Purpose The purpose of all three queries in this report is for a user to be able to report on weekly sales. Various key figures exist, including service levels, sales orders, estimates, and actual. The user is able to specify specific weeks in a month, as well as month-to-date figures, and compare these to previous year sales. This report can be used as a weekly sales tracker. This simulation will show you the basic steps to run Estimates vs. Actual Report (EVA) Summary. Trigger Perform this procedure when you need to run estimates vs. actual report (EVA) - Summary. Menu Path Use the following Business Explorer Application menu path(s) to begin this procedure:
Open > Queries > Info Areas > U2AA INFO AREA > U2AA DP INFO AREA > U2AA DP BACKUP CUBES > DP PA U2AADPPA01 MULTI CUBES > Estimates vs. Actual Report (EVA) Summary (Primary).
1/12
Work Instruction
Screen Flow
2/12
Work Instruction
Procedure
1.
Start the procedure using the Business Explorer Application menu path.
Microsoft Excel
2. 3.
. .
3/12
Work Instruction
4.
Click the
InfoAreas button
4/12
Work Instruction
5. 6. 7. 8. 9.
U2AA INFO AREA node U2AA DP INFO AREA node U2AA DP BACKUP CUBES node DP PA U2AADPP01 MULTI CUBES node
. . . .
Double-click the
5/12
Work Instruction
. .
11. Click the Sales Org (*) edit field Example: Field 9001
R R/O/C Description
6/12
Work Instruction
13. Click the Previous Year Week From (*) edit field
7/12
Work Instruction
01.2007 R
Previous Year Week From
15. Click the Previous Year Week To (*) edit field 16. As required, complete/review the following fields:
Refers to the previous year week ending value when specifying a range. It is used to indicate that the record must be assigned to the previous year week. Field Example: R/O/C Description
52.2008 R
Previous Year Week to
17. Click the Calendar Week From (*) edit field 18. As required, complete/review the following fields:
Wednesday, December 31, 2008 IP_APO.BEX_Estimates vs. Actual Report (EVA) - Summary.udc
8/12
Work Instruction
R/O/C
Description
01.2008 R
Calendar Week From-To (*)
19. Click the Calendar Week To (*) edit field 20. As required, complete/review the following fields:
Indicates the R/O/C ending calendar week when specifying a range. Field Example: Description
33.2008 R
Calendar Week to
9/12
Work Instruction
10/12
Work Instruction
11/12
Work Instruction
Result You have successfully ran Estimates vs. Actual summary report.