Scheduling/Leveling Report - 04-Sep-13 - PM.exe =============================================== Default Project..................................................OBG-UPD ATE2013-08-25 Projects: OBG-UPDATE2013-08-25............................................ .

Phase IV - OMAN BOTANIC GARDENS - AUGUST 2013_25 Scheduling/Leveling Settings: ----------------------------General ------Scheduling ......................................................Yes Leveling ........................................................No Ignore relationships to and from other projects .................No Make open-ended activities critical .............................No Use Expected Finish Dates .......................................Yes Schedule automatically when a change affects dates ..............No Level resources during scheduling ...............................No Recalculate assignment costs after scheduling ...................No When scheduling progressed activities use .......................Progres s Override Calculate start-to-start lag from ...............................Early S tart Define critical activities as Total Float less than or equal to .100 Compute Total Float As ..........................................Finish Float Calculate float based on finish date of .........................Each pr oject Calendar for scheduling Relationship Lag ........................Predece ssor Activity Calendar Advanced -------Calculate multiple float paths...................................No Statistics: ----------# Projects.......................................................1 # Activities.....................................................866 # Not Started....................................................596 # In Progress....................................................87 # Completed......................................................183 # Relationships..................................................1488 # Activities with Constraint.....................................19 Project: OBG-UPDATE2013-08-25 Activity: A1520 Project Completion & Handover Project: OBG-UPDATE2013-08-25 Activity: A1530 Issue of Construction Permit Project: OBG-UPDATE2013-08-25 Activity: A1550 Construction Commencement Date Project: OBG-UPDATE2013-08-25 Activity: A1570 Preparation & Submission of Commissioning protocols for the biomes Project: OBG-UPDATE2013-08-25 Activity: A1840 Develop Access to site, laydown areas, etc Project: OBG-UPDATE2013-08-25 Activity: A1850 Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: A1890

Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: A2070 Approved Kitchen Layout drawings - approved by Muscat Food Control Authority Project: OBG-UPDATE2013-08-25 Activity: A4370 Main Plantations in Northern Mountains (by others) Project: OBG-UPDATE2013-08-25 Activity: A8410 Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: A8420 Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: A8430 Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: A8440 Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: A8450 Main Plantations in overall Southern Mountains (by others) Project: OBG-UPDATE2013-08-25 Activity: A8460 Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: A8470 Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: A8480 Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: A8490 Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: A8500 All Plantings for the Wadi area (by others) Errors: ------Warnings: --------Activities without predecessors..................................1 Project: OBG-UPDATE2013-08-25 Activity: A1000 Award of letter to proceed / Award preferred tender status Activities without successors....................................5 Project: OBG-UPDATE2013-08-25 Activity: A1520 Project Completion & Handover Project: OBG-UPDATE2013-08-25 Activity: A8380 Procurement & delivery of Rock Fall Protection system Project: OBG-UPDATE2013-08-25 Activity: A9150 Fixing Ladder & Opening Cover to tank Project: OBG-UPDATE2013-08-25 Activity: WA - 853 0 Submission & approval of Architectural Shop drawings for Wadi Ancillary Building Project: OBG-UPDATE2013-08-25 Activity: WM - 853 0 Submission & approval of Architectural Shop drawings for Waster Manageme nt Facility Out-of-sequence activities.......................................62 Project: OBG-UPDATE2013-08-25 Activity: A1160 Pile head breaking, compaction - all incl pile cap concrete Project: OBG-UPDATE2013-08-25 Activity: A1170 Pile head breaking, compaction - all incl beam foundation Project: OBG-UPDATE2013-08-25 Activity: A1190 Construction of Suspended Slab for Ground Floor - Level 131.55 (DELETED) Project: OBG-UPDATE2013-08-25 Activity: A1250 Construction of Suspended Slab at Roof Level 137.50 (Grid L2 - L4) (taken at 141 lvl sloping slab) Project: OBG-UPDATE2013-08-25 Activity: A1260 Structural Steel Erection - upto Roof

