Professional Documents
Culture Documents
Drawing No.
SR.No. PART DESCRIPTION PART IDENTIFICATION FIRST SIDE SECOND SIDE
PROJECT:
W.O. No.
QC CHECK SHEET
CHECKED
NOT APPLICABLE
SURFACE DEFECT CHECK OVER LAPPING PHYSICAL COND. INSPECTION RESULTS : Inspection passed. Rectification works listed above to be completed and inspection is required after repair works Rectification works listed above to be completed but no further inspection required. Rejected CONTRACTOR SIGNATORY NAME SIGN DATE OBESERVATIONS/REMARKS : AXON PRODUCTION NAME SIGN DATE AXON QA/QC STATUS ACCEPT RECTIFY & RE-OFFER TCE NAME SIGN DATE SURFACE ROUGHNESS SAGGING
PAGE NO.:1 OF 1