BILL NO.

1 SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04)

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 2 - SITE WORK EXCAVATION SUPPORT AND PROTECTION (SHORING WORKS ... IF REQUIRED) Design, supply and installation of shoring system to suit the conditions on site as per drawings and specifications 01 Shoring wall (approximate quantity) EXCAVATION AND EARTHWORK Excavation in natural land consisting of solid rock formation, cracked rocks, bolders and natural contoured soil, temporary earthwork supports, dewatering ( if any ) as per specifications sections 02200 02 Mass excavation for basement (4-levels) commencing from existing grade level BACK FILLING 03 Approved selected imported fill material including compaction in making up levels around and over foundations, beds and the like as per spec. sections 02200 Approved fill material selected from excavated material including compaction as per specification section 02200 0 0 0 0 0 0 0 (Rate only) 0

15370

201553

7674

04

Price only

To Collection

SR

Project No.: J09-07800 Date: MAY 2011 ZUHAIR FAYEZ PARTNERSHIP


B1 - 2 / 108
GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 2 - SITE WORK Disposal 01 Hauling and disposing off site excavated materials to designated approved tips NOTES: 1) Apart from where specifically referred to, the works are deemed to include necessary moving or transportation about the site of excavated material including hauling to temporary stockpiles are to be included in the unit rates of excavation 2) Before commencing the shoring work, the Contractor is required to provide documents related to shoring methods, design, calculation and details to the consultant for necessary approval. 3) The Contractor will be paid for shoring works according to actual measurements taken on site. Soil treatment application for termite control 02 To subgrades of slabs and along periphery of building

201553

Note

Note

Note

14000

To Collection

SR

Project No.: J09-07800 Date: MAY 2011 ZUHAIR FAYEZ PARTNERSHIP


B1 - 3 / 108
GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 2 - SITE WORK Thermoplastic paint for traffic marking on parking pavement in parking floor and sub-terrain floor as per detail 4 on drawing G-A 902 and specification section 02580 01 02 03 04 05 06 07 Handicapped marking on floor and lane marking Exit (text) Entry / No entry (text) Straight arrows Straight arrows combination with right/left arrows Turning arrows Parking lane marking, 100 mm wide

30 2 2 173 6 52 11605

No No No No No No M
SR

To Collection
Collection Sheet B1-1 Sheet B1-2 Sheet B1-3

To Bill Summary

SR

Project No.: J09-07800 Date: MAY 2011 ZUHAIR FAYEZ PARTNERSHIP


B1 - 4 / 108
GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 3 - CONCRETE CONCRETE TYPES Include in Unit Rates for concrete of the following types and locations: 20 Mpa a) Blinding concrete b) Slabs on grade 35 Mpa a) Precast concrete elements 40 Mpa a) Raft Foundation & Footings b) Columns and R.C. walls c) Floor and roof slabs,beams,girders,stairs, CONCRETE WORK Plain insitu concrete, 20 Mpa, cement type I with microsilica as per specifications section 03300 01 02 Blinding beds, 150 mm minimum thickness Screed concrete, 50 mm minimum thickness Insitu reinforced concrete, 40 Mpa cement type I with microsilica including formwork and steel reinforcements conforming to ASTMA615and A185 as per specifications sections 03100, 03200 & 03300 03 04 05 Raft Foundation including sump pits Concrete retaining walls 300 mm thk. Concrete retaining walls 400 mm thk. Note

2016 672

M M

16875 103 2406

M M M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 5 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 3 - CONCRETE CONCRETE WORK Insitu reinforced concrete, 40 Mpa type I cement including formwork and steel reinforcements conforming to ASTM A615 and A185 as per specifications sections 03100, 03200 & 03300 01 02 03 04 Ramps Reinforced concrete for tank walls 200mm thick Reinforced concrete for tank slabs 300mm thick Slab on grade 100 mm thick with A252WWF mesh reinforcement including thickening 150 mm thick raised slabs ramps and curbs with hight required to suit parking area as per detail on drwing Beams Suspended slabs (solid slabs) 150 mm thick Suspended slabs (solid slabs) 200 mm thick Suspended slabs (solid slabs) 220 mm thick Suspended slabs (solid slabs) 250 mm thick Suspended flat slabs 300 mm thick Drop panels 150 mm thick Stairs

633 29 24 10

M M M M

05

1500

06 07 08 09 10 11 12 13

1175 118 146 90 38 25084 1658 175

M M M M M M M M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 6 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 3 - CONCRETE CONCRETE WORK Insitu reinforced concrete, 40 Mpa type I cement including formwork and steel reinforcements conforming to ASTM A615 and A185 as per specifications sections 03100, 03200 & 03300 01 02 03 04 05 Columns Composite columns Shear walls 300 mm thick Shear walls 400 mm thick Shear walls 600 mm thick PRECAST CONCRETE Precast concrete splash block including fixing and all accessories for complete installation as per detail on drawing 06 Precast conceret splash block including grouting as per detailed Precast concrete wheel stopper including dowels, grouting and accessories for complete installation as per detail 9 on drawing G-A04 and spec. section 03410 07 Precast concrete wheel stopper to suit required locations Sundries 08 Allow for reinforced concrete equipment pads, upstand surrounds and anti-vibration accessories as required Allow for 12 mm premoulded joint filler and sealant at contact joints of concrete as required. Allow for precast concrete scupper drain including all associated works as shown detail on drawing To Collection

3326 100 1474 18 68

M M M M M

No.

1566

No.

18

M3

09

Item

10

No.

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 7 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 3 - CONCRETE CONCRETE WORK NOTES: Water stops including junction accessories, all joints and temporary supports Water stops including junction accessories are not measured separately The cost of water stop items are to be included in the unit rates of the related concrete items Include in unit rates works associated to construction and control joints including joints surrounding equipment pads along with necessary caulking,

Note

Note

To Collection Collection Sheet B1-1 Sheet B1-2 Sheet B1-3 Sheet B1-4

SR

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 8 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 4 - MASONRY UNIT MASONRY Concrete hollow blocks in courses with cement-lime mortar including vertical and horizontal reinforcement, fixings, fillers, sealants grout and RC lintels over openings as per specification section 04200 01 02 03 04 05 06 07 08 09 10 11 12 100 mm thick wall Ditto, but one hour fire rated Ditto, but two hour fire rated 150 mm thick wall Ditto, but two hour fire rated 200 mm thick wall Ditto, but one hour fire rated Ditto, but two hour fire rated 200 mm thick pre-insulated wall Ditto, but one hour fire rated Ditto, but two hour fire rated 300 mm thick wall, two hour fire rated

183 43 96 378 46 4650 6843 1971 191 12 1811 21

M M M M M M M M M M M M

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 9 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 5 - METALS HANDRAILS 40, 60mm dia., brushed stainless steel pipe handrail and 22mm dia., brushed stainless steel double tubes baluster with 8mm thick single clear tempered toughens anti scratch glass panel including fixing, finishing and the like as per detail 2 on drawing A401 as per specification section 05500 01 02 Handrail to suit required locations Handrail to suit required locations as per ID drawing ID-401 Painted galvanized steel pipe rail and baluster 40mm dia., including fixing, finishing and the like as per detail 1 on drawing G-A05 and as per specs. Section 05500 03 04 Guard rail to suit stairs Guard rail to fixed on wall to suit parking as per detail on drawing Painted galvanized steel pipe rail and baluster 38 mm dia., including fixing, finishing and the like as per detail 5 on drawing G-A05 as per specification section 05500 05 Guard rail to suit ramps Wall mounted painted galvanized steel pipe handrail 38 mm dia., on painted steel wall brackets including fixings, finishing and the like per detail (2) drawing G-A05 and as per specification section 05500 06 Wall brackets to suit stairs LADDERS Ladder hook including finishing and all associated works as per detail no. 8 on drawing G-A05 07 Ladder hook to suit required locations

390 22

M M

484 470

M M

11

295

No

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 10 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 5 - METALS LADDERS Ladder including fixing finishing and all associated works as per details on drawing A-403 01 ladders to suit required location METAL NOSING Abrasive cast iron nosing including fixing and accessories as per detail 3 on drawings GA05 specification section 05500 02 Step nosing , size 40 x 40 mm ROOF HATCH Roof hatch including fixing finishing and all associated works as per details no 1 on drawing A-403 03 Roof hatch to suit in location GRATING Cast iron grating 300 mm depth galvanized cast iron gratings including medium gauge galvanised steel gutter as per detail on drawing and as per specification section 05500 04 To suit required locations Stainless steel grating as detail 11 on drawing G-A03, and specification section 05500, including all associated work 05 Grating to suit ablution STEEL COVER Steel cover as per details on structural drawings 06 To suit PG. trench (300mm wide)

No

1656

No

98

34

708

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 11 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 5 - METALS METAL FABRICATIONS Roofing shade structure comprising aluminum cladding panels, on metal frames, supprting on steel columns, including fixing, finishes, accessories complete as per detail on drawings 01 Aluminum roofing shade structure Bollard steel pipe filed with concrete as per detail 15 on drawing GA-04 and as per specification section 05500 02 To suit required locations Anodized aluminum cladding panels or white color on metal frames including vapour retarder, fixing finishing on the building faade, as shown on drawing 03 04 Aluminum cladding white color to suit building faade Aluminum cladding to suit building faade ALUMINUM SHEET CLADDING 05 Aluminum sheet cladding including finishes, fabrication, fixings and all accessories for complete installation as per detail 2b on drawing ID-401 ALUMINUM SHEET END CAP AT PARAPET 06 4mm thick formed aluminum coping panel including weather sealant, fabrication, fixings and accessories for complete installation as per detailed on drawing

1895

M2

No

140 2445

M2 M2

115

M2

425

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 12 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 5 - METALS CHAIN LINK FENCE Chain link fence including steel posts fabric, brace rail, tension band complete fixing and all associated works as per detail 18 on drawing GA-05 01 Chain link fence including gates SPACE TRUSS Space truss W/1000mm depth elements W/pipe dia., 100x10mm verify as per manufacture's recommendations including aluminum cladding and all other required accessories to complete the system as per supplier recommendation and subject to engineer approval as per detailed on drawing and specifications 02 Spherical dome space truss including aluminum cladding METAL DECKING Metal decking comprising steel joist 800mm depth as per manufacturer standard and 100mm thick concrete slab with steel reinforcement and all other required accessories to complete the system as per supplier recommendation and subject to engineer approval as per detailed on drawing and specifications Note: fireproof coating on bollow surfaces 03 To suit mechanical rooms (RO-01,03)

220

1100

M2

600

M2

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 13 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 5 - METALS METAL DECKING Metal decking comprising main steel beams HEB900 and secondary steel beams IPE800, IPE750, IPE600, IPE550, IPE400, IPE280, IPE200, metal deck galvanized steel sheet 0.6mm thick covering as per detail on drawing including stiffener plate, steel angle, planted steel columns, welded, bolts, nuts, and all other required accessories to complete the system as per supplier recommendation and subject to engineer approval as per detailed on drawing and specifications Note: fireproof coating on bollow surfaces 01 Steel framing and metal decking to cover floor area at second floor Steel framing with metal decking and planted IPE column, hollow section column, between 3rd and 4th floor to cover area at thired floor 03 Steel framing with metal decking to cover floor area at 4th floor STAIRS STEEL STRUCTURE Stairs steel structure comprising steel beams IPE400, IPE280, galvanized steel steps and covering as per detail on drawing including all other required accessories to complete the system as per supplier recommendation and subject to engineer approval as per detailed on drawing and specifications Note: fireproof coating on bollow surfaces 04 Stairs steel structure incdluing covering

425

M2

02

633

M2

615

M2

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 14 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

EXPANSION JOINT Expansion joint including extruded aluminum assemblies, fillets, accessories, fixing and sealants as per detail on drawing and as per specification section 05810 01 02 03 04 05 06 07 Ceiling to ceiling as per detail 10 Ceiling to wall as per detail 11 Floor to floor as per detail 12 Floor to wall as per detail 13 Roof to roof as per detail 14 Roof to wall as per detail 15 Wall to wall as per detail 16

115 70 115 70 62 3 285


To Collection

M M M M M M M
SR

Collection Sheet B1-1 Sheet B1-2 Sheet B1-3 Sheet B1-4 Sheet B1-5 Sheet B1-6

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 15 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISON 6 - WOOD AND PLASTIC KITCHEN CABINETS Kitchen wall and base cabinets including doors, hardware, shelves, decorations as per detail 9 on drawings G-A03 and specification (kitchen sink and drainer measured elsewhere) 01 02 Ref. 001, wood base cabinet plastic laminate finish Ref. 002, wood wall cabinet plastic laminate finish CABINET AND COUNTER Coustom made counters as per detailed on drawing and specification section 06400 03 Reception counter (00-32), (01-31), (02-35), (03-37), (04-86) as per detail on drawing to suit required areas Security room counter (-4-02), (-4-35), (-3-03), (-3-10) (-2-010), (-2-02), (-1-41), (-1-02) as per detail on drawing to suit required areas Security room counter (00-48), (01-50), (02-54), (03-56), (04-57) as per detail on drawing to suit required areas Security room counter (-4-23), (-3-29), (-2-29), (-1-29) as per detail on drawing to suit required areas Security room counter (00-73), (01-02), (03-06) as per detail on drawing to suit required areas Shoe rack cabinet combination dark cherry veneered finished wall cladding and dark cherry veneered finish on plywood fixed shelves to suit at pray hall rooms as per detailed on ID drawing and specification 08 09 To suit at pray hall rooms To suit at lobby

36 40

M M

No.

04

No.

05

No.

06

No.

07

No.

5 5

No. No.

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 16 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 7 - THERMAL AND MOISTURE PROTECTION WATER PROOFING AND MOISTURE PROTECTION AS PER SPECIFICATION SECTION 07100 01 Membrane waterproofing to suit "wet room" areas including upturn to abutting walls Membrane waterproofing to suit concrete wall and foundation Protection board to suit concrete walls ROOFING SYSTEM Roofing system comprising gravel layer separation sheet, rigid insulation, waterproofing membrane and concrete screed to form slope to drain, including precast tiles where occur for maintenance walks, forming of cant strips, and waterproofing membrane base flashing, metal flashing, sealants and fixings, steel fabrications, all as per detail 1 on drawing GA001 and specifications section 07500 04 To suit roof area NOTES: (vapor retarder are measured , with metal cladding & granite cladding & rigid insulation are measured with curtion wall)

2738

02 03

26341 13366

M M

5524

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 17 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION DIVISION 8 - DOORS AND WINDOWS GENERAL All doors including fixings, decorations, threshold, weather stripping, smoke seal and the like as detailed on drawing G-A02 and specification to suit masonry openings. METAL DOORS 44mm thick painted hollow metal insulated door with door grill (where required) including frames, hardwares, saddle and decoration as described on drawing GA-02 and specifications section 08100

QTY

UNIT

RATE

AMOUNT SR

Note

01 02

Type A1, frame type 3, single leaf, leaf size 900 x 2150 mm Type A1, frame type 3, single leaf, leaf size 900 x 2150 mm , with 60 minutes fire rating Type A1, frame type 3, single leaf, leaf size 900 x 2150 mm , with but 90 minutes fire rating Type A2, frame type 1, single leaf, leaf size 1000 x 2150 mm Type A2, frame type 4, single leaf, leaf size 1000 x 2150 mm Type A2, frame type 4, single leaf, leaf size 1000 x 2150 mm, with 60 minutes fire rating Type A2, frame type 4, single leaf, leaf size 1000 x 2150 mm, with 90 minutes fire rating Type A3, frame type 3, double leaf , overall leaf size 1600 x 2150 mm Type A3, frame type 3, double leaf , overall leaf size 1600 x 2150 mm, with 60 minutes fire rating Type A3, frame type 3, double leaf , overall leaf size 1600 x 2150 mm, with 90 minutes fire rating Type A4, frame type 3, double leaf, overall leaf size 1800 x 2150 mm, with 90 minutes fire rating Type A6, frame type 3, single leaf, leaf size 700 x 2150 mm , with 60 minutes fire rating To Collection

63 97

No. No.

03

No.

04 05 06

1 7 2

No. No. No.

07

40 5

No. No.

08

09

34

No.

10

No.

11

14

No.

12

No.
SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 18 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 8 - DOORS AND WINDOWS METAL DOORS 44mm thick fully louvered painted hollow metal doors. and frames including fixings, hardwares, saddle and decoration as described on drawing G-A02 and specification section 08100 01 Type C1, frame type 3, double leaf, overall leaf size 2000 x 2150 mm, with 60 minutes fire rating Type C1, frame type 3, double leaf, overall leaf size 2000 x 2150 mm, with 90 minutes fire rating Type C2, frame type 3, single leaf, leaf door 1000 x 2150 mm, with 60 minutes fire rating Type C2, frame type 3, single leaf, leaf door 1000 x 2150 mm, with 90 minutes fire rating WOODEN DOORS Hard wood solid core door with laminated maple wood veneer including frames, finishes, hardwares, saddle and decoration as described on drawing G-A02 and specification section 08210 05 06 Type E1, frame type 4, single leaf, leaf size 900 x 2150 mm Type E1, frame type 4, single leaf, leaf size 900 x 2150 mm , with 60 minutes fire rating Type E3, frame type 4, duoble leaf, overall size 1600 x 2150mm Type E3, frame type 4, duoble leaf, overall size 1600 x 2150mm with 60 minutes fire rating Type E4, frame type 4, double leaf, overall size 1800 x 2150mm , with 90 minutes fire rating

No.

02

No.

03

No.

04

No.

137 6

No. No.

07 08

63 2

No. No.

09

17

No

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 19 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 8 - DOORS AND WINDOWS GLAZED DOORS All glazed doors including all hardware, saddle, fixtures, packings, sealants, weather stripping and the like as shown on drawing to suit masonry openings. 24 mm thick double tinted / clear tempered glass pivoted door on aluminum frames including hardwares, saddles, weatherstripping and all accessories for complete installation as per drawings A801 and specifications section 08120 01 02 Type D01, double leaf, overall size 1800 x 2400 mm Type D01, double leaf, overall size 1800 x 2400 mm, with 90 minutes fire rating Type D02, double leaf, overall size 1800 x 2200 mm 12 mm thick single tempered clear frameless glass pivoted single door including hardwares, saddles, weatherstripping and all accessories for complete installation as per drawings A801 and specifications section 08120 04 Type D03, single leaf, overall size 1150 x 2400 mm

Note

8 2

No No.

03

No

No

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 20 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 8 - DOORS AND WINDOWS CURTAIN WALLING 24 mm thick double tempered glazed curtain walling, 6 mm thick clear outside, 12 mm air space and 6 mm thick clear inside all with polyurethane sealant fixed on metal frames system including spanderl panel, vapor retarder, rigid insulation, fire stopper all hardware, fixtures, packings, sealants, weather strippings and the like as described drawing A802 & A803 to suit openings and as per specification section 08920 01 02 03 04 05 06 07 Ref. CW01, see type, approximate area 4826 M2 Ref. CW02, approximate area 112 M2 Ref. CW03, approximate area 76 M2 Ref. CW04, approximate area 26 M2 Ref. CW05, approximate area 37 M2 Ref. CW06, approximate area 120 M Ref. CW07, approximate area 104 M WINDOWS 24 mm thick double tempered glazed window, 6 mm thick clear outside, 12 mm air space and 6 mm thick clear inside all with polyurethane sealant fixed on metal frames system as shown on drawings including all hardwares, fixtures, packings, sealants, weather strippings and the like as described drawing A801 to suit opening and as per specification section 08520 08 09 10 Ref. W01, size 15600 2700 mm Ref. W02, size 8800 2700 mm Ref. W03, size 6700 2700 mm
2

1 1 1 1 1 1 1

No No No No No No No

2 5 2

No No No

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 21 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 8 - DOORS AND WINDOWS SKYLIGHT 24mm thick double glazed acrylic pyramid shaped skylight with painted steel support including necessary flashings and fixings as described on drawing A801 and as per specification section 08620 (Areas are measured on plan) 01 To suit required locations SUNDRIES Glass partition double clear tempered glazed on metal frame system provided with caskets and fire stopping system as shown on drawings including all hardware, fixtures, packing's, sealants, and the like as described on drawing A801 02 Glass partition type ( P01 )as per detail 4 on drawing A801 overall size 45800 x1700 mm ( Glazed Doors are measured separately )

89

M2

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 22 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 8 - DOORS AND WINDOWS Collection Sheet B1-1 Sheet B1-2 Sheet B1-3 Sheet B1-4 Sheet B1-5

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 23 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES INTERNAL FINISHES Flooring including respective types of finish materials, concrete screed sub-floor of required thickness, (if any) accessories for complete installations as per drawings and spec. sections 09310, 09600, 09660, 09680, 09685 01 100 mm thick steel troweled concrete screed with hardener , ref. CS1 Epoxy coat on concrete, ref. EC2 Anti-static vinyl tiles on raised floor (raised floor measured elsewhere),ref. VPT1 Carpet on cement screed, ref. CP1 Anti-static carpet tiles( 600x600mm) on raised floor (raised floor measured elsewhere) , ref. CPT1 Floor patterned anti-static carpet tiles ( 600x600mm) on raised floor (raised floor measured elsewhere) , ref. CPT2 Floor patterned carpet tiles gray color (600x600mm) on raised floor (raised floor measured elsewhere) , ref. CPT3 Floor patterned comprising carpet tiles gray color (600x600mm) , ref. CPT3 and carpet tiles dark color (600x600mm), ref. CPT4 on raised floor (raised floor measured elsewhere) Broadloom carpet with underlay (80% wool & 20% nylon) , ref. CA-01 Ceramic floor tiles size 200x200 mm , ref. CTF2
Porcelain tiles , ref. PCF1

5761

02 03

61475 758

M2 M

04 05

407 7832

M2 M

06

1130

07

505

08

952

09

265

M2

10 11 12

175 451 198

M M M

Polished granite tiles size 500x500 mm, light color , 20 mm thick ref. GT-01 Polished granite tiles size 500x500 mm, dark color , 20 mm thick ref. GT-02 To Collection

13

728

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 24 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES INTERNAL FINISHES Flooring including respective types of finish materials, concrete screed sub-floor of required thickness, (if any) accessories for complete installations as per drawings and spec. sections 09310, 09600, 09660, 09680, 09685 01 Floor pattern comprising polished granite tiles size 500x500 mm, light color , 20 mm thick ref. GT-01, polished granite tiles size 500x500 mm, dark color , 20 mm thick ref. GT-02, polished granite tiles size 250x500 mm, dark color, 20 mm thick ref. GT-03 Floor pattern comprising polished granite tiles size 500x500 mm, light color , 20 mm thick ref. GT-01, polished granite tiles dark color, 20 mm thick ref. GT-04 Floor pattern comprising polished granite tiles size 500x500 mm, light color , 20 mm thick ref. GT-01 polished granite tiles size 250x500 mm, dark color, 20 mm thick ref. GT-03 Floor pattern comprising polished granite tiles size 500x500 mm, light color , 20 mm thick ref. GT-01, polished granite tiles size 500x500 mm, dark color , 20 mm thick ref. GT-02 Non-toxic epoxy coat water proofing for tanks on concrete, ref. EXY 3 Seamless, self smoothing, heavy duty polyethane base flooring system, dark and light color, ref. SHP Finishings : bases including sand-cement backing mortar and grout 07 08 09 10 100 mm H. Solid wood natural finish, ref. WB1 100 mm H. Painted wood, ref. WB2 100x20 mm. Polished granite base, ref. GB1 100 x20 mm. Cement plaster base , ref. CB1

675

02

48

03

1776

M2

04

99

05

65

06

1476

326 4742 1980 1666

M M M M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 25 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES INTERNAL FINISHES Finishings : walls including metal angle beads and lathing at junctions of differing backgrounds 01 02 03 04 05 06 07 08 09 10 Wall cladding polished marble tile 20 mm thick ref.GC1 Cement plaster to suit walls Paint on cement plaster, ref. P01 Paint on gypsum board ,ref. P04 Paint on exposed structure ref. P06 Black paint on gypsum board ,ref. P07 Ceramic wall tiles size 200x200 mm ,ref. CTW2 Wall cladding acoustical wood,ref. W-03 Wall cladding porcelain tiles , ref. PCW Wall cladding combination wooden cladding light dark maple wood and gypsum ornament white color with decorative shadow to ornament in brown color to suit praying area as per detailed on ID drawing (5 pieces - mahrab) Special decorative paint finish as per drawing ID-401 Decorative sand glass unit for light as per drawing ID-401 Non-toxic epoxy coat water proofing for tanks on concrete, ref. EXY 3

2531 41488 41488 17525 2932 55 797 355 2190 60

M M M M M M M M M M

11 12 13

15 40 140

M No. M

10

Fabric acoustical wall panles , ref. FW

990

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 26 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES INTERNAL FINISHES Wall board system : Free-standing dry wall partition, including rockwool insulation and metal studs (where erquired) as discribed on drawing and as per specifications section 09250 01 02 03 Wall partition type ( g ) size 100mm Ditto but one hour fire rated Double layered gypsum board with acoustical mineral rock wool insulation and caulking at penetrations. Wall to be treated with fabric acoustical wall panles. Wall thickness , treatment and colors to be subject to audio / visual system contractor instructions. Item includes all required accessories to complete as per supplier recommendations and subject to engineer approval as per detailed on drawings and specification Finishings : treads , risers and stair landings, including bedding mortar, abrasive inserts and pointing as per detail 4/GA05 04 Polished granite light grey color 30mm thk. To suit stair treads ref. GT-05 Polished granite light grey color 20mm thk. To suit stair risers ref. GT-05 Polished granite light grey color 20mm thk. ref. GT-05 to suit stair landings Broom finsh with hardner to suit fair faced treads, risers and stair landings as shown on details & drawings 07 08 To suit tears and risers, ref. EC1 To suit landings, ref. EC1

8969 180 990

M M M

243

05

243

06

23

1656 672

M M2

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 27 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES INTERNAL FINISHES Finishing : ceilings 01 02 03 04 Cement plaster to suit ceiling Paint on cement plaster ,ref. P01 Paint on exposed structure, ref. P06 Non-toxic epoxy coat water proofing for tanks on concrete, ref. EXY 3 Finishings: Suspended ceilings including suspension system as shown on drawings and as per specification sections 09250, 09510 & 09547 (Area measured on plan) 05 13 mm Painted gypsum board, on metal suspension system ,ref. GBC1 13 mm Moisture resistant painted gypsum board on metal suspension system ,ref. GBC2 600 x 600 mm acoustical tiles ,ref. ATC with 13 mm painted gypsum board, ref. GBC1, all on metal suspension system 600 x 600 mm acoustical tiles ,ref. ATC2 , with 13 mm painted gypsum board, ref. GBC1, all on metal suspension system 13 mm Painted gypsum board ref. GBC1 and metal stripes on metal suspension system , Dome for theater ceiling (projection aera) including suspended panels on metal suspension system, treatment with fiberglass batting or mineral wool.Ceiling thickness , treatment and colors to be subject to audio / visual system contractor instructions. Item includes all required accessories to complete as per supplier recommendations and subject to engineer approval as per detailed on drawings and specification

4700 4700 64068 65

M M M M

6360

06

530

07

8915

08

772

09

582

10

345

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 28 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES EXTERNAL FINISHES Finishings : walls including metal angle beads and lathing at junctions of differing backgrounds 01 02 Cement plaster to external surface including paint system Paint system to fairface concrete Faade wall cladding rough texture granite cladding including vapour retarder fixings , finishings and all associated work as per detail on drawings and specification 03 Rough texture granite cladding (dark gray color ) along building faades including fixing, finishing as shown on drawings EXTERNAL FINISHES Finishings : treads , risers and stair landings, including bedding mortar, abrasive inserts and pointing as per detail 4 on drawing GA05 04 05 06 Polished granite treads Polished granite risers, Polished granite landings and floors SUNDRIES 07 08 Cement board ceiling on metal suspension system ,ref. CBC Granite copping including fixing as required as per detailed on drawing

1740 215

M2 M2

1265

M2

10 10 8

M M M2

455 182

M M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 29 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 9 - FINISHES Collection Sheet B1-1 Sheet B1-2 Sheet B1-3 Sheet B1-4 Sheet B1-5 Sheet B1-6

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 30 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 10 -SPECIALTIES TOILET AND BATH ACCESSORIES Supply and installation of following toilet and bath accessories as per schedule including fixings and trims as shown on drawings and specification section 10800 to suit locations as required 01 Ref. FM1, Clear glass counter wide mirror on 20 mm thick plywood backing, 1000 mm high Ref. FM2, Clear glass mirror with stainless steel frame, size 900 x 1500 mm Ref. FMh, Clear glass mirror with stainless steel frame, size 400 x 600 mm ( handicapped) Ref. GB1, 32 mm dia. Satin finish stainless steel grab bar 600 mm length Ref. GB2, 32 mm dia. Satin finish stainless steel grab bar 1050 mm length Ref. GB3, 32 mm dia. Satin finish stainless steel grab bar 300 mm length Ref. HD, Surface mounted push button electric hand dryer Ref PTD surface mounted stainless steel paper towel dispencer Ref. RH2, Single robe hook Ref. RHh, Single robe hook (handicapped ) Ref. SD, Wall mounted soap dispenser Ref. HS, Hand spray with flexible hose and wall hook Ref. HS2, Hand spray with flexible hose and wall hook Ref. TPH, Toilet paper holder Partitions for urial area 56 M

02

No

03

19

No.

04

19

No.

05

19

No.

06

35

No.

07 08 09 10 11 12 13 14 15

23 23 68

No. No. No.

36 46
51 255 51 10

No No
No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 31 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 10 -SPECIALTIES TOILET COMPARTMENTS


Proprietary solid phenolic core toilet compartments with high pressure melamine matt surface, including, stainless steel pilasters, fixings, finishings, hardware and accessories as per detailed on drawing and specification section 10165

01

Toilet partitions including doors as per drawings CORNER AND COLUMN GUARDS Corner and column guards install at 600 high from finish floor heavy duty rubber guard bumper, including all associated works, as shown and detailed 10 on drawings GA-04 as specification section 10260

106

02

To suit column location as required SUNDRIES Aluminum Louvers panels including insects mesh (where required) as per detail on drawing A801

2552

No.

03 04 05 06 07 08

Aluminum Louvers panels type (L01) size 2250 x 1950 mm Aluminum Louvers panels type (L02) size 1350 x 1950 Aluminum Louvers panels type (L03) size 3000 x 1950 Aluminum Louvers panels type (L04) size 2550 x 2400 Aluminum Louvers panels type (L05) size 1800 x 1950 Aluminum Louvers panels type (L06) size 4000 x 2000 RAISED FLOOR AS PER DETAIL ON DRAWINGS

3 1 2 16 2 2

No No No No No No

09

Raised floor to suit anti-static vinyl tiles flooring ref, VPT1 , and anti-static carpet tiles flooring ref, CPT1, CPT2, CPT3, CPT4

11177

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 32 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 10 -SPECIALTIES VANITY TOP Vanity top, comprising counter top holed for lavatory (lavatory measured elsewhere) with splash board, facial, sides, and metal framing including finishings, sealants, and trims as shown on drawings and per specification 01 Granite vanity top 30 mm thick to suit required locations SIGNAGE Manufacturer's standard indoor signs, letters and plaques including fixings, finishes, accessories complete as per interior design drawings i- 900 to i-947 and specifications 02 03 04 Refer type S01, Room sign ( door mounted / wall mounted) Refer type S02, Pictograms ( door mounted / flag mounted) Refer type S03, Projected signs, double face (flag mounted beside door) Refer type S04, Directional signs (wall mounted ) Refer type S05, Directional sign, double face (suspended) Refer type S06, Area sign, (mounted above door/ wall mounted) Refer type S07, Fire exit sign, (mounted above door) Refer type S08, Fire exit sign, double face (suspended) Refer type S10, Building directory, free standing with LCD panel (digital) 0 0 0 0

48

228 251 33

No. No. No.

05 06 07 08 09 10

1 38 13 78 23 17

No. No. No. No. No. No.


SR

To Collection Collection Sheet B1-1 Sheet B1-2 Sheet B1-3 To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 33 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 11 -EQUIPMENT FOOD SERVICE EQUIPMENT Supply and install the following equipment including necessary fixings and services connections required as shown on drawings and as per specification section 11410 01 02 03 04 Refer Item 04 bottle type water cooler Refer Item 05, stainless steel refrigerator under counter Refer Item 06, Water boiler Refer Item 07, two hot plate electric range on counter PARKING CONTROL EQUIPMENT Parking control equipment as per specifications section 11150 05 Traffic control barrier 3 No.

3 9 9 9

No. No. No. No.

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 34 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 12 - FURNISHINGS FLOOR MATS Supply and install floor mats as per detail 20 on drawing G-A05 and specification section 12695 01 Floor mats various size to suit location including carpet tread

10

No.

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 35 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 13 -SPECIAL CONSTRUCTION

METAL FABRICATIONS Allow for design, supply and install single layer triangular steel structure system, with rectangular hollow galvanized steel sections members with polyurethane paint fixed with painted forged steel nodes including steel triangular mesh panels with polyurethane paint on metal frames fixing, finishing, accessories, and all associated works to complete the system as per supplier recommendations and subject to engineer approval as per detailed on drawings and spec. 01 Single layer triangular steel structure system with steel triangular mesh panels with polyurethane paint to suit building faade

3660

M2

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 36 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 14 - CONVEYING SYSTEM ELEVATORS Supply, installation, testing and commissioning of electric traction elevators complete including driving mechanism, cars, hoistways, entrances, rails guide rollers, buffers, signals, indicating devices, control system, lighting and wiring within elevator unit and all accessories and spare parts required as per drawings and specification section 14240 01 Ref. Elevator No. 1,2,3,4 Type: A Capacity: 1600 kg Speed: 1.6 m/sec No. of stops: (5) Ref. Elevator No.5 Type: B Capacity: 500 kg Speed: 1.0 m/sec No. of stops: (9) Ref. Elevator No. 6,7 Type: A Capacity: 1600 kg Speed: 1.6 m/sec No. of stops: (9) Ref. Elevator No. 8 Type: A Capacity: 1600 kg Speed: 1.6 m/sec No. of stops: (5) Ref. Elevator No. 9 Type: A Capacity: 1600 kg Speed: 1.6 m/sec No. of stops: (4) 4 No.

02

No.

03

No.

04

No.

