LCS sub-contract Labour Schedule of Rates

District : NOAKHALI, LAXMIPUR LCS Schedule of Rates, LGED - RRMAIDP, October 2009
Item Code 1 Brief Description of Item 2 Unit 3 Rate 4 Labour involved 5

Chapter - 2 : Earth Works in Road Embankment


2.1.04.01

Earth filling work : LCS labour part only Earth filling work with specified soil in any type of embankment including cutting, carrying, filling by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types of soil except rocky, gravelly and slushy including benching not more than 30cm in vertical and 60cm in horizontal steps along the sides while widening any embankment, etc. all complete as per the direction of site manager. Earth shall be arranged by the contractor at his own cost and it will include all necessary lead & lift. Payment will be made on compacted volume.

cum

49.90

Ordinary Labour

2.1.08.01

Manual compaction : LCS labour part only Manual compaction of earth in 150mm thick compacted layers by breaking clods to a maximum size of 25mm using wooden drag or ladder and compacting using concrete drop hammer (Durmus), watering or drying to obtain optimum moisture content if necessary including supplying of wooden drag, ladder, bamboo hammer, steel/concrete hammer and other requisite tools, etc. all complete as per direction of the site manager. 85% compaction of the maximum dry density is to be obtained by the standard compaction test (Rate is for each layer of 150mm thick).

cum

19.80

Ordinary Labour

2.1.08.02

Mechanical compaction : LCS labour part only Mechanical compaction of earthworks in 150mm thick compacted layers by breaking clods to a maximum size of 25mm using wooden drag or ladder and compacting using mechanical equipment, watering or drying to obtain optimum moisture content watering if necessary including the equipment and other tools required to work site, etc. all complete as per direction of the site manager. 98% compaction of the maximum dry density is to be obtained by the standard compaction test (Rate is for each layer of 150mm thick).

cum

4.95

Ordinary Labour

2.3.01

Leveling and dressing: LCS labour part only Leveling and dressing the embankment crown, road flanks, building compound etc. by earth cutting and filling as necessary in proper slope and camber including compaction etc. all complete as per direction of the site manager.

sqm

6.93

Ordinary Labour

2.3.03.1

Turfing : LCS labour part only Turfing on embankment top and slope, building compound with good quality turf supplied by the contractor of not less than 225mm square in dimension including placing and watering till grass is fully grown, etc. all complete as per direction of the site manager (payment to be made only when grass is fully grown).

sqm

10.34

Ordinary Labour

Page 1 of 12

LCS sub-contract Labour Schedule of Rates


District : NOAKHALI, LAXMIPUR LCS Schedule of Rates, LGED - RRMAIDP, October 2009
Item Code 1
2.3.06

Brief Description of Item 2 Earth work up to 5m lift : LCS labour part only Earth filling work with specified soil in any type of embankment upto 5m lift from the toe of embankment including cutting, carrying, filling by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types rocky, gravelly and slushy including benching not more than 30cm in vertical and 60cm in horizontal steps along the sides while widening any embankment, etc. all complete as per the direction of site manager. Earth shall be arranged by the contractor at his own costs. The item is applicable when earth is supplied by the contractor and taken from land adjacent to the embankment but not falling within the right of way for all lead. (Payment will be made on compacted volume). Earth work beyond 5m lift : LCS labour part only Earth filling work with specified soil in any type of road embankment and bridge approaches beyond 5.00m lift from the toe of embankment including cutting, carrying, filling by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types of rocky, gravelly and slushy including benching not more than 30cm in vertical and 60cm in horizontal steps along the sides while widening any embankment, etc. all complete as per the direction of site manager. Earth shall be arranged by the contractor at his own costs. The item is applicable when earth is supplied by the contractor and taken from land adjacent to the embankment but not falling within the right of way for all lead. (Payment will be made on compacted volume).

Unit 3

Rate 4

Labour involved 5

cum

95.04

Ordinary Labour

2.3.07

cum

97.02

Ordinary Labour

Chapter - 3 : Road Works


3.1.02

Box cutting up to 300mm & sub-grade compaction mechanically: LCS labour part only Earth work in box cutting on road crest up to 300mm depth with proper sqm 11.88 grade, camber and alignment maintaining super elevation at curves, removing soils to a safe distance or if necessary, spreading the excavated earth on road flanks and slopes uniformly including leveling, dressing, watering, compacting the sub-grade by appropriate mechanical means to give minimum compaction 98% of MDD Standard (at a depth of 150mm) etc. all complete as per direction of the site manager. Minimum soaked CBR requirement of the sub-grade is 4%. Box cutting up to 450mm & sub-grade compaction mechanically: LCS labour part only Earth work in box cutting on road crest up to 450mm depth with proper sqm 16.83 grade, camber and alignment maintaining super elevation at curves, removing soils to a safe distance or if necessary, spreading the excavated earth on road flanks and slopes uniformly including leveling, dressing, watering compacting the sub-grade by appropriate mechanical means to give minimum compaction 98% of MDD, Standard (at a depth of 150mm), etc. all complete as per direction of the site manager. Minimum soaked CBR requirement of the sub-grade is 4%. Preparation of bed: LCS labour part only Preparation of bed by cutting and filling including watering, compacting by appropriate mechanical means etc. to give minimum compaction 98% of MDD (Standard) to obtain a minimum soaked CBR 4% etc. all complete as per direction of the site manager.

