You are on page 1of 10

PILLING WORK DIARY - NHT KY THI CNG CC

Project (D an) :Midori Safety Footwear Address (a im ) : DNDN Industrial Zone Weather Condition (iu kin thi tit) : : 0 Rain (Ma) 2 4 6 8 Wind (Gio) 10 12 Storm (Bao) 14 16 18 Fine (Tt) 20 22 24 Day (Th) : . Date (Ngay) : ......

Numbers Of Workers

(Contractor's Carpenter, Mason, Reinforcement Group, Labour including Sub-contracotrs)

(S lng nhn cng) (Th mc, n, ct thep, lao ng,. k ca cac thu phu) Site Engineer (Ky s): .. Piling machine operator: .. Team leader (i trng): .. Serveyor (Trc ac): (iu khin may ong coc) Welder (Th han): Labour (Lao ng PT): .. Progress Of Works : (Cng vic din ra trong ngay):
(Summary of Activities including Location) (Tng hp cac hoat ng, chi ro v tri)

Instructions (Chi th cng trng): (Including Documentations And Verbal) (Bao gm tai liu va chi th ming)

Material / Equipment Delivered To Site : (Vt t, Thit b nhp vao Cng trng) Cranes (Dan ong coc): Hammers (Bua): Remaining pile segments (Cac coc con lai cha ong):

Other Comments : (Cac ngh khac)

Signature (Ch ky) Contractor NewC.C

Form No:PM-FC05

Rev:1

Page:1/10

e (Ngay) : ......

18

20

22

24

Form No:PM-FC05

Rev:1

Page:2/10

INSPECTION REPORT (BIN BN KIM TRA) PILE BEFORE DRIVING (KIM TRA CC TRC KHI THI CNG)
(For each 10 pile set) (cho mi l 10 tim cc)
Project (D n): Adress (a ch): Item (Hng mc): A. PARTICIPANTS (THNH PHN THAM D): Owner's Rep. (i din ch u t): Supervision's Rep. (i din t vn gim st): Contractor's Rep. (i din nh thu): B. INSPECTION CHECKLIST (NI DUNG KIM TRA) : No
1 Midori Safety Footwear

Ref. No (S tham chiu): Date Inspection (Ngy nghim thu): Location (V tr):

DNDN Industrial Zone

Description Din gii cng vic Actual Dimensions in compared with shop drawing (Kch thc thc t so vi bn v shop)
Mc BT ca cc c tng thch hay khng (The Concrete Grade of pile in compared with requirement) Chng ch xut xng ca cc (The manufacturing CV of pile ) Xc nhn v tr h cc c khng ch so vi mc chun (The pile position is controled base on the benchmark) The theodolite is arranged both directions to inspect in driving process (B tr my trc t theo di thng ng ca cc theo hai phng) The steel plate for connection ( thickness, the straightenness) Bn m ni cc hai u ( chiu dy, kn kht khi tip xc) The pile top level is controled by benchmark (Xc nhn cao dng cc c khng ch so vi mc chun) The status of pile after putting in driving rig (Xc nhn tnh trng ca cc sau khi cu lp v a vo v tri ng cn m bo cht lng hay khng)

Sastified or not Chp nhn hay khng

Standard (if having) Tiu chun (nu c)

Comment kin

Note (Ghi ch) : P : Pass (t yu cu) ; NC : Non conform (Khng t yu cu) ; N : Bo inspection (Khng kim tra); NO : Not (khng c) ; Y : Yes (C)

C. CONCLUSION (KT LUN CA TVGS): Work inspected and ready to be continued (Cng vic c nghim thu v sn sng cho bc tip theo) Work inspected and fail (Cng vic c nghim thu v khng t) OWNER / NEW CC CONTRACTOR

Form No:PM-FC06

Rev:1

Page:3/10

INSPECTION REPORT (BIN BN KIM TRA) PILE DRIVING CV (L LCH CC NG)


Project (D n): Midori Safety Footwear Adress (a ch): Item (Hng mc): Pile label ( Nhn hiu cc): A. PARTICIPANTS (THNH PHN THAM D): Owner's Rep. (i din ch u t): Supervision's Rep. (i din t vn gim st): Contractor's Rep. (i din nh thu): B. INSPECTION CHECKLIST (NI DUNG KIM TRA) : 1. Pile Driving rigs/ H thng my ng cc:.. 2. Hammer type/ Loi ba:.. 3. Punching weight of of hammer/ Trng lng phn p ca ba:.. 4. The weight of pile covering set/ Trng lng m cc:. 5. The ground level in compared with benchmark/ Cao t hin hu so vi mc chun 6. The level of pile head in compared with benchmark/ Cao ca u cc so vi cao chun 7. The level of pile toe in compared with benchmark/ Cao ca mi cc so vi cao chun 8. The designed rebound value/ chi thit k:. 9. Starting time/ Bt u
10. Welding quality of connection joint/ Cht lng mi hn ni ID 1 2 11. The piling quality after driving/Cht lng cc sau khi ng ID Inspection Kim tra Pile eccentric in compared with design position lch tim ca cc trn mt bng Pile declination in compared with vertical direction nghing ca cc so vi phng thng ng The quality of pile top after driving Cht lng m cc sau khi ng Actual Vision or Measurement/ Quan st hay o c thc t Pass or Fail t hay khng t Remarks Ghi ch Joint Number S mi hn The quality of welding joint Cht lng mi hn ni The rest time after welding/ Thi gian ngh sau khi hn Weather Thi tit Remarks Ghi ch End time/ Kt thc

Ref. No (S tham chiu): Date Inspection (Ngy nghim thu): Location (V tr):
X=. Y=..

DNDN Industrial Zone

1 2 3

C. CONCLUSION (KT LUN CA TVGS): Work inspected and ready to be continued (Cng vic c nghim thu v sn sng cho bc tip theo) Work inspected and fail (Cng vic c nghim thu v khng t) OWNER / NEW CC CONTRACTOR

Form No:PM-FC07a

Rev:1

Page:4/10

PROJECT: Midori Safety Footwear D AN: PILE DRIVING CV


L LCH CC ONG
Date (Ngay): Structure Name (Hang muc): Pile No. (Coc s): Pile Dimension (Kich thc coc):
Penetration Depth (m) (Chiu su xuyn) No. of Blow per 0.5m (nos) (S nht ba/0.5m) Cumulation No of Blow (nos) (S nht ba cng dn) Average Rebounding Penetration Value (mm) per One Blow ( chi) ( xuyn tr.bnh/1 nht ba) (mm) Drop Height of Ram (m) (Chiu cao ri ba) Penetration Depth (m) (Chiu su xuyn) No. of Blow per 0.5m (nos) (S nht ba/0.5m) Cumulation No of Blow (nos) (S nht ba cng dn) Average Rebounding Penetration Value (mm) per One Blow ( chi) ( xuyn tr.bnh/1 nht ba) (mm) Drop Height of Ram (m) (Chiu cao ri ba)

0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5 9.0 9.5 10.0 10.5 11.0 11.5 12.0 12.5 13.0 13.5 14.0 14.5 15.0 Compiled by (Ngi lp)

15.5 16.0 16.5 17.0 17.5 18.0 18.5 19.0 19.5 20.0 20.5 21.0 21.5 22.0 22.5 23.0 23.5 24.0 24.5 25.0 25.5 26.0 26.5 27.0 27.5 28.0 28.5 29.0 29.5 30.0

Form No:PM-FC07b

Rev:1

Page:5/10

INSPECTION REPORT (BIN BN KIM TRA) PILE DRIVING REGISTER (BNG TNG HP NG CC)
Project (D n): Adress (a ch): Item (Hng mc): A. PARTICIPANTS (THNH PHN THAM D): Owner's Rep. (i din ch u t): Supervision's Rep. (i din t vn gim st): Contractor's Rep. (i din nh thu): su Depth Tng s nht p Total of blowcount chi Rebound Value Khi ng As driving Khi kim tra As test
Midori Safety Footwear

Ref. No (S tham chiu): Date Inspection (Ngy nghim thu): Location (V tr):

DNDN Industrial Zone

STT ID

Tn cc Pile label

Loi ba Loi cc Ngy,ca Hammer Pile type Date Thit k Thc t Type Design Actual

Ghi ch Remarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Contractor (Nh thu thi cng) Supervisor (T vn gim st) Owner (Ch u t)