05

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 37 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 14 - CONVEYING SYSTEM ESCALATORS Supply, installation, testing and commissioning complete escalators including driving mechanisms, signals, indicational devices, steps, balustrade panels, control systems, safety devices, cabling and wiring within escalator unit, and all accessories and spare parts as per manufacturer's requirements and all associated works as shown on drawings and spec. section 14310 01 02 Escalator (up) Escalator (down)

2 2

No No

To Collection Collection Sheet B1-1 Sheet B1-2

SR

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 38 / 108

Date: MAY 2011


GMG

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL PLUMBING INSTALLATIONS Supply, installation sanitary wares and fixtures including traps, spouts, valves water mixers and short lengths of water supply pipes, all fittings, accessories, trims and the like as on drawing and as per specification section 15440 01 02 Ref. WC1, Wall hung water closet with flush valve Ref. WCh, Wall hung water closet with flush valve ( for handicapped) Ref. UR, wall mounted urinal with flush valve One bowl sink with side drain Ref. LAV1, wall hung lavatory (law category) Ref. LAV2, counter top lavatory Ref. LAVh, Wall hung lavatory for handicapped DRINKING WATER FOUNTAINS Recessed wall mounted type medel 103 as manufactured by Filtrine or equally approved including satin finish push button bubbler, removable access panel as shown on drawing and specification section 15441 08 09 Ref. DWF, Drinking fountain Package type chiller / purifier unit for dedicated drinking water system model ES-40-RFC by FILTRINE or equally approved rating 1.5 HP as per drawing and specifications

32 19

No. No.

03 04 05 06 07

24 9 1 51 19

No. No. No. No. No.

13

No.

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 39 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL DRAINAGE INSTALLATIONS Supply, installation and test drainage pipe work UPVC schedule 40, including fittings, supports hangers, excavation and backfilling, cast iron pipes on roof for vent with caps as shown on drawings and as per specifications section 15420 01 02 03 04 05 06 150 mm dia 100 mm dia 75 mm dia 50 mm dia 40 mm dia 32 mm dia Supply, installation and test discharge drainage pipe work UPVC schedule 80, including fittings, supports hangers, excavation and backfilling, as shown on drawings and as per specifications section 15420 07 50 mm dia Supply and installation drainage piping specialties including supports and fixation as shown on drawings and as per specification section 15420 08 09 10 11 12 13 14 50 mm dia floor drain 100 mm dia. parking drain 32 mm dia cleanout 40 mm dia cleanout 50 mm dia cleanout 75 mm dia cleanout 100 mm dia cleanout To Collection

770 4535 320 1130 245 770

M M M M M M

200

143 152 46 8 90 18 178

No. No. No. No. No. No. No.


SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 40 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL DRAINAGE INSTALLATIONS Supply and installation drainage piping specialties including supports and fixation as shown on drawings and as per specification section 15420 01 02 03 04 05 06 07 08 09 10 11 12 13 14 150 mm dia cleanout 100 mm dia plant drain 75 mm dia area drain 100 mm dia trench drain outlet 50 mm dia, air handling unit drain ref. (AHUD) 75 mm dia. Splash to day light 100 mm dia. Splash to day light 150 mm dia. Splash to day light Vent stack thru roof (different sizes) Roof drain 100 mm dia. Roof drain 150 mm dia. 32 mm dia floor cleanout 40 mm dia floor cleanout 100 mm dia floor cleanout

40 6 19 3 6 1 2 4 6 2 2 2 2 40

No. No. No. No. No. No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 41 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL DRAINAGE INSTALLATIONS Reinforced concrete gray water tank with proprietary medium duty cast iron manhole cover and frame, including sump pit, internal lining, access ladder vent pipework within tank as detailed on drawing (Concrete work, earthwork & water proofing measured elsewhere) 01 Gray water tank Reinforced concrete sump pit (concrete works measured elsewhere) , including waterproofing, internal lining, proprietary galvanized steel floor mounted inspection hatch, guide, bar lifting chain and all associated works similar to detailed on drawings 02 03 04 Sump pit -1 Sump pit -2 Sump pit -3 Submersible pumps (one duty and one stand-by) including associated valving, pipework, valves controllers and accessories within sump pit chamber as described on drawings (sump pit measured separately) 05 06 07 Ref. ( SP1 ) capacity 85 GPM & 2 BARS Ref. ( SP2 ) capacity 98 GPM & 2 BARS Ref. ( SP3 ) capacity 36.85 GPM & 2 BARS Allow for the design, supply and installation of packaged type waste water treatment plant complete including filter, chemical feeders, air blowers controls, wirings, piping and all as associated works as per specifications section 02736 and scheduled on drawing 08 Packaged water treatment unit, 35 m3 / day , ref. GWU-1 Packaged type variable speed discharge pressure system non-potable water lift pumps, including piping and valves network within pump chamber, complete with all controllers, accessories for automatic operation as scheduled on drawing and spec. section 15453 09 Ref. (NP - 1) capacity 115 GPM & 3.8 BARS To Collection

Item

1 1 1

No No No

1 1 1

set set set

Item

Set
SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 42 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL COLD WATER INSTALLATION Supply, installation and test pipe work UPVC schedule 80, for potable cold water, including valves, fittings and supports, excavation and backfilling as required as shown on drawings and as per specifications sections 15100 & 15411 01 02 03 04 05 06 07 08 75 mm dia 65 mm dia 50 mm dia 40 mm dia 32 mm dia 25 mm dia 20 mm dia 15 mm dia NON-POTABLE WATER INSTALLATION Reinforced concrete non- potable, water tank and pump room with proprietary cast iron manhole covers and frames, including internal lining access ladders, pipework submersible pump (SP), ventilating fans with exhaust and fresh air pipework, valves, vent pipes as detailed on drawings (concrete work & earthwork, water proofing measured elsewhere) 09 Non potable water tanks

80 280 185 775 330 1155 1720 15

M M M M M M M M

Item

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 43 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL NON-POTABLE WATER INSTALLATION Supply, installation and test pipe work UPVC schedule 80, for non-potable water, including valves, fittings and supports, excavation and backfilling as required as shown on drawings and as per spec. sections 15100 & 15411 01 02 03 04 05 75 mm dia 65 mm dia 50 mm dia 40 mm dia 32 mm dia HOT WATER SUPPLY & RETURN INSTALLATION Supply, installation and test pipe work CPVC schedule 80, for hot water, including valves, fittings and supports, excavation and backfilling as required as shown on drawings and as per specification sections 15100 & 15411 06 07 08 09 10 40 mm dia 32 mm dia 25 mm dia 20 mm dia 15 mm dia

15 220 5 25 30

M M M M M

15 70 45 145 245

M M M M M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 44 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL HOT & COLD WATER INSTALLATION Fittings and accessories as per drawing and specification section 15100 & 15411 01 02 03 04 05 06 07 08 09 Supply & install, 50 mm dia gate valve Supply & install, 40 mm dia gate valve Supply & install, 32 mm dia gate valve Wall mounted faucet 15 mm dia., Janitor sink water mixer Ref. (HS) hand spray with flexible hose and wall hook Hose bibb 20 mm dia. W/ IV Ref. (WHA) water hammer arrestor Supply & install, 75 mm dia valve chamber Ref. ( VC ) Electrical water heaters including short length pipework, valves, supports, controls, fixings and accessories as detailed on drawing and spec. section 15411 10 11 12 13 14 Ref. EWH, 1D , Capacity 60 liters @ 1.5 Kw Ref. EWH, 2D , Capacity 80 liters @ 3 Kw Ref. EWH, 2E , Capacity 100 liters @ 3 Kw Ref. EWH, 2F , Capacity 120 liters @ 3 Kw Ref. EWH, 4H , Capacity 250 liters @ 6 Kw

10 11 1 30 5 51 126 26 2

No. No. No. No. No. No. No. No. No.

8 1 1 4 5

No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 45 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL FIRE PROTECTION SYSTEM Supply, installation and test pipework, galvanized steel schedule 40 to ASTM A53 seamless including fittings, supports, excavation and backfilling as shown on drawings and as per spec. section 15300 01 02 03 04 05 06 07 08 150 mm dia 100 mm dia 75 mm dia 63 mm dia 50 mm dia 40 mm dia 32 mm dia 25 mm dia ACCESSORIES 09 10 11 12 13 14 Supply and install floor control valve assembly 150 mm dia Supply and install fire department valve 100mm dia., ref. (FDV) Inspector test valve Supply and install sprinkler heads, pendent type Supply and install sprinkler heads, upright type Sprinkler heads side wall type Proprietary integrated fire hose reel and fire extinguisher, cabinet including fire extinguisher, hose reel nozzle, fixing, isolating valve, 63mm dia. and trims as detailed on drawings and specifications section 15300 15 Ref. FHC To Collection

5270 1470 425 1950 7110 8430 5020 15600

M M M M M M M M

18 41 9 1602 4850 27

No. No. No. No. No. No.

77

No.
SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 46 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL FIRE PROTECTION SYSTEM Supply and install portable fire extinguisher, multipurpose including fixing as per specifications section 15300 01 02 Ref. PFE Ref CO2 Allow for the supply and installation of Clean agent , fire suppression systems complete including cylinder assemblies, release panels, detection control panels and all associated piping, wirings, sensors, alarm devices, switches, nozzles and all as reqired for automatic operation 03 Clean agent cylinder (2 duty + 1 standby) each 95 Kg Clean agent cylinder (1 duty + 1 standby) each 95 Kg Clean agent cylinder (2 duty + 1 standby) each 132 Kg Clean agent cylinder (1 duty + 1 standby) each 132 Kg FOAM 07 08 09 10 Water tank with 39 gal. capacity Foam storage tank with 1.2 gal. capacity Recirculation pump for foam Foam discharge nozzle

120 77

No. No.

No.

04

No.

05

No.

06

No.

1 1 1 3

No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 47 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL FIRE PROTECTION SYSTEM Schedule 40 seamless piping including fittings and supports as required 01 02 03 04 40 mm dia 50 mm dia 65 mm dia 75 mm dia Accessories 05 06 07 08 09 10 11 Manual release switch Abort switch Fire alarm bell Fire alarm horn Ionization smoke detector 4-port nozzle Control panel 9 9 9 9 16 16 9 No No No No No No No 45 30 22 11 M M M M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 48 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15A - MECHANICAL DIESEL FUEL STORAGE TANK INSTALLATION Allow for underground fiberglass diesel fuel storage tank with required capacity including concrete anti-flotation pad, heavy duty traffic type manhole ring and cover, pipework, valves duplex diesel fuel transfer pumps, steel ladder, pea gravel bed, earthworks, fixings and accessories all as detailed on drawings 01 Proprietary tank units CAPACITY 500 GAL

Item

To Collection Collection Sheet B1- 1 Sheet B1- 2 Sheet B1- 3 Sheet B1- 4 Sheet B1- 5 Sheet B1- 6 Sheet B1- 7 Sheet B1- 8 Sheet B1- 9 Sheet B1- 10 Sheet B1- 11

SR

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 49 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM ERW Black steel pipework including fittings thermal insulation, valving,gagues, strainers and accessories as per required drawings and spec. sections15050 to 15140 ,15510 01 02 03 04 05 06 07 08 09 10 20 mm dia. 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. 65 mm dia. 80 mm dia. 100 mm dia. 150 mm dia. 200 mm dia. Expansion tank as detailed on drawings and spicifications 11 Ref ET-1 Expansion tank ( Capacity 600 Liters ) Air separator tank as detailed on drawings and spicifications 12 Ref. AS

1390 275 740 430 400 520 595 190 345 170

M M M M M M M M M M

No.

