APPLICATION FOR NOMINATION TO SHRAM VEER AWARD-2012 I.

PARTICULARS OF THE EMPLOYEE (i) Name in full (block letters): CHANDRA SEKHAR BURAGOHAIN. (ii) Date and Place of birth : Date: 09.02.1981 Place: Digboi, District -Tinsukia, Assam Age: 32 years Sex: Male.

(iii)

Address:
INSTRUMENTATION SECTION, (Maintenance Department) Indian Oil Corporation Limited (Assam Oil Division) P.O.: Digboi, District: Tinsukia Pin: 786171, Assam (India) E-mail ID: - chandrasekharburagohain@gmail.com

II. QUALIFICATION: i) EDUCATIONAL Appeared 2nd year M.B.A (PT) and continuing 3 rd year classes. Passed 1st year M.B.A(PT) in 2012 from Centre For Management (Dibrugarh University) Passed B.Sc (Three year Degree course) in 2004 from Digboi college under Dibrugarh University. Passed Assam Higher secondary Education Council in1999 from Vivekananda Vidyalaya, Digboi. Passed High School Leaving Certificate Examination in 1997 from Vivekananda Vidyalaya, Digboi. iii) i) TECHNICAL Passed Standard Trade Test in 24.07.2006 after successful completion of Training as Instrument Trainee. Passed Instrument Technician Trainee certificate examination against Internal notification of vacancy no ERS916/14Z-2005 dated 14.06.2005 in 24.01.2006. Joined IOCL (AOD) while in B.Sc 2nd year, subsequently completed the degree in 2004. PROFESSIONAL i) Certificate on Training programmed on EPKS (Experion Process Knowledge System) for MSQ-project in Pune in 2010. ii) Certificate on Training programmed on sizing, selection & maintenance of control valves, actuators & accessories held at MIL Controls Ltd. Cochin in 2007.

ii)

ii)

iii)

iv)

v)

02 of 07 III. EXPERIENCE: Date of appointment 01.07.2011 till date Designation Starting Promoted to Jr. Engineering AssttV (Inst). Leaving Year of experience Remarks

June2010 to March2011

22.12.200801.07.2011 24.07.200622.12.2008 24.01.200624.07.2006

Was part of Six member project team constituted for Instrument erection and commissioning of Motor Spirit Quality Up-gradation project at IOCL Digboi. Total value of Instrument part of the project was 9 crores. Re-designated as Jr. Engineering Asstt-IV (Inst). Accelerated promotion to Instrument Technician Grade-IV from Grade-I after successfully clearing Standard Trade Test. Promoted to Instrument Technician Trainee after completion of B.Sc and passing Internal Departmental Exam on 14.06.2005 Was part of project instrument team for Instrument erection and commissioning of Captive Power Plant and Solvent De-waxing Unit project at IOCL Digboi. Confirmed as Sramik Grade-I Group-III in Refinery Instrument section. Joined as Sramik Grade-I GroupIII in Refinery Instrument section on the basis of SABF scheme after my fathers death on 24.10.2001 who was working in AOD hospital. At that time I was studying B.Sc in Digboi college under Dibrugarh University.

11 Years

My Job responsibilities includes installation & maintenance of field instruments e.g. Pressure, Temp, Level Flow Tx, Analyzers, Gas Detectors, Control & Shutdown Valves etc for petroleum processing plants. It further includes maintenance & troubleshooting of Control Room equipments e.g. DCS, Safety PLC, Alarm Systems and Tank Gauging systems.

Year 2003

30.04.2003

01.05.2002

Worked at Field and DCS in the plants like DCU, AVU ,CDU/VDU, CRU, HDTU, HGU,HPNU, SRU, SWS.