Project: OBG-UPDATE2013-08-25 Activity: Construct MEP trenches, tunnels & biome platform Project: OBG-UPDATE2013-08-25 Activity: Internal Finishes to MEP rooms in Basement Project: OBG-UPDATE2013-08-25 Activity: Set up Piling rigs for micropiling Project: OBG-UPDATE2013-08-25 Activity: Pile head breaking, compaction - all incl pile cap concrete Project: OBG-UPDATE2013-08-25 Activity: Erect Structural Steel Columns upto roof, etc Project: OBG-UPDATE2013-08-25 Activity: Construct MEP trenches & biome platform Project: OBG-UPDATE2013-08-25 Activity: Erect Structural Steel Framing for Concrete panels on Elevation Project: OBG-UPDATE2013-08-25 Activity: Set up Piling rigs for micropiling Project: OBG-UPDATE2013-08-25 Activity: Walls construction from foundation level to First level Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing Project: OBG-UPDATE2013-08-25 Activity: Construct Tie Beams Project: OBG-UPDATE2013-08-25 Activity: Suspended Slab for Entry Buildings Project: OBG-UPDATE2013-08-25 Activity: Construct Hollow / Bubble Deck Slab Project: OBG-UPDATE2013-08-25 Activity: Blockwork Project: OBG-UPDATE2013-08-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: Concrete Slab on Grade Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fix & Plaster finish Project: OBG-UPDATE2013-08-25 Activity: Floor Finishes (offices) Project: OBG-UPDATE2013-08-25 Activity: Door & Windows Project: OBG-UPDATE2013-08-25 Activity: Excavate for Wall Foundations Project: OBG-UPDATE2013-08-25 Activity: General Excavation for Southern Biome areas Project: OBG-UPDATE2013-08-25 Activity: Wall Foundations Project: OBG-UPDATE2013-08-25 Activity: Excavate for Wall Foundations Project: OBG-UPDATE2013-08-25 Activity: Wall Foundations Project: OBG-UPDATE2013-08-25 Activity: Construction of all Walls & Slabs upto Level 144.90 (Segment 1, 2, 3) Project: OBG-UPDATE2013-08-25 Activity: Excavation for Foundations & Tunnel Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2013-08-25 Activity: Construct Retaining Wall for External Bench & Waiting area

A1290 A1360 A1460 A1480 A1500 A1730 A1740 A1870 A1910 A2040 A2050 A2060 A2080 A2090 A2140 A2440 A2510 A2540 A2570 A2590 A2880 A2900 A3380 A3440 A3450 A3460 A3510 A6020 A6030 A6060

Project: OBG-UPDATE2013-08-25 Activity: A6190 Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2013-08-25 Activity: A6770 Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: A7240 Blockwork partitions inside the biome Project: OBG-UPDATE2013-08-25 Activity: A8070 Procurement, fabrication & delivery of Structural Steel frame Project: OBG-UPDATE2013-08-25 Activity: A8120 Procurement, fabrication & delivery of Aluminium doors & Windows Project: OBG-UPDATE2013-08-25 Activity: A8160 Procurement of Artificial Rock items Project: OBG-UPDATE2013-08-25 Activity: A8200 Procurement of various Floor finishes Project: OBG-UPDATE2013-08-25 Activity: A9290 Fixing Windows & Doors Project: OBG-UPDATE2013-08-25 Activity: ENT 8510 Submission & approval of Civil structural shop drawings for Entry Gate Building Project: OBG-UPDATE2013-08-25 Activity: ENT 8520 Submisison & approval of MEP Shop drawings for Entry Gate Building Project: OBG-UPDATE2013-08-25 Activity: ENT 8530 Submission & approval of Architectural Shop drawings for Entry Gate Building Project: OBG-UPDATE2013-08-25 Activity: GAR 8510 Submission & approval of Civil structural shop drawings for Garage Project: OBG-UPDATE2013-08-25 Activity: MOS 8510 Submission & approval of Civil structural shop drawings for Mosque Project: OBG-UPDATE2013-08-25 Activity: NB8580 Submission & approval of Vertical Structural steel shop drawings - Northern Biom e Project: OBG-UPDATE2013-08-25 Activity: NB8760 Submission & approval of all MEP shop drawings - Northern Biome Project: OBG-UPDATE2013-08-25 Activity: NM8775 Submission & approval of Civil Structural shop drawings for Northern Mountains Project: OBG-UPDATE2013-08-25 Activity: SB8680 Submission & approval of shop drawings for Ground Floor slabs - Southern Biome Project: OBG-UPDATE2013-08-25 Activity: SB8690 Submission & approval of shop drawings for Suspended slabs - Southern Biome Project: OBG-UPDATE2013-08-25 Activity: SB8730 Submission & approval of Glazing shop drawings - Southern Biome Project: OBG-UPDATE2013-08-25 Activity: TRA 8510 Submission & approval of Civil structural shop drawings for the Transformation C entre Project: OBG-UPDATE2013-08-25 Activity: TRA 8520 Submisison & approval of MEP Shop drawings for the Transformation Centre Project: OBG-UPDATE2013-08-25 Activity: TