PAINTING/SLAG BLASTING INSPECTION REPORT

Drawing No.
SR.No. PART DESCRIPTION PART IDENTIFICATION FIRST SIDE SECOND SIDE

PROJECT:

W.O. No.

SLAG BLASTING STATUS REMARKS FIRST SIDE

PAINTING STATUS REPORT NO. SECOND SIDE REMARKS

QC CHECK SHEET

CHECKED

NOT APPLICABLE

SURFACE DEFECT CHECK OVER LAPPING PHYSICAL COND. INSPECTION RESULTS : Inspection passed. Rectification works listed above to be completed and inspection is required after repair works Rectification works listed above to be completed but no further inspection required. Rejected CONTRACTOR SIGNATORY NAME SIGN DATE OBESERVATIONS/REMARKS : AXON PRODUCTION NAME SIGN DATE AXON QA/QC STATUS ACCEPT RECTIFY & RE-OFFER TCE NAME SIGN DATE SURFACE ROUGHNESS SAGGING