FORTNIGHT PROGRESS REPORT as on 09 March 2012

Name of the work - Construction of Group III works at IIM , Indore Work Order No : IIMI/19/Project/WO GPIII/2010-11 Dt 9 th July 2010 Client : - MNIT, Jaipur Consultant : Suresh Goel & Associates Contractor: M/s KMV Projects Limited S. No 1 2 3 4 Name of the Structure Block D Block B Block C Block D Description of Work Completed. Completed. Completed. Completed. 1) GF,FF,SF Brick Work completed. 2) Head room brick work Completed. 3) Outer corridor under progress 4)Internal plastering completed. 5)GF Class room steps demolishing as per IIM's requirement under progress 6)External plastering 80% completed 7)Terrace water proofing 50% completed. 1) All roof Slabs Completed. 2) GF,FF,SF brick work completed and TF brick work 50% completed. 3)GF,FF & SF plastering completed. 4)External Plastering in progress. 1) RCC Retaining walls 90% completed, balance under progress. 2) External Watersupply for Hostel blocks 100% completed,For Qtrs in progress. 3)Road work in progress. 1) Aluminium windows work under progress. 2)Vitrified flooring completed for 18 buildings 3)Internal painting progress in 18 buildings 4) External painting progress for 18 buildings 5) Sanitary & Water supply works 80% completed. 6) External development works 70% completed ,balance under progress. Location

Date: 8/8/2013 Approx. Qty. executed

Block D

Block A

Block A

Block A

Page 1 of 4

FORTNIGHT PROGRESS REPORT as on 09 March 2012


Name of the work - Construction of Group III works at IIM , Indore Work Order No : IIMI/19/Project/WO GPIII/2010-11 Dt 9 th July 2010 Client : - MNIT, Jaipur Consultant : Suresh Goel & Associates Contractor: M/s KMV Projects Limited S. No 9 Name of the Structure Block A Description of Work 1) GF, FF & SF internal painting & External painting 90% completed. 2) External development work completed,Windows work under progress. 1) GF, FF & SF Floorings completed 2) GF, FF & SF internal & External painting 80% completed. 3) External development work in progress.Aluminium Windows work under progress. 1) GF, FF & SF Floorings completed 2) GF, FF & SF internal & External painting 80% completed. 3) External development work in progress.Aluminium Windows work under progress. 1)GF slab cast 2)FF columns completed, FF Beams and chajjas 50% completed. 3)GF brick work 90% completed. 1) GF Brick work and plastering completed. 2) FF brick work 60% completed. Location

Date: 8/8/2013 Approx. Qty. executed

10

Block A

11

Block A

12

Block A

13

Block A

Constraints faced: Remarks / Other issues 1)Dining Hall Kitchen Water Supply, Gas lines, Electrical points, Furniture details, flooring pattern, Internal & External finishings required urgently 2)Lecture Hall interior details (electrical),wall panelling,required for Mockup preparation.External finishings,outerdevelopment required for planning and progressing. 3)PHD block corridor flooring pattern,colour scheme,terrace working drawing,machine room,water tank,Head room details required immediately. 4)Foodcourt finshing details 5)External development details for Lecture Hall, PhD. Students Hostel and Food Court are Required.

Page 2 of 4