PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type

(Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

SITE CONSTRUCTION Earthwork on proposed structural built-up areas from part of the Work pertaining to respective building or structure as measured elsewhere. PAVING AND SURFACING 01 Precast concrete pavers size 400 x400x40 mm gray color shotblasted and dark or light beige color smooth finish, inclduing 20mm cement mortar bed, 100 mm thick concrete slab with a 193WWF, polyethylene moisture barrier, compacted sub grade as per detail no.2 on drawing VL-GL-01 and specifications section 2515 37 M Note

02

Precast concrete pavers size 400 x400x40 mm with 43 M 200x100x80mm thk. brick bands inclduing sand leveling course layer and cement mortar for tiles fixation, 100 mm thick concrete slab with a 193WWF, polyethylene moisture barrier, compacted sub grade as per detail no.3 on drawing VL-GL-01 and specifications section 2515 200x100x80mm thk. interlocking concrete pavers and concrete edger inclduing compacted sand leveling course, 20mm cement mortar bed, cast in place concrete foundation, compacted aggregate base course, subgrade as per detail no.4 on drawing VL-GL-01 and specifications section 2515 400X400X10mm thk.non slip ceramic tiles terracotta inclduing 20mm cement mortar bed, 100 mm thick concrete slab with a 193WWF, polyethylene moisture barrier, compacted sub grade as per detail no.5 on drawing VL-GL-01 and specifications section 2515 RAISED PLANTER 15 M

03

04

121

05

Raised planter including plain concrete and 150mm tkick R.C planter wall with granite cladding finish ,granite copping, gravel surface, weep hole, moisture barrier, compacted sub grade as per detail no. 6 on drawing VL-GL-01 and specifications section 3100, 3200, 3300, and 2515 SUNDRIES Granite steps

06

30mm thick flamed granite tread, 20mm thick polished granite riser including 150 mm minimum depth cast in situ concrete foundation, moisture barrier, drainage fll, expansion joint, 20mm cement mortar bedding as per detail no. 10 on drawing VL-GL-01 and specifications section 2525 To Collection

17

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

1 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

PVC SHADE STRUCTURE PVC structure shade comprising tent fabric, beams, column (as per manufacture recommendation), earthworks, foundations, water proofing, fixing, finishing and all related works as per detail no. 7 on drawing VL-GL-01 and specification section 13015, 2870 (area measured on plan) 01 PVC shade structure TENSILE STRUCTURE Tensile structure comprising of posts, canopy (as per manufacture recommendation), earthworks, foundations, water proofing, fixing, finishing and all related works as per detail no. 8 on drawing VL-GL-01 and specification section 05500, 2870 (area measured on plan) 02 Tensile structure canopy CONCRETE FENCE Boundary concrete fence comprising excavation, backfilling, plain and reinforced concrete foundation, insulation, grade beams, columns, precast concrete w/plaster and paint (Both side), grooves, two aluminum doors tubular sections with glass, parking door, expansion joints, decorating, finishing as per elevations A,B,C on drawing VL02-X-L02 and as per specifications section 03300, 08120 03 Boundary concrete fence 2750mm height to suit required locations 84 M 18 M 16 M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

2 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT WATER FOUNTAIN

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

Water Fountain comprising, reinforced concrete structure, 30mm thick cladding (sand stone , finish : natural/rought) fixed on 20mm thick latex modified mortar bed, 200x200x30mm thick sand stone coping all exposed edges to be pencil rounded finished sand blasted color to match surrounding, water basin with 20x20x4mm thick vitreous tile non slip glass mosaic, color mix laid on 15mm thick latex modified mortar bed,20mm thick cut to size black slate with natural finished to achieve wave/surge effect laid on 15mm thick latex modified mortar bed, 50mm thick x varies width hollow section marine grade stainless steel capping with water supply for cascade. Fin. polished to water feature, water proofing membrane, supply and drainage pipework, fountain pump, electrical power and lighting, required to complete the work installation and all associated works as per detail 9 on drawing VL-GL-01 and specification section 13150 01 To suit Fountain (approximate area 16 m ) measure as plan
2

No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

3 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT LANDSCAPING

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

Palms including pit, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer, concrete screed and waterproofing membrane and all required as per details P1 & P2 and planting schedule on drawing VL-GL-01 and specifications section 2900 PALMS 01 P/Re TREE PLANTING 02 T/Aa Shrubs and ground cover including planting, , soil planting mix, filter, 63mm thick expanded polystyrene water storage and drainage element, 80 mm thick screed slope to drain, 3mm water proofing membrane and drainage layer all as per detail P3 and planting schedule on drawing VL-GL-01 as per specification section 2900 SHRUBS 3 4 5 S/HS S/Ld S/GF GROUND COVER 6 7 G/Cgp G/Gr(Y) LAWN 8 L/Cd 18 M 57 6 No. No. 8 4 4 No. No. No. 1 No. 2 No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

4 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

PLUMBING INSTALLATIONS WASTE AND DRAINAGE INSTALLATION Supply, install and test pipework, UPVC schedule 40, for waste and drainage the work shall include but not limited to earthwork, fittings, supports, trenchwork and all materials and equipment required to complete and finish the work as shown on drawings and according to specifiactions section 2730 01 02 03 50 mm dia 100 mm dia 150 mm dia Accessories 04 Gully trap, ef. (GT) Inspection chambers , including reinforced concrete, with aluminium cover and frame, including earthworks, and all materials and equipment required to complete the work as per drawings, and according to specifications section 2730 05 Ref. (IC) 600 x 600 mm STORM DRAIN INSTALLATION Supply, install and test pipework, UPVC schedule 40, for storm drainage the work shall include but not limited to earthwork, fittings, supports, trenchwork and all materials and equipment required to complete and finish the work as per drawings and according to specifiactions, section 2720 06 07 50 mm dia 75 mm dia Accessories 08 09 Ground cleanout 100mm dia., ref. (GCO) Ground cleanout 750mm dia., ref. (GCO) 2 1 No. No. 6 26 M M 2 No 1 No. 12 5 32 M M M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

