CK80_99 - JPN - Generate Cost Components Report

Purpose Use this procedure to show the costs calculated in a material cost estimate across all production levels, broken down into cost components such as Raw Material, Pack Material, Bought In, Premiums, Subcontracting, and Conversion Cost etc. Trigger Perform this procedure when there is a need to generate a Cost Components Report. Menu Path Use the following SAP Easy Access menu path(s) to begin this transaction: Accounting > Controlling > Product Cost Controlling > Product Cost Planning > Information System > Detailed Reports > For Materials > CK80_99 - Cost Components

Transaction Code CK80_99

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

1/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Screen Flow

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

2/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Procedure 1. In SAP, start the transaction using the menu path or transaction code. SAP Easy Access

2. Double-click the Accounting node 3. Double-click the Controlling node 5. Double-click the Product Cost Planning node 6. Double-click the Information System node

. . . . .

4. Double-click the Product Cost Controlling node

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

3/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

7. Double-click the Detailed Reports node 8. Double-click the For Material node . 9. Double-click the CK80_99 - Cost Components node .

You can also enter "CK80_99" in the Command field " " and click Enter " transaction. Set Controlling Area " to go directly to this

10 As required, complete/review the following fields: . Organizati R/O/C onal unit within a company, used to represent a closed system for cost accountin g purposes. A controllin g area may
Wednesday, July 15, 2009

Description

CO_CK80_99_JPN_Generate Cost Components Report.udc

4/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

include single or multiple company codes that may use different currencies . These company codes must use the same operative chart of accounts. All internal allocation s refer exclusivel y to objects in the same controllin g area. Field Example: TH01 R Controlling Area 11 Click the Enter button . .

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

5/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Analyze Cost Component Split for Planned Costs: Cost Components

12 Click the Material edit field .

13 As required, complete/review the following fields: . The goods R/O/C that are the subject of Description

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

6/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

business activity. The material can be traded, used in manufact ure, consumed , or produced. Field Example: 20199998 R Material

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

7/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

R R/O/C Quantity on which the displayed costs are based. R Date from which a costing run is valid. R Method of distinguis hing two or more cost estimates for the same material. R Contains all control paramete rs for costing, including paramete rs that control how cost estimates are executed

Description

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

8/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

and which material prices or activity prices are used to valuate the costing items. A plant is an organizati onal unit for dividing an enterprise according to productio n, procurem ent, maintena nce, and materials planning. It is a place where materials are produced, or goods and

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

9/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

services are provided. Field Example: 1.000 Cost base Example: 01.11.2008 Costing Date Example: 1 Costing version Example: PPC1 Costing variant Example: 7001 R Plant

14 Click the Cost Comp. View drop-down list . 15 Click the 1 Cost of Goods Manufactured list item . . 16 Click the Execute button . .

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

10/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Cost Components

17 Click the 20 list item . 18 Click the Details button .

. .

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

11/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Details

19 Click the Enter button .

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

12/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Cost Components

20 Click the Change Layout button .

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

13/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Change layout

21 Click the Cost Comp. Grp1 List item . 22 Click the Show selected fields button . 23 Click the Name of Group list item . 24 Click the Show selected fields button . 25 Click the Enter button .
Wednesday, July 15, 2009

. . . .

CO_CK80_99_JPN_Generate Cost Components Report.udc

14/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Cost Components

26 Click the Exit button .

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

15/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Analyze Cost Component Split for Planned Costs: Cost Components

27 Click the Exit button .

You can also run the following reports with steps similar to this one: S_ALR_87013047 S_ALR_87013048

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

16/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Result You have successfully executed a cost component report.

Wednesday, July 15, 2009

CO_CK80_99_JPN_Generate Cost Components Report.udc

17/18

Work Instruction

CK80_99 - JPN - Generate Cost Components Report

Scenario Instructions In this simulation you are required to: Analyze the cost component split for planned cost in SAP ECC 6.0. Required Data This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise. 1. Cost of Goods Manufactured 1.000 01.11.2008 1 PPC1 7001 20199998 Field Cost Comp. View Cost base Costing Date Costing version Costing variant Plant Material TH01 Controlling Area Value