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 50 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install and test heat exchanger including valves and short length piping as detail on drawings and as per specification section 15871 01 Ref. HEX-01, 02, 03 ( Capacity 21.88 Kw each ) Supply, install, test and commission, hot water pumps unit including mounting and fixings to pads (measured separately) as detailed on drawing and spec. section 15510 02 Ref. TCWP-01, 02, 03 capacity 39.4 L/S 40 m TDH Air handling units /VAV with return air fan including pressure gauge, thermostats, drain valve, pressure differential valve, combination balancing and isolating valve, manual air vent, hose bibb mounting and fixings to pads (pads measured separately) as per drawings and specifications - section 15488 03 04 05 06 Ref AHU-01 ( Capacity71.0 Kw) Ref AHU-02 ( Capacity85.3 Kw) Ref AHU-03 ( Capacity91.1 Kw) Ref AHU-04 ( Capacity180.7 Kw) Air handling units /CAV (Fresh air) with return air fan including (heat pipe system ) unit pressure gauge, thermostats, drain valve, pressure differential valve, combination balancing and isolating valve, manual air vent, hose bibb mounting and fixings to pads (pads measured separately) as per drawings and specifications section 15488 07 08 09 Ref FAHU-01 ( Capacity157.7 Kw) Ref FAHU-02 ( Capacity170.55 Kw) Ref FAHU-03 ( Capacity170 Kw) To Collection

No.

No.

1 1 1 1

No. No. No. No.

1 1 1

No. No. No.


SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 51 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Mini split type air conditiong including mounting and fixing as per drawings and specifications, section 15860 01 02 03 04 05 06 Ref. DX FCU-01/ACCU-01 ( Capacity3.3 Kw) Ref. DX FCU-02/ACCU-02 ( Capacity3.3 Kw) Ref. DX FCU-03/ACCU-03 ( Capacity3.3 Kw) Ref. DX FCU-04/ACCU-04 ( Capacity3.3 Kw) Ref. DX FCU-05/ACCU-05 ( Capacity3.3 Kw) Ref. DX FCU-06/ACCU-06 ( Capacity3.3 Kw) Supply, install, test and commission, Fan coil units ducted type including mounting and fixing as per drawings and specifications section 15781 07 08 09 10 11 12 13 14 15 16 17 Ref. FCU-01, 8.5 KW Capacity Ref. FCU-02, 4.7 KW Capacity Ref. FCU-03, 12.3 KW Capacity Ref. FCU-04, 15.8 KW Capacity Ref. FCU-05, 16.4 KW Capacity Ref. FCU-06, 30.4 KW Capacity Ref. FCU-07, 27.4 KW Capacity Ref. FCU-08, 9.1 KW Capacity Ref. FCU-09, 6.5 KW Capacity Ref. FCU-10, 5.9 KW Capacity Ref. FCU-11, 3.1 KW Capacity To Collection

4 4 4 16 1 1

No. No. No. No. No. No.

10 3 2 1 5 1 1 2 1 4 1

No. No. No. No. No. No. No. No. No. No. No.
SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 52 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, Fan coil units ducted type including mounting and fixing as per drawings and specifications section 15781 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 Ref. FCU-12, 10.9 KW Capacity Ref. FCU-13, 2.1 KW Capacity Ref. FCU-14, 34.15 KW Capacity Ref. FCU-15, 11.8 KW Capacity Ref. FCU-16, 33.1 KW Capacity Ref. FCU-17, 35.2 KW Capacity Ref. FCU-18, 38.3 KW Capacity Ref. FCU-19, 6.5 KW Capacity Ref. FCU-20, 10.9 KW Capacity Ref. FCU-21, 15.6 KW Capacity Ref. FCU-22, 18.3 KW Capacity Ref. FCU-23, 15.2 KW Capacity Ref. FCU-24, 22.5 KW Capacity Ref. FCU-25, 7.2 KW Capacity Ref. FCU-26, 1.8 KW Capacity Ref. FCU-27, 1.2 KW Capacity Ref. FCU-28, 5.8 KW Capacity Ref. FCU-29, 18.2 KW Capacity

1 1 3 3 4 4 4 6 6 6 3 6 3 5 3 9 4 1

No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 53 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, Fan coil units ducted type including mounting and fixing as per drawings and specifications section 15781 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 Ref. FCU-30, 26.6 KW Capacity Ref. FCU-31, 5.6 KW Capacity Ref. FCU-32, 23.8 KW Capacity Ref. FCU-33, 23.3 KW Capacity Ref. FCU-34, 25.3 KW Capacity Ref. FCU-35, 11.9 KW Capacity Ref. FCU-36, 17.3 KW Capacity Ref. FCU-37, 1.1 KW Capacity Ref. FCU-38, 2.3 KW Capacity Ref. FCU-39, 5.1 KW Capacity Ref. FCU-40, 18.8 KW Capacity Ref. FCU-41, 21.1 KW Capacity Ref. FCU-42, 14.5 KW Capacity Ref. FCU-43, 21.1 KW Capacity Ref. FCU-44, 4.5 KW Capacity Ref. FCU-45, 20 KW Capacity Ref. FCU-46, 5 KW Capacity Ref. FCU-47, 26.5 KW Capacity

1 2 1 1 2 1 10 1 2 2 1 1 1 1 2 2 1 1

No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 54 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, Fan coil units ducted type including mounting and fixing as per drawings and specifications section 15781 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 Ref. FCU-48, 9.1 KW Capacity Ref. FCU-49, 1.6 KW Capacity Ref. FCU-50, 1.7 KW Capacity Ref. FCU-51, 31.6 KW Capacity Ref. FCU-52, 21.3 KW Capacity Ref. FCU-53, 31.3 KW Capacity Ref. FCU-54, 18.8 KW Capacity Ref. FCU-55, 1.6 KW Capacity Ref. FCU-56, 1.2 KW Capacity Ref. FCU-57, 1.7 KW Capacity Ref. FCU-58, 1.4 KW Capacity Ref. FCU-59, 1.8 KW Capacity Ref. FCU-60, 22 KW Capacity Ref. FCU-61, 1.6 KW Capacity Ref. FCU-62, 13.6 KW Capacity Ref. FCU-63, 1.6 KW Capacity Ref. FCU-64, 0.9 KW Capacity Ref. FCU-69 5.9 KW Capacity

4 1 1 1 1 1 1 1 1 1 4 5 2 4 1 3 3 1

No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 55 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Ventilating fans as details on drawings and specifications, section 15860 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 Ref. EF- 01, 2250 LPS Capacity Ref. EF- 02, 1670 LPS Capacity Ref. EF- 03, 270 LPS Capacity Ref. EF- 04, 2140 LPS Capacity Ref. EF- 05, 2070 LPS Capacity Ref. EF- 06, 4460 LPS Capacity Ref. EF- 07, 120 LPS Capacity Ref. EF- 08, 610 LPS Capacity Ref. EF- 09, 600 LPS Capacity Ref. EF- 10, 345 LPS Capacity Ref. EF- 11, 465 LPS Capacity Ref. EF- 12, 320 LPS Capacity Ref. EF- 13, 10425 LPS Capacity Ref. EF- 14, 185 LPS Capacity Ref. EF- 15, 445 LPS Capacity Ref. EF- 16, 230 LPS Capacity Ref. EF- 17, 545 LPS Capacity Ref. EF- 18, 140 LPS Capacity Ref. EF- 19, 35 LPS Capacity To Collection

1 1 1 1 1 1 4 4 4 1 1 1 1 5 2 10 3 1 4

No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.
SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 56 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Ventilating fans as details on drawings and specifications, section 15860 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. EF- 20, 410 LPS Capacity Ref. EF- 21, 135 LPS Capacity Ref. EF- 22, 1705 LPS Capacity Ref. EF- 23, 185 LPS Capacity Ref. EF- 24, 225 LPS Capacity Ref. EF- 25, 345 LPS Capacity Ref. EF- 26, 320 LPS Capacity Ref. EF- 27, 990 LPS Capacity Ref. EF- 28, 315 LPS Capacity Ref. EF- 29, 1050 LPS Capacity Ref. EF- 30, 1380 LPS Capacity Ref. EF- 31, 1780 LPS Capacity Ref. EF- 32, 320 LPS Capacity Ref. EF- 33, 115 LPS Capacity Ref. EF- 34, 150 LPS Capacity Ref. EF- 35, 220 LPS Capacity Ref. EF- 36, 200 LPS Capacity

4 4 3 3 1 4 1 3 2 4 1 1 1 2 4 1 1

No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 57 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Ventilating fans as details on drawings and specifications, section 15860 01 02 03 04 05 06 07 Ref. PIF-01, 3360 LPS Capacity Ref. PIF-02, 2615 LPS Capacity Ref. SMEF-01, 15120 LPS Capacity Ref. SPF-01, 375 LPS Capacity Ref. SPF-02, 415 LPS Capacity Ref. SPF-03, 330 LPS Capacity Ref. FAF-01, 10425 LPS Capacity Ventilating fans including ductwork, fire damper, motorized damper as details on drawings and specifications, section 15860 08 09 Ref. PAF-01, 18480 LPS Capacity Ref. PEF-01, 18480 LPS Capacity Variable air volume boxes, pressure independent type, including insulated flexible ducting and control transformer as detailed on drawing and specification, section 15891 10 11 12 13 14 15 Ref. VAV- 03A, capacity range 226 to 280 LPS Ref. VAV- 04A, capacity range 281 to 425 LPS Ref. VAV- 06A, capacity range 566 to 1130 LPS Ref. VAV- 07A, capacity range 1131 to 1415 LPS Ref. VAV- 07B, capacity range 1131 to 1415 LPS Ref. VAV- 08, capacity range 1416 to 1980 LPS To Collection

88 35 1 2 1 1 1

No. No. No. No. No. No. No.

16 16

No. No.

1 2 2 1 2 4

No. No. No. No. No. No.


SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 58 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Sound attenuator units as detailed on drawing and specification, section 15781 01 02 03 04 05 06 07 08 09 10 Ref. SA-1S Ref. SA-2S Ref. SA-3S Ref. SA-6S Ref. SA-2R Ref. SA-6R Ref. SA-04E Ref. SA-05E Ref. SA-06E Ref. SA-1

1 2 1 1 1 1 1 1 1 8

No. No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 59 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Galvanized steel sheet rectangular ductwork, including supports and volume damper , fire damper , and bill mouth opening as per drawings and specification, section 15891 01 Various gauges Duct insulation 02 Thermal semi-rigid insulation to rectangular ductwork Generator ductwork 03 Generator exhaust louver including exhaust duct and other accessories required to complete installation section 15860 Fresh air louver complete with filter and sand trap as detailed on drawing and specification 04 05 Size 2.25X1.95 m Size 3.0X1.95 m motorized door louver as detailed on drawing and specification 06 Size 1800x1800 mm Exhaust louver as detailed on drawing and specification 07 2550X2400 m Fresh air intake with sand trap louver as detailed on drawing and specification 08 2550X2400 m

26300

Kg

4370

No.

2 1

No. No.

No.

No.

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 60 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply air square ceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailed on drawing and specification, section 15860 01 02 03 04 05 06 07 08 Ref. SD1A, B, C, D, E Ref. SD2A, B, C, D & E Ref. SD3A, B, C, D & E Ref. SD4A, B, C, D & E Ref. SD5A, B, C, D & E Ref. SD6A, B, C, D & E Ref. SD7A, B, C, D & E Ref. SD8 A, B, C, D & E Supply air round ceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailed on drawing and specification, section 15860 09 10 11 12 13 Ref. SD1 Ref. SD2 Ref. SD3 Ref. SD4 Ref. SD5 Supply and install return air slot linear diffuser as detailed on drawings and spec. section 15891 14 Ref. RLD8 To Collection

11 15 1 139 13 77 112 103

No. No. No. No. No. No. No. No.

19 2 70 75 89

No. No. No. No. No.

20

No.
SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 61 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Return square louver face ceiling diffusers as detailed on drawing and specification, sections 15860 & 15891 01 02 03 04 05 06 07 08 Ref. RD1A, B, C, D & E Ref. RD2A, B, C, D & E Ref. RD3A, B, C, D & E Ref. RD4A, B, C, D & E Ref. RD5A, B, C, D & E Ref. RD6A, B, C, D & E Ref. RD7A, B, C, D & E Ref. RD8A, B, C, D & E Supply and install return round ceiling diffusers as detailed on drawing and specification, section 15891 09 10 11 12 13 Ref. RD1 Ref. RD2 Ref. RD3 Ref. RD4 Ref. RD5 Supply and install exhaust register grille as detailed on drawing and specification, section 15891 14 15 16 Ref. ER 15120 L/S Ref. ER1 Ref. ER2 To Collection

11 15 1 139 13 77 118 103

No. No. No. No. No. No. No. No.