(i) (ii) (iii)

03 0f 07 Present Designation: Jr. Engineering Assistant-V (Instrumentation). Nature of Duties: Maintenance of Instruments and Control Systems in the Refinery involving following:

a) Field Instrumentation:
Maintenance and troubleshooting of various field instruments like control valves, Shutdown Valves, Butterfly Valves, Dampers, Pressure, level & Temperature Transmitters, Analysers, Switches, Pressure & Temperature Gauges, Flame Scanners, I/P converters, Solenoid Valves and Limit Switches. Many Field instruments are critical in nature (trip interlocks, hazardous locations etc) and safety has to be ensured for attending these instruments online during plant running condition. Nature of jobs for maintenance of these control systems are detailed as below: 1. Online Calibration (Zero, LRV (Lower Range Value) & URV (Upper Range Value), set point checking) and ranging of different transmitters and sensors, 5000 nos. approximately scattered about 6 sq Km area in the refinery. 2. Checking healthiness of power supply to the instruments. 3. Checking termination of the signal and power cables for identifying any lose connections, short path, earth fault, cable faults etc. 4. Calibration of process analysers and gas detectors, which are critical from safety point of view. 5. TPM jobs like range marking, abnormality identification and liquidation, checking for any anomaly from standard installation, General mounting of Instruments, condition of Impulse Lines/ Supports, Glanding of Signal Cable/Power Cables Instrument Cover/Lid tightening, General approach to Instruments Identification of instruments connected with ESD system, identification of Instrument Tag No.,JB identification, supporting, approach, Cable Glanding, Tightness ,Canopies etc.

b) Control Systems: Maintenance of Distributed Control Systems (DCS) of different makes and models for different plants viz. Honeywell, Yokogawa, ABB critical for smooth running of the plant as well as Emergency Shutdown Systems like PLC (Programmable Logic Controllers) critical for safety of the plant. The maintenance of these systems requires detailed knowledge of the software as well as hardware parts and ensuring full functionality and availability is essential. Nature of jobs for maintenance of these control systems are detailed as below: 1. Checking healthiness of power supply to the processors, I/O cards, marshalling cabinets, communication modules, network switches etc. 2. Checking healthiness of the I/O cards for any error/ failure and ensuring replacement of the same. 3. Checking healthiness of input/output barriers, trip amplifiers, relays, patch cards, signal processors, Cabinet Cooling-fans, Taking of backups of application software/project etc. 4. Modification of logic as and when required for these systems. 5. Assisting in Annual Maintenance Contract Jobs (AMC) with the vendor.

04 of 07 c) Instrument workshop: Nature of jobs at instrument workshop is detailed as follows: 1. Maintaining a schedule for preventive maintenance of all the critical instruments, approximately 1000 nos. 2. Overhauling and repair of control valves, shutdown valves, by checking all the parts and accessories and replacement of any parts if found damaged. 3. Testing of instrument at the workshop before actual installation in the field to ensure proper functioning. 4. Pressure testing of high pressure instruments, leak test of control/ Shutdown valves. 5. Report generation, like instrument failure report, history report, calibration report, inventory report etc.

(iv)

Present monthly salary/allowance: Basic Pay Rs: 16,710/- plus other allowances as per Corporation rules with Gross at Rs. 35000/- (Rupees Thirty Five thousand only).

IV. Details about the Industrial Enterprise where the Nominated Person is employed: 1. Name & address of enterprise: Indian Oil Corporation Limited (Assam Oil Division) P.O.: Digboi, District: Tinsukia, PIN : 786171, Assam (India) 2. No. of employees: factory/office : Executive : 414 nos. Non-executive : 1824 nos. 3. Nature of Business/Products, etc.: Manufacturing / Service /Others

05 of 07 4. Nature of Activities/Products etc. Activities : Petroleum Oil refining and marketing of products Products : Motor Spirit ( popularly known as Petrol) High Speed Diesel (popularly known as Diesel) Superior Kerosene Oil (popularly known Kerosene) Liquefied Petroleum Gas ( LPG) Naphtha Raw Petroleum Coke (RPC) Jute Batching Oil (JBO) Wood oil Furnace oil (FO) Malarial oil (MO) Paraffin wax 5. Annual Turnover: FY 2008-09 FY 2007-08 FY 2006-07 : Rs. Lacs : Rs. Lacs : Rs. Lacs :

(Figures as per IOC(AOD) Ltd.s balance sheet)