Ordinary Labour

3.1.04

Ordinary Labour

3.1.05

sqm

1.58

Ordinary Labour

Page 2 of 12

LCS sub-contract Labour Schedule of Rates


District : NOAKHALI, LAXMIPUR LCS Schedule of Rates, LGED - RRMAIDP, October 2009
Item Code 1
3.1.06.01

Brief Description of Item 2 Improved sub-grade with sand FM 0.80 : LCS labour part only Sand (FM 0.80) filling on the road bed in the improved sub-grade with sand free from dust, earth, other vegetable growth and foreign materials including supplying all materials, spreading, watering, compacting by appropriate mechanical means to obtain a minimum soaked CBR 8% at minimum compaction 98% of MDD (Modified), etc. all complete as per direction of the site manager. Improved sub-grade with sand FM 0.50 : LCS labour part only Sand (FM 0.50) filling on the road bed in the improved sub-grade with sand free from dust, earth, other vegetable growth and foreign materials including supplying all materials, spreading, watering, compacting by appropriate mechanical means to obtain a minimum soaked CBR 8% at minimum compaction 100% of MDD (Modified), etc. all complete as per direction of the site manager. Dismantling sub-base and base, WBM: LCS labour part only Dismantling of (damaged) (any nature) sub-base and WBM works in paved road of any thickness and removing the debris to a safe distance, stacking properly including all tools and plants, etc. all complete as per direction of the site manager.

Unit 3

Rate 4

Labour involved 5

cum

39.60

Ordinary Labour

3.1.06.02

cum

39.60

Ordinary Labour

3.2.01

cum

161.96

Ordinary Labour

3.2.02.01

Sub-base course: LCS labour part only Constructing compacted aggregate sand sub-base course with 38mm down brick chips mixed thoroughly with sand to obtain a homogeneous mix including mixing, carrying, placing and spreading uniformly in appropriate layer to give specified compacted thickness not more than 100mm in a single layer, watering, compacting by appropriate mechanical means all complete as per direction of the site manager. Base course: LCS labour part only Laying, spreading and compacting 38mm down graded aggregates or wet mix macadam made of 1st class and Picked Jhama bricks; premixing the material with water in mechanical mix plant; laying in uniform layers of specified loose thickness not more than 125mm on well prepared surface and compacting with vibratory roller of minimum 8 tonne to achieve soaked CBR not less than 80% at a degree of compaction to minimum 98% (Modified Proctor) all complete as per direction of the site manager. Picking up HBB : LCS labour part only Labour charge for picking up the existing HBB and staking the materials at a specified distance, etc. all complete as per direction of the site manager.

cum

504.68

Ordinary Labour, Skilled Labour

3.2.02.02

cum

103.40

Ordinary Labour, Skilled Labour

3.2.08

sqm

23.76

Ordinary Labour

3.2.09

Picking up Brick flat soling : LCS labour part only Labour charge for picking up the existing brick flat soling and staking the materials at a specified distance, etc. all complet as per direction of the site manager. Picking up Brick end edging : LCS labour part only Labour charge for picking up the existing brick on end edging and staking the materials at a specified distance, etc. all complete as per direction of the site manager.

sqm

19.80

Ordinary Labour

3.2.10

7.92

Ordinary Labour

Page 3 of 12

LCS sub-contract Labour Schedule of Rates


District : NOAKHALI, LAXMIPUR LCS Schedule of Rates, LGED - RRMAIDP, October 2009
Item Code 1 Brief Description of Item 2 Unit 3 Rate 4 Labour involved 5

3.2.11

Brick flat soling : LCS labour part only Single layer brick flat soling with 1st class or picked jhama bricks, true to level, camber/super elevation and grade including carrying bricks, filling the interstices tightly with sand. all complete as per direction of the site manager.

sqm

19.80

Ordinary Labour

3.2.13

Herring Bone Bond (HBB) : LCS labour part only Brick on edge pavement in single layer of Herring Bone Bond with 1st class or picked jhama bricks true to level, camber, super elevation and grade over 25mm thick sand cushion including filling the interstices tightly with same type of sand, etc. all complete as per direction of the site manager.

sqm

33.66

Ordinary Labour

3.2.15.01

Brick on end edging : LCS labour part only Brick on end edging (75mm across) with 1st class/picked jhama bricks including cutting trenches true to level & grade including removing earth, refilling & ramming the sides properly & filling the gaps with local sand, etc. all complete as per direction of the E-I-C. Palisading with double pre-cast plate : LCS labour part only Palisading work with double pre-cast plate (1150mmx600mm) fitted with RCC (1:2:4) post of 150mmx150mm, 3m long, 0.9m c/c to be driven 2/3rd of the total length (3m) of the post made by 20mm down graded brick chips. Pre-cast plate to be fitted with RCC post fixed necessary nuts and bolts at driving of post Complete as per direction of site manager.