Form No:PM-FC07c

Rev:1

Page:6/10

PROJECT: D AN:

Midori Safety Footwear


BLOW RECORD CHART (BIU ONG CC)

PILE NUMBER (COC S):

PENETRATION ( SU XUYN) (m): .

s=.. (mm)

c=.. (mm) CONTRACTOR

H= (m)

Qtt=.. (ton) SUPERVISOR OWNER

Notes: (Ghi chu) s:Penetration per blow ( xuyn/1 nhat bua) c: Deformation value

H: Drop height oh ram (Chiu cao ri bua) Qtt: Bearing capacity of pile (Kha nng chiu tai tinh toan cua coc)

Form No:PM-FC07d

Rev:1

Page:7/10

INSPECTION REPORT (BIN BN KIM TRA) PILE PRESSING CV (L LCH CC P)


Project (D n): Midori Safety Footwear Adress (a ch): Item (Hng mc): A. PARTICIPANTS (THNH PHN THAM D): Owner's Rep. (i din ch u t): Supervision's Rep. (i din t vn gim st): Contractor's Rep. (i din nh thu): B. INSPECTION CHECKLIST (NI DUNG KIM TRA) : 1. Pile Pressing rigs/ H thng my p cc:. 2. Maximum Oil Pressure/ p lc ti a ca bm du.. 3.Maximum Flow of Oil Pump/Lu lng ca bm du (l/ph).. 4. Valid area of piston/Din tch hu hiu ca piptong (cm2): 5. Machine Certification No/ S giy kim nh. 6. Pile label/ Nhn hiu cc. 7. The number and length of pile segment / S lng v chiu di on cc ni.. 8. The level of pile head in compared with benchmark/ Cao ca u cc so vi cao chun 9. The level of pile toe in compared with benchmark/ Cao ca mi cc so vi cao chun 10. The designed pressing load/ Lc p thit k.. 11. The actual result of pressing load/ Kt qu lc p thc t Date of driving Ngy gi p Driving depth su p Oil pressure value(kg/cm2) Gi tr p lc du Compressive load (ton) Gi tr lc p qui i Remarks Ghi ch DNDN Industrial Zone Ref. No (S tham chiu): Date Inspection (Ngy nghim thu): Location (V tr):

ID

12. Welding quality of connection joint ID Joint Number S mi hn The quality of welding joint Cht lng mi hn ni The rest time after welding/ Thi gian ngh sau khi hn Weather Thi tit Remarks Ghi ch

1 2 3
13. The piling quality after driving/ Cht lng cc sau khi p

Form No:PM-FC08a

Rev:1

Page:8/10

ID 1 2 3

Inspection Kim tra Pile eccentric in compared with design position lch tim ca cc trn mt bng Pile declination in compared with vertical direction nghing ca cc so vi phng thng ng The quality of pile top after driving Cht lng m cc sau khi p

Actual Vision or Measurement/ Quan st hay o c thc t

Pass or Fail t hay khng t

Remarks Ghi ch

C. CONCLUSION (KT LUN CA TVGS): Work inspected and ready to be continued (Cng vic c nghim thu v sn sng cho bc tip theo) Work inspected and fail (Cng vic c nghim thu v khng t)

OWNER / NEW CC

CONTRACTOR

Form No:PM-FC08a

Rev:1

Page:9/10

INSPECTION REPORT (BIN BN KIM TRA) PILE DRIVING REGISTER (BNG TNG HP P CC)
Project (D n): Adress (a ch): Item (Hng mc): A. PARTICIPANTS (THNH PHN THAM D): Owner's Rep. (i din ch u t): Supervision's Rep. (i din t vn gim st): Contractor's Rep. (i din nh thu): K hiu on cc Section name Loi my p Machine type Lc p khi dng (T) Compression finish su (m) Depth Thit k Design Thc t Actual
Midori Safety Footwear

Ref. No (S tham chiu): Date Inspection (Ngy nghim thu): Location (V tr):

DNDN Industrial Zone

STT ID

Tn cc Pile label

Loi cc Ngy,ca Pile type Date

Ghi ch Remarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Contractor (Nh thu thi cng) Supervisor (T vn gim st) Owner (Ch u t)

Form No:PM-FC08b

Rev:1

Page:10/10

You might also like