Located just five blocks from the White House, 1331 L Street embodies the highest standards of sustainable design to create an environmentally responsible building that shines for its location and quality construction. Today 1331 L Street is one of just a small handful of properties nationwide to be certified as a LEED Gold Core and Shell office building.
In late Spring 2011 a major build-out targeting LEED Platinum level certification will be finished. This build-out will take the building far beyond its present LEED distinction to a new level of Platinum performance, economy and design.
buildings garage.
always-on monitors will be open for public display from the sidewalk.
n Tasteful, prominent signage will identify the buildings
Lobby Excitement.
The removal of the current staircase will open the atrium-style lobby for a two-story high video wall. The spectacular video display will present a real-time view of the commercial real estate industry in action, in addition to other periodic messages. An energy-usage dashboard will also present the buildings energy performance advantage for all to see.
A Center of Learning.
Included in the continuing build-out is a tiered-level 50seat auditorium that will provide a superb venue for live and video-cast lectures. The auditorium will be equipped with the very latest audio and video technology.
Floor Plans
n 18,000 SF Typical Floor n Open Office Concept n LEED Platinum Interiors Build Out
First Floor
n Research Dispatch Center n Lobby with Video Wall n Gym Facility n Auditorium
Second Floor
n Training/Education n Staff Lounge with Video Kiosks
Third/Fourth/Fifth Floors
n Renovating to Open Floor Plan n Private Offices n Meeting Rooms
Seventh/Eighth/Ninth Floors
n Seventh/Eighth/Ninth Floors n Platinum-Grade Open Floors n Automatic Window Shades n Assorted Private Offices n Meeting Rooms n Raised Flooring accessibility n Build Out to LEED Platinum
Tenth Floor
n Open Floor n Prominent Skylights n Large Formal Board Room n Meeting Rooms n Assorted Private Offices n Build Out to LEED Platinum
Interiors Standards
Interiors Standards
Amenities
n Highly-Secure, Keycard-Restricted Turnstile Access n Large, Well-Equippred Workout Gym with the Latest Fitness Technology n Lutron Lighting Throughout n Computer-Controlled Heating/Cooling n Touchless Restroom Fixtures n Five High-Speed Elevators n Floor-to-Ceiling Glass on the South and East Elevations
COSTAR DC
COSTAR DC
Preliminary
Schedule
Preliminary
Schedule
Monday date
September 6 13
20
27
2010 2011 November September December October JanuaryNovember 1 8 156 2213 2920 6 27 134 2011 2718 325 10 1 17 8 24 15
2010 2011 January February March April 28 20 727 143 2110 2817 4 24 1131 187
June July May April 2314 3021 6 28 134 2011 2718 4 25 112 189
September July October August 2213 2920 5 27 124 1911 2618 3 25 101 178
2011 2012 2011 2012 November September December October January November February December January February April March 2415 3122 7 29 145 2112 2819 5 26 123 1910 2617 3 24 1031 177 2414 3121 7 28 145 21 12 28 19 7 26 14 3 21 10 28 17 4 24 11 31 187
June July April May 2314 3021 6 28 134 2011 2718 4 25 112 189
2516
13
20
27
July 4
11
18
25
Monday date
9th Floor 10th Floor 10th Floor Skylight 1st CoStar 2nd Floor 1st Floor Lobby Green Roof 5th Floor 4th Floor 3rd Floor Roof Top Canopy Exterior Signage
Monday date 6 13 20 27 4
9th Floor 10th Floor 10th Floor Skylight 1st CoStar 2nd Floor 1st Floor Lobby Green Roof 5th Floor 4th Floor 3rd Floor Roof Top Canopy Exterior Signage
11 Monday 18 date 25 1 8 156 2213 2920 6 27 134 2011 2718 325 10 1 17 8 24 15 31 22 729 14 6 21 13 28 20 727 143 2110 2817 4 24 1131 187 2514 2 21 9 28 167 2314 3021 6 28 134 2011 2718 4 25 112 189 2516 1 23 8 30 156 2213 2920 5 27 124 1911 2618 3 25 101 178 2415 3122 7 29 145 2112 2819 5 26 123 1910 2617 3 24 1031 177 2414 3121 7 28 145 21 12 28 19 7 26 14 3 21 10 28 17 4 24 11 31 187 2514 2 21 9 28 167 2314 3021 6 28 134 2011 2718 4 25 112 189 2516
9th Floor 10th Floor 10th Floor Skylight 1st CoStar 2nd Floor 1st Floor Lobby Green Roof 5th Floor 4th Floor 3rd Floor Roof Top Canopy Exterior Signage
Monday 23 30 date 6 13 20 27 4 11 18 25
9th Floor 10th Floor 10th Floor Skylight 1st CoStar 2nd Floor 1st Floor Lobby Green Roof 5th Floor 4th Floor 3rd Floor Roof Top Canopy Exterior Signage
Monday date
Design Documentation Permit /Bid Remove Furniture Demolition Mobilization Construction Furniture Move-in
Design Documentation Permit /Bid Remove Furniture Demolition Mobilization Construction Furniture Move-in