18 2 33 47 57

No. No. No. No. No.

1 72 20

No. No. No.


SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 62 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply and install door grille as per drawings and specification section 15891 01 02 03 04 05 Ref. DG1 Ref. DG2 Ref. DG3 Ref. DG4 Ref. DG5 Supply and install relif outlet hood as per drawings and spec. section 15891 06 Ref. ROH Supply and install return registers return grilles with directional vanes including frame and trims as detailed on drawing and spec. section 15891 07 08 09 10 11 12 13 14 15 Ref. SR1,RR1 Ref. SR2,RR2 Ref. SR3, RR3 Ref. SR4, RR4 Ref. SR5, RR5 Ref. SR6, RR6 Ref. SR7, RR7 Ref. SR8 Ref. SR9, RR9

5 9 53 34 20

No. No. No. No. No.

No.

55 48 39 16 10 18 10 2 12

No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 63 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install and commissioning of electric works and motor control centers MCC C/W weather proof, magnetic starters, cabinets including , power cables, wiring and conduits and cable trays from the MCCs to HVAC equipment, interlocks, earthing ...etc and all materials and equipments required to complete and finish the work according to drawings, specifications and code of practices 01 02 Ref. MCC- 1 Ref. MCC- 2

1 1

No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 64 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Collection Sheet B1-1 Sheet B1-2 Sheet B1-3 Sheet B1-4 Sheet B1-5 Sheet B1-6 Sheet B1-7 Sheet B1-8 Sheet B1-9 Sheet B1-10 Sheet B1-11 Sheet B1-12 Sheet B1-13 Sheet B1-14 Sheet B1-15

To Bill Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 65 / 108

Date: MAY 2011


SAKE

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL PRIMARY POWER SUPPLY INSTALLATION Generally Virtual building refer to ID consultant package for (lighting, power & low current) 01 Contractor is responsible for the coordination and liaison with infrastructure contractor for the supply and installation of power supply from medium voltage switchgears (network points) on site including provision of builders work or any other work deemed necessary to facilitate speedy installation of power to the convention building MEDIUM VOLTAGE INSTALLATION Supply installation, testing and commissioning of the following equipment including all accessories and necessary works required for installation as shown on the drawings B01-E701 - E703 and as described in specifications section 16231, 16320, 16342, 16410, 16441 & 16442 02 Metal enclosed SF6, 13.8 KV (17.5 KV level), 3 phase, 60 Hz medium voltage switchgear equipment including battery charger, batteries, LCD MIMIC screen system (control and monitoring and all associated works for complete installation (nos. of cubicles and rating as shown on drawing B01-E701-E703) and specification and is to comply with SEC specifications and approval Dry type transformer 1600 KVA, 13.8KV-380/220V, 3PH, 60HZ , ref (TR1,&,TR3) Dry type transformer 1000 KVA, 13.8KV-380/220V, 3PH, 60HZ , ref (TR2 &TR4) 1 Item 1 Note

Item

03

No.

04

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 66 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL MEDIUM VOLTAGE INSTALLATION Supply , install and test medium voltage Cables XLPE/PVC , copper Between ( TR'S ) and switch gear units as required to suit the following extensions as shown on drawings B01-E701 - E703 and as described in specifications section16124 The actual length of cable will be measured in site 01 Comprising 3-core 120 mm Cu/XLPE/PVC cables to suit medium voltage line routine from MV switchgear located in 1st basement upto each transformers, as shown on drawing E701 &E703 and as described in specifications MAIN AND SUB-MAIN POWER Supply and install an Emergency Power Generating Set including all associated works In addition to circuit breakers, pads, supports, controls , daily diesel fuel storage tanks, including all necessary equipment, accessories and associated works, as shown on drawings B01-E701-E703 and as described in specifications.section 16231, 2 Ref. (GEN.) 1000 KVA,380/220V, 3 phase 60 Hz, 4W . Automatic transfer switch including fixings and all works required for complete installation as per detailed on drawings 3 Ref. (ATS -1600A, 3P ) 1 No. 1 No. 64 Note M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 67 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply and install automatic capacitor bank including cables, conduits, fittings, supports, fixings, tapes, connections enclosures and all nessecary works required to suit the locations shown on drawing and as described in specifications. 01 02 03 21 KVAR Rating. 76 KVAR Rating. 232 KVAR Rating. Supply and install an emergency Uninterruptible Power Supply (UPS) unit including supports, battery rack, accessories and all associated works to suit the location shown on drawings and as described in specifications. Section 16610 04 5 Ref. UPS (20 KVA , with 30 min.) Ref. UPS (60 KVA , with 15 min.) Supply, installation & commissioning of bus duct system including connectors or plug in and all associated works as shown on drawings and described in specification section 16129 06 07 08 9 Bus duct, 800 AMP Bus duct, 1250 AMP Bus duct, 1600 AMP Bus duct, 2500 AMP 245 130 68 40 M M M M 1 1 No. No. 1 1 1 No No No

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 68 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply and install 600/1000V PVC multicore copper cable in conduit or on cably tray , including junction boxes, connection for feeders and various power loads as shown on drawings and as per specification section 16126 01 (4C-10mm2-CU/PVC/PVC)+10mm2G/cably tray Sub-Main Circuit: supply and install 600/1000V XLPE multicore copper cable in conduit or on cably tray , including junction boxes, connection for feeders and various power loads as shown on drawings and as per specification section 16126 2 3 4 5 6 7 8 9 10 11 12 13 (3C-16mm2+10mm2N-CU/XLPE/PVC)+10mm2G/cably tray (4C-16mm2-CU/XLPE/PVC)+16mm2G/cably tray (4C-25mm2-CU/XLPE/PVC)+16mm2G/cably tray (4C-35mm2-CU/XLPE/PVC+16mm2G/cably tray (3C-50mm2+25mm2N-CU/XLPE/PVC)+25mm2G/cably tray (4C-50mm2-CU/XLPE/PVC)+25mm2G/cably tray (3C-70mm2+35mm2N-CU/XLPE/PVC)+35mm2G/cably tray (4C-70mm2-CU/XLPE/PVC+35mm2G/cably tray (3C-95mm2+50mm2N-CU/XLPE/PVC)+50mm2G/cably tray (4C-95mm2-CU/XLPE/PVC+50mm2G/cably tray (4C-120mm2-CU/XLPE/PVC)+70mm2G/cably tray 4C-150mm2-CU/XLPE/PVC+95mm2G/cably tray 50 640 111 10 15 305 715 65 115 45 400 25 M M M M M M M M M M M M 4164 M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 69 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply and install 600/1000V XLPE multicore copper cable in conduit or on cably tray , including junction boxes, connection for feeders and various power loads as shown on drawings and as per specification section 16126 01 02 03 04 05 06 (4C-185mm2-CU/XLPE/PVC)+95mm2G/cably tray 2[(4C-185mm2-CU/XLPE/PVC)+185mm2G]/cably tray (4C-240mm2-CU/XLPE/PVC)+120mm2G/cably tray 2[(4C-240mm2-CU/XLPE/PVC)+240mm2G]/cably tray (4C-300mm2-CU/XLPE/PVC+150mm2G/cably tray 2[(4C-300mm2-CU/XLPE/PVC)+300mm2G]/cably tray Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 07 08 09 10 11 12 13 14 15 Ref. MDP1 Ref. MDP2 Ref. MDP3 Ref. EMDP Ref. DPBA Ref. DPBB Ref. DPBC Ref. DPBD Ref. DPA To Collection 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. SR 185 100 40 120 10 150 M M M M M M

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 70 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. DP4A Ref. DPGB Ref. DP1B Ref. DP2B Ref. DP3B Ref. DP4B Ref. DPGC Ref. DP1C Ref. DP2C Ref. DP3C Ref. DP4C Ref. DPGD Ref. DP1D Ref. DP2D Ref. DP3D Ref. DP4D1 Ref. DP4D2 To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 71 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. DPV Ref. EDPBA Ref. EDPBB Ref. EDPBC Ref. EDPBD Ref. EDPA Ref. EDPFAN Ref. EDPB Ref. EDPC Ref. EDPD Ref. EDPV Ref. ELP1A Ref. ELP1B Ref. ELP1C Ref. ELP1D Ref. ELP2A Ref. ELP2B To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 72 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. ELP2C Ref. ELP2D Ref. ELP2M Ref. ELP3A Ref. ELP3B Ref. ELP3C Ref. ELP3D Ref. ELP4A Ref. ELP4B Ref. ELP4C Ref. ELP4D Ref. ELPB1A Ref. ELPB1B Ref. ELPB1C Ref. ELPB1D Ref. ELPB2A Ref. ELPB2B To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 73 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. ELPB2C Ref. ELPB2D Ref. ELPB3A Ref. ELPB3B Ref. ELPB3C Ref. ELPB3D Ref. ELPB4A Ref. ELPB4B Ref. ELPB4C Ref. ELPB4D Ref. ELPGA Ref. ELPGB Ref. ELPGC Ref. ELPGD Ref. ELPMA Ref. ELPMD Ref. ELPR1 To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 74 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. ELPR2 Ref. ELV 3 Ref. ELV 4 Ref. ELV F Ref. ELV G Ref. ELV S Ref. FAN1 Ref. FAN2 Ref. FAN3 Ref. FANB1A Ref. FANB1B Ref. FANB1C Ref. FANB1D Ref. FANB2A Ref. FANB2B Ref. FANB2C Ref. FANB2D To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 75 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. FANB3A Ref. FANB3B Ref. FANB3C Ref. FANB3D Ref. FANB4A Ref. FANB4B Ref. FANB4C Ref. FANB4D Ref. FANG Ref. FANM Ref. LP101 Ref. LP102 Ref. LP103 Ref. LP104 Ref. LP105 Ref. LP106 Ref. LP107 To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 76 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. LP108 Ref. LP109 Ref. LP110 Ref. LP111 Ref. LP112 Ref. LP113 Ref. LP114 Ref. LP115 Ref. LP116 Ref. LP117 Ref. LP118 Ref. LP1A Ref. LP1B Ref. LP1C Ref. LP1D Ref. LP201 Ref. LP202 To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 77 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. LP203 Ref. LP204 Ref. LP205 Ref. LP206 Ref. LP207 Ref. LP208 Ref. LP209 Ref. LP210 Ref. LP211 Ref. LP212 Ref. LP213 Ref. LP214 Ref. LP216 Ref. LP217 Ref. LP218 Ref. LP219 Ref. LP220 To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 78 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. LP221 Ref. LP222 Ref. LP2A Ref. LP2B Ref. LP2C Ref. LP2D Ref. LP2M Ref. LP301 Ref. LP302 Ref. LP303 Ref. LP304 Ref. LP305 Ref. LP306 Ref. LP307 Ref. LP308 Ref. LP309 Ref. LP310 To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 79 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. LP311 Ref. LP312 Ref. LP313 Ref. LP314 Ref. LP316 Ref. LP317 Ref. LP318 Ref. LP319 Ref. LP320 Ref. LP321 Ref. LP322 Ref. LP3A Ref. LP3B Ref. LP3C Ref. LP3D Ref. LP401 Ref. LP402 To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 80 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. LP403 Ref. LP404 Ref. LP405 Ref. LP406 Ref. LP408 Ref. LP409 Ref. LP410 Ref. LP411 Ref. LP412 Ref. LP413 Ref. LP414 Ref. LP415 Ref. LP416 Ref. LP417 Ref. LP418 Ref. LP419 Ref. LP420 To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 81 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. LP421 Ref. LP422 Ref. LP423 Ref. LP424 Ref. LP425 Ref. LP426 Ref. LP428 Ref. LP430 Ref. LP431 Ref. LP432 Ref. LP433 Ref. LP434 Ref. LP435 Ref. LP436 Ref. LP437 Ref. LP438 Ref. LP439 To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 82 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. LP440 Ref. LP4A Ref. LP4B Ref. LP4C Ref. LP4D Ref. LPB1A Ref. LPB1B Ref. LPB1C Ref. LPB1D Ref. LPB2A Ref. LPB2B Ref. LPB2C Ref. LPB2D Ref. LPB3A Ref. LPB3B Ref. LPB3C Ref. LPB3D To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 83 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. LPB4A Ref. LPB4B Ref. LPB4C Ref. LPB4D Ref. LPG01 Ref. LPG02 Ref. LPG03 Ref. LPG04 Ref. LPG05 Ref. LPG06 Ref. LPG07 Ref. LPG08 Ref. LPG09 Ref. LPG10 Ref. LPG11 Ref. LPG12 Ref. LPG13 To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 84 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. LPG14 Ref. LPG16 Ref. LPGA Ref. LPGB Ref. LPGC Ref. LPGD Ref. LPMA Ref. LPMD Ref. LPR1 Ref. LPR2 Ref. LPV3 Ref. LPV4 Ref. LPVF Ref. LPVG Ref. LPVS Ref. PP1B Ref. PP1C 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 85 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply, installation, testing and commissioning of control gear panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors for complete installation as shown on drawings and as per specification section 16442 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Ref. PP2B Ref. PP2C Ref. PP3B Ref. PP3C Ref. PP4B Ref. PP4C Ref. PPGB Ref. PPGC Ref. PPV3 Ref. PPV4 Ref. PPVF Ref. PPVG Ref. PPVS Ref. PPVT Ref. UPSP Ref. UPSV 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 86 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Sub-Main Circuits: Supply and install heavy duty hot dip galvanized steel cably tray / cable ladder and for power and communication cables, including fixings, covers and supports as required to suit the locations shown on drawings and as described in specifications, section 16050 01 02 03 04 05 06 07 08 100 mm wide, single layer 150 mm wide, single layer 200 mm wide, single layer 200 mm wide, single layer covered 300 mm wide, single layer 400 mm wide, single layer 600 mm wide, single layer 900 mm wide, two layer 760 20 105 10 775 990 65 20 M M M M M M M M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 87 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply and install power and lighting accessories including all necessary boxes, switches, sockets and as required seal enclosures. In addition to final sub-circuits comprising cables, conduits, fittings, connections and assocciated works as required to suit the locations shown on drawings and as described in spec. section 16050 The contractor is to insure that all power outlets mounted at less than 1.8m in wet areas and all service outlets for kitchens, bathrooms, laundry and water heaters are to be protected by residual current device (RCD) or earth leakage circuit breaker circuit All Exhaust fans must have the ability to be controlled by BMS system 01 02 03 04 Junction box, ceiling mounted Junction box, wall mounted Junction box, floor mounted Above false ceiling disconnect switch, non-fused, 20A, 1P, 220V for EWH-2F-1D Above false ceiling disconnect switch, fused, 20A, 1P, 220V for FCU-14 Disconnect switch, non-fused and with pilot light,20 A, 1P, 220V for FCU'S & ACCU-01 Disconnect switch, fused and with pilot light, 16 A, 1P, 220V for simulation motion Disconnect switch, non-fused and with pilot light , weatherproof, 20A, 1P, 220V for SP-01, 02 & fuel pump Above false ceiling disconnect switch, non-fused, 20A, 3P, 380V for FAF-01 61 78 22 9 Note