5 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

STORM DRAIN INSTALLATION Inspection chambers , including reinforced concrete, with aluminium cover and frame, including earthworks, and all materials and equipment required to complete the work as per drawings and specifications section 2720 01 Ref. (STIC) 600 x 600 mm Supply, installation and test pipework, UPVC schedule 80class V for water and CPVC schedule 80 class V for hot water the work shall include but not limited to installation, fittings, insulation for hot pipework, valves, supports and all materials and equipment required to complete and finish the work as per drawings and according to specifications section 2668 02 03 40 mm dia. 50 mm dia. Accessories 04 Water meter assembly 50mm dia., ref. (WMA) Irrigation water installation Supply, installation and test pipework, UPVC schedule 80class V for Irrigation water the work shall include but not limited to installation, fittings, valves, supports and all materials and equipment required to complete and finish the work as per draiwngs and according to specifications section 2810 05 06 15 mm dia. 20 mm dia. 3 28 M M 1 No 25 40 M M 1 No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

6 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

PLUMBING INSTALLATIONS Irrigation water installation Accessories 01 02 Water meter assembly 20mm dia., ref. (WMA) Hose bib 15mm dia., ref. (HP) POTABLE WATER SUPPLY Reinforced concrete under ground water tank with proprietary cast iron manhole covers and frames the work shall include but not limited to earthworks, concrete works, internal lining and water proofing, access ladders, pipework and valves, vent pipes, and all materials and equipments required to complete and finish the work according to drawings and specifications section 2668 03 Potable water tank capacity 10 m3 POTABLE WATER SUPPLY SYSTEM Supply, installation and test Packaged type constant pressure booster potable water pumps, set of one duty and one stand by pump, the work shall include but not limited to piping and valves complete with all controllers, accessories for automatic operateion and all materials and equipments required to complete and finish the work according to drawings and specifications section 2668 04 Potable water pumps, power 1.32 KW 1 Set 1 Item 1 2 No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

7 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

ELECTRICAL UTILITIES MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in conduit , including junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16126 01 4C-120mm-CU/XLPE/PVC/ 110 mmd UPVC conduit in ground Supply, install ,test and commissioning panel boards complete including circuit breakers, enclosures, fixings, supports and associated lighting contactors where required as shown on drawings and as described in specifications section 16129 & 16442 02 Bus bar interface panel (IP54) OUTDOOR HAND HOLE Supply, install, testing and commissioning reinforced concrete Hand Holes connected via UPVC conduit, complete with hand hole bolted type metal cover, drain pipe outlet, including trenching and backfilling for UPVC conduits for power & telecommunication cables in UPVC conduit, tapes, , grounding, all as required to suit locations as shown on drawings and as described in specifications section 16050 03 Hand Hole Ref.( HH) 1 No 1 No 22 M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

8 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

ELECTRICAL WORKS OUTDOOR POWER AND LIGHTING Supply , install, test and commissioning power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050 01 02 Wall mounted junction box Disconnect switch, non-fused with pilot light, weatherproof , 20A, 1P, 230V for fountain pump & lift pump OUTDOOR LIGHTING INSTALLATION Supply, install and testing of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panel boards and associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16500 & 16050 03 Lighting fixture outlets 24 No 5 2 No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

9 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

ELECTRICAL WORKS OUTDOOR LIGHTING INSTALLATION Supply ,install, assembly, test and commissioning of lighting fixture (furnished with lamp and electronic blast, accessories and internal wires) mounting accessories.(according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16500 & 16050 01 02 Ref. WL2 Ref. WL3 DATA AND VOICE SYSTEM INSTALLATION Supply and install a data and voice system ( apart including fiber optic cable all UTP CAT 6A cable, switches , conduits, connection/ extension and interfacing all as shown on drawings, specifications section 16720 & 16770 and single line diagram drawing all as complete consisting of, but not limited to: To suit system network equipped with: 03 Wall mounted telecommunication outlet, weatherproof for intercom, ref. (TO) I 1 No 16 8 No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

10 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

ELECTRICAL WORKS OUTDOOR COMMUNICATION SYSTEMS OUTDOOR INTEGRATED SECURITY SYSTEM Supply, install, testing and commissioning of integrated security system ( included all feeders/conduits where required) for extension, connection & interfacing) complete to suit the locations shown on drawings, coordination, integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16783 To suit a integrated security system consisting of, but not limited to: 01 IP digital color fixed outdoor camera, wall mounted with advanced smart motion detection Reader interface module (ref. RIM) Door access system push button (ref. PB) Elec. door shutter Door contact with electric lock Garage contact Long range card reader Integrated security system network including conduits, wiring, pull boxes, outlets, connections, and all required accessories required to form a complete and fully operative system 4 No

02 03 04 05 06 07 08

1 1 1 1 1 1 1

No No No No No No Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

11 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM SITE DEVELOPMENT Collection Sheet - 1 Sheet - 2 Sheet - 3 Sheet - 4 Sheet - 5 Sheet - 6 Sheet - 7 Sheet - 8 Sheet - 9 Sheet - 10 Sheet - 11

