You are on page 1of 76

Form # 1: Monthly Energy-Kashmir

MONTHLY ENERGY INPUT, ENERGY BILLED & LOSSES FOR THE YEAR 2012-113
(For Achievement under Triparitite MoU and for progress to SERC)
S.No

Month

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

10

Jan-13

11

Feb-13

Energy Input
Billed and losses

Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %
Input (LU's)
Billed (LU's)
Losses %

Hawal

Rainawari

129.51
38.99
69.89
121.43
38.28
68.48
110.79
35.70
67.78
94.25
36.02
61.78
81.35
29.51
63.72
81.65
29.73
63.59
89.14
29.39
67.03
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!

K.K.Moulla

Khanyar

Zakura

Total for
the Division

129.51
38.99
69.89
121.43
38.28
68.48
110.79
35.70
67.78
94.25
36.02
61.78
81.35
29.51
63.72
81.65
29.73
63.59
89.14
29.39
67.03
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!

12

Mar-13

Input (LU's)
Billed (LU's)
Losses %

0.00
0.00
#DIV/0!

0.00
0.00
#DIV/0!

Form # 2: Monthly Meters-Kashmir

MONTHLY TOTAL CONSUMERS, ELECTRONIC METERS INSTALLED AND %age ELECTRONIC FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

Month

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

10

11

Dec-12

Jan-13

Feb-13

Total consumers
electronic metering level
and % metering at end of
month

Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed

Hawal

Rainawari

11000
9921
90.19
11082
10333
93.24
11137
10821
97.16
11199
10971
97.96
11198
10970
97.96
11191
10963
97.96
11203
10963
97.86
0
#DIV/0!
0
#DIV/0!
0
#DIV/0!
0

K.K.Moulla

Khanyar

Zakura

Total for
the Division

11000.00
9921.00
90.19
11082.00
10333.00
93.24
11137.00
10821.00
97.16
11199.00
10971.00
97.96
11198.00
10970.00
97.96
11191.00
10963.00
97.96
11203.00
10963.00
97.86
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00

11

12

Feb-13

Mar-13

% Metering
Total Consumers
Meters Installed
% Metering

#DIV/0!
0
#DIV/0!

#DIV/0!
0.00
0.00
#DIV/0!

Form # 3: Monthly Revenue-Kashmir

MONTHLY REVENUE REALISED (PURE AND ED) FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC)
S.No

Month

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

10

Jan-13

11

Feb-13

Monthly Revenue
Realised, Pure & ED
(Rs. In lacs)

Revenue Pure
ED
Total (Rs. In lacs)
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED

Hawal

Rainawari

26.51
5.82
32.33
86.34
18.95
105.29
13.77
3.02
16.79
152.36
33.44
185.80
81.25
17.83
99.08
59.88
13.14
73.02
111.97
24.58
136.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

K.K.Moulla

Khanyar

Zakura

Total for
the Division

26.51
5.82
32.33
86.34
18.95
105.29
13.77
3.02
16.79
152.36
33.44
185.80
81.25
17.83
99.08
59.88
13.14
73.02
111.97
24.58
136.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

11

12

Feb-13

Mar-13

Total
Revenue Pure
ED
Total

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

Form # 4: Monthly Connection-Kashmir

MONTHLY CONNECTIONS ADDED (METERED AND FLAT RATE) FOR THE YEAR 2012-13
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

Month

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

10

Jan-13

11

Feb-13

Monthly
Connections added
metered and flat rate
(No's)
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered

Hawal

Rainawari

15
0
15
92
0
92
91
0
91
8
0
8
8
0
8
49
0
49
1
0
1

K.K.Moulla

Khanyar

Zakura

Total for
the Division
15
0
15
92
0
92
91
0
91
8
0
8
8
0
8
49
0
49
1
0
1
0
0
0
0
0
0
0
0
0
0

11

Feb-13

12

Mar-13

Flat Rate
Total
Metered
Flat Rate
Total

0
0
0
0
0

Form # 5: Category Detail-Kashmir

Circle-Ist, Srinagar

Division:- Electric Division-IV, Khanyar

CATEGORIES CONNECTIONS ENERGY SALES AND REVENUE FOR THE YEAR 2012-13.
(For Achievement under Triparitite MoU and for progress reporting to SERC)

Connections

Description

Year 2012

Category
May

June

July

Aug

Sept.

Oct

Domestic

9188

9254

9317

9359

9359

9352

9366

N.Dom/Commercial

1667

1683

1675

1695

1695

1695

1695

Irrigation/Aggri.

16

16

16

16

16

16

16

State / Central

45

45

45

45

45

45

45

Public Lighting

LT Industries

80

80

80

80

79

79

79

HT Industries

HT P. Inten.

LT Pub. WW

HT Pub. WW

Gen. Bulk

Temporary

11000

11082

11137

11199

11198

11191

11205

Total
Description

Energy Billed

Year 2013

April

Nov.

Dec

Jan

Year 2012

Category

Feb

Mar

Year 2013

April

May

June

July

Aug

Sept.

Oct

Nov.

Dec

Jan

Feb

Mar

Domestic

916548.66

1139548.28

501446.74

1681785.06

1134482.76

1194252.874

1276871.264

N.Dom/Commercial

306691.11

350608.15

80592.96

429895.19

353333.33

470740.7407

543652.963

Irrigation/Aggri.

875.00

0.00

0.00

4901.00

3000.00

2800

1596

State / Central

0.00

1062386.29

24193.55

1959298.23

609032.26

331451.6129

1286507.097

Public Lighting

0.00

0.00

0.00

0.00

0.00

LT Industries

5265.71

10238.10

1223.81

13519.05

10476.19

11904.7619

22370

HT Industries

0.00

0.00

0.00

0.00

0.00

HT P. Inten.

0.00

0.00

0.00

0.00

0.00

LT Pub. WW

0.00

0.00

0.00

0.00

0.00

HT Pub. WW

0.00

0.00

0.00

205886.34

533902.44

202030.7317

202030.7317

Gen. Bulk

0.00

0.00

0.00

0.00

0.00

Temporary

0.00

0.00

0.00

0.00

0.00

1229380

2562781

607457

4295285

2644227

2213181

3333028

April

May

June

July

Aug

Sept.

Oct

Nov.

Dec

Jan

Feb

Mar

Domestic

2392192

2974221

1308776

4389459

2961000

3117000

3332634

N.Dom/Commercial

1467863

Total
Metered
Flat Rate
Total
Description

Year 2012

Category

828066

946642

217601

1160717

954000

1271000

Irrigation/Aggri.

1750

9802

6000

5600

3192

State / Central

6586795

150000

12147649

3776000

2055000

7976344

Public Lighting
Revenue

Year 2013

LT Industries

11058

21500

2570

28390

22000

25000

46977

HT Industries

HT P. Inten.

LT Pub. WW

HT Pub. WW

844134

2189000

828326

828326

Gen. Bulk

Temporary

3233066

10529158

1678947

18580151

9908000

7301926

13655336

Total
Metered
Flat Rate
Total

Executive Engineer
Electric Division-IV, Khanyar

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF APRIL, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal
Total

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

10.90
9.47
17.00
4.60
10.31
9.90
11.80
13.97
1.03
10.77
2.43
2.80
8.75
14.94
0.84
129.51

2.87
2.46
2.83
4.24
10.00
2.14
0.85
1.36
1.02
1.57
2.19
0.49
2.56
3.58
0.84
38.99

7.23
6.20
7.12
32.73
25.98
5.40
2.13
3.43
22.41
3.95
10.05
1.02
6.40
9.03
6.45
149.53

Losses (LU's) %age Losses

8.03
7.01
14.17
0.36
0.31
7.76
10.95
12.61
0.01
9.20
0.24
2.31
6.19
11.36
0.00
90.52

73.68
74.02
83.38
7.83
3.01
78.35
92.84
90.26
0.97
85.45
9.88
82.50
70.74
76.02
0.00
69.89

Energy Realised
(LU's)

Energy Realised
in Rs (Lac's)

1.87
1.71
1.41
0.07
2.63
1.23
0.44
0.70
0.01
0.44
0.08
0.18
0.65
0.83
0.00
12.25

4.89
4.46
3.69
0.46
6.87
3.21
1.14
1.83
0.09
1.15
0.21
0.48
1.69
2.16
0.00
32.33

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF MAY, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

9.75
9.43
15.53

2.88
2.61
2.81

7.52
6.81
7.34

Losses (LU's) %age Losses

6.87
6.82
12.72

70.46
72.32
81.91

Energy Realised
(LU's)

Energy Realised
in Rs (Lac's)