06 of 07 V. MAJOR CONTRIBUTIONS: 1. Installation of no-play coupling in 15 Pressure Swing Adsorber (PSA) high cycle valves online without OEM vendor assistance. Identification and calibration of PSA equalization valves for smooth functioning of the unit. It has improved the overall performance of the Hydrogen Generation Unit of the Refinery and all the interlock logics have been taken in line as the purge gas fluctuation has minimized. Total savings has amounted to INR 1, 89, 80, 000/- per annum. Detailed report attached as Annexure-I Working along with Sri P K Dev ( Senior Engineering Assistant) in a two member team, ensured calibration and commissioning of all 77 displacer type Level Transmitters in MSQU project, within limited time frame, timely installation of which was a major step in the successful project completion. Innovative modification for over temperature safety tripping scheme for four numbers compressors at Wax Hydro finishing Unit (WHFU) at DR by replacing 12 numbers Temperature Switches with combinations of Smart Transmitters and Trip Amplifiers to ensure reliability and trouble free plant operation. Above modification also provided for continuous monitoring and history trending of temperature value in DCS for analysis which was not possible with switches. Innovative modification in WHFU startup override switches for four interlocks by providing alternate hardware key switch arrangement in addition to earlier soft communication scheme. Above modification ensured availability of scheme (which is critical for unit startup and emergency handling) even in case of soft communication failure between plant DCS and safety PLC. Provided for control and monitoring of tempered water vessel at WHFU by installing new Level Transmitter using existing level gauge stand pipe and hooking up the same with one number redundant control valve which was installed but not in use. Above scheme ensured stable control of tempered water vessel level, which is critical for plant operation. Carried out replacement of unreliable float-tape level measurement with latest Radar Level Technology at SDU Glycol Tank. New technology has been observed to be operating without any trouble since its installation in April2011. Provided for alternate fluid path for liquid wax to SDU Filter VAT level transmitter impulse line, bypassing existing path through Rotameter, which was not successful due to high viscosity and congealing nature of Wax. Further, he also suggested and provided for external steam tracing along the fluid path which enhanced the fluidity and ensured free flow of liquid wax. Thermocouple modification at SDU (Solvent De-waxing Unit) compressor in 2007 to eliminate the error arising out of compressor vibration, thus ensuring the measurement of exact temperature by innovative scheme. Installation of needle valve in SDU PSV ( Pressure Safety Valve) for proper isolation of the PSV, provision for which was not provided in the original design, hence ensuring safety while attending these instruments.

2.

3.

4.

5.

6.

7.

8.

9.

10. Installation of Differential Pressure Transmitters for measurement of Level in vessels (VV-002 & VV-003) of WHFU (Wax Hydro-finishing Unit), provision for which was not in the original P&ID ( Process & Instrument Diagram), thus ensuring more reliability in controlling the level of the vessels.

07 0f 07

CITATION
Name Designation : SRI CHANDRA SEKHAR BURAGOHAION . : Junior Engineering Assistant (Instrumentation)

Department/Section : Maintenance Department/ Instrumentation Section An outstanding performer with an excellent creative mind. He has been a major contributor in all the instrument related activities and performed his job with responsibility and creativity. He along with Sri P.K.Borthakur (EA, Inst) has installed no-play coupling in 15 numbers critical high cycle PSA valves of Hydrogen Generation Unit at DR, without vendor assistance and made the unit steady. Installation saves huge flare loss of Hydrogen and purge gas amounting Rs.1, 89, 80, 000/- per annum (Calculation sheet attached as Annexure-I). Moreover he was a sincere member with dedication during MSQU project commissioning activities, innovative modifier for

temperature tripping scheme for compressors , alternate arrangement provider for startup override switches for reliable start up activity & provided new level Transmitter to control &

monitor of tempered water vessel at WHFU and many more ( Elaborate description mentioned at MAJOR CONTRIBUTIONS) He remains committed to the Corporation displaying qualities of an able techno-social troubleshooter, widely admired for his abilities and commitment.

Signature of nominee

Signature ( P. K. Goswami) Chief Instrumentation Manager Indian Oil Corporation Ltd. (Assam Oil Division) Date Place : 14.03.2013 : Digboi, Assam