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

12 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 2 - SITE WORK SITE GRADING All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation Excavation in natural land consisting of solid rock formation, cracked rocks, bolders and natural contoured soil, temporary earthwork supports, dewatering ( if any ) as per specifications sections 02200 01 Excavation for foundations commencing from existing grade level Backfilling 02 Approved selected imported fill material including compaction in making up levels around and over foundations, beds and the like as per spec. sections 02200 Drainage layer 03 100 mm thick compacted coarse gravel to underside of slabs on grade as per specification section 02200 Soil treatment application for termite control 04 To subgrades of slabs and along periphery of building Note

Note

127

66

200

297

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

13 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 3 - CONCRETE CONCRETE WORK CONCRETE TYPES Include in Unit Rates for concrete of the following types and locations: 20 Mpa a) Blinding concrete b) Catch basins and side walks 40 Mpa a) Footings b) Columns and R.C. walls c) Floor and roof slabs, beams, girders, stairs d) Concrete topping or structural screed e) Slab on grade f) water tanks Plain insitu concrete, 20 Mpa, cement type V as per specifications section 03300 01 Blinding beds, 100 mm thick Insitu reinforced concrete, 40 Mpa cement type V including formwork and steel reinforcements conforming to ASTMA615and A185 as per specifications sections 03100, 03200 & 03300 02 03 04 05 06 Footing Grade and tie beams Strap beams Columns pedestals Slab on grade 125 mm thick with A193WWF mesh reinforcement including thickening

Note

14

20 16 12 4
25

M M M M
M

To Collection

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

14 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 3 - CONCRETE CONCRETE WORK Insitu reinforced concrete, 40 Mpa type I cement including formwork and steel reinforcements conforming to ASTM A615 and A185 as per specifications sections 03100, 03200 & 03300 01 02 03 04 05 06 Columns Beams Suspended flat slabs, 240mm thick Suspended flat slabs, 220mm thick Suspended flat slabs, 180mm thick Stairs Sundries 07 08 R.C coping to suit parapet as per detail 7 on drawing GA04 Allow for precast concrete splash block including grout and all associated works as shown and detailed on drawings NOTES: Include in unit rates works associated to construction and control joints including joints surrounding equipment pads along with necessary caulk To Collection Collection Sheet - 14 Sheet - 15 72 1 M No. 17 24 77 28 6 11 M M M M M M

Note

SR

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

15 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 4 - MASONRY UNIT MASONRY Supply and fix concrete masonry blocks in courses with cement lime mortar including concrete lintels over openings , horizontal and vertical reinforcement, fixings, fillers, sealants and grout to complete the work according to specifications section 04200 and drawing VL-GA-02 01 02 03 04 05 06 07 100 mm thick wall 200 mm thick wall ditto, but one hour fire rated 400 mm thick wall 300 mm thick insulated wall 200 mm thick wall for parapet 200 mm pre insulated wall

430 297 121 6 160 72 61

M M M M M M M

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

16 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM DIVISION 5 - METALS HANDRAILS

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

Supply and install twisted wrought iron handrail with beech wood cap rail including fixing and all required to complete the work as shown on drawings and according to specifiactions section 05500 01 02 To suit main stair as per detail no.7 on drawing VL-GA-01 To suit main stair as per detail no.8 on drawing VL-GA-01 Supply and install stainless steel handrail of diameter 60 mm and 30 mm including fixing and all required to complete the work as shown on drawings and according to specifiactions section 05500 03 To suit terraces per detail no.13 on drawing VL-GA-04 Supply and install stainless steel pipes 50 mm diameter including fixing and all required to complete the work as shown on drawings and according to specifiactions section 05500 04 Stainless steel pipes to suit facades 4 18 M M

17

20

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

17 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISON 6 - WOOD AND PLASTIC External wooden tiles including fixings, finishings and all associated work as per detail on drawings and specifications section 6400

QTY

UNIT

RATE

AMOUNT SR

01

External wooden tiles to suit faade SUNDRIES Supply and install counter top lavatory, comprising counter top holed for lavatory (lavatory measured elsewhere) with backsplash, facia, sides, and metal framing including finishings, sealants and trims as per details 2, 3 on drawing VL-GA-01 and specifications section 6100

15

M2

02

Granite vanity top to suit required locations

20

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

18 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION

QTY

UNIT

RATE

AMOUNT SR

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Wall insulation 01 Vapour retarder as per specifications Water proofing and moisture protection as per specification section 07100 02 Membrane waterproofing to suit "wet room" areas including upturn to abutting walls or upstands concrete screed and all required material and equipments to complete the work as per details shown on drawing, according to specifications and code of practice Two coats of bituminous coatings on to surfaces of concrete in contact with soil as per specifications section 07150 Vapour barrier 04 Vapour barrier to underside of slabs, beds, and the like, specifications section 07100 ROOFING SYSTEM Roofing system comprising gravel layer separation sheet, rigid insulation, waterproofing membrane and concrete screed to form slope to drain, including precast tiles where occur for maintenance walks, forming of cant strips, and waterproofing membrane base flashing, metal flashing, sealants and fixings, steel fabrications, all as per detail no.1 on drawing VL-GA-04 and specifications section 07500 05 To suit roof area

116

50

03

320

200

160

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

19 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 8 - DOORS AND WINDOWS DOOR SETS Supply and install all doors to suit masonry openings and approved samples including fixings, decorations, frames, architrave, hardwares and saddles and all required materials and equipments to complete and finish the work as detailed on drawing VL-GA-02 and according to specifications section 08210 and 08100 44mm thick solid hard wood door including frames and decoration as per drawings and specifications

QTY

UNIT

RATE

AMOUNT SR

Note

01

Type A1, double leaves door, leaf size 1300x2150mm 44mm thick paneled wood door. including frames and decoration as per drawings and specifications

No.

