Site Survey Report

SITE SURVEY REPORT


Project Province Site name Site address Old Configuration New Configuration Date Surveyor name VMS Engineer Hong Thanh Ba BD_Phu_Hoa_8 TECH/TCT VMS-426- Bnh Dng Site ID BDPG07

188 ap kinh nhuong, xa phu hoa, h.Phu giao - 2G ALU: 0 - 3G NSN: / - 2G NSN: / - 3G NSN: 1/0/1900 3-Mar-13 Telephone number Telephone number APPROVED BY VMS 904711966

VNPT TECHNOLOGY

Site Survey Report 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 2 2.1 2.2 2.3 2.4 2.5 3 3.1 3.2 3.3 3.4 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 GENERAL Geographical coordinates: Map Datum: Location: Site/station manager: Telephone: Type of building: Building height (m.a.g.l): Structure type (tower/mast/boom): Structure height (m.a.g.l): Site Access Road Condition: Key Required: Site Access: Delivery Access: 2G TECHNICAL DATA Site type: No. of cell: No. and type of radio-cabinet: No. of TRX: Frequency band: 3G TECHNICAL DATA Site type: No. of cell: No. and type of radio-cabinet: No. of Carrier: RF ANTENNA Antenna quantity: Antenna 2G height (m.a.g.l): Proposed Antenna 2G direction (degrees): Antenna 3G height (m.a.g.l): Proposed Antenna 3G direction (degrees): Antenna 2G model: Antenna 2G gain (dBi): Antenna 3G model: Antenna 3G gain (dBi): Antenna mounting required: New 3 Sector 1 3 Sector 1 1 0m 0 31m 60 0 0 Single 0 Sector 2 1 0m 0 31m 220 0 0 Single 0 Yes(Bracket) Sector 3 1 0m 0 31m 260 0 0 Single 0 0 0 Sector 0 0 0 E 11.26525 N 106.76874 WGS84 188 ap kinh nhuong, xa phu hoa, h.Phu giao 0 0 House 0m MAST 0m Ok Good Yes Working hours Good

Site Survey Report 5 5.1 5.2 5.3 5.4 6 6.1 6.2 6.3 6.4 7 7.1 7.2 7.3 7.4 7.5 7.6 8 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 9 9.1 9.2 9.3 9.4 9.5 FEEDER No. of feeder: Total feeder length/cell (m): Feeder diameter: Feeder arrest: FEEDERLESS No. fiber cable: Length of fiber cable: No. jumper: Total jumper length (m): EQUIPMENT ROOM Space available for equipment: Yes Equipment room location: Floor ground Equipment room dimension (LxWxH): 3700 x 2800 x 3700 Require renovation/Additional work: No Equipment room air-conditioning: Yes Equipment room lighting & security: Yes ELECTRICAL DATA 230V AC Power required/cabinet: No. of main circuit breaker (20A): Space available for batteries: Space available for rectifier: Existing rectifier voltage: Existing rectifier capacity: Generator: AC lightning protector: Grounding voltage TRANSMISSION No. and Type of 2Mbps Link: 1 Type of 2Mbps connection in DDF: Yes Optical transmission: 0 FE transmission: 0 DDF termination: Yes 5450W (fully configuration) Yes Yes Yes -48V 2000W Yes Yes 5.2VV. 1 100m 6 30m

Site Survey Report 10 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 link. 11 Sector 1 2 3 12 COMMENTS LENGTH OF CABLE Length of Feeder cable /m Length of ground connection cable from RF module to Grouding Bar 6m Length of ground connection cable from BTS to Grounding Bar: 6m Length of ground connection cable from DC Supply to Grounding Bar: 6.5m Length of DC cable from BTS to DC Supply: 10.5m Length of DC cable from RF module to DC Supply: 39m Length of AC cable from DC Supply to AC Box: Error! Not a valid link.m Cable Ladder: Error! Not a valid COVERAGE OBJECTIVE Coverage Objective 60:Road, resident zone 220:Road, resident zone 260:Road, resident zone

ITEMS Building Height/ Roof Top Space Tower Type Antenna Type and Proposed Antenna Posisition Site Status Transmission Other Comments

NOTES / ISSUE 3,7m

Mast 3 Legs

0 0 0

Site Survey Report

PHOTOS AND SKETCH MAPS


13 13.1 SKETCH MAPS OF INSTALLATION SPACE Site Platform Equipment room (overview) Site O verview (Front) Site Over view (Top)

Inlet/Outlet

Master Ground Bar

13.2

Side View Building height, Antenna pole length and Antenna pole location Tower V tr lp anten mi m

Site Survey Report Tower Tower Horizontal Ladder Equiqment rom Tower Vertical Ladder

13.3

Equipment Position Rom overview V tr lp 3G System Module mi

AC Box Position Power supply position V tr lp power System mi

Site Survey Report 13.4 GPS GPS

13.5

Environment Photos It includes 12 photos: 0, 30, 60 , 90, 120, 150, 180, 210, 240, 270, 300 and 330.

Photo of 0o direction Photo of 60o direction Photo of 120o direction Photo of 180o direction Photo of 240odirection Photo of 300o direction 14 SKETCH MAP OF OBSTACLES

Photo of 30o direction Photo of 90o direction Photo of 150o direction Photo of 210o direction Photo of 270o direction Photo of 330o direction

No Obstacle

Site Survey Report


0 330 30

300

60

270

90

100m

200m 240 120 300m

210

400m 150 500m 180

No. 1 2 3 4 5 6

Direction (degree)

Height of obstacle

Distance from obstacle to BTS

Obstacle description

Site Survey Report 15 PROPOSED ANTENNA POSITION

Refer to the Autocad file. 16 SITE & FLOOR LAYOUT Refer to the Autocad file