5.94

Ordinary Labour

3.2.56.01

1,563.98

Ordinary Labour, Skilled Labour

3.2.56.02

Palisading with single pre-cast plate : LCS labour part only Palisading work with single pre-cast plate (1150mmx600mm) fitted with RCC (1:2:4) post of 150mmx150mm, 2m long, 0.9m c/c to be driven 2/3rd of the total length (2m) of the post made by 20mm down graded brick chips. Pre-cast plate to be fitted with RCC post fixed necessary nuts and bolts at driving of post Complete as per direction of site manager.

995.50

Ordinary Labour, skilled labour

3.2.58

Preparation of hard bed : LCS labour part only Preparation of hard bed by scarifying and loosening of existing sub-base/ base course materials up to the depth of 75mm (minimum) leveling dressing and maintaining camber & grade, watering if needed, rolling with 8 to 10 MT road roller to give compaction to 100% of MDD as obtained by standard proctor test etc. all complete as per direction of the site manager.

sqm

12.87

Ordinary Labour

Chapter - 4 : Bridge/Culvert Works


4.1.03

Earth work in foundation trenches : LCS Labour part only Earth work in excavation in foundation trenches in all sorts of soil except rocky, gravelly, slushy or organic type, up to a depth of 2m to the lines, grades and elevation as shown on the drawing, removing boulders, logs and other objectionable materials, clearing all loose materials, disposing of all excavated materials to a safe distance designated by the site manager for an initial lead of 20m, and cut to a firm surface including bailing out water, removal of spoils to a safe distance, back filling of sites of trenches up to original level, shoring if necessary etc. all complete as per requirement and instruction of the site manager. Back- filled materials shall be compacted to a density comparable with the adjacent Page 4 of 12 undisturbed material. cum 65.45 Ordinary Labour, Mason

Earth work in excavation in foundation trenches in all Labour sorts of soil except LCS sub-contract Schedule of Rates rocky, gravelly, slushy or organic type, up to a depth of 2m to the lines, grades and elevation as shown on the drawing, removing District : NOAKHALI, LAXMIPUR boulders, logs and other objectionable materials, clearing all loose materials, disposing of all excavated materials to a safe distance LCS Schedule of Rates,by LGED - RRMAIDP, October 2009 designated the site manager for an initial lead of 20m, and cut to a firm surface including bailing out water, removal of spoils to a safe distance, back Item Code Brief Description of Item Unit Rate filling of sites of trenches up to original level, shoring if necessary etc. all complete as per requirement and instruction of the site manager. Back- filled 1 2 3 4 materials shall be compacted to a density comparable with the adjacent undisturbed material.
4.1.08

Labour involved 5

Sand filling in foundation bed : LCS Labour part only Sand filling on the prepared foundation bed with sand of minimum FM 0.80 in difficult areas with 150mm in thickness in each layer; placing in conformity with the profile and level as per design including watering, compaction, etc. all complete as per direction of the site manager. cum 99.00 Ordinary Labour

4.1.09

Brick flat soling : LCS Labour part only Single layer brick flat soling with 1st class or picked jhama kiln burnt bricks in foundation, filling the interstices tightly with sand of minimum FM 0.50, watering, leveling, dressing, etc. all complete as per instruction of the site manager. sqm 25.85 Ordinary Labour, Mason

4.1.14.01

First class brick work (1 : 4) : LCS Labour part only First class brick works in cement mortar (1:4) in staining of wells with sand (minimum FM 1.50) and cement, cutting bricks to required sizes, hoisting and keeping in position the MS bond rods and finished with flush pointing joints, watering, all complete as per direction of the site manager. cum 521.40 Ordinary Labour, Skilled Labour, Mason

4.1.14.02

First class brick work (1 : 3) : LCS Labour part only First class brick works in cement mortar (1:3) in staining of wells with sand (minimum FM 1.50) and Portland cement, cutting bricks to required sizes, hoisting and keeping in position the MS bond rods and finished with flush pointing joints, watering, all complete as per direction of the site manager. cum 521.40 Ordinary Labour, Skilled Labour, Mason

