaker Ratings
=< 7 kw
40 A
7.1 to
63 A
11kw
11. 1 to
80 A
14 kw
14.1 to
100 A
17.5 kw
17.6 to 22
125 A
kw
22.1 to 28
160 A
kw
28.1 to 35
200 A
kw

1
2
3
4
5
6
7

500
630
800
1000

0.180
0.26
0.160

*
*
*
*

VD/M
(SQARE
D) Cu @
0.8 P.F
0.108
0.086
0.094
0.094

VD/A/M
(mV)

0.069

0.083

0.063
0.053
0.046
0.033
0.029
0.025
0.020
0.015

0.085
0.085
0.092
0.082
0.087
0.081
0.081
0.075

MCCB

Area of
Condr.

10
16

2.5
2.5

20
32
40
50
63
80
100
125
160
200
225
250
320
400
630
800
1000
1600
2000
3200
4000
5000
6300

2.5
6
10
16
25
35
50
50
70
95
95
95
150
185
300
400
400
400
400
400
400
400
400

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

4130

BNG CHN THIT BI CHO M


MY BiN P

BO V
H P

15KV

0,4KV-A

PHA

3K
3K
6K
8K
10K
15KV
20K
6K
8K
10K
15KV
6K
10K
10K
15KV
20K
20K
30K
30K
40K
65K
65K

50
75
125
175
250
350
500
125
175
250
350
150
250
300
400
500
630
800
1000
1250
1600
2000
2,500
MY CT
MY CT

38
38
60
80
150
200
250
60
80
150
200
80
150
150
200
250
350
2x250
2x250
2x300
4x250
4x300
5x300
6x300

BO V CAO P

STT
KVA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

CU CH

1x
1x
1x
1x
1x
1x
1x
3x
3x
3x
3x
III III III III III-320
III III III III III III III III III -

10
15
25
37.5
50
75
100
25
37.5
50
75
100
160
180
250
(3x100)
400
560
630
750
1000
1250
1500
2000
3000

FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
FCO - 100
LBFCO - 200
LBFCO - 200
LBFCO - 200
LBFCO - 200
RECLOSER
RECLOSER
RECLOSER

DY DN H TH

N THIT BI CHO MY BiN P


DY DN H TH
NEUTRAL
38
38
60
80
150
200
250
60
80
150
200
80
100
100
150
150
250
250
250
300
2x300
3x250
3x300
4x300

CT
H
TH

15KV
A/A

PT
22KV
A/A

15KV
V/V

200/5
250/5
400/5
500/5
100/5
200/5
250/5
400/5
150/5
250/5
300/5
400/5
500/5
600/5
25/5
25/5
30/5
40/5
50/5
75/5
100/5
120/5

15/5
20/5
20/5
30/5
40/5
50/5
75/5
100/5

8400/120
8400/120
8400/120
8400/120
8400/120
8400/120
8400/120
8400/120

22KV
V/V

IN K

220/100A
220/100A
220/120A
220/5A
220/5A
220/5A
220/5A
380/5A
380/5A
380/5A
380/5A
380/5A
380/5A
380/5A
380/5A
380/5A
380/5A
14000/120208/120V/5A
14000/120208/120V/5A
14000/120208/120V/5A
14000/120208/120V/5A
14000/120208/120V/5A
14000/120208/120V/5A
14000/120208/120V/5A
14000/120208/120V/5A

B
H TH
KVAR

40
60
80
40
60
80
100
120
160
200
250
280
400
500
600
800
1200

Installation methods of table A.52-1


Cu/PVC

Nominal crosssectional area of


conductor mm2

A1

A2

B1

B2

Copper
1,5
2,5
4
6
10
16
25
35
50
70
95
120
150
185
240
300

14,5
19,5
26
34
46
61
80
99
119
151
182
210
240
273
321
367

14
18,5
25
32
43
57
75
92
110
139
167
192
219
248
291
334

17,5
24
32
41
57
76
101
125
151
192
232
269
Cu/XLPE/PVC

16,5
23
30
38
52
69
90
111
133
168
201
232
-

19,5
27
36
46
63
85
112
138
168
213
258
299
344
392
461
530

Copper
1,5
2,5
4
6
10
16
25
35
50
70
95
120
150
185
240
300

19
26
35
45
61
81
106
131
158
200
241
278
318
362
424
486

18,5
25
33
42
57
76
99
121
145
183
220
253
290
329
386
442

23
31
42
54
75
100
133
164
198
253
306
354
-

22
30
40
51
69
91
119
146
175
221
265
305
-

24
33
45
58
80
107
138
171
209
269
328
382
441
506
599
693

.52-1
D
7
22
29
38
47
63
81
104
125
148
183
216
246
278
312
361
408

26
34
44
56
73
95
121
146
173
213
252
287
324
363
419
474

PVC