2.18
0.95
2.12

5.70
2.47
5.53

4
5
6
7
8
9
10
11
12
13
14
15

Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal
Total

3.49
10.40
9.28
8.30
12.73
0.94
10.53
2.64
3.99
8.87
14.38
1.17
121.43

3.34
9.95
2.20
0.89
1.31
0.84
1.54
2.27
0.39
2.51
3.57
1.17
38.28

30.00
25.98
5.75
2.32
3.43
12.94
4.03
10.23
1.02
6.55
9.32
9.39
142.63

0.15
0.45
7.08
7.41
11.42
0.10
8.99
0.37
3.60
6.36
10.81
0.00
83.15

4.30
4.33
76.29
89.28
89.71
10.64
85.38
14.02
90.23
71.70
75.17
0.00
68.48

3.17
14.54
1.67
1.02
1.05
1.30
0.67
0.21
0.18
0.96
1.23
0.00
31.26

25.36
37.94
4.35
2.67
2.74
9.31
1.74
1.28
0.47
2.51
3.22
0.00
105.29

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JUNE, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

8.61
9.09
14.14
3.49
10.64
9.22
6.50
11.90
0.86
10.31
2.44
1.92
7.91
12.22

3.10
1.53
2.85
3.48
9.77
1.96
1.00
1.35
0.84
3.45
1.83
0.21
1.07
1.72

8.10
3.99
7.44
27.80
25.49
5.12
2.60
3.35
6.00
9.00
11.00
0.55
2.80
4.50

Losses (LU's) %age Losses

5.51
7.56
11.29
0.01
0.87
7.26
5.50
10.55
0.02
6.86
0.61
1.71
6.84
10.50

64.00
83.17
79.84
0.29
8.18
78.74
84.62
88.66
2.33
66.54
25.00
89.06
86.47
85.92

Energy Realised
(LU's)

Energy Realised
in Rs (Lac's)

1.13
0.64
1.27
0.03
0.89
0.80
1.05
0.28
0.00
0.04
0.00
0.01
0.07
0.17

2.94
1.67
3.32
0.23
2.31
2.09
2.74
0.74
0.00
0.10
0.00
0.03
0.17
0.45

15

PHE Pokhribal
Total

1.54
110.79

1.54
35.70

12.31
130.05

0.00
75.09

0.00
67.78

1.05
7.42

0.00
16.79

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JULY, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal
Total

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

8.36
7.38
13.73
2.67
8.75
7.40
5.14
10.24
0.79
8.14
2.31
1.48
6.20
10.24
1.42
94.25

2.89
1.60
3.59
2.52
8.39
1.82
1.99
2.25
0.76
2.74
1.69
0.31
1.62
2.42
1.42
36.02

7.54
4.17
9.38
20.10
21.90
4.75
5.20
5.88
5.45
7.15
12.10
0.81
4.23
6.32
11.37
126.35

Losses (LU's) %age Losses

5.47
5.78
10.14
0.15
0.36
5.58
3.15
7.99
0.03
5.40
0.62
1.17
4.58
7.82
0.00
58.23

65.44
78.35
73.82
5.66
4.11
75.41
61.24
78.00
3.51
66.35
26.74
79.03
73.86
76.35
0.00
61.78

Energy Realised
(LU's)

Energy Realised
in Rs (Lac's)

2.68
1.51
3.26
7.76
8.85
2.07
1.91
1.86
0.70
1.10
17.15
0.22
1.21
2.09
0.00
52.37

7.00
3.94
8.50
50.45
23.10
5.39
4.98
4.86
12.31
2.88
44.75
0.58
3.16
5.46
8.44
185.80

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF AUGUST, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal
Total

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

7.25
6.12
11.40
2.65
7.72
6.44
4.46
8.72
0.76
7.10
2.07
1.50
5.62
8.12
1.42
81.35

2.78
1.69
3.12
2.28
4.45
2.53
1.42
1.94
0.75
1.55
1.70
0.25
1.37
2.26
1.42
29.51

18.92
15.97
29.75
6.92
20.15
16.81
11.64
22.76
1.98
18.53
5.40
3.92
14.67
21.19
11.37
219.99

Losses (LU's) %age Losses

4.47
4.43
8.28
0.37
3.27
3.91
3.04
6.78
0.01
5.55
0.37
1.25
4.25
5.86
0.00
51.84

61.66
72.39
72.63
13.96
42.36
60.71
68.16
77.75
1.32
78.17
17.87
83.33
75.62
72.17
0.00
63.72

Energy Realised
(LU's)

Energy Realised
in Rs (Lac's)

2.25
1.57
1.93
0.19
11.92
1.78
1.14
1.62
0.57
0.54
0.25
0.16
0.88
1.18
0.00
25.97

5.87
4.10
5.05
1.26
31.10
4.64
2.97
4.22
10.15
1.41
0.64
0.41
2.29
3.08
21.89
99.08

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF SEPTEMBER, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

7.39
6.85
10.20
2.50
7.24
6.32
4.71
8.10

3.01
1.82
3.96
2.16
4.52
2.44
1.55
1.95

7.86
4.75
10.34
5.64
11.80
6.37
4.05
5.09

Losses (LU's) %age Losses

4.38
5.03
6.24
0.34
2.72
3.88
3.16
6.15

59.27
73.43
61.18
13.60
37.57
61.39
67.09
75.93

Energy Realised
(LU's)

Energy Realised
in Rs (Lac's)

2.17
1.21
3.51
0.07
5.44
1.87
1.53
1.39

5.67
3.16
9.15
0.47
14.21
4.89
3.99
3.63

9
10
11
12
13
14
15

Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal
Total

0.77
6.90
2.87
1.56
6.01
10.23
1.03
82.68

0.75
1.54
2.35
0.27
1.33
2.08
1.03
30.76

1.96
4.02
6.13
0.70
3.47
5.43
8.28
85.88

0.02
5.36
0.52
1.29
4.68
8.15
0.00
51.92

2.60
77.68
18.12
82.69
77.87
79.67
0.00
62.80

0.65
0.52
0.25
0.17
0.92
1.19
3.17
24.07

11.44
1.37
0.64
0.45
2.4
3.1
8.28
72.85

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF OCTUBER, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal
Total

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

8.39
7.81
11.40
2.50
8.10
6.44
5.21
9.10
0.90
7.40
2.76
1.55
6.31
11.27
1.03
90.17

3.02
1.93
3.51
2.21
4.23
2.21
1.48
1.94
0.88
1.55
2.31
0.27
1.37
2.48
1.03
30.42

7.88
5.04
9.16
18.17
23.27
5.77
3.86
5.06
7.23
4.05
6.03
0.70
3.58
6.47
8.28
114.55

Losses (LU's) %age Losses

5.37
5.88
7.89
0.29
3.87
4.23
3.73
7.16
0.02
5.85
0.45
1.28
4.94
8.79
0.00
59.75

64.00
75.29
69.21
11.60
47.78
65.68
71.59
78.68
2.22
79.05
16.30
82.58
78.29
77.99
0.00
66.26

Energy Realised
(LU's)

Energy Realised
in Rs (Lac's)

6.25
2.40
3.07
8.18
7.58
1.51
1.10
2.25
0.01
0.85
0.00
0.16
1.90
1.06
3.17
39.49

16.3
6.27
8.01
53.2
19.78
3.95
2.87
5.86
0.12
2.23
0.01
0.41
4.96
2.76
8.28
135.01

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF NOVEMBER, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal
Total

Energy Pumped

0.00

Energy Billed

0.00

Energy Billed in
Rs (Lac's)

0.00

Losses (LU's) %age Losses

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Energy Realised
(LU's)

Energy Realised
in Rs (Lac's)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF DECEMBER, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

Losses (LU's) %age Losses

0.00
0.00
0.00
0.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Energy Realised
(LU's)

0.00
0.00
0.00
0.00

Energy Realised
in Rs (Lac's)

5
6
7
8
9
10
11
12
13
14
15

Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal
Total

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JANUARY, 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

Losses (LU's) %age Losses

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Energy Realised
(LU's)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Energy Realised
in Rs (Lac's)

Total

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF FEBRUARY, 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Name of Feeder

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal
Total

Energy Pumped

0.00

Energy Billed

0.00

Energy Billed in
Rs (Lac's)

0.00

Losses (LU's) %age Losses

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Energy Realised
(LU's)

Energy Realised
in Rs (Lac's)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF MARCH, 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)

S.No

Name of Feeder

Energy Pumped

Energy Billed

Energy Billed in
Rs (Lac's)

Losses (LU's) %age Losses

Energy Realised
(LU's)

Energy Realised
in Rs (Lac's)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Feeder-2 Habak
Feeder-3 Habak
Feeder-5 Habak
Feeder-1 Hazratbal
Feeder-2 Hazratbal
Feeder-3 Hazratbal
Feeder-1 Kathidarwaza
Feeder-2 Kathidarwaza
Feeder-3 Kathidarwaza
Feeder-5 Kathidarwaz
Feeder-1 Rainawari
Feeder-2 Rainawari
Feeder-3 Rainawari
Feeder-4 Rainawari
PHE Pokhribal
Total

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

Form # 6: En. Au

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Whether KVAH
Based tariff
implemented

0.00

Form # 6: En. Aud. Ind.