02 03 04

Type C1, single leaf door, size 900x2150mm Type C2, single leaf door, size 800x2150mm Type C4, single leaf door, size 600x1950mm 44mm thick paneled wood folded door. including frames and decoration as per drawings and specifications

8 8 1

No. No. No.

05

Type D1, four leaves door, leaf size 1400x2150mm 44mm thick wrought iron door with laxan sheet backing including frames, finishes as shown on drawing and specification

No.

06

Type E1, single leaf door, size 900x2150mm 44mm thick painted hollow metal insulated door including frames and decortion as per drawings and specification

No.

07

Type F2, single leaf door, size 500x1100mm

No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

20 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 8 - DOORS AND WINDOWS DOOR SETS GLAZED DOORS 24 mm thick double glazed sliding door tinted ouside clear inside on powered coated aluminum frames with fixed upper panel including saddels and hardware as shown on drawing VL-GA-02 and specifications section 08800

QTY

UNIT

RATE

AMOUNT SR

01

Ref GD03, double leaves door, door size1600x2200mm

No

24 mm thick double glazed sliding door tinted outside clear inside on powder coated aluminum frames including saddels and hardware as shown on drawing VL-GA-02 and specifications section 08800 02 03 Ref GD09, double leaves door, door size 2600x2200mm Ref GD10, double leaves door, door size 3260x1400mm Curtain Walling Supply and install 24 mm thick double insulated tempered glass curtain walling, tinted outside clear tempered inside on powder coated aluminum frames including, spanderl glass panel, vapor retarder, rigid insulation, fire stopper all hardware, fixtures, packings, sealants, weather strippings and the like as described drawing VL-GA-03 to suit openings and as per specification 04 05 06 07 Ref. CW2, approximate area 9 m2 Ref. CW3, approximate area 14 m Ref. CW5, approximate area 3 m2 Ref. CW6, approximate area 21 m
2 2

1 2

No No

1 1 2 1

No No No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

21 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 8 - DOORS AND WINDOWS WINDOWS Supply and install all windows to suit masonry opening including all hardware, fixtures, packing's, sealants, weather stripping and the like as described on drawing VL-GA-03 and according to specifications section 08520 6 mm thick single frosted awining window, on powder coated aluminum frame

QTY

UNIT

RATE

AMOUNT SR

01 02

Ref. W01, overall size 600x800mm Ref. W08, overall size 600x1250mm 24mm thick double tempered glazed sliding window, tinted outside clear inside on powder coated aluminum frame

4 3

No No

03 04 05 06 07 08 09 10 11 12

Ref. W02, overall size 1000x1500mm Ref. W09, overall size 600x2000mm Ref. W13, overall size 600x600mm Ref. W11, overall size 220x2810mm Ref. W25, overall size 2810x3290mm Ref. W26, overall size 900x2860mm Ref. W27, overall size 1200x2800mm Ref. W28, overall size 900x2200mm Ref. W29, overall size 2450x2570mm Ref. W32, overall size 1200x2200mm

1 1 3 1 1 1 1 1 1 2

No No No No No No No No No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

22 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 8 - DOORS AND WINDOWS Collection Sheet - 20 Sheet - 21 Sheet - 22

QTY

UNIT

RATE

AMOUNT SR

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

23 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 9 - FINISHES INTERNAL FINISHES Flooring including respective types of bounding materials, concrete screed sub-floor of required thickness, (if any) accessories for complete installations as per ID drawing and specifications section 9310, 9420, 9600, 9660, 9671, 9680 and 9685

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06 07

Ceramic floor tiles size 300x300 mm , ref. CR Porcelain floor tiles size 600x600mm , ref. PT1 Porcelain floor tiles size 300x300mm , ref. PT2 Vinyl sheet for sportage use, ref. VS 20mm thick polished crema marfel marble, ref. M1 Terrazzo floor tiles , ref. TR 20mm thick polished crema marfel marble, ref. M1 with 20mm thick polished dark embradore marble stripes, ref. M2 Polished dark emprador marble stripes 600x600mm,ref.M2 Polished marble stripes(for treads 30mmthk. And risers 20mm) ref. M3 Finishings : bases including sand-cement backing mortar and grout

35 25 61 30 150 6.6

M M M M M M

88 44

M M

08 09

13

10 11 12 13 14

100 mm high Polished crema marfile marble base, ref. B01 100 mm high porcelain base, ref. B02 100 mm high Ceramic tiles base , ref. B03 100 mm high vinyl base , ref. B04 100mm thick terrazzo tiles skirting, ref. B05

292 55 55 11 22

M M M M M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

24 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 9 - FINISHES INTERNAL FINISHES Finishings : walls including metal angle beads and lathing at junctions of differing backgrounds according to specifications section 9200, 9310, 9900 and 6400

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06

Cement plaster to suit walls Paint on cement plaster ,ref. W01 Decorative paint on cement plaster ,ref. W02 Ceramic wall tiles ,ref. W03 Porcelain wall tiles, ref. W04 External emulson paint on cement plaster, ref. W06 Finishing: stair treads, risers and landings including bedding and pointing as per detail 6 shown on drawing VL-GA-01 and according to specifications section 9600

