wall length CB Str MCC 267.63 194.55 46.

78

Brick work

585.304

Vimalini Technologies and Instrumentation


Quotation (Labour Rate) for Sub-Contract Works

Ario Infrastructure
Project: Civil works IOCL NTPL
DESCRIPTION Civil works IOCL NTPL Project
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Site cleaning Excavation upto 1.5 M 1.5 to 5 M Anti termite treatment Selected earth / moorum Excavation upto 3 M Selected earth / moorum Course sand for filling under reamed piles 400 dia 6 M long Extra for addl depth of 6 M Pile load test Test column Pile load Job column Concrete 1:4:8 Concrete 1:3:6 Concrete 1:3:6 Concrete 1:2:4 Concrete 1:2:4 Concrete 1:2:4 40 mm thick Concrete 1:3:6 50 mm thick RCC 1:2:3 RCC 1:2:3 RCC 1:2:3 Precast RCC 1:2:4 Reinforcement steel Water proofing compound Plasticizer for RCC Shinkkomp grout Painting foundation concrete Flat brick soling Brick work Brick work Half brick masonary Structural steel work with supply & Design HOT Crane 3 T Structural steel work with supply Structual steel work Rolling shutters Extra for providing grilling Steel wire fabric Steel wiremesh door MS Sheet 38670 7035 875 1510 59400 7600 1515 860 2700 260 4 8 710 35 770 195 120 410 460 10 1240 830 30 305 4420 200 63975 600 2185 1640 1520 85 288 1 58 54 65 10 20 20 20 M2 M3 M3 M2 M3 M3 M3 M3 Mtrs Mtrs Each Each M3 M3 M3 M3 M3 M2 M3 M3 M3 M3 M3 T Kgs Ltrs Kgs M2 M2 M3 M3 M2 M2 Each T T M2 M2 M2 M2 Each with Machine with Machine Filling Road works 1056.9 with materials

QTY

UNIT

Rate

Remarks

513 602 602 602 602 602 602 1345 1345 1345 1477 6710

incld Machines, C/S incld Machines, C/S incld Machines, C/S incld Machines, C/S incld Machines, C/S incld Machines, C/S incld Machines, C/S incld Machines, C/S incld Machines, C/S

1482 1482 410.205

DESCRIPTION
42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 5 mm thick chequered plate pigeon net Chainlink fencing barbed wire GI Concertina wire Aluminium door Glass Panel work double Glass Panel work single Fully glazed windor Extra for double glazed Louver type glazed ventilator Sun control film Hydraulic floor spring Mosic flooring 40 mm Ceramic wall tiles Ceramic glazed floor tiles Polished vitrified floor tiles Unitile Solid Feel Panel lifter Vinle floor conductive tiles Acid resistant tiles Mirror polished granite Extra for flame granite Granite stone tiles concrete flooring 52 mm thick Chequered cement concrete tiles APP water proofing membrane PVC rain water pipe 4" dia Profiled sheeting As above but plain sheeting Polycarbonate sheet Luxalon aluminimum panel Extra for perforated panels Gola in CC Plastering 15 mm thick 1:6 Plastering 6 mm thick 1:4 Plastering 15 mm thick 1:4 Cement punning Grooves GI chicken wire net Two coats distermber Three coats textured paint Synthetic enamel paint Three coats water proof cement paint Terracota tiles 12 mm thick brick tiles elevational 1.5" dia 18" long rain water spouts in GI pipes Khurras 18 x 18 inch Wash basin Wash basin

QTY
275 530 1450 3700 925 170 30 10 135 50 45 320 55 510 80 135 250 100 1 330 345 30 30 20 950 440 1600 250 1660 125 100 430 50 375 13200 4900 4200 920 1150 800 5780 1600 50 8900 225 290 5 40 7 1

UNIT
M2 M2 M2 Mtrs Mtrs M2 M2 M2 M2 M2 M2 M2 Each M2 M2 M2 M2 M2 Each M2 M2 M2 M2 M2 M2 M2 M2 Mtrs M2 M2 M2 M2 M2 Mtrs M2 M2 M2 M2 Mtrs M2 M2 M2 M2 M2 M2 M2 Each Each Each Each

Rate

Remarks

240 200 140

DESCRIPTION
92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 SS kitchen sink Water closet Water closet Water closet Urinal basin CP central hole wash basin mixture CP central hole wash basin mixture CP kitchen sink mixer CP brass bib cock CP brass bib cock CP Brass angle valve CP Brass stop cock SS liquid soap container CP brass double coat hook CP brass toilet paper holder CP brass deodorant holder Chromium plated tower rail CP Brass towel ring Anglevalve + health faucet CP shower rose Mirror 6 mm thick copper back finish Sand cast iron floor trap Gully trap Septic tank 30 user soak pit 2.5 x 3 M Precolation pit 3 x 2 M CI vent pipe Stoneware pipe 150 dia 200 dia PPR pipes 110 mmdia 50 mm dia 40 mm dia 32 mm dia 32 mm dia 20 mm dia PE roof top tank 500 L Brass ball valve 32 mm GM full way valve 50 mm 40 mm dia 32 mm dia RCC hume pipe NP3 1000 mm dia 600 mm dia 450 mm dia 300 mm dia 250 mm dia Brick drain 200 x 200 Brick catch pit Brick man hole 750x750x1200 CI man hole cover 500 dia Sub grade box cutting 200 mm

QTY
1 1 3 1 5 1 6 1 1 8 4 4 5 6 5 5 5 3 4 1 10 6 5 1 1 7 60 60 60 60 360 60 60 60 110 2 2 6 6 12 10 60 50 120 300 500 1 1 1 5360

UNIT
Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each M2 Each Each Each Each Each Mtrs Mtrs Mtrs Mtrs Mtrs Mtrs Mtrs Mtrs Mtrs Each Each Each Each Each Mtrs Mtrs Mtrs Mtrs Mtrs Mtrs Each Each Each M2

Rate

Remarks

DESCRIPTION
142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 Extra for sub base road pavement, pathway Sub base course 100 mm Base course 75 mm RCC road Precast CC 1:3:6 450x150x600 PVC pipe 3" Pre cast cement blocks M 30 60 mm thick Sand pad foundation Morrum Bitumen carpet 75 mm thick Premid carpet 50 mm thick crushed stone ring beam MS funnel 450x250x700 CI special in drain bed Open surface drain 300x450x300 circum 300x450x350 radial 250 mm CI gate valve CI spool piece 600 mm long 250 mm dia Demolishing RCC Demolishing PCC Demolishing brick work Cutting bitumenous road Safety shower cum eye wash with basin Bituminastic compound 50 x 150 Construction joints mechanical cutting Expansion joints 25 mm Construction joints in RCC / wall Multi panel cladding Verticle fabric blind system 100 mm Graphics / Signages Planters Barricading 3 M height from GI corrigated sheet Filling good earth for gardening Sludge manure Cowdung / Neem oil cake / Agro meal Grassing Digging holes and refilling earch 600x600 1200x 1200 Beds preparation hedging and shrubbery Sapling of plants

QTY
880 540 410 540 2240 185 50 450 60 80 110 15 1 1 50 50 1 2 10 10 10 100 1 3300 3100 250 20 200 120 45 15 1410 920 150 150 2700 180 180 200 360

UNIT
M3 M3 M3 M3 Mtrs Mtrs M2 M3 M3 M2 M2 M3 Each Each Mtrs Mtrs Each Each M3 M3 M3 M2 Each Mtrs Mtrs Mtrs Mtrs M2 M2 Each Each M2 M3 M3 M3 M2 Each Each M3 Each

Rate

Remarks

954

800 600 600

Margin (assuming 35% per month and 2 months outsatnding of bill) Office Rent @ 1500 per month Engineer Sal @ 15000 per month Labour transport Drinking Water Communication Mason MC FC Operator Mixer Machine with mobilization Mini Batching Plant including power moblization for 1 year Weighing Machine including Power Vibrator incld fuel C/S iron Sheets less then 3m high C/S iron Sheets above 3m high Filling sand JCB JCB Opretor Grader Grader Opretor

0.1 50 500 500 100 50 550 450 300 600 1000 2000 1000 300 per day per day per day per day per day per day per day per day per day per day per day per day per day

300 Sq.m 450 Sq.m 5000 833.3333 500 833.3333 500 per load (3 unit) per day per day per day per day

per load (3 unit)

652.4074 days to complete Assuming 76.63923 Cum per day) Rate per CUM 587.1667 10.87346 6.524074 10.87346 6.524074 6.524074 31.42429 Turn Over per day 45000 833.3333 500 833.3333 500 500 2408.333 0 0 2528.75 53103.75

Earth JCB JCB Opretor Grader Grader Opretor Level Engg - 1no Over Head

5%

Margin Total

5%

32.9955 692.9056

58.71667 days to complete Assuming 851.547 Cum per day) Rate per CUM 587.1667 10.87346 6.524074 10.87346 6.524074 6.524074 4.713644 Turn Over per day 500000 9259.259 5555.556 9259.259 5555.556 5555.556 4013.889 0 0 4043.993 543243.1

Earth JCB JCB Opretor Grader Grader Opretor Level Engg - 1no Over Head 0.75 %

Margin Total

0.75 %

4.748996 637.9484

Labour Rate with Machine and tools PCC 148 (assuming 25 Cum per day)

Bed preparation Marking and Leveling (Filling or cutting excluded) Earth Ramming (including transport, Fuel, Rental cost of Machine) Concrete Mixer Machine Rental incld trans, fuel (25 cum capacity for 148) Labour (operator, Mason, Workers) Over Head Engineer (3) Labour transport Drinking Water Office Room Rent @ 1500 per month Communication Others Margin Total

Rs 0.6 2

Sq.m Sq.ft

assuming 0.1 m thick Per Cum of Concrete 6 21.52

40 308

60 20 4 2 2 2.5 46.602 513

Labour Rate with Machine and tools PCC 136 or 124 (assuming 20 Cum per day) 400

Concrete Mixer Machine Rental incld trans, fuel Labour (operator, Mason, Workers) C/S Over Head Engineer (3) Labour transport Drinking Water Office Room Rent @ 1500 per month Communication Others Margin Total Side C/S 10 Sq.m per 1Cum not included

Sq.m

Per Cum of Concrete 50 385 0

75 25 5 2.5 2.5 2.5 54.75 602

Labour Rate with Machine and tools PCC 136 or 124 40, 50 mm thick (assuming 20 Cum per day) 400

Concrete Mixer Machine Rental incld trans, fuel Labour (operator, Mason, Workers) C/S Over Head Engineer (3) Labour transport Drinking Water Office Room Rent @ 1500 per month Communication Others Margin Total Side C/S 10 Sq.m per 1Cum not included

Sq.m

Per Cum of Concrete 50 385 0

75 25 5 2.5 2.5 2.5 54.75 602

Labour Rate with Machine and tools RCC 123 incld C/S less then 3m (assuming 10 Cum per day) 200

Preparation Assisting in Marking and Leveling Concrete Mini Batching Plant incld Rental, trans, fuel Vibrator incld fuel Labour (operator, Mason, Workers) C/S Side C/S 10 Sq.m per 1Cum not included

Over Head Engineer (3) Labour transport Drinking Water Office Room Rent @ 1500 per month Communication Others Margin Total

Sq.m

Per Cum of Concrete 100

200 30 415 0

150 50 10 5 5 2.5 86.75 954

Labour Rate with Machine and tools RCC 123 incld C/S less then 3m (assuming 10 Cum per day) 200

Concrete Mini Batching Plant incld Rental, trans, fuel Vibrator incld fuel Labour (operator, Mason, Workers) C/S Side C/S 10 Sq.m per 1Cum not included

Shifting Over Head Engineer (3) Labour transport Drinking Water Office Room Rent @ 1500 per month Communication Others Margin Total

Sq.m Per Cum of Concrete 200 30 790 0

100

150 50 10 5 5 2.5 134.25 1477

Labour Rate with Machine and tools RCC 123 incld C/S less then 3m (assuming 10 Cum per day) 200

Preparation Assisting in Marking and Leveling Concrete Mini Batching Plant incld Rental, trans, fuel Vibrator incld fuel Labour (operator, Mason, Workers) C/S Side C/S 10 Sq.m per 1Cum not included

Over Head Engineer (3) Labour transport Drinking Water Office Room Rent @ 1500 per month Communication Others Margin Total

Sq.m

Per Cum of Concrete 100

200 30 770 0

150 50 10 5 5 2.5 122.25 1345

Labour Rate with Machine and tools BW (assuming 5 Cum per day)

Stage preparation Materials Labour for stage BW Labour (operator, Mason, Workers) Over Head Engineer (3) Labour transport Drinking Water Office Room Rent @ 1500 per month Communication Others Margin Total

Per Cum of BW 15 90

800

300 100 20 10 10 2.5 134.75 1482

Labour Rate with Machine and tools BW (assuming 2 Cum per day)

Stage preparation Materials Labour for stage BW Labour (operator, Mason, Workers) Over Head Engineer (3) Labour transport Drinking Water Office Room Rent @ 1500 per month Communication Others Margin Total

0.115

thick

Per Cum of BW 15 450

1675

750 250 50 25 25 2.5 324.25 410.205 per Sq.m

per day 30 sqm Labour Stage Over head Margin Total 100 10 20 10 per Sq.m per Sq.m per Sq.m per Sq.m

140 per Sq.m

Labour Stage Over head Margin Total

100 60 50 30

per Sq.m per Sq.m per Sq.m per Sq.m

240 per Sq.m

Labour Stage Over head Margin Total

100 20 50 30

per Sq.m per Sq.m per Sq.m per Sq.m

200 per Sq.m

2T per day Labour Machine rent Minimum Shifting Overhead Margin Total 5000 250 100 750 610 per MT per MT per MT per MT per MT

6710 per MT

RCC Road

954