Background
WSP was appointed to identify the most appropriate scheme to mitigate Arborfield Garrison SDL development (3,500 houses) Stage 1A Scheme Identification Stage 1B will gain certainty of delivery and costs of the recommended scheme Stage 2 will complete the Planning Application Stage 3 will prepare Construction Drawings and Tender documents for construction
Stage 1A
The analysis considered: Traffic Policy Environmental impacts Property impacts Land requirements Engineering design Deliverability Public and political refinement
Stage 1A Progress
The draft report has been reviewed by officer disciplines It has been reported to local Councillors and Members (09 July) Land owners directly affected have been contacted This event provides details of the technical recommendation (15 July) It will be discussed at Executive (July 2013) ( )
Options
READING
Schematic Options
N
Wokingham
A B
Spencers Wood
DM
Arborfield Cross
C
Finchampstead
Swallowfield
Riseley
Modelled link
This map is based on Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of HMSO (c) Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Wokingham Borough Council Licence No. 100019592.
D A B C
Public Right of Way Listed Building Ancient Woodland Local Wildlife Site Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Groundwater Source Protection Zone Public Right of Way Listed Building Ancient Woodland Local Wildlife Site Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Reading
Winnersh
Wokingham
Local Wildlife Site Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Hampshire
Generally satisfies objectives
Speed Limit
C
Groundwater Source Protection Zone Public Right of Way Listed Building Ancient Woodland Local Wildlife Site
Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Speed Limit
40
B
Groundwater Source Protection Zone Public Right of Way Listed Building Ancient Woodland Local Wildlife Site Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Speed Limit
40
B1
Groundwater Source Protection Zone Public Right of Way Listed Building Ancient Woodland Local Wildlife Site Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Speed Limit
40
D1
Groundwater Source Protection Zone Public Right of Way Listed Building Ancient Woodland Local Wildlife Site Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Speed Limit
40
D2
Groundwater Source Protection Zone Public Right of Way Listed Building Ancient Woodland Local Wildlife Site Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Noise Engineering
Generally satisfies objectives
Speed Limit
40
A
Groundwater Source Protection Zone Public Right of Way Listed Building Ancient Woodland Local Wildlife Site
Main River
Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Speed Limit
40
A1
Groundwater Source Protection Zone Public Right of Way Listed Building Ancient Woodland Local Wildlife Site
Main River
Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Speed Limit
40
A2
Groundwater Source Protection Zone Public Right of Way Listed Building Ancient Woodland Local Wildlife Site
Main River
Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Speed Limit
40
A3
Groundwater Source Protection Zone Public Right of Way Listed Building Ancient Woodland Local Wildlife Site
Main River
Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
Speed Limit
40
A3 D1 B1
Speed Limit
40
A3
Technical Recommendation Groundwater Source Protection Zone Public Right of Way
Listed Building Ancient Woodland Local Wildlife Site Local Nature Reserve Tree Protection Orders 1 in 30yr Flood Level 1 in 20yr Flood Level
A3
Technical Recommendation
A3
Technical Recommendation
A3
Technical Recommendation
Conservation Area
Conservation Area Listed Building Yew Tree Farm Chamberlains Farm Ducks Nest Farmhouse Main river Possible impact from noise and visual intrusion
or
Severance of Lockey Farm fields
A3
Technical Recommendation
Conservation Area
or
Speed Limit 1. Crossing of Main River. 2. Impact on Playing Fields. Consider alignment change?
40
A3
Technical Recommendation
Land Ownership
Note: Land parcels indicate different ownership. Two parcels of the same colour does not infer the same land owner.
Process
Stage 1A completed in draft Member and Public Consultation underway Confirm or modify Stage 1A scheme Executive approval Spring 2014? Commission Stage 1B for design and costing Stage 2 prepares the scheme for Planning Application Stage 3 prepares scheme drawings to enable construction
Questions
?
N