1205 875 330 88 61 40

M M M M M M

07

Polished marble 30mm thick for treads and 20mm thick for riser, ref. M3 to suit stair Polished marble to suit stair landing, ref. M3

88

08

15

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

25 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 9 - FINISHES INTERNAL FINISHES Finishings: Suspended ceilings including suspension system as shown on ID drawing and according to specifications section 9250, 9510 & 9547 (Area measured on plan)

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04

Paint on cement plaster, ref.C01 Painted gypsum board, ref.C02 Painted gypsum board with cove light, ref.C03 Ceiling pattern comprising paint gypsum board with cove light, ref.C03 and paint on cement plaster, ref.C01 Moisture resistant painted gypsum board, ref.C04 Ceiling pattern comprising moisture resistant painted gypsum board, ref.C04 and 600x600mm metal tiles , ref.C05 Cement board ceiling, ref CBC as shown on drawing VL04-i02

143 100 49

M M M

66 33

M M

05 06

14 31

M M

07

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

26 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 9 - FINISHES EXTERNAL FINISHES Stone cladding mechanical fixation including fixings , finishings and all associated work as per detail on drawings and specifications section 9600

QTY

UNIT

RATE

AMOUNT SR

01

Rough texture stone cladding Finishing : walls including metal angle beads and lathing at junctions of differing backgrounds according to specifications section 9200, 9600 and 9900

75

M2

02 03

Cement plaster to suit external surface External Paint on cement plaster beige color to suit external surface Ditto, but light brown color Black marble cladding Paint on cement plaster to suit internal side of parapet

248 176

M2 M2

04 05 06

85 45 75
To Collection

M2 M2 M2
SR

Collection Sheet - 24 Sheet - 25 Sheet - 26 Sheet - 27

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

27 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 10 -SPECIALTIES TOILET AND BATH ACCESSORIES Supply and installation of following toilet and bath accessories as per schedule including fixings and trims as shown on drawings and specification section 10800 to suit locations as required

QTY

UNIT

RATE

AMOUNT SR

01

Ref. FM1, Clear glass counter wide mirror on 20 mm thick plywood backing, 900mm high Ref. FM2, Clear glass mirror size 400x600mm with stainless steel frame Ref. RH, single robe hook Ref. SDH, wall mounted soap dish and holder Ref. TPH, Toilet paper holder Ref. TB, towel SSTL bar fixed on vanity unit Ref. TR, towel ring

20

02

No.

03 04 05 06 07

16 14 8 22 6

No. No. No. No. No.

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

28 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS SANITARY FIXTURES Supply and install sanitary fixtures, water mixers and accessories, as selection schedule, the work shall include but not limited to necessary fittings, trims, valves, traps, spouts and all materials and equipment required to complete and finish the work according to specifiactions section 15440 and drawings

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06 07

Floor mounted water closet with flush tank, ref. (WC) Conuter top lavatory, ref. (LAV1) Surface-mounted wash basin over vanity unit, ref. (LAV2) Lavatory without pedistal, ref. (LAV3) Bath tub 70x160cm, ref. (BT) Counter top one bowel sink, ref. (03) One bowel sink with side drain, ref. (04) WASTE AND DRAINAGE INSTALLATION Supply, installation and test drainage pipe work UPVC schedule 40 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions section 15050, 15100, 15125, 15140 & 1540 and drawings

6 2 6 1 3 1 1

No No No No No No No

08 09 10 11 12

32 mm dia 40 mm dia 50 mm dia 75 mm dia 100 mm dia

27 75 136 16 84

M M M M M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

29 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS WASTE AND DRAINAGE INSTALLATION Accessories

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06

Floor drain, 50 mm dia., ref. (FD) Area drain 50mm dia., (AD) Scupper roof drain 75mm dia., ref. (SCD) Scupper roof drain 100mm dia., ref. (SCD) Floor cleanout 100mm dia., ref. (FCO) Splash to roof deck 75mm dia., Packaged duplex type discharge pressure system potable water booster lift pumps, one duty & one stand-by, the work shall include but not limited to piping, valves, fittings, support, controllers, accessories for automatic operation and all materials and equipment required to complete and finish the work according to specifications, section 15453 and drawings

11 4 2 1 3 1

No. No. No. No. No. No.

07

Potable water booster lift pump, power 0.88 kw each Supply, install, test and commissioning fiber glass elevated water tank for potable water, the work shall include but not limited to related piping fitting, valves and all materials and equipment required to complete and finish the work according to specifications section 15411 and drawings

Set

08

Elevated water tank cap 1000 liters

No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

30 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS COLD WATER INSTALLATION Supply, installation and test pipework, plypropylene for cold water the work shall include but not limited to installation, fittings, insulation for hot pipework, valves, supports and all materials and equipment required to complete and finish the work according to specifications section 15411 and drawings

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06

15 mm dia. 20 mm dia. 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia., HOT WATER INSTALLATION Supply, installation and test pipework, plypropylene for hot water the work shall include but not limited to installation, fittings, insulation for pipework, valves, supports and all materials and equipment required to complete and finish the work according to specifications section 15411 and drawings

23 37 58 2 29 41

M M M M M M

07 08

15 mm dia. 20 mm dia.

27 13

M M

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

31 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 15 - MECHANICAL HOT AND COLD WATER INSTALLATION Accessories

QTY

UNIT

RATE

AMOUNT SR

01 02 03

Isolating valve, 25 mm dia, ref. (IV) Hand spray with flexible hose and wall hook, ref. (HS) Wall mounted shower head, ref. (SH) Supply, install, testing and commissioning electrical water heaters the work shall include but not limited to short length pipework, valves, supports, controls, fixings, accessories and all associate works and all materials and equipments required to complete and finish the work according to drawings, specification section 15860 to drawings, specification and code of practices

6 6 1

No. No. No.