Form # 7

MONTHLY ENERGY ACCOUNT & REVENUE REALISATION FOR INSTALLATIONS HAVING LOAD 25 KVA & ABOVE FROM APRIL,
2012 TO JUNE, 2012
Energy/Revenue
Total for
Hawal
Rainawari
K.K.Moulla
Khanyar
Zakura
Details
the Division

No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
April, 2012
Revenue Collected (Lacs)
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
May, 2012
Revenue Collected (Lacs)
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
June, 2012
Revenue Collected (Lacs)
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
July, 2012
Revenue Collected (Lacs)
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
August, 2012 Revenue Collected (Lacs)
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account
Energy Billed (LU's)
for the Month of
Amount Billed (Lacs)
September,
2012

16
11.18
11.18
84.10
0.00
0.00
16
11.31
11.31
85.93
65.87
76.66
16
9.19
9.19
68.01
53.48
78.64
16
9.87
9.87
73.67
65.00
88.23
16
8.75
8.75
65.73
44.60
67.86
16
8.71
8.71
65.46

16
11
11
84
0
0
16
11
11
86
66
77
16
9
9
68
53
79
16
10
10
74
65
88
16
9
9
66
45
68
16
9
9
65

Energy Account
for the Month of
September,
Revenue Collected (Lacs)
2012
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
Octuber, 2012 Revenue Collected (Lacs)
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
November, 2012 Revenue Collected (Lacs)
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
December, 2012 Revenue Collected (Lacs)
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
January, 2013 Revenue Collected (Lacs)
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
February, 2013 Revenue Collected (Lacs)
% of Revenue Collection
No. of Consumers
Energy Supplied (LU's)
Energy Account Energy Billed (LU's)
for the Month of Amount Billed (Lacs)
March, 2013 Revenue Collected (Lacs)
% of Revenue Collection

95.36
145.69
16
10.44
10.44
75.74
8.28
10.94

95
146
16
10
10
76
8
11
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Format # 8

Status of KVAR Compensation for Installations having Load 25 KVA & Above as on 30-06-2012
(For achievement under Tripartite MoU and for progress reporting to SERC)

KVAR Compensation Details

Hawal

Electric Division-IV, Khanyar.


Rainawari
K.K.Moulla
Khanyar

Zakura

Total for the


Division

No
Connections with load 25
KVA & Above
KVA
Required
(KVAR)

KVAR
Compensation through
Shunt Capacitor

Installed
(KVAR)
Deficiency
(KVAR)
%
Deficiency

Executive Engineer
Electric Division-IV, Khanyar

Form # 9

Monthly detail of Computerised Billed Energy From April 2012 to March 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)
S.No

Month

Apr-12

Computerized
Billing
Total Energy Biled (LU's)
Energy Billed through computer(LU's)
%age computerised Billing
Total Energy Biled (LU's)

May-12 Energy Billed through computer(LU's)


%age computerised Billing

Jun-12

Total Energy Biled (LU's)


Energy Billed through computer(LU's)
%age computerised Billing

Jul-12

Total Energy Biled (LU's)


Energy Billed through computer(LU's)
%age computerised Billing
Total Energy Biled (LU's)

Aug-12 Energy Billed through computer(LU's)


%age computerised Billing
Total Energy Biled (LU's)

Sep-12 Energy Billed through computer(LU's)


%age computerised Billing

Oct-12

Total Energy Biled (LU's)


Energy Billed through computer(LU's)
%age computerised Billing
Total Energy Biled (LU's)

Nov-12 Energy Billed through computer(LU's)


%age computerised Billing
Total Energy Biled (LU's)

Dec-12 Energy Billed through computer(LU's)


%age computerised Billing

10

Jan-13

Total Energy Biled (LU's)


Energy Billed through computer(LU's)
%age computerised Billing
Total Energy Biled (LU's)

11

Feb-13 Energy Billed through computer(LU's)


%age computerised Billing
Total Energy Biled (LU's)

12

Mar-13 Energy Billed through computer(LU's)


%age computerised Billing

Hawal

Rainawari

38.99
38.99
100.00
38.28
38.28
100.00
35.70
35.70
100.00
36.02
36.02
100.00
29.51
29.51
100.00
30.76
30.76
100.00
30.42
30.42
100.00
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!

K.K.Moulla

Khanyar

Zakura

Total for
the Division

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:

Nazir Ah. Zargar


LT Indust.
CT Ratio:

DiVision:
N.A

Supply Type:

N.A

Meter Type:

Installation No:

17510

Meter Rated Current:

Computer Code:

9386

Capacitor Installed: Y/NN

Sanctioned Load:

30 HP

S.No

Month

KVAH
Units
supplied

Electric Division-IV, Khanyar

Rating of Capacitor:

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

Apr-12

N.A

N.A

0.00

N.A

N.A

273158.28

0.00

May-12

N.A

N.A

0.00

N.A

N.A

278259.49

0.00

Jun-12

N.A

N.A

0.00

N.A

N.A

283437.22

0.00

Jul-12

N.A

N.A

0.00

N.A

N.A

284426.22

0.00

Aug-12

N.A

N.A

0.00

N.A

N.A

289696.45

0.00

Sep-12

N.A

N.A

0.00

N.A

N.A

295045.73

0.00

Oct-12

N.A

N.A

0.00

N.A

N.A

300475.25

0.00

Nov-12

305986.21

Dec-12

0.00

10

Jan-13

0.00

11

Feb-13

0.00

12

Mar-13

0.00
0

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH
demand
readings
will be required
loadthan
more
than 100KW
In caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

DiVision:

Electric Division-IV, Khanyar

Name of Installation:Executive Engineer, UEED


Category:
LT Water Works
CT Ratio:

N.A

Supply Type:

Installation No:

18334

Meter Rated Current:

N.A

Meter Type:

Computer Code:

10074

Capacitor Installed: Y/NN

Sanctioned Load:

70 KW

Rating of Capacitor:

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
computed
Factor
computed

Max.
Demand
Recorded
KVA

Energy
Charges / F.R
Charges
billed
(In Rs.)

S.No

Month

KVAH
Units
supplied

E=D/C

Apr-12

29411.76

25000.00

29411.7647

25000.00

0.85

N.A

1326242.25

104775.00

May-12

28235.29

24000.00

28235.2941

24000.00

0.85

N.A

1471497.75

100584.00

Jun-12

25882.35

22000.00

25882.3529

22000.00

0.85

N.A

1611640.23

92202.00

Jul-12

27058.82

23000.00

27058.8235

23000.00

0.85

N.A

1741556.67

96393.00

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13

Opening
Balance

94000

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH
demand
readings
will be required
loadthan
more
than 100KW
In caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:
Name of Installation:Category:

EM & RE Circle-Ist, Srinagar

DiVision:

Director National Institute of Technology


Central
CT Ratio:
N.A

Installation No:

46785

Meter Rated Current:

N.A

Computer Code:

9943

Capacitor Installed: Y/NN

Supply Type:
Meter Type:
Rating of Capacitor:

Electric Division-IV, Khanyar

1200 KW

Sanctioned Load:

KVAH
Units
supplied

S.No

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

Apr-12

295294.12

251000.00 295294.118

251000

0.85

N.A

1639500.0

1517295

May-12

275294.12

234000.00 275294.118

234000

0.85

N.A

3186795.0

1414530

Jun-12

223529.41

190000.00 223529.412

190000

0.85

N.A

1444530

1148550

Jul-12

187058.82

159000.00 187058.824

159000

0.85

N.A

2623080

961155

Aug-12

180000.00

153000.00

153000

0.85

N.A

2169705

924885

Sep-12

157647.06

134000.00 157647.059

134000

0.85

N.A

954885

810030

Oct-12

355294.12

302000.00 355294.118

302000

0.85

N.A

840030

1825590

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13

180000

1423000

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 In
KVAH
demand
readings
will be required
loadthan
more
than 100KW
caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:
Name of Installation:Category:

EM & RE Circle-Ist, Srinagar


Joint Director Poultary
State
CT Ratio:

DiVision:
N.A

Supply Type:

N.A

Meter Type:

Installation No:

75858A

Meter Rated Current:

Computer Code:

10039

Capacitor Installed: Y/NN

Sanctioned Load:

53 KW

Rating of Capacitor:

Electric Division-IV, Khanyar

S.No

Month

KVAH
Units
supplied

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

Apr-12

10588.24

9000.00

10588.2353

9000

0.85

N.A

4096144.25

59845.5

May-12

12941.18

11000.00

12941.1765

11000

0.85

N.A

4170480.8

73144.5

Jun-12

7058.82

6000.00

7058.82353

6000

0.85

N.A

4261042.1

39897

Jul-12

5882.35

5000.00

5882.35294

5000

0.85

N.A

4311041.4

33,247.50

Aug-12

8235.29

7000.00

8235.29412

7000

0.85

N.A

4352928.3

46,546.50

Sep-12

10588.24

9000.00

10588.2353

9000

0.85

N.A

4311040.1

59,845.50

Oct-12

3529.41

3000.00

3529.41176

3000

0.85

N.A

3285376.6

19,948.50

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13
50000

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH
demand
readings
will be required
loadthan
more
than 100KW
In caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:
Name of Installation:Category:

EM & RE Circle-Ist, Srinagar


Supdtt. JLNM Hospital
CT Ratio:

State

DiVision:
N.A

Supply Type:

N.A

Meter Type:

Installation No:

14260A

Meter Rated Current:

Computer Code:

10043

Capacitor Installed: Y/NN

Sanctioned Load:

300 KW

Rating of Capacitor:

Electric Division-IV, Khanyar

S.No

Month

KVAH
Units
supplied

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

0.85

N.A

806473.5

600801.00

97988

0.85

N.A

1552958.7

607525.60

127955.00 150535.294

127955

0.85

N.A

2307715.2

793321.00

127058.82

108000.00 127058.824

108000

0.85

N.A

0.0

669600.00

Aug-12

130588.24

111000.00 130588.235

111000

0.85

N.A

831108.0

688200.00

Sep-12

132352.94

112500.00 132352.941

112500

0.85

N.A

1685094.0

697500.00

Oct-12

129411.76

110000.00 129411.765

110000

0.85

N.A

2550519.0

682000.00

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13

Apr-12

114003.98

96903.39

May-12

115280.00

97988.00

Jun-12

150535.29

Jul-12

5
6

114003.985 96903.387
115280

764346.39

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH
demand
readings
will be required
loadthan
more
than 100KW
In caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:

DiVision:

Joint Director Floriculture, Hazratbal


State
CT Ratio:
N.A

Installation No:

6162SD

Meter Rated Current:

Computer Code:

10049

Capacitor Installed: Y/NN

Sanctioned Load:

32 KW

S.No

Month

KVAH
Units
supplied

N.A

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Electric Division-IV, Khanyar

Supply Type:
Meter Type:
Rating of Capacitor:

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

Apr-12

9035.29

7680.00

9035.29412

7680

0.85

N.A

1395814.38

51068.16

May-12

9035.29

7680.00

9035.29412

7680

0.85

N.A

1458917.54

51068.16

Jun-12

9035.29

7680.00

9035.29412

7680

0.85

N.A

1522020.69

51068.16

Jul-12

9035.29

7680.00

9035.29412

7680

0.85

N.A

1585123.85

51068.16

Aug-12

9035.29

7680.00

9035.29412

7680

0.85

N.A

1672950.41

51068.16

Sep-12

9035.29

7680.00

9035.29412

7680

0.85

N.A

1762094.36

51068.16

Oct-12

9035.29

7680.00

9035.29412

7680

0.85

N.A

1852575.48

51068.16

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13
53760

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH
demand
readings
will be required
loadthan
more
than 100KW
In caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:

DiVision:

Joint Director Poultary Briolers


State
CT Ratio:
N.A

Installation No:

90SD

Meter Rated Current:

Computer Code:

10040

Capacitor Installed: Y/NN

Sanctioned Load:

53 KW

S.No

Month

KVAH
Units
supplied

A
1
2

N.A

Supply Type:
Meter Type:
Rating of Capacitor:

KVAH Units KWH Units


KWH Units
AV-Power
recorded / COMPUTE
supplied
Factor
computed
D

Electric Division-IV, Khanyar

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

Apr-12

8235.29

7000.00

8235.29412

7000

0.85

N.A

1,908,727.50

46546.5

May-12

11764.71

10000.00

11764.7059

10000

0.85

N.A

1966839.23

66495

Jun-12

8235.29

7000.00

8235.29412

7000

0.85

N.A

2049288.13

46546.5

Jul-12

7058.82

6000.00

7058.82353

6000

0.85

N.A

2107399.86

39897

Aug-12

8235.29

7000.00

8235.29412

7000

0.85

N.A

2107399.20

46546.5

Sep-12

16470.59

14000.00

16470.5882

14000

0.85

N.A

2165510.93

93093

Oct-12

8235.29

7000.00

8235.29412

7000

0.85

N.A

2280409.39

46546.5

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13
58000

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 In
KVAH
demand
readings
will be required
loadthan
more
than 100KW
caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:

Ex. Engineer LAWDA, Habak


State
CT Ratio:200/5A

DiVision:
N.A

Supply Type:

N.A

Meter Type:

Installation No:

LAWDA2

Meter Rated Current:

Computer Code:

10085

Capacitor Installed: Y/NN

Sanctioned Load:

200 KW

Electric Division-IV, Khanyar

Rating of Capacitor:

Energy
Charges / F.R
Charges
billed
(In Rs.)

Month

E=D/C

Apr-12

30588.24

26000.00

30588.2353

26000

0.85

N.A

5665832.5

108966

May-12

27058.82

23000.00

27058.8235

23000

0.85

N.A

5848331.0

96393

Jun-12

31764.71

27000.00

31764.7059

27000

0.85

N.A

6105722.8

113157

Jul-12

32941.18

28000.00

32941.1765

28000

0.85

N.A

6293334.4

117348

Aug-12

30588.24

26000.00

30588.2353

26000

0.85

N.A

6583349.8

108966

S.No

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Max.
Demand
Recorded
KVA

KVAH
Units
supplied

Opening
Balance

Sep-12

31764.71

27000.00

31764.7059

27000

0.85

N.A

6867336.1

113157

Oct-12

36470.59

31000.00

36470.5882

31000

0.85

N.A

6049359.0

129921

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13
188000

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH
demand
readings
will be required
loadthan
more
than 100KW
In caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:

DiVision:

Ex. Engineer LAWDA, Hazratbal


State
CT Ratio:200/5A
N.A

Installation No:

LAWDA1

Meter Rated Current:

N.A

Computer Code:

10084

Capacitor Installed: Y/NN

Sanctioned Load:

200 KW

Electric Division-IV, Khanyar

Supply Type:
Meter Type:
Rating of Capacitor:

Energy
Charges / F.R
Charges
billed
(In Rs.)

Month

E=D/C

Apr-12

9411.76

8000.00

9411.76471

8000

0.85

N.A

840,711.94

33528

May-12

12941.18

11000.00

12941.1765

11000

0.85

N.A

931176.10

46101

Jun-12

11764.71

10000.00

11764.7059

10000

0.85

N.A

1036979.32

41910

Jul-12

9411.76

8000.00

9411.76471

8000

0.85

N.A

1137669.52

33528

Aug-12

7058.82

6000.00

7058.82353

6000

0.85

N.A

1246555.69

25146

Sep-12

8235.29

7000.00

8235.29412

7000

0.85

N.A

1346695.71

29337

Oct-12

1176.47

1000.00

1176.47059

1000

0.85

N.A

887032.71

4191

Nov-12

S.No

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Max.
Demand
Recorded
KVA

KVAH
Units
supplied

Opening
Balance

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13
51000

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 KVAH
demand
readings
will be required
loadthan
more
than 100KW
In caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:

Registrar Kashmir University


State
CT Ratio:60/5A

DiVision:
N.A

Supply Type:

N.A

Meter Type:

Installation No:

222M

Meter Rated Current:

Computer Code:

10060

Capacitor Installed: Y/NN

Sanctioned Load:

2017 KW

S.No

Month

KVAH
Units
supplied

A
1

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

Rating of Capacitor:

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Electric Division-IV, Khanyar