No. No. No. No.

05

No.

06

133

No.

07

No.

08

No.

09

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 88 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply and install power and lighting accessories including all necessary boxes, switches, sockets and as required seal enclosures. In addition to final sub-circuits comprising cables, conduits, fittings, connections and assocciated works as required to suit the locations shown on drawings and as described in speci. section 16050 01 Above false ceiling disconnect switch, non-fused ,weatherproof, 20A, 3P, 380V for BIF-01, 02 & EWH-4H Disconnect switch, non-fused and with pilot light, 20 A, 3P, 380V for FCU-01, 02, 03, 04, 07, 08, 09, 10, 15, 20, 21, 22, 23, 25, 29, 30, 31, 35, 36, 40, 41, 42, 43, 45, 48 Above false ceiling disconnect switch, non-fused, 25 A, 1P, 220V for EWH-2D Disconnect switch, non-fused and with pilot light,25 A, 1P, 220V for FCU-02, 03, 15, 62, 67 Disconnect switch, non-fused and with pilot light, 25 A, 3P, 380V for FCU - 32, 33, 44, 47, 51 Disconnect switch, non-fused and with pilot light, 32 A, 1P, 220V for FCU - 01, 02, 03, 12 Disconnect switch, fused and with pilot light, 32 A, 1P, 220V for theater projection Disconnect switch, non-fused and with pilot light, 32 A, 3P, 380V for FCU - 06, 11, 24, 34 Disconnect switch, non-fused and with pilot light,weatherproof, 40 A, 3P, 380V for CWP - 01 Disconnect switch, non-fused and with pilot light, 40 A, 3P, 380V for UPS Disconnect switch, non-fused , weatherproof, 63 A, 3P,380V for ELEV To Collection 128 No.

02

65

No.

03

No.

04

No.

05

No.

06

11

No.

07

12

No.

08

No.

09

No.

10

No.

11

No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 89 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply and install power and lighting accessories including all necessary boxes, switches, sockets and as required seal enclosures. In addition to final sub-circuits comprising cables, conduits, fittings, connections and assocciated works as required to suit the locations shown on drawings and as described in spec. section 16050 01 Disconnect switch, non-fused ,weatherproof, 100 A, 3P,380V for SMEF01 Disconnect switch, non-fused , weatherproof, 80 A, 3P,380V for PEF-01, PAF-01 Disconnect switch, non-fused , weatherproof, 125 A, 3P,380V for UPS Motor switch with built-in overload protection (tumbler switch) Single socket outlet, 15A, 220V, grounding type 05 Ditto. But with weatherproof 06 Single socket outlet, 13A, 220V, with residual current device ,ref.RCD Single socket outlet, 13A, 220V, (2400 mm height mounted) ref.WAP Duplex socket outlet,15A,220V, grounding type Three phase single socket outlet 20A, 380V, grounding type Two phase power socket outlet, 20A, 220V, grounding type Two phase, single socket outlet, 15A, 220V, grounded type. / floor mounted Exhaust fan points outlets 200 66 No. No. 1 No.

02

32

No.

03

No.

04

36 655

No. No.

07

18

No.

08 09 10 11

3 5 51 951

No. No. No. No.

12

13

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 90 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply and install power and lighting accessories including all necessary boxes, switches, sockets and as required seal enclosures. In addition to final sub-circuits comprising cables, conduits, fittings, connections and assocciated works as required to suit the locations shown on drawings and as described in specifications section 16050 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Single pole one-way switch (13A) Ditto. But with weatherproof Single pole, two gang switch, 13A Single pole, four gang switch, 13A Three-way switch (13A) Ditto, but with weatherproof Push button switch Pull cord switch Exit light ceiling mounted, single sided Exit light wall mounted, single sided Chandlier outlet (360W) Chandlier outlet (500W) Chandlier outlet (1000W) Type ES Type F Type F1 To Collection 614 63 9 1 130 8 35 19 22 46 1 2 4 629 26 2122 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 91 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply and install power and lighting accessories including all necessary boxes, switches, sockets and as required seal enclosures. In addition to final sub-circuits comprising cables, conduits, fittings, connections and assocciated works as required to suit the locations shown on drawings and as described in specifications section 16050 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Type F1E Type F2 Type F2E Type F2AE Type FE Type F3E Type F5 Type F5E Type F14 Type I Type I1 Type I1E Type I2 Type I2E Type I2B Type I2BE To Collection 16 1328 273 184 6 84 123 3 1 16 116 8 86 19 27 1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 92 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply and install power and lighting accessories including all necessary boxes, switches, sockets and as required seal enclosures. In addition to final sub-circuits comprising cables, conduits, fittings, connections and assocciated works as required to suit the locations shown on drawings and as described in specifications section 16050 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 Type I4 Type I4E Type I5 Type I5E Type I6 Type I6E Type I7 Type I7E Type I11 Type I11E Type I12 Type I13 Type I13E Type I14 Type I15 Type I15E To Collection 96 50 53 6 436 19 14 2 30 10 222 55 11 241 49 2 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 93 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL POWER AND LIGHTING INSTALLATION Supply and install power and lighting accessories including all necessary boxes, switches, sockets and as required seal enclosures. In addition to final sub-circuits comprising cables, conduits, fittings, connections and assocciated works as required to suit the locations shown on drawings and as described in specifications section 16050 01 02 03 04 05 06 07 08 09 Type I16 Type I17 Type HC Type N Type NE Type ST1 Type WL Type WL1E Lighting fixtures ,Type FT (cove light) 19 40 19 225 383 2 48 41 2187 No. No. No. No. No. No. No. No. M.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 94 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL 3 COMPARTMENT UNDER FLOOR TRUNKING Supply and installation of under floor mounted, 3-compartment metal trunking system for power and communication including ladders where required, fittings, fixings and support system as shown on drawings and as described in specifications section 16050 01 Size 300 mm x 70 mm SMART METERING SYSTEM Allow for supply and installation of Smart Metering System comprising of M-bus mater controller complete with soft ware and server, including digital KWH meter, interface with water meter, digital BTU meter, M-bus 1 pair twisted cable # 22 AWG, RS 232 to TCP/IP net work and all associated works required as shown on drawing 801E 807 and as described in specifications 02 To suit Building Smart Metering System as required to form a complete and fully operative system to link all project building with the existing computer center 1 Item 2465 M

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 95 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL DIGITAL ADDRESSABL LIGHTING INTERFACE SYSTEM (DALI SYSTEM ) Supply, installation, testing and commissioning of DALI system complete with all accessories required for installation &according to specification including conduits , conduiting supports fitting, interfacing work as shown on drawings , as described in specification and also include 8 gange wall plate , touchpad with scense control , 4 channels contraller digital motion detector , lighting digital sensor , 3.5" display unit , BM DALI commissioning wizard , interface to building network TCP/IP & all softwores required for programming &operating system . 01 To suit Building DALI system GROUNDING AND LIGHTNING PROJECTION Supply and installation of a grounding & lightning protection system comprising bare copper tape conductor to bond the building's distribution boards and HVAC equipments, Pump Room's , to the main ear thing grid of the building. Including necessary earthwork, buried copper clade steel rod foundations strips surrounding the building & extended to the lightning protection network on the roof & upper roof including down conductor, phosphor bronze test joints & triangular counter poise and all associated works to suit grounding resistivity required all as shown on drawings and as described in specifications sections 16452 & 16670 To suitl grounding & lightning protection system consisting of, but not limited to: 02 03 To suit the building grounding resistivity To suit complete building lightning protection system network from upper roof up to down ground & basement

Item

1
1

Item Item

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 96 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL DATA AND VOICE SYSTEM Supply, installation, testing and commissioning of data and voice system comprising of main data/computer hub,voice and IP PABX, server as required, data/printer/voice outlets including cable / wires and conduits as shown on drawings and as described in specification section 16715 To suit system network equipped with: 01 Main voice communication cabinet "IP PABX [capacity of 1200 extension lines, 200 trunk lines] (with IP interface, power supply) Main data and communication panel with cabinet, BD( building disrributor with core swith manger & O.F.P.P ) , and all associated work as shown on drawings Telecommunication outlet (1 Data) @ 300MM AFFL, ref. (T0) Telecommunication outlet ceiling mounted (1 Data), ref. (T0)C Telecommunication outlet with (RJ45) for wireless access point ref. (TO-WAP) Telecommunication outlet (1 Data, 1 Telephone) @ 300MM AFFL, ref. (T01) Telecommunication outlet floor mounted (1 Data, 1 Telephone), ref. (T01)F Telecommunication outlet (2 Data, 1 Telephone), ref. (T02) Telecommunication outlet floor mounted (2 Data, 1 Telephone 1 ), ref. (T02)F Telecommunication outlet (1 telephone) @ 300 MM, ref. (T05) Fiber optic patch panel according to drawings and specifications To Collection

No

02

No

03 04

64 26

No. No.