04 05 06

Ref. EWH- 1, capacity 20 liters, 3 KW Ref. EWH- 2, capacity 10 liters, 1.5 KW Ref. EWH- 3, capacity 40 liters, 3 KW FIRE PROTECTION SYSTEM Supply and install portable fire extinguisher, multipurpose including fixing and all materials and equipments required to complete and finish the work according to drawings, specification section 15320

4 3 1

No No No

07

Ref. PFE

No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

32 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 15A - MECHANICAL PLUMBING INSTALLATIONS Collection Sheet - 28 Sheet - 29 Sheet - 30 Sheet - 31 Sheet - 32

QTY

UNIT

RATE

AMOUNT SR

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

33 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install and test black steel pipework including fittings thermal insulation, valves, gagues, strainers, flexible connections and accessories as per required drawings and specifications

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06

15 mm dia. 20 mm dia. 25 mm dia. 32 mm dia. 40 mm dia. Flush mounted cabinet including 40mm dia., BTU meter, 2 isolating valves 40mm dia., and check valve 40mm dia.,

55 60 10 30 45

M M M M M

No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

34 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, Fan coil units ducted type including control valves, pressure & temperature, gauge, Y-strainer mounting and fixing as per drawings and specifications

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06 07 08 09 10 11

Ref. FCU-01, 5.5 KW cooling capacity, 2 kw heating capacity Ref. FCU-02, 5 KW cooling capacity, ... 2 heating capacity Ref. FCU-03, 5.7 KW cooling capacity, Ref. FCU-04, 7.9 KW cooling capacity, 3 kw heating capacity Ref. FCU-05, 3.8 KW cooling capacity, 2 kw heating capacity Ref. FCU-06, 2.7 KW cooling capacity, 1 kw heating capacity Ref. FCU-07, 6.5 KW cooling capacity, 2 kw heating capacity Ref. FCU-08, 2.7 KW cooling capacity, 1 kw heating capacity Ref. FCU-09, 2.5 KW cooling capacity, 1 kw heating capacity Ref. FCU-10, 2.2 KW cooling capacity, 1 kw heating capacity Ref. FCU-11, 5 KW cooling capacity, 1.5 kw heating capacity

1 1 1 1 1 1 1 1 1 1 1

No. No. No. No. No. No. No. No. No. No. No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

35 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, Ventilating fans as details on drawings and specifications,

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06 07 08 09 10

Ref. EF- 01, 40 LPS capacity Ref. EF- 02, 30 LPS capacity Ref. EF- 03, 55 LPS capacity Ref. EF- 04, 30 LPS capacity Ref. EF- 05, 50 LPS capacity Ref. EF- 06, 40 LPS capacity Ref. EF- 07, 30 LPS capacity Ref. EF- 08, 30 LPS capacity Ref. EF- 09, 30 LPS capacity Ref. FAF- 01, 260 LPS capacity Supply, install, test and commission, Supply air square ceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailed on drawing and specification,

1 1 1 1 1 1 1 1 1 1

No. No. No. No. No. No. No. No. No. No.

11

Ref. SD1A, B, C, D & E Supply, install and test Supply air slot linear diffusers as detaild on drawings and spec.

No.

12 13

Ref. SLD3 Ref. SLD5

10 7

No. No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

36 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install and test Supply air round ceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailed on drawing and specification

QTY

UNIT

RATE

AMOUNT SR

01

Ref. SD1 Supply, install, test and commission, Supply return air slot linear diffuser as detailed on drawings and specification

No.

02 03

Ref. RLD3 Ref. RLD5 Supply, install, test and commission, Return square louver face ceiling diffusers as detailed on drawing and specification

10 7

No. No.

04

Ref. RD1A, B, C, D & E Supply, install and test return air round ceiling diffusers as detailed on drawing and specification

No.

05

Ref. RD1 Supply and install exhaust register as detailed on drawing and specification

No.

06

Ref. ER1 Supply and install Galvanized steel sheet rectangular ductwork, including supports and volume damper , and bill mouth opening as per drawings and specification

13

No.

07

Various gauges Supply and install Duct insulation

750

Kg

08

Thermal semi-rigid insulation to rectangular ductwork

150

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

37 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission door grille as detailed on drawing and specification

QTY

UNIT

RATE

AMOUNT SR

01

Ref. DG 1

5
To Collection

No.
SR

Collection Sheet - 34 Sheet - 35 Sheet - 36 Sheet - 37 Sheet - 38

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

38 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL PRIMARY POWER SUPPLY Smart Metering System Supply, installation , testing and commissioning of Smart Metering System comprising of M-bus master controller ,M-bus IP router, complete with soft ware, including electronic KWH meter, interface with water meter& digital BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each meter, and the necessary connection to TCP/IP net work and all associated works required as shown on drawing and as described in specifications section 1621 To suit Building Smart Metering System as required to form a complete and fully operative system to link all project buildings with the existing data center at phase (1)

QTY

UNIT

RATE

AMOUNT SR

Note

01 02 03

Electronic KWH meters M-bus master controller complete with software M-bus IP router MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V PVC multicore copper cable in conduit , including junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16126

1 1 1

No No No

04

2C-10mm-CU/PVC/PVC+10mmG/32mmd PVC conduit in masonry

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

39 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in conduit , including junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16126