4.2.03.02

R.C.C. work : LCS Labour part only Reinforced Cement Concrete work in bottom and top slab of box culvert of any height with 1st class brick/ picked jhama bricks chips, sand (minimum FM 1.80) and cement having minimum 28 days ultimate cylinder crushing strength of 170kg/cm2 (suggested mix proportion 1:2:4) including shuttering, casting, curing for 28 dayscomplete in all respect as per direction of the site manager. Bottom slab and approach slab Top slab upto height of 5m M.S rod : LCS Labour part only Fabrication of M.S High strength deformed bar/ Twisted bar reinforcement of required size and length for all types of RCC work including straightening the rod, removing ruts, cleaning, cutting, hooking, bending, binding with supply of 22 B.W.G. GI wire, placing in position, including lapping, spacing and securing them in position by concrete blocks (1:1), metal chairs, etc. as per direction of the site manager. M.S. Rod, deformed (grade 40, billet, SK-30) M.S. Rod, deformed (grade 40) kg kg 2.04 2.04 Ordinary Labour, Skilled Labour Ordinary Labour, Skilled Labour cum cum 552.20 552.20 Ordinary Labour, Skilled Labour, Mason Ordinary Labour, Skilled Labour, Mason

4.2.03.02.1 4.2.03.02.2.1

4.2.06

4.2.06.01 4.2.06.02

Page 5 of 12

LCS sub-contract Labour Schedule of Rates


District : NOAKHALI, LAXMIPUR LCS Schedule of Rates, LGED - RRMAIDP, October 2009
Item Code 1 Brief Description of Item 2 Unit 3 Rate 4 Labour involved 5

4.3.02

Dismantling work : LCS Labour part only Labour for dismantling of the damaged works in abutment, wing bases and walls, piers and well caps, columns, long and cross girders deck slabs, side walks, fillets, wheel-guards and railing, etc. by any means and removing the dismantled materials, such as, concrete and MS rods of different sizes to a safe distance including scrapping and removing concrete from MS rods, preparation and erection of platform where necessary, carrying, all sorts of handling, stacking the same properly after clearing, leveling and dressing the site and clearing the river bed, etc. all complete as per direction of the site manager. RCC works Plain concrete Brick works cum cum cum 2,618.00 1,408.00 704.00 Ordinary Labour, Skilled Labour Ordinary Labour, Skilled Labour Ordinary Labour, Skilled Labour

4.3.02.01 4.3.02.02 4.3.02.03

Chapter - 5 : Building Works


5.102.01

12mm Cement plaster (1 : 4) : LCS Labour part only Minimum 12mm thick cement plaster (1:4) to dado and plinth wall up to 150mm below ground level with neat cement finishing in/c washing of sand, finishing the edges and corners and curing for the requisite period etc. all complete as per direction of the site manager. (Sand of minimum FM 1.2 be used).

sqm

47.52

Ordinary Labour, Mason

5.104.01

Rule pointing (1 : 2) : LCS Labour part only Rule pointing to brick wall with cement morter (1:2) and rakig out the joints, scaffolding, curing for the requisite period etc. all complete as per direction of the site manager. (Sand of minimum FM 1.2 be used).

sqm

47.52

Ordinary Labour, Mason

Rates for unforseen/extra works not in LGED rate analysis:


Contractor shall pay the LCS on the basis of time input for the Item of works not included in LGED rate analysis. per hour per labour 22.50 Ordinary Labour

The probable items are :


i) loading & unloading of bricks, sand, cement, brick chips, stone chips,MS rod etc. into/from truck, tractor or van. ii) carrying of bricks, sand, cement, brick chips, stone chips,MS rod etc. if these are stacked beyond 20m from the working point. iii) any unforseen items of work outside LCS-BoQ and rates are not available in LGED rate schedule

Page 6 of 12

Unit Cost Analysis of LCS sub-contract Labour Schedule of Rates


District : NOAKHALI, LAXMIPUR
Item Code 1 Brief Description of Item 2

As per Schedule of Rates, LGED, July 2009


Detailed Analysis Unit 3 Sub-Item 4 Quantity Unit 5 6 Rate 7 Amount 8

Chapter - 2 : Earth Works in Road Embankment


2.1.04.01

Earth filling work : LCS labour part only Earth filling work with specified soil in any type of embankment including cutting, carrying, filling by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types of soil except rocky, gravelly and slushy including benching not more than 30cm in vertical and 60cm in horizontal steps along the sides while widening any embankment, etc. all complete as per the direction of site manager. Earth shall be arranged by the contractor at his own cost and it will include all necessary lead & lift. Payment will be made on compacted volume.

cum Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.252 day 180.00 45.36 45.36 4.54 49.90

2.1.08.01

Manual compaction : LCS labour part only Manual compaction of earth in 150mm thick compacted layers by breaking clods to a maximum size of 25mm using wooden drag or ladder and compacting using concrete drop hammer (Durmus), watering or drying to obtain optimum moisture content if necessary including supplying of wooden drag, ladder, bamboo hammer, steel/concrete hammer and other requisite tools, etc. all complete as per direction of the site manager. 85% compaction of the maximum dry density is to be obtained by the standard compaction test (Rate is for each layer of 150mm thick).