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

474117.65

403000.00 474117.647

403000

0.85

N.A

7383068

2436135

450588.24

383000.00 450588.235

383000

0.85

N.A

10405578

2315235

348235.29

296000.00 348235.294

296000

0.85

N.A

13280589

1789320

421176.47

358000.00 421176.471

358000

0.85

N.A

15513985

2164110

368235.29

313000.00 368235.294

313000

0.85

N.A

13204624

1892085

420000.00

357000.00

357000

0.85

N.A

15563393

2158065

469411.76

399000.00 469411.765

399000

0.85

N.A

13246657

2411955

420000

10

Jan-13

11

Feb-13

12

Mar-13
2509000

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 In
KVAH
demand
readings
will be required
loadthan
more
than 100KW
caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. JLNM Hospital

Category:

State

CT Ratio:

Installation No:
Computer Code:

14260

Sanctioned Load:

90 KW

S.No

Month

10042

KVAH
Units
supplied

DiVision:

N.A

Meter Rated Current: N.A


Capacitor Installed: Y/NN

Supply Type:
Meter Type:
Rating of Capacitor:

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Electric Division-IV, Khanyar

Apr-12

31830.55

27055.97

31830.5503 27055.968

0.85

N.A

431705

167747

May-12

32418.79

27555.97

32418.7856 27555.968

0.85

N.A

640283.81

170847

Jun-12

31242.31

26555.97

31242.315

26555.968

0.85

N.A

852676

164647

Jul-12

63529.41

54000.00

63529.4118

54000

0.85

N.A

334800

Aug-12

61176.47

52000.00

61176.4706

52000

0.85

N.A

414054

322400

Sep-12

58823.53

50000.00

58823.5294

50000

0.85

N.A

812856

310000

Oct-12

60000.00

51000.00

60000

51000

0.85

N.A

1196406

316200

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13
288167.9

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 In
KVAH
demand
readings
will be required
loadthan
more
than 100KW
caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:-

Supdtt. Mental Hospital

Category:

State

CT Ratio:

Installation No:
Computer Code:

46827

Sanctioned Load:

51 KW

S.No

Month

10045

KVAH
Units
supplied

DiVision:

N.A

Meter Rated Current: N.A


Capacitor Installed: Y/NN

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Electric Division-IV, Khanyar

Supply Type:
Meter Type:
Rating of Capacitor:

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

Apr-12

20000.00

17000.00

20000

17000

0.85

N.A

14,361,727.00

113041.5

May-12

22352.94

19000.00

22352.9412

19000

0.85

N.A

13600912.63

126340.5

Jun-12

12941.18

11000.00

12941.1765

11000

0.85

N.A

13962668

73144.5

Jul-12

10588.24

9000.00

10588.2353

9000

0.85

N.A

14053179

59845.5

Aug-12

14117.65

12000.00

14117.6471

12000

0.85

N.A

14339378

79794

Sep-12

18823.53

16000.00

18823.5294

16000

0.85

N.A

14654571

106392

Oct-12

11764.71

10000.00

11764.7059

10000

0.85

N.A

15007429

66495

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13

94000

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 In
KVAH
demand
readings
will be required
loadthan
more
than 100KW
caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:

Supdtt. Central Jail, Kathi Darwaza


State
CT Ratio:
N.A

Installation No:
Computer Code:

5531M

Sanctioned Load:

360 KW

S.No

Month

DiVision:

10030

KVAH
Units
supplied

Meter Rated Current: N.A


Capacitor Installed: Y/NN

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Electric Division-IV, Khanyar

Supply Type:
Meter Type:
Rating of Capacitor:

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

Apr-12

129411.76

110000.00 129411.765

110000

0.85

N.A

30794952

731445

May-12

137647.06

117000.00 137647.059

117000

0.85

N.A

31696315

777991.5

Jun-12

95294.12

81000.00

95294.1176

81000

0.85

N.A

32654465

538609.5

Jul-12

92941.18

79000.00

92941.1765

79000

0.85

N.A

32520568

525310.5

Aug-12

90588.24

77000.00

90588.2353

77000

0.85

N.A

33170447

512011.5

Sep-12

40000.00

34000.00

40000

34000

0.85

N.A

33804101

226083

Oct-12

30588.24

26000.00

30588.2353

26000

0.85

N.A

34088922

172887

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13
524000

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 In
KVAH
demand
readings
will be required
loadthan
more
than 100KW
caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:

Supdtt. Central Jail


State
CT Ratio:

Installation No:
Computer Code:

5531A

Sanctioned Load:

47.25 KW

S.No

Month

10031

KVAH
Units
supplied

DiVision:
N.A

Meter Rated Current: N.A


Capacitor Installed: Y/NN

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Electric Division-IV, Khanyar

Supply Type:
Meter Type:
Rating of Capacitor:

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

Apr-12

12941.18

11000.00

12941.1765

11000

0.85

N.A

1200510

73144.5

May-12

10588.24

9000.00

10588.2353

9000

0.85

N.A

1290946

59845.5

Jun-12

0.00

0.00

0.85

N.A

1365158

Jul-12

0.00

0.00

0.85

N.A

1166358

Aug-12

0.00

0.00

0.85

N.A

1167558

Sep-12

0.00

0.00

0.85

N.A

1168758

Oct-12

0.00

0.00

0.85

N.A

1169958

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13
20000

Note:

1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT


2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
3 In
KVAH
demand
readings
will be required
loadthan
more
than 100KW
caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:
Installation No:
Computer Code:

Ghulam Mohd. Zaroo


LT Indust.
CT Ratio:
N.A
420SM
Meter Rated Current: N.A
8482
Capacitor Installed: Y/NN

Month

Electric Division-IV, Khanyar

Supply Type:
Meter Type:
Rating of Capacitor:

26 HP

Sanctioned Load:

S.No

DiVision:

KVAH
Units
supplied

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

Apr-12

3170.59

2695.00

3170.58824

2695

0.85

N.A

214162.188

7855.925

May-12

3170.59

2695.00

3170.58824

2695

0.85

N.A

227976

7855.925

Jun-12

2652.94

2255.00

2652.94118

2255

0.85

N.A

241996

6573.325

Jul-12

871.76

741.00

871.764706

741

0.85

N.A

1898

2160.01

Aug-12

128.24

109.00

128.235294

109

0.85

N.A

317.73

Sep-12

280.00

238.00

280

238

0.85

N.A

693.77

Oct-12

98.82

84.00

98.8235294

84

0.85

N.A

1733

244.86

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13
8817

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


3 In
KVAH
demand
readings
will be required
loadthan
more
than 100KW
caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE


Circle:

EM & RE Circle-Ist, Srinagar

Name of Installation:Category:

Ex. Engineer PHE, Pokhribal


State
CT Ratio:

DiVision:
N.A

Supply Type:

N.A

Meter Type:

Installation No:

100-SD

Meter Rated Current:

Computer Code:

10021

Capacitor Installed: Y/NN

Sanctioned Load:

760 KW

S.No

Month

KVAH
Units
supplied

Rating of Capacitor:

KVAH Units
KWH Units
KWH Units AV-Power
recorded /
supplied
recorded
Factor
computed

Electric Division-IV, Khanyar

Max.
Demand
Recorded
KVA

Opening
Balance

Energy
Charges / F.R
Charges
billed
(In Rs.)

E=D/C

Apr-12

137647.06

117000.00 137647.059

117000

0.85

NA

9060675

758043

May-12

181176.47

154000.00 181176.471

154000

0.85

NA

9999662

997766

Jun-12

123529.41

105000.00 123529.412

105000

0.85

NA

11399579

680295

Jul-12

167058.82

142000.00 167058.824

142000

0.85

NA

12243714

920018

Aug-12

121176.47

103000.00 121176.471

103000

0.85

NA

13380311

667337

Sep-12

121176.47

103000.00 121176.471

103000

0.85

NA

12200045

667337

Oct-12

112941.18

96000.00

96000

0.85

NA

12383046

621984

Nov-12

Dec-12

10

Jan-13

11

Feb-13

12

Mar-13

112941.176

820000

Note:
1 Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

2 Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH


3 In
KVAH
demand
readings
will be required
loadthan
more
than 100KW
caseand
trivector
meter
is not installed
for loadfor
more
100KW,
pleaseonly.
workout the KVAH units by dividing
4 recorded KWH units with power factor = 0.85
5 Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

Asstt. Exe. Engineer


Rainawari

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
LT3Ph

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Flat Rate

N.A

Name of 33/11KV Sub-Stations:

N.A

Feeder No:

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

989.00

0.00

0.00

0.00

0.00

989.00

989.00

0.00

0.00

0.00

0.00

989.00

0.00

0.00

0.00

989.00

0.00

0.00

989.00

0.00

989.00
989.00

Rainawari

F-3

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

274147.28

0.00

274147.28

989.00

279248.49

0.00

279248.49

0.00

989.00

284426.22

0.00

284426.22

0.00

0.00

989.00

285415.22

0.00

285415.22

0.00

0.00

0.00

989.00

290685.45

0.00

290685.45

0.00

0.00

0.00

0.00

989.00

296034.73

0.00

296034.73

0.00

0.00

0.00

0.00

989.00

301464.25

0.00

301464.25

N=H+I+J+K+L+M O=G+N

6923

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar

Sub-Division:- Rainawari

11KV
HT
Trivector

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:

N.A

Feeder No:

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Rainawari

F-3

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

N=H+I+J+K+L+M O=G+N

Arrears

Q=O-P

17430.00

23050.5

9525.00

0.00

0.00

145255.50

1471497.8

0.00

1471497.8

17430.00

22128.48

9144.00

0.00

0.00

140142.48

1611640.2

0.00

1611640.2

17430.00

20284.44

8382.00

0.00

0.00

129916.44

1741556.7

0.00

1741556.7

17430.00

21206.46

8763.00

0.00

0.00

135029.46

1876586.1

0.00

1876586.1

550343.88

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
11KV
HT
Trivector

N.A

Type: Metered / Flat Rate:


Name of 33/11KV Sub-Stations:
Feeder No:

Sub-Division:- Rainawari
Metered
Hazratabal

F-2

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

30000

1547295

30000

30000

30000

30000

30000

30000

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

3186795

3186795.0

1444530

4631325

3186795

1444530.0

1178550

2623080

2623080.0

991155

3614235

1,444,530.00

2169705.0

954885

3124590

2,169,705.00

954885.0

840030

1794915

954,885.00

840030.0

1855590

2695620

2695620.0

N=H+I+J+K+L+M O=G+N

8812035

7755915

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
11KV
HT
Trivector

N.A

Type: Metered / Flat Rate:


Name of 33/11KV Sub-Stations:
Feeder No:

Sub-Division:- Rainawari
Metered
Kathi Darwaza

F-3

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

1325

13166.01

5440.5

0.00

0.00

74336.51

1325

16091.79

6649.5

0.00

0.00

1325

8777.34

3627

0.00

1325

7314.45

33,247.50

1325

10240.23

1325
1325

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

4170480.8

0.0

4170480.8

90561.29

4261042.1

0.0

4261042.1

0.00

49999.34

4311041.4

0.0

4311041.4

0.00

0.00

41886.95

4352928.3

0.0

4352928.3

4,231.50

0.00

0.00

58111.73

4411040.1

100000.0

4311040.1

13166.01

5,440.50

0.00

0.00

74336.51

4385376.6

1100000.0

3285376.6

4388.67

1,813.50

0.00

0.00

25662.17

3311038.8

0.0

3311038.8

N=H+I+J+K+L+M O=G+N

414894.5

1200000

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
11KV
HT
Trivector

N.A

Type: Metered / Flat Rate:


Name of 33/11KV Sub-Stations:
Feeder No:

Sub-Division:- Rainawari
Metered
Rainawari

F-1

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

7500.00

132176.22

6008.01

0.00

0.00

746485.23

7500.00

133655.63

6075.26

0.00

0.00

754756.49

7500.00

174530.62

7933.21

0.00

0.00

7500.00

147312

6696.00

0.00

7500.00

151404

6882.00

7500.00

153450

7500.00

150040

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

1552958.7

0.0

1552958.7

2307715.2

0.0

2307715.2

983284.83

3291000.0

3291000.0

0.0

0.00

831108.00

831108.0

0.0

831108.0

0.00

0.00

853986.00

1685094.0

0.0

1685094.0

6975.00

0.00

0.00

865425.00

2550519.0

0.0

2550519.0

6820.00

0.00

0.00

846360.00

3396879.0

0.0

3396879.0

N=H+I+J+K+L+M O=G+N

5881405.548

3291000

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
LT3Ph

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

N.A

Name of 33/11KV Sub-Stations:

Habak

N.A

Feeder No:

F-5

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

N=H+I+J+K+L+M O=G+N

Q=O-P

800

11234.995

4642.56

0.00

0.00

63103.16

1458917.5

0.0

1458917.54

800

11234.995

4642.56

0.00

0.00

63103.16

1522020.7

0.0

1522020.69

800

11234.995

4642.56

0.00

0.00

63103.16

1585123.8

0.0

1585123.85

800

11234.995

4642.56

0.00

0.00

63103.16

1648227.0

0.0

1648227.00

800

11234.995

4642.56

0.00

0.00

63103.16

1736053.6

0.0

1736053.56

800

11234.995

4642.56

0.00

0.00

63103.16

1825197.5

0.0

1825197.52

800

11234.995

4642.56

0.00

0.00

63103.16

1915678.6

0.0

1915678.64

441722.0864

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
11KV
HT
Trivector

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:

Kathi Darwaza

N.A

Feeder No:

F-3

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

1325

10240.23

4231.5

0.00

0.00

58111.73

1325

14628.9

6045

0.00

0.00

82448.90

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

1966839.23

0.00

1966839.23

2049288.13

0.00

2049288.13

N=H+I+J+K+L+M O=G+N

1325

10240.23

4231.5

0.00

0.00

58111.73

2107399.86

0.00

2107399.86

1325

8777.34

3627

0.00

0.00

49999.34

2157399.20

50000.00

2107399.20

1325

10240.23

4231.5

0.00

0.00

58111.73

2165510.93

0.00

2165510.93

1325

20480.46

8463

0.00

0.00

114898.46

2280409.39

0.00

2280409.39

1325

10240.23

4231.5

0.00

0.00

58111.73

2338521.12

0.00

2338521.12

479793.62

50000

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
11KV
HT
Trivector

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:

N.A

Feeder No:

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Hazratbal

F-2

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

Total
Amount due
(in Rs.)

N=H+I+J+K+L+M O=G+N

Amount
received (In
Rs.)

Arrears

Q=O-P

49560

23972.52

9906

0.00

0.00

182498.52

5848331.0

0.0

5848331.0

49560

21206.46

8763

0.00

0.00

167159.46

6015490.5

0.0

6015490.5

49560

24894.54

10287

0.00

0.00

187611.54

6293334.4

0.0

6293334.4

49560

25816.56

10668.00

0.00

0.00

192724.56

6486058.9

0.0

6486058.9

49560

23972.52

9906.00

0.00

0.00

182498.52

6765848.3

0.0

6765848.3

49560

24894.54

10287.00

0.00

0.00

187611.54

7054947.6

1094988.0

5959959.6

49560

28582.62

11811.00

0.00

0.00

208063.62

6257422.6

0.0

6257422.6

1308167.76

1094988

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
11KV
HT
Trivector

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:

N.A

Feeder No:

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Hazratbal

F-2

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

Total
Amount due
(in Rs.)

N=H+I+J+K+L+M O=G+N

Amount
received (In
Rs.)

Arrears

Q=O-P

49560

7376.16

3,048.00

0.00

0.00

90464.16

931176.10

0.0

931176.10

49560

10142.22

4,191.00

0.00

0.00

105803.22

1036979.32

0.00

1036979.32

49560

9220.2

3,810.00

0.00

0.00

100690.20

1137669.52

0.00

1137669.52

49560

7376.16

3,048.00

0.00

0.00

90464.16

1228133.68

0.00

1228133.68

49560

5532.12

2,286.00

0.00

0.00

80238.12

1326793.81

0.00

1326793.81

49560

6454.14

2,667.00

0.00

0.00

85351.14

1432046.85

558123.00

873923.85

49560

922.02

381.00

0.00

0.00

54673.02

941705.73

0.00

941705.73

607684.02

558123

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
11KV
HT
Trivector

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:

Hazratbal

N.A

Feeder No:

F-1

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

50425

535949.7

0.00

0.00

0.00

3022509.7

50425

509351.7

0.00

0.00

0.00

50425

393650.4

0.00

0.00

50425

476104.2

0.00

50425

416258.7

50425
50425

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

10405578

0.0

10405578

2875011.7

13280589

0.0

13280589

0.00

2233395.4

15513985

0.0

15513985

0.00

0.00

2690639.2

18204624

5000000.0

13204624

0.00

0.00

0.00

2358768.7

15563393

0.0

15563393

474774.3

0.00

0.00

0.00

2683264.3

18246657

5000000.0

13246657

530630.1

0.00

0.00

0.00

2993010.1

16239667

0.0

16239667

N=H+I+J+K+L+M O=G+N

18856599.1

10000000

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar

11KV
HT
Trivector

N.A

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:


Feeder No:

Rainawari

F-1

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

2250

36904.34

1677.47

0.00

0.00

208578.8

2250

37586.34

1708.47

0.00

0.00

2250

36222.34

1646.47

0.00

2250

73656

3348.00

2250

70928

2250
2250

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

640284

0.0

640284

212391.8

852676

0.0

852676

0.00

204765.8

1057441

1057441.0

0.00

0.00

414054.0

414054

0.0

414054

3224.00

0.00

0.00

398802.0

812856

0.0

812856

68200

3100.00

0.00

0.00

383550.0

1196406

0.0

1196406

69564

3162.00

0.00

0.00

391176.0

1587582

0.0

1587582

N=H+I+J+K+L+M O=G+N

2213318.43

1057441

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar

11KV
HT
Trivector

N.A

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:


Feeder No:

Kathi Darwaza

F-3

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

1275

24869.13

10276.50

0.00

0.00

139185.6

1275

27794.91

11485.50

0.00

0.00

1275

16091.79

6649.50

0.00

1275

13166.01

5440.50

1275

17554.68

1275

23406.24

1275

14628.9

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

14500913

900000.0

13600913

155410.4

13756323

0.0

13756323

0.00

90511.3

14053179

0.0

14053179

0.00

0.00

74286.5

14127466

0.0

14127466

7254.00

0.00

0.00

98623.7

14438001

0.0

14438001

9672.00

0.00

0.00

131073.2

14785645

0.0

14785645

6045.00

0.00

0.00

82398.9

15089828

0.0

15089828

N=H+I+J+K+L+M O=G+N

771489.66

900000

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
11KV
HT
Trivector

N.A

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:


Feeder No:

Kathi Darwaza

F-3

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

9000

160917.9

66495.00

0.00

0.00

901362.9

9000

171158.13

70726.50

0.00

0.00

9000

118494.09

48964.50

0.00

9000

115568.31

47755.50

9000

112642.53

9000
9000

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

31696315

0.0

31696315

958149.6

32654465

0.0

32654465

0.00

666103.6

33320568

800000.0

32520568

0.00

0.00

649878.8

33170447

0.0

33170447

46546.50

0.00

0.00

633654.0

33804101

0.0

33804101

49738.26

20553.00

0.00

0.00

284821.3

34088922

0.0

34088922

38035.14

15717.00

0.00

0.00

219922.1

34308844

0.0

34308844

N=H+I+J+K+L+M O=G+N

4313892.36

800000

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
11KV
HT
Trivector

N.A

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:


Feeder No:

Kathi Darwaza

F-3

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

1200

16091.79

6649.50

0.00

0.00

90436.3

1200

13166.01

5440.50

0.00

0.00

1200

0.00

0.00

1200

0.00

1200

1200
1200

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

1290946

0.0

1290946

74211.5

1365158

0.0

1365158

0.00

1200.0

1366358

200000.0

1166358

0.00

0.00

1200.0

1167558

0.0

1167558

0.00

0.00

0.00

1200.0

1168758

0.0

1168758

0.00

0.00

0.00

1200.0

1169958

0.0

1169958

0.00

0.00

0.00

1200.0

1171158

0.0

1171158

N=H+I+J+K+L+M O=G+N

170647.8

200000

Surcharge shall include following:

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
LT3Ph
N.A
N.A

Sub-Division:- Rainawari

Type: Metered / Flat Rate:


Name of 33/11KV Sub-Stations:
Feeder No:

Metered
Rainawari

F-2

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

860

1728.3035

416.24

0.00

0.00

10444.2

860

1728.3035

399.69

0.00

0.00

860

1446.1315

657.33

0.00

860

475.2022

196.37

860

69.9006

860
860

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

224606

0.0

224606

10444.2

238420

0.0

238420

0.00

8879.5

250875

0.0

250875

0.00

0.00

3495.2

5393

5393.0

28.89

0.00

0.00

1247.6

1248

1247.0

152.6294

63.07

0.00

0.00

1706.4

1707

0.0

1707

53.8692

22.26

0.00

0.00

1158.7

2892

0.0

2892

N=H+I+J+K+L+M O=G+N

37375.8849
Surcharge shall include following:

6640

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

ALLATIONS UNDER TRIPARITE MoU FROM APRIL 2012 TO MAR 2013.


Electric Division-IV, Khanyar
11KV
HT
Trivector

Sub-Division:- Rainawari

Type: Metered / Flat Rate:

Metered

Name of 33/11KV Sub-Stations:

Kathi Darwaza

N.A

Feeder No:

F-3

Demand
charges
billed (In
Rs. )

ED Billed
(In Rs.)

14175

166769.46

68913.00

0.00

0.00

938987.5

14175

219508.52

90706.00

0.00

0.00

14175

149664.9

61845.00

0.00

14175

202403.96

83638.00

14175

146814.14

14175
14175

Capacitor
Late
Surcharge
Surcharge
payment
for metering
Billed(In
surchar
on LT side
Rs.)
ge biled

Total
Amount
Billed
(In Rs.)

Total
Amount due
(in Rs.)

Amount
received (In
Rs.)

Arrears

Q=O-P

9999662

0.0

9999662

1231449.5

11231112

0.0

11231112

0.00

844134.9

12243714

0.0

12243714

0.00

0.00

1136597.0

13380311

0.0

13380311

60667.00

0.00

0.00

828326.1

14208637

2188888.0

12019749

146814.14

60667.00

0.00

0.00

828326.1

13028371

828326.0

12200045

136836.48

56544.00

0.00

0.00

772995.5

13156041

828326.0

12327715

N=H+I+J+K+L+M O=G+N

6580816.6
Surcharge shall include following:

3845540

Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.

Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

Surcharge on HT consumers for having metering on LT.

hin due date.

Executive Engineer
Electric Division-IV, khanyar

Total For the Year


S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LAWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

Computer
Code:

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021

Sanctioned
Load
(KW/HP)

KWH Units
supplied
(LU's)

Total Amount
Billed
(Lac Rs.)

30 HP
0
6923
70 KW
94000
550343.88
1200 KW
1423000
8812035
53 KW
50000
414894.5
300 KW 764346.387 5881405.55
32 KW
53760
441722.086
53 KW
58000
479793.62
200 KW
188000
1308167.76
200 KW
51000
607684.02
2017 KW
2509000 18856599.1
90 KW
288167.903 2213318.43
51 KW
94000
771489.66
360 KW
524000
4313892.36
47.25 KW
20000
170647.8
26 HP
8817
37375.8849
760 KW
820000
6580816.6
Total
69.46
514.47

Apr-12
S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

Sanctioned
Load
(KW/HP)

KWH Units
supplied
(LU's)

30 HP
70 KW
1200 KW
53 KW
300 KW
32 KW
53 KW
200 KW
200 KW
2017 KW
90 KW
51 KW
360 KW
47.25 KW
26 HP
760 KW
Total

0.00
989.00
25000.00
145255.50
251000.00 1547295.00
9000.00
74336.51
96903.39
746485.23
7680.00
63103.16
7000.00
58111.73
26000.00
182498.52
8000.00
90464.16
403000.00 3022509.70
27055.97
208578.81
17000.00
139185.63
110000.00 901362.90
11000.00
90436.29
2695.00
10444.23
117000.00 938987.46
11.18
82.20

Computer
Code:

Sanctioned
Load
(KW/HP)

KWH Units
supplied
(LU's)

9386
10074
9943
10039

30 HP
70 KW
1200 KW
53 KW

0.00
989.00
24000.00
140142.48
234000.00 1444530.00
11000.00
90561.29

Computer
Code:

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021

Total Amount
Billed
(Lac Rs.)

May-12
S.No.

1
2
3
4

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary

Total Amount
Billed
(Lac Rs.)

5
6
7
8
9
10
11
12
13
14
15
16

Supdtt. JLNM Hospital


Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

10043
10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021

300 KW
97988.00
754756.49
32 KW
7680.00
63103.16
53 KW
10000.00
82448.90
200 KW
23000.00
167159.46
200 KW
11000.00
105803.22
2017 KW 383000.00 2875011.70
90 KW
27555.97
212391.81
51 KW
19000.00
155410.41
360 KW
117000.00 958149.63
47.25 KW
9000.00
74211.51
26 HP
2695.00
10444.23
760 KW
154000.00 1231449.52
Total
11.31
83.67

Jun-12
S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

Sanctioned
Load
(KW/HP)

KWH Units
supplied
(LU's)

30 HP
70 KW
1200 KW
53 KW
300 KW
32 KW
53 KW
200 KW
200 KW
2017 KW
90 KW
51 KW
360 KW
47.25 KW
26 HP
760 KW
Total

0.00
989.00
22000.00
129916.44
190000.00 1178550.00
6000.00
49999.34
127955.00 983284.83
7680.00
63103.16
7000.00
58111.73
27000.00
187611.54
10000.00
100690.20
296000.00 2233395.40
26555.97
204765.81
11000.00
90511.29
81000.00
666103.59
0.00
1200.00
2255.00
8879.46
105000.00 844134.90
9.19
68.01

Computer
Code:

Sanctioned
Load
(KW/HP)

KWH Units
supplied
(LU's)

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045

30 HP
70 KW
1200 KW
53 KW
300 KW
32 KW
53 KW
200 KW
200 KW
2017 KW
90 KW
51 KW

Computer
Code:

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021

Total Amount
Billed
(Lac Rs.)