QTY

UNIT

RATE

AMOUNT SR

01 02

4C-10mm-CU/XLPE/PVC+10mmG/32mmd PVC conduit in masonry 4C-16mm-CU/XLPE/PVC+16mmG/38mmd PVC conduit in masonry Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers and SAC switching actuator , DAC dimming actuators , other functional units and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16442

22 13

M M

03 04 05 06 07

Ref. DP-VL04 Ref. LPG Ref. LPF Ref. LPR Ref. UPG

1 1 1 1 1

No No No No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

40 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of an emergency Uninterruptible Power Supply (UPS) unit including supports, battery rack, accessories and all associated works to suit the location shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16610

QTY

UNIT

RATE

AMOUNT SR

01

Ref. UPS (6 KVA , with 15 min.) POWER INSTALLATION The contractor is to insure that all power outlets mounted in wet areas and all service outlets for kitchens, bathrooms, laundry and water heaters are to be protected by central ground fault circuit interrupter (GFCI) Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050

No.

Note

02

Disconnect switch, non-fused with pilot light, weatherproof, 20A, 1P, 230V for booster pump control panel, EWH-01,02,03 & washing M/C Disconnect switch, non-fused with pilot light, weatherproof, 32A, 1P, 230V for drying tumber Disconnect switch, non-fused with pilot light, 45A, 1P, 230V ,weatherproof for Elec. Range Disconnect switch, non-fused with pilot light, 32A, 3P, 400V for UPS Disconnect switch, fused with pilot light, 20A, 1P, 230V for FCU-01,02,04,05,06,07,09 ,10 ,11 Disconnect switch, fused with pilot light ,weatherproof, 20 A, 1P, 230V for FCU-03 To Collection

10

No

03

No

04

No

05

No

06

11

No

07

No SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

41 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces (according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04

Wall mounted junction box Single socket outlet, 15A, 230V, grounding type Single socket outlet, weatherproof , 15A, 230V, grounding type Single socket outlet, weatherproof , 15A, 230V, with ground fault circuit interrupter ,ref. GF Single phase, single socket outlet, 16A, 230V,grounding type for emergency portable lighting fixture , mounted at 2200mm AFFL ,ref. (EPL ) Duplex socket outlet,15A,230V, grounding type Duplex socket outlet,15A,230V , with ground fault circuit interrupter ,ref. GF Duplex socket outlet,15A,230V, grounding type (2400 mm height mounted) ref.WAP Single phase power socket outlet 20A\230V, grounding type

12 34 13 8

No No. No. No.

05

17

No.

06 07

28 3

No. No.

08

No.

09 10 11 12

No. No. No. No.

Single phase power socket outlet ,weatherproof ,20A\230V,grounding type1 Floor mounted duplex socket outlet, 15A,230V, grounding type Door electric bell 3 1

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

42 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply, install , testing and commissioning of switches lighting accessories including all necessary boxes, switches, faces, conduits, wires (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050 & 16500

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04

Single pole one-way switch (13A) Single pole ,two gang, switch weatherproof (13A) Push button switch for door electric bell Motor switch with built-in overload protection (tumbler switch)

8 1 1 11

No. No. No. No.

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

43 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply, install , testing and commissioning of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panel boards and associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050 and 16500

QTY

UNIT

RATE

AMOUNT SR

01 02 03

Ref.Chandelier (480W) Lighting fixture outlets Lighting fixture outlets type FT (cove light )

4 149 38

No No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

44 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply ,install, testing and commissioning of lighting fixture (furnished with lamp and electronic blast, accessories and internal wires) mounting accessories. (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16050 & 16500

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06 07 08 09 09 10

Ref. F1 Ref. F2 Ref. F4 Ref. F5 Ref. F6 Ref. F7 Ref. FT Ref. WL1 Ref. WL3 Ref. I1 Ref. EPL

27 13 24 8 2 4 216 11 4 40 16

No No No No No No M. No No No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

45 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL COMMUNICATION SYSTEMS DATA AND VOICE SYSTEM INSTALLATION Supply ,install, testing and commissioning of integrated data and voice system with inter-link with CCTV camera, comprising equipment rack consisting of building data distribution, outlets, patch panels, patch cords including cabling (including fiber optic cable all UTP CAT 6A cable, switches) , in conduits, connection/ extension and interfacing all as shown on drawings .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16720, 16770 & 16715 To suit system network equipped with:

QTY

UNIT

RATE

AMOUNT SR

01

Wall mounted telecommunication outlet ( one data ) , 300mm A.F.F.L.) ref. (T0 ) Wall mounted telecommunication outlet ( one tel ) , 300mm A.F.F.L. Ref. (T01) Wall mounted telecommunication outlet ( one tel ) ,1500mm A.F.F.L. Ref. (T01)w Wall mounted telecommunication outlet, 2 ports ( one data, one tel ) Ref.( T02 ) Wall mounted telecommunication outlet ( one TV ) Ref. ( T03) Wall mounted telecommunication outlet, ports ( one TV, one MRM ) Ref.( T04) Wall mounted telecommunication outlet, ports ( one data, one TV, one MRM ) Ref. T05 Wireless access points (ref. WAP) Wall mounted telecommunication outlet for intercom system ref. (TO) I

No

02

No

03

No

04

No

05 06

1 5

No No

07

No

08 09

3 7

No No

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

46 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL COMMUNICATION SYSTEMS DATA AND VOICE SYSTEM INSTALLATION Supply ,install, testing and commissioning of integrated data and voice system with inter-link with CCTV camera, comprising equipment rack consisting of building data distribution, outlets, patch panel, patch cords including cabling (including fiber optic cable all UTP CAT 6A cable, switches) , in conduits, connection/ extension and interfacing all as shown on drawings .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16720, 16770 & 16715