05

17

No.

06

667

No.

07

237

No.

08 09

7 33

No. No.

10 11

204 16

No. No.

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 97 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL DATA AND VOICE SYSTEM Supply, installation, testing and commissioning of floor Distributor includes O.F.P.P ,UP.P.P. 48 or 36 RJ 45 ports, switches, fiber optic patch panels,19" standard rack including UPS, fans and all accessories to complete the work as per drawings and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 Ref. FDB1A Ref. FDB1B Ref. FDB1C Ref. FDB1D Ref. FDGA Ref. FDGB Ref. FDGC Ref. FD1A Ref. FD1B Ref. FD1C Ref. FD2A Ref. FD2B Ref. FD2C Ref. FD3A Ref. FD3B Ref. FD3C Ref. FD4A Ref. FD4B Ref. FD4D Ref. FD4C To Collection 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 No No No No No No No No No No No No No No No No No No No No SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 98 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM Supply, installation, testing and commissioning of fire detection/alarm system comprising of analogue addressable intelligent fire alarm control panel, repeater panel, sounders detectors, control, alarm bell, pull stations, modules including associated cable wires and conduiting, interfacing as shown on drawings and as described in specification section 16721 To suit system network equipped with: 01 Modular decentralized analogue addressable intelligent fire alarm control panel ((FACP-1,FACP-2 FACP-3 -8 loops) with fire alarm "TCP-1P" interface and power supply unit with back-up battery (3 hours of continous operation) Including interfacing to (TCP/ IP Ethernet port for LAN/WAN connectivity, BMS system, interlock to motorized dampers, to egress door interlock, building security system, interfacing to auto - dialer to local fire department and graphic annunciator panel Fire alarm repeater panel & power supply unit ref. (FARP-1,2,3) Ceiling mounted optical smoke detector, Wall mounted optical smoke detector, False ceiling optical smoke detector, Ceiling mounted heat detector, Duct smoke detector, Sounder with red strobe light Fire alarm manual call station Fire alarm bell Fire alarm Interface unit Ceiling mounted multi sensor detector,( gas , smoke & heat ) ref. (M) Pull box fire alarm ref. ref.(PB) Graphic annunciator panel To Collection

No.

02 03 04 05 06 07 08 09 10 11 12

3 542 55 238 705 7 19 104 104 13 103

No. No. No. No No. No. No. No. No. No. No

13 14

21 3

No. No.
SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 99 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM Supply, installation, testing and commissioning of fire detection/alarm system comprising of analogue addressable intelligent fire alarm control panel, repeater panel, sounders detectors, control, alarm bell, pull stations, modules including associated cable wires and conduiting, interfacing as shown on drawings and as described in specification section 16721 01 02 03 Gas suppression manual release Gas suppression abort station Builing manual pull station VOICE EVACUATION SYSTEM Supply, installation, testing and commissioning of voice evacuation system comprising of evacuation speaker, fire fighter telephone jack outlet, distribution and master panel with all cabling and conduiting, interfacing (to FACP), connection, extension and associated works required as per single line diagram on drawing as shown on drawings and as described in specification section 16770 To suit locations on building voice evacuation system consisting of, but not limited to: 04 Master voice evacuation distribution panel ref. MP complete with fire phone, power supply unit, with battery back-up and charger, 3 hours duration, including master mic with zone selection, 1 No. master mic control, 1 No. 96 switch control, 1 No. dual channel , 1 No. integrated fire phone & interface to master fire alarm control panel (FACP). Voice evacuation distribution panel (ref. DP) complete with 2x100W amplifier, & 1 No. power supply unit with battery back-up, 3 hrs. continuous operation

3 3 3

No. No. No.

No.

05

23

No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 100 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL VOICE EVACUATION SYSTEM Supply, installation, testing and commissioning of voice evacuation system comprising of evacuation speaker, fire fighter telephone jack outlet, distribution and master panel with all cabling and conduiting, interfacing (to FACP), connection, extension and associated works required as per single line diagram on drawing as shown on drawings and as described in specification section 16770 01 02 03 04 05 06 1 watts, voice evacuation speaker, wall mounted 2 watts, voice evacuation speaker, ceiling mounted 4 watts, voice evacuation speaker, wall mounted Fire fighter telephone jack outlet Public address power amplifier for prayer hall 60W Loudspeakers for prayer hall

39 183 165 41 1 10

No. No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 101 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL INTEGRATED SECURITY SYSTEM Supply , installation testing and commisioning of integrated security system comprising of CCTV IP cameras, network video recorder with built in motion detection, CCTV monitors, video display unit, keypad,system controllers, readers, readers interface modules,push buttons, electro magnetic locks, encoders,security srever, workstations, wire,power supplies,conduits, interfaces and all accessories required for the system as per drawings, riser diagrams and specifications section 16783 To suit locations on building integrated security system consisting of, but not limited to: Note : All security system devices must be interfaced with LAN TCP/IP network 01 02 03 04 Intelligent ststem controller, ref. (ISC) Keypad controller for CCTV Work station with 22" LCD Monitor CCTV server with complete network video recorder (NVR) with power supply, raid storage system 2no., 17" color LCD monitor and CCTV "TCP-IP" interface 22" LCD Monitor 42" LCD Monitor Card encoder Video display unit Door contact ref. (DC) Electro magnetic lock (single door) ref. (EML) Electro magnetic lock (double door) ref. (EML) To Collection

26 1 6 1

No. No. No. Item

05 06 07 08 09 10 11

2 1 1 1 272 188 65

No. No. No. No. No. No. No.


SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 102 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL INTEGRATED SECURITY SYSTEM Supply , installation testing and commisioning of integrated security system comprising of CCTV IP cameras, network video recorder with built in motion detection, CCTV monitors, video display unit, keypad,system controllers, readers, readers interface modules,push buttons, electro magnetic locks, encoders,security srever, workstations, wire,power supplies,conduits, interfaces and all accessories required for the system as per drawings, riser diagrams and specifications section 16783 01 02 03 04 05 06 07 08 09 10 Exit push button ref. (PB) Rfid smart card reader ref. (CR) Dual reader interface module ref. (DRIM) Reader interface module ref. (RIM) IP digital color indoor camera, wall mounted Indoor IP fixed color dome camera Outdoor,IP fixed color camera, wall mounted Fixed PTZ color camera wall mounted Power supply unit for transponder card reader. Programming and software as required to form complete functional security system

254 254 80 78 27 33 5 20 155 1

No. No. No. No. No. No. No. No. No. Item

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 103 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL PARKING SYSTEM supply, install, testing &commissioning of car parking system complete with all accessories required for installation and according to specifications includes conduits fitting interfacing works as shown on drawing &as described in specifications section 16785 include also loop controllers for parking in and out loop wires ,interfacing with parking server, barrier gate &barrier access card reader for in &out access card controller , tag reader ,tag reader controller, all required software &interface with building network over TCP/IP 01 To suit Building car parking system as required to form a complete and fully operative system to link all project building with the existing computer center CAR MANAGEMENT SYSTEM Supply, install, testing &commissioning of car management system complete with all accessories required for installation and according to specifications includes conduits and cable/wires fitting interfacing works as shown on drawing &as described in specifications include loop controllers , in/out loop wires ,car occupancies sensors display screens for free car space and busy one, interface with building network To suit locations on building car management system consisting of, but not limited to: 02 03 04 05 06 07 08 Seven segment led display Parking guidance system controller Directional led display Car presence indicator Car presence detector RS 485 to RS232 converter Loop detector with loop wire

Item

20 1 105 1379 1379 20 37

No. Item No. No. No. No. No.

To Collection

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 104 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL CAR MANAGEMENT SYSTEM 01 PC work station for acr management system oporation software with all accessories required for praper operation Loop controller Multi-media advertisement screen system Supply, install, test and commissioning multi-media advertisement screen system complete with all accessories required for installation according to specifications includes, conduits, supports, fitting interfacing works as shown on drawings and described 03 04 LCD screen Audio/video encoder with TCP/IP interface GMS signal enhancer system 05 Supply, install, test and commissioning GSM signal enhancer system with all accessories required for installation according to specifications includes conduits, supports fittings, interfacing works, transmitter/ recervier panels, indoor cettuar booster, celluar antenna booster & outdoor antenna as shown on drawings & described in specifications BUILDING MANAGEMENT SYSTEM (BMS) Supply and install a BMS system consisting of, but not limited to: BMS equipment including BMS Monitoring and control server LAN TCP/IP operator terminal (PC), direct digital controllers DCC, IP/Routers , printer and power supply with UPS,as necessary to suit system network for the monitoring and control of electro-mechanical installations as indicated on plumbing, HVAC and electrical input/output schedules (all BMS as in the drawing and as in the specification section 15960, 15961 06 To suit building BMS system To Collection

No.

02

10

No.

17 17

No. No.

Item

Item
SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 105 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL Collection Sheet B1-1 Sheet B1-2 Sheet B1-3 Sheet B1-4 Sheet B1-5 Sheet B1-6 Sheet B1-7 Sheet B1-8 Sheet B1-9 Sheet B1-10 Sheet B1-11 Sheet B1-12 Sheet B1-13 Sheet B1-14 Sheet B1-15 Sheet B1-16 Sheet B1-17 Sheet B1-18 Sheet B1-19 Sheet B1-20 To Collection SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 106 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 16 - ELECTRICAL Collection Sheet B1-21 Sheet B1-22 Sheet B1-23 Sheet B1-24 Sheet B1-25 Sheet B1-26 Sheet B1-27 Sheet B1-28 Sheet B1-29 Sheet B1-30 Sheet B1-31 Sheet B1-32 Sheet B1-33 Sheet B1-34 Sheet B1-35 Sheet B1-36 Sheet B1-37 Sheet B1-38 Sheet B1-39 Sheet B1-40 To Bill Summary SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 107 / 108

Date: MAY 2011


SAAA

PROJECT: THE PLANNING DESIGN FOR INFORMATION TECHNOLOGY AND COMMUNICTIONS COMPLEX - RIYADH BOQ FOR - SERVICE OFFICES AND VIRTUAL BUILDING WHITE (WH 01-04) - (ISSUED FOR CONSTRUCTION)

Bill no. 01 BUILDING

ITEM BILL SUMMARY DIVISION-2 DIVISION-3 DIVISION-4 DIVISION-5 DIVISON 6 DIVISION-7 DIVISION-8 DIVISION-9 DIVISION-10 DIVISION-11 DIVISION-12 DIVISION-13 DIVISION-14 DIVISION-15A DIVISION-15B DIVISION-16 SITEWORK CONCRETE MASONRY METALS WOOD AND PLASTIC THERMAL AND MOISTURE PROTECTION DOORS AND WINDOWS FINISHES SPECIALTIES EQUIPMENT FURNISHINGS SPECIAL CONSTRUCTION CONVEYING SYSTEMS MECHANICAL (PLUMBING) MECHANICAL (HVAC) ELECTRICAL

AMOUNT S.R.

To Tender Summary

SR

Project No.: J09-07800 ZUHAIR FAYEZ PARTNERSHIP


B1 - 108 / 108

Date: MAY 2011