Jul-12
S.No.

1
2
3
4
5
6
7
8
9
10
11
12

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital

Total Amount
Billed
(Lac Rs.)

0.00

989.00

23000.00

135029.46

159000.00
5000.00
108000.00
7680.00
6000.00
28000.00
8000.00
358000.00
54000.00
9000.00

991155
41886.95
831108.00
63103.16
49999.34
192724.56
90464.16
2690639.2
414054
74286.51

13
14
15
16

Supdtt. Central Jail, Kathi Darwaza


Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

10030
10031
8482
10021

360 KW
79000.00
649878.81
47.25 KW
0.00
1200
26 HP
741.00
3495.2122
760 KW
142000.00 1136596.96
Total
9.87
73.67

Aug-12
S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

Computer
Code:

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021

Sanctioned
Load
(KW/HP)

KWH Units
supplied
(LU's)

Total Amount
Billed
(Lac Rs.)

30 HP
70 KW
1200 KW
53 KW
300 KW
32 KW
53 KW
200 KW
200 KW
2017 KW
90 KW
51 KW
360 KW
47.25 KW
26 HP
760 KW
Total

0.00

989.00

0.00

0.00

153000.00
7000.00
111000.00
7680.00
7000.00
26000.00
6000.00
313000.00
52000.00
12000.00
77000.00
0.00
109.00
103000.00
8.75

954885
58111.73
853986.00
63103.16
58111.73
182498.52
80238.12
2358768.7
398802
98623.68
633654.03
1200
1247.6306
828326.14
65.73

Sanctioned
Load
(KW/HP)

KWH Units
supplied
(LU's)

Total Amount
Billed
(Lac Rs.)

30 HP
70 KW
1200 KW
53 KW
300 KW
32 KW
53 KW
200 KW
200 KW
2017 KW
90 KW
51 KW
360 KW
47.25 KW
26 HP
760 KW
Total

0.00
0.00
134000.00
9000.00
112500.00
7680.00
14000.00
27000.00
7000.00
357000.00
50000.00
16000.00
34000.00
0.00
238.00
103000.00
8.71

989.00
0.00
840030
74336.51
865425.00
63103.16
114898.46
187611.54
85351.14
2683264.3
383550
131073.24
284821.26
1200
1706.3994
828326.14
65.46

Sep-12
S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

Computer
Code:

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021
Oct-12

S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

Computer
Code:

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021

Sanctioned
Load
(KW/HP)

KWH Units
supplied
(LU's)

30 HP
0.00
70 KW
0.00
1200 KW 302000.00
53 KW
3000.00
300 KW
110000.00
32 KW
7680.00
53 KW
7000.00
200 KW
31000.00
200 KW
1000.00
2017 KW 399000.00
90 KW
51000.00
51 KW
10000.00
360 KW
26000.00
47.25 KW
0.00
26 HP
84.00
760 KW
96000.00
Total
10.44

Total Amount
Billed
(Lac Rs.)

989.00
0.00
1855590
25662.17
846360.00
63103.16
58111.73
208063.62
54673.02
2993010.1
391176
82398.9
219922.14
1200
1158.7292
772995.48
75.74

Nov-12
S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

Computer
Code:

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021

Sanctioned
Load
(KW/HP)

KWH Units
supplied
(LU's)

Total Amount
Billed
(Lac Rs.)

KWH Units
supplied
(LU's)

Total Amount
Billed
(Lac Rs.)

30 HP
70 KW
1200 KW
53 KW
300 KW
32 KW
53 KW
200 KW
200 KW
2017 KW
90 KW
51 KW
360 KW
47.25 KW
26 HP
760 KW
Total

Dec-12
S.No.

1
2
3
4
5

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital

Computer
Code:

Sanctioned
Load
(KW/HP)

9386
10074
9943
10039
10043

30 HP
70 KW
1200 KW
53 KW
300 KW

6
7
8
9
10
11
12
13
14
15
16

Joint Director Floriculture, Hazratbal


Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021

32 KW
53 KW
200 KW
200 KW
2017 KW
90 KW
51 KW
360 KW
47.25 KW
26 HP
760 KW
Total

Jan-13
S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

Computer
Code:

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021

Sanctioned
Load
(KW/HP)

KWH Units
supplied
(LU's)

Total Amount
Billed
(Lac Rs.)

KWH Units
supplied
(LU's)

Total Amount
Billed
(Lac Rs.)

30 HP
70 KW
1200 KW
53 KW
300 KW
32 KW
53 KW
200 KW
200 KW
2017 KW
90 KW
51 KW
360 KW
47.25 KW
26 HP
760 KW
Total

Feb-13
S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza

Computer
Code:

Sanctioned
Load
(KW/HP)

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045
10030

30 HP
70 KW
1200 KW
53 KW
300 KW
32 KW
53 KW
200 KW
200 KW
2017 KW
90 KW
51 KW
360 KW

14 Supdtt. Central Jail


15 Ghulam Mohd. Zaroo
16 Ex. Engineer PHE, Pokhribal

10031
8482
10021

47.25 KW
26 HP
760 KW
Total

Mar-13
S.No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Name of Installation

Nazir Ah. Zargar


Executive Engineer, UEED
Director National Institute of Technology
Joint Director Poultary
Supdtt. JLNM Hospital
Joint Director Floriculture, Hazratbal
Joint Director Poultary Briolers
Ex. Engineer LAWDA, Habak
Ex. Engineer LWDA, Hazratbal
Registrar Kashmir University
Supdtt. JLNM Hospital
Supdtt. Mental Hospital
Supdtt. Central Jail, Kathi Darwaza
Supdtt. Central Jail
Ghulam Mohd. Zaroo
Ex. Engineer PHE, Pokhribal

Computer
Code:

9386
10074
9943
10039
10043
10049
10040
10085
10084
10060
10042
10045
10030
10031
8482
10021

Sanctioned
Load
(KW/HP)

30 HP
70 KW
1200 KW
53 KW
300 KW
32 KW
53 KW
200 KW
200 KW
2017 KW
90 KW
51 KW
360 KW
47.25 KW
26 HP
760 KW
Total

KWH Units
supplied
(LU's)

Total Amount
Billed
(Lac Rs.)

Amount
received (Lac
Rs.)

0
0
7755915
1200000
3291000
0
50000
1094988
558123
10000000
1057441
900000
800000
200000
6640
3845540
307.60
Amount
received (Lac
Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
900000.00
0.00
0.00
0.00
0.00
9.00
Amount
received (Lac
Rs.)

0.00
0.00
3186795.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31.87
Amount
received (Lac
Rs.)

0.00
0.00
0.00
0.00
3291000.00
0.00
0.00
0.00
0.00
0.00
1057441.00
0.00
800000.00
200000.00
0.00
0.00
53.48
Amount
received (Lac
Rs.)

0.00

0.00
1,444,530.00
0
0
0
50000.00
0
0.00
5000000
0
0

0
0
5393
0
65.00
Amount
received (Lac
Rs.)

0.00

0.00
2,169,705.00
100000
0
0
0.00
0
0.00
0
0
0
0
0
1247
2188888
44.60
Amount
received (Lac
Rs.)

0.00
0.00
954,885.00
1100000
0
0
0.00
1094988
558123.00
5000000
0
0
0
0
0
828326
95.36

16
53
90
127
164
201
238
275
312
349
386
423
460
497
534
571

37
37
37
37
37
37
37
37
37
37
37
37
37
37
37
37

53
90
127
164
201
238
275
312
349
386
423
460
497
534
571
608

Amount
received (Lac
Rs.)

0.00
0.00
0.00
0
0
0
0.00
0
0.00
0
0
0
0
0
0
828326
8.28
Amount
received (Lac
Rs.)

Amount
received (Lac
Rs.)

18
55
92
129
166
203
240
277
314
351
388
425
462
499
536
573

37
37
37
37
37
37
37
37
37
37
37
37
37
37
37
37

55
92
129
166
203
240
277
314
351
388
425
462
499
536
573
610

Amount
received (Lac
Rs.)

Amount
received (Lac
Rs.)

Amount
received (Lac
Rs.)

You might also like