QTY

UNIT

RATE

AMOUNT SR

01

Floor Distributor includes :19", 30U telecom rack, Home automation gateway ( by others ) ,Fast Ethernet switch 2x48 port, Fast Ethernet switch 2x 24 port ,UTP P.P. CAT6 a 5x 24 port . with fans ,UPS ,home controller and all accessories to complete the work as per drawings and specifications according to latest technology Ref (FD ) Data and voice system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system

No

02

Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

47 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM


Supply, install , testing and commissioning of fire detection /alarm system comprising of analogue addressable fire alarm panel , detectors, alarm bell, break glass, modules including associated cable wires, earthling for equipment and conducting, interfacing with other systems as shown on drawings and .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16721

QTY

UNIT

RATE

AMOUNT SR

To suit fire alarm system network equipped with: 01 Analogue addressable fire alarm control panel- (ref. FACP '2 Loops) and power supply unit Ceiling mounted optical smoke detector, Ceiling mounted heat detector Fire alarm bell Fire alarm manual call station Fire alarm system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 1 No

02 03 04 05 06

19 2 4 4 1

No No No No Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

48 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL AUDIO / VIDEO IP INTERCOM SYSTEM Supply , installation testing and commissioning of audio / video IP intercom system comprising of outdoor station unit with built-in color camera, indoor station units with built -in monitors, electrical door lock , AC power supply, cables and conduits and associated works as required to suit the locations shown on drawings and coordination & integration & communication kit with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16760 To suit audio /video phone IP intercom system network equipped with:

QTY

UNIT

RATE

AMOUNT SR

01

Waterproof outdoor station unit (7 lines) including but not limited to color camera, mic, speaker, push buttons, power supply, etc. Indoor station unit including but not limited color LCD, head set, push buttons, door release push button, etc. Electric door lock Network controller with power supply Distributor Exit push button Audio / video IP intercom system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system

No

02

No

03 04 05 06 07

1 1 1 1 1

No No No No Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

49 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL SMART HOME SYSTEM Supply, installation , testing and commissioning of smart home system comprising of motion sensor, interactive LCD touch screen intelligent switches including all necessary cables, conduits, fittings, connections and associated works as required to suit the locations shown on drawings, coordination, integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16783 To suit system network equipped with:

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06 07 08

7" interactive wireless portable LCD touch screen (LCD) 7.5 " interactive LCD touch screen (LCD1) Intelligent switch Type (LCD2) Presence sensor (Indoor type) Presence sensor (Outdoor type) Motion sensor (Indoor type) Motion sensor (Outdoor type) Smart home system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system

1 4 24 11 4 13 2 1

No No No No No No No Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

50 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL ACCESS CONTROL SYSTEM (VILLA DOOR LOCK ) Supply, installation , testing and commissioning of access control system (villa door lock ) comprising of Intelligent system controller ,double reader interface module , access system touch screen ,door access system push button , electro magnetic lock ,Magnetic door contact , including all necessary cables, conduits, fittings, connections and associated works as required to suit the locations shown on drawings, coordination, integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16783 To suit system network equipped with:

QTY

UNIT

RATE

AMOUNT SR

01 02 03 04 05 06 07 08 09 10

Intelligent system controller (ref. ISC) Double reader interface module (ref. DRIM) Door access system touch screen ref. (CR) Door access system push button (ref. PB) Electro magnetic lock Magnetic door contact(ref. DC) Security alarm bell ref. (SEC) Security alarm bell outdoor ref. (SEC) Security alarm bell weatherproof outdoor ref. (SEC) Access control system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system

1 1

No No

2
2

No.
No

2
2 1 1 1 1

No.
No No No No Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

51 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL IP TV SYSTEM Supply, install, test and commissioning of television system connected to TCP/IP (LAN) comprising of RJ45 TV outlets (measured elsewhere) set top box , power supply , and associated work as shown on drawings and .Coordination, integration with other systems disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications section 16787

QTY

UNIT

RATE

AMOUNT SR

To suit IPTV system network equipped with:


01 02 Set top box IP TV system network including coaxial cable and all required accessories to form a complete and fully operative system 9 1 No Item

To Collection

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

52 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION DIVISION 16 - ELECTRICAL Collection Sheet - 39 Sheet - 40 Sheet - 41 Sheet - 42 Sheet - 43 Sheet - 44 Sheet - 45 Sheet - 46 Sheet - 47 Sheet - 48 Sheet - 49 Sheet - 50 Sheet - 51 Sheet - 52

QTY

UNIT

RATE

AMOUNT SR

To Bill Summary

SR

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

53 / 54 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR Villa Type (Vb 2)

Bldg. no. VL04 Bill no. 1

ITEM

DESCRIPTION

AMOUNT S.R.

BILL SUMMARY Sheet - 12 Sheet - 13 Sheet - 15 Sheet - 16 Sheet - 17 Sheet - 18 Sheet - 19 Sheet - 23 Sheet - 27 Sheet - 28 Sheet - 33 Sheet - 38 Sheet - 53 SITE DEVELOPMENT SITEWORK CONCRETE MASONRY METALS WOOD AND PLASTIC THERMAL AND MOISTURE PROTECTION DOORS AND WINDOWS FINISHES SPECIALTIES PLUMBING HVAC ELECTRICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

To Tender Summary

SR

0.0

Project No.: J10-13300 ZUHAIR FAYEZ PARTNERSHIP

54 / 54 REVISED PAGE