cum Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.100 day 180.00 18.00 18.00 1.80 19.80

2.1.08.02

Mechanical compaction : LCS labour part only Mechanical compaction of earthworks in 150mm thick compacted layers by breaking clods to a maximum size of 25mm using wooden drag or ladder and compacting using mechanical equipment, watering or drying to obtain optimum moisture content watering if necessary including the equipment and other tools required to work site, etc. all complete as per direction of the site manager. 98% compaction of the maximum dry density is to be obtained by the standard compaction test (Rate is for each layer of 150mm thick).

cum Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.025 day 180.00 4.50 4.50 0.45 4.95

2.3.01

Leveling and dressing: LCS labour part only Leveling and dressing the embankment crown, road flanks, building compound etc. by earth cutting and filling as necessary in proper slope and camber including compaction etc. all complete as per direction of the site manager.

sqm Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.035 day 180.00 6.30 6.30 0.63 6.93

2.3.03.1

Turfing : LCS labour part only Turfing on embankment top and slope, building compound with good quality turf supplied by the contractor of not less than 225mm square in dimension including placing and watering till grass is fully grown, etc. all complete as per direction of the site manager (payment to be made only when grass is fully grown).

sqm Turf Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 1.000 0.030 m2 day 4.00 180.00 4.00 5.40 9.40 0.94 10.34

2.3.06

Earth work up to 5m lift : LCS labour part only Earth filling work with specified soil in any type of embankment upto 5m lift from the toe of embankment including cutting, carrying, filling by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types rocky, gravelly and slushy including benching not more than 30cm in vertical and 60cm in horizontal steps along the sides while widening any embankment, etc. all complete as per the direction of site manager. Earth shall be arranged by the contractor at his own costs. The item is applicable when earth is supplied by the contractor and taken from land adjacent to the embankment but not falling within the right of way for all lead. (Payment will be made on compacted volume).

cum Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.480 day 180.00 86.40 86.40 8.64 95.04

Page 7 of 12

Unit Cost Analysis of LCS sub-contract Labour Schedule of Rates


District : NOAKHALI, LAXMIPUR
Item Code 1
2.3.07

As per Schedule of Rates, LGED, July 2009


Detailed Analysis Unit 3 Sub-Item 4 Quantity Unit 5 6 Rate 7 Amount 8

Brief Description of Item 2 Earth work beyond 5m lift : LCS labour part only Earth filling work with specified soil in any type of road embankment and bridge approaches beyond 5.00m lift from the toe of embankment including cutting, carrying, filling by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types of rocky, gravelly and slushy including benching not more than 30cm in vertical and 60cm in horizontal steps along the sides while widening any embankment, etc. all complete as per the direction of site manager. Earth shall be arranged by the contractor at his own costs. The item is applicable when earth is supplied by the contractor and taken from land adjacent to the embankment but not falling within the right of way for all lead. (Payment will be made on compacted volume).

cum Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.490 day 180.00 88.20 88.20 8.82 97.02

Chapter - 3 : Road Works


3.1.02

Box cutting up to 300mm & sub-grade compaction mechanically: LCS labour part only Earth work in box cutting on road crest up to 300mm depth with proper sqm grade, camber and alignment maintaining super elevation at curves, Ordinary Labour 0.060 removing soils to a safe distance or if necessary, spreading the Sub-total : excavated earth on road flanks and slopes uniformly including leveling, Profit : 10% of sub-total dressing, watering, compacting the sub-grade by appropriate mechanical Total : means to give minimum compaction 98% of MDD Standard (at a depth of 150mm) etc. all complete as per direction of the site manager. Minimum soaked CBR requirement of the sub-grade is 4%.

day

180.00

10.80 10.80 1.08 11.88

3.1.04

Box cutting up to 450mm & sub-grade compaction mechanically: LCS labour part only Earth work in box cutting on road crest up to 450mm depth with proper sqm grade, camber and alignment maintaining super elevation at curves, Ordinary Labour 0.085 removing soils to a safe distance or if necessary, spreading the Sub-total : excavated earth on road flanks and slopes uniformly including leveling, Profit : 10% of sub-total dressing, watering compacting the sub-grade by appropriate mechanical Total : means to give minimum compaction 98% of MDD, Standard (at a depth of 150mm), etc. all complete as per direction of the site manager. Minimum soaked CBR requirement of the sub-grade is 4%.

day

180.00

15.30 15.30 1.53 16.83

3.1.05

Preparation of bed: LCS labour part only Preparation of bed by cutting and filling including watering, compacting by appropriate mechanical means etc. to give minimum compaction 98% of MDD (Standard) to obtain a minimum soaked CBR 4% etc. all complete as per direction of the site manager.

sqm Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.008 day 180.00 1.44 1.44 0.14 1.58

3.1.06.01

Improved sub-grade with sand FM 0.80 : LCS labour part only Sand (FM 0.80) filling on the road bed in the improved sub-grade with sand free from dust, earth, other vegetable growth and foreign materials including supplying all materials, spreading, watering, compacting by appropriate mechanical means to obtain a minimum soaked CBR 8% at minimum compaction 98% of MDD (Modified), etc. all complete as per direction of the site manager.

cum Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.200 day 180.00 36.00 36.00 3.60 39.60

3.1.06.02

Improved sub-grade with sand FM 0.50 : LCS labour part only Sand (FM 0.50) filling on the road bed in the improved sub-grade with sand free from dust, earth, other vegetable growth and foreign materials including supplying all materials, spreading, watering, compacting by appropriate mechanical means to obtain a minimum soaked CBR 8% at minimum compaction 100% of MDD (Modified), etc. all complete as per direction of the site manager.

cum Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.200 day 180.00 36.00 36.00 3.60 39.60

Page 8 of 12

Unit Cost Analysis of LCS sub-contract Labour Schedule of Rates


District : NOAKHALI, LAXMIPUR
Item Code 1
3.2.01

As per Schedule of Rates, LGED, July 2009


Detailed Analysis Unit 3 Sub-Item 4 Quantity Unit 5 6 Rate 7 Amount 8

Brief Description of Item 2 Dismantling sub-base and base, WBM: LCS labour part only Dismantling of (damaged) (any nature) sub-base and WBM works in paved road of any thickness and removing the debris to a safe distance, stacking properly including all tools and plants, etc. all complete as per direction of the site manager.

cum Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.818 day 180.00 147.24 147.24 14.72 161.96

3.2.02.01

Sub-base course: LCS labour part only Constructing compacted aggregate sand sub-base course with 38mm down brick chips mixed thoroughly with sand to obtain a homogeneous mix including mixing, carrying, placing and spreading uniformly in appropriate layer to give specified compacted thickness not more than 100mm in a single layer, watering, compacting by appropriate mechanical means all complete as per direction of the site manager.

cum Ordinary Labour Skilled Labour Sub-total : Profit : 10% of sub-total Total : 1.260 1.160 day day 180.00 200.00 226.80 232.00 458.80 45.88 504.68

3.2.02.02

Base course: LCS labour part only Laying, spreading and compacting 38mm down graded aggregates or wet mix macadam made of 1st class and Picked Jhama bricks; premixing the material with water in mechanical mix plant; laying in uniform layers of specified loose thickness not more than 125mm on well prepared surface and compacting with vibratory roller of minimum 8 tonne to achieve soaked CBR not less than 80% at a degree of compaction to minimum 98% (Modified Proctor) all complete as per direction of the site manager.

cum Ordinary Labour Skilled Labour Sub-total : Profit : 10% of sub-total Total : 0.300 0.200 day day 180.00 200.00 54.00 40.00 94.00 9.40 103.40

3.2.08

Picking up HBB : LCS labour part only Labour charge for picking up the existing HBB and staking the materials at a specified distance, etc. all complete as per direction of the site manager.

sqm Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.120 day 180.00 21.60 21.60 2.16 23.76

3.2.09

Picking up Brick flat soling : LCS labour part only Labour charge for picking up the existing brick flat soling and staking the materials at a specified distance, etc. all complet as per direction of the site manager.

sqm Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.100 day 180.00 18.00 18.00 1.80 19.80

3.2.10

Picking up Brick end edging : LCS labour part only Labour charge for picking up the existing brick on end edging and staking the materials at a specified distance, etc. all complete as per direction of the site manager.

m Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.040 day 180.00 7.20 7.20 0.72 7.92

3.2.11

Brick flat soling : LCS labour part only Single layer brick flat soling with 1st class or picked jhama bricks, true to level, camber/super elevation and grade including carrying bricks, filling the interstices tightly with sand. all complete as per direction of the site manager.

sqm Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.100 day 180.00 18.00 18.00 1.80 19.80

3.2.13

Herring Bone Bond (HBB) : LCS labour part only Brick on edge pavement in single layer of Herring Bone Bond with 1st class or picked jhama bricks true to level, camber, super elevation and grade over 25mm thick sand cushion including filling the interstices tightly with same type of sand, etc. all complete as per direction of the site manager.

sqm Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.170 day 180.00 30.60 30.60 3.06 33.66

Page 9 of 12

Unit Cost Analysis of LCS sub-contract Labour Schedule of Rates


District : NOAKHALI, LAXMIPUR
Item Code 1
3.2.15.01

As per Schedule of Rates, LGED, July 2009


Detailed Analysis Unit 3 Sub-Item 4 Quantity Unit 5 6 Rate 7 Amount 8

Brief Description of Item 2 Brick on end edging : LCS labour part only Brick on end edging (75mm across) with 1st class/picked jhama bricks including cutting trenches true to level & grade including removing earth, refilling & ramming the sides properly & filling the gaps with local sand, etc. all complete as per direction of the E-I-C.

m Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.030 day 180.00 5.40 5.40 0.54 5.94

3.2.56.01

Palisading with double pre-cast plate : LCS labour part only Palisading work with double pre-cast plate (1150mmx600mm) fitted with RCC (1:2:4) post of 150mmx150mm, 3m long, 0.9m c/c to be driven 2/3rd of the total length (3m) of the post made by 20mm down graded brick chips. Pre-cast plate to be fitted with RCC post fixed necessary nuts and bolts at driving of post Complete as per direction of site manager.

m Ordinary Labour Skilled Labour Sub-total : Profit : 10% of sub-total Total : 7.860 0.035 day day 180.00 200.00 1,414.80 7.00 1,421.80 142.18 1,563.98

3.2.56.02

Palisading with single pre-cast plate : LCS labour part only Palisading work with single pre-cast plate (1150mmx600mm) fitted with RCC (1:2:4) post of 150mmx150mm, 2m long, 0.9m c/c to be driven 2/3rd of the total length (2m) of the post made by 20mm down graded brick chips. Pre-cast plate to be fitted with RCC post fixed necessary nuts and bolts at driving of post Complete as per direction of site manager.

m Ordinary Labour Skilled Labour Sub-total : Profit : 10% of sub-total Total : 5.000 0.025 day day 180.00 200.00 900.00 5.00 905.00 90.50 995.50

3.2.58

Preparation of hard bed : LCS labour part only Preparation of hard bed by scarifying and loosening of existing sub-base/ base course materials up to the depth of 75mm (minimum) leveling dressing and maintaining camber & grade, watering if needed, rolling with 8 to 10 MT road roller to give compaction to 100% of MDD as obtained by standard proctor test etc. all complete as per direction of the site manager.

sqm Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.065 day 180.00 11.70 11.70 1.17 12.87

Chapter - 4 : Bridge/Culvert Works


4.1.03

Earth work in foundation trenches : LCS Labour part only Earth work in excavation in foundation trenches in all sorts of soil except rocky, gravelly, slushy or organic type, up to a depth of 2m to the lines, grades and elevation as shown on the drawing, removing boulders, logs and other objectionable materials, clearing all loose materials, disposing of all excavated materials to a safe distance designated by the site manager for an initial lead of 20m, and cut to a firm surface including bailing out water, removal of spoils to a safe distance, back filling of sites of trenches up to original level, shoring if necessary etc. all complete as per requirement and instruction of the site manager. Back- filled materials shall be compacted to a density comparable with the adjacent undisturbed material. cum Mason Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.025 0.300 day day 220.00 180.00 5.50 54.00 59.50 5.95 65.45

4.1.08

Sand filling in foundation bed : LCS Labour part only Sand filling on the prepared foundation bed with sand of minimum FM 0.80 in difficult areas with 150mm in thickness in each layer; placing in conformity with the profile and level as per design including watering, compaction, etc. all complete as per direction of the site manager. cum Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.500 day 180.00 90.00 90.00 9.00 99.00

4.1.09

Brick flat soling : LCS Labour part only Single layer brick flat soling with 1st class or picked jhama kiln burnt bricks in foundation, filling the interstices tightly with sand of minimum FM 0.50, watering, leveling, dressing, etc. all complete as per instruction of the site manager. sqm Mason Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.025 0.100 day day 220.00 180.00 5.50 18.00 23.50 2.35 25.85

Page 10 of 12

Unit Cost Analysis of LCS sub-contract Labour Schedule of Rates


District : NOAKHALI, LAXMIPUR
Item Code 1
4.1.14.01

As per Schedule of Rates, LGED, July 2009


Detailed Analysis Unit 3 Sub-Item 4 Quantity Unit 5 6 Rate 7 Amount 8

Brief Description of Item 2 First class brick work (1 : 4) : LCS Labour part only First class brick works in cement mortar (1:4) in staining of wells with sand (minimum FM 1.50) and cement, cutting bricks to required sizes, hoisting and keeping in position the MS bond rods and finished with flush pointing joints, watering, all complete as per direction of the site manager.

cum Mason Skilled Labour Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.700 0.700 1.000 day day day 220.00 200.00 180.00 154.00 140.00 180.00 474.00 47.40 521.40

4.1.14.02

First class brick work (1 : 3) : LCS Labour part only First class brick works in cement mortar (1:3) in staining of wells with sand (minimum FM 1.50) and Portland cement, cutting bricks to required sizes, hoisting and keeping in position the MS bond rods and finished with flush pointing joints, watering, all complete as per direction of the site manager. cum Mason Skilled Labour Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.700 0.700 1.000 day day day 220.00 200.00 180.00 154.00 140.00 180.00 474.00 47.40 521.40

4.2.03.02

R.C.C. work : LCS Labour part only Reinforced Cement Concrete work in bottom and top slab of box culvert of any height with 1st class brick/ picked jhama bricks chips, sand (minimum FM 1.80) and cement having minimum 28 days ultimate cylinder crushing strength of 170kg/cm2 (suggested mix proportion 1:2:4) including shuttering, casting, curing for 28 dayscomplete in all respect as per direction of the site manager. Bottom slab and approach slab cum Mason Skilled Labour Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.350 1.000 1.250 day day day 220.00 200.00 180.00 77.00 200.00 225.00 502.00 50.20 552.20

4.2.03.02.1

4.2.03.02.2

Top slab cum Mason Skilled Labour Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.350 1.000 1.250 day day day 220.00 200.00 180.00 77.00 200.00 225.00 502.00 50.20 552.20

4.2.03.02.2.1 Upto height of 5m

4.2.06

M.S rod : LCS Labour part only Fabrication of M.S High strength deformed bar/ Twisted bar reinforcement of required size and length for all types of RCC work including straightening the rod, removing ruts, cleaning, cutting, hooking, bending, binding with supply of 22 B.W.G. GI wire, placing in position, including lapping, spacing and securing them in position by concrete blocks (1:1), metal chairs, etc. as per direction of the site manager. M.S. Rod, deformed (grade 40, billet, SK-30) kg Skilled Labour Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.003 0.008 day day 200.00 180.00 0.50 1.35 1.85 0.19 2.04

4.2.06.01

4.2.06.02

M.S. Rod, deformed (grade 40)

kg Skilled Labour Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.003 0.008 day day 200.00 180.00 0.50 1.35 1.85 0.19 2.04

Page 11 of 12

Unit Cost Analysis of LCS sub-contract Labour Schedule of Rates


District : NOAKHALI, LAXMIPUR
Item Code 1
4.3.02

As per Schedule of Rates, LGED, July 2009


Detailed Analysis Unit 3 Sub-Item 4 Quantity Unit 5 6 Rate 7 Amount 8

Brief Description of Item 2 Dismantling work : LCS Labour part only Labour for dismantling of the damaged works in abutment, wing bases and walls, piers and well caps, columns, long and cross girders deck slabs, side walks, fillets, wheel-guards and railing, etc. by any means and removing the dismantled materials, such as, concrete and MS rods of different sizes to a safe distance including scrapping and removing concrete from MS rods, preparation and erection of platform where necessary, carrying, all sorts of handling, stacking the same properly after clearing, leveling and dressing the site and clearing the river bed, etc. all complete as per direction of the site manager. RCC works

4.3.02.01

cum Skilled Labour Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 2.000 11.000 day day 200.00 180.00 400.00 1,980.00 2,380.00 238.00 2,618.00

4.3.02.02

Plain concrete

cum Skilled Labour Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 1.000 6.000 day day 200.00 180.00 200.00 1,080.00 1,280.00 128.00 1,408.00

4.3.02.03

Brick works

cum Skilled Labour Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.500 3.000 day day 200.00 180.00 100.00 540.00 640.00 64.00 704.00

Chapter - 5 : Building Works


5.102.01

12mm Cement plaster (1 : 4) : LCS Labour part only Minimum 12mm thick cement plaster (1:4) to dado and plinth wall up to 150mm below ground level with neat cement finishing in/c washing of sand, finishing the edges and corners and curing for the requisite period etc. all complete as per direction of the site manager. (Sand of minimum FM 1.2 be used).

sqm Mason Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.108 0.108 day day 220.00 180.00 23.76 19.44 43.20 4.32 47.52

5.104.01

Rule pointing (1 : 2) : LCS Labour part only Rule pointing to brick wall with cement morter (1:2) and rakig out the joints, scaffolding, curing for the requisite period etc. all complete as per direction of the site manager. (Sand of minimum FM 1.2 be used).

sqm Mason Ordinary Labour Sub-total : Profit : 10% of sub-total Total : 0.108 0.108 day day 220.00 180.00 23.76 19.44 43.20 4.32 47.52

Rates for unforseen/extra works not in LGED rate analysis:


Contractor shall pay the LCS on the basis of time input for the Item of works not included in LGED rate analysis. per hour per labour 22.50

The probable items are :


i) loading & unloading of bricks, sand, cement, brick chips, stone chips,MS rod etc. into/from truck, tractor or van. ii) carrying of bricks, sand, cement, brick chips, stone chips,MS rod etc. if these are stacked beyond 20m from the working point. iii) any unforseen items of work outside LCS-BoQ and rates are not available in LGED rate schedule

Notes : If any LGED approved item of works outside the item of works mentioned above is required due to variation of works then LCS labour rate shall be prepared similarway following LGED's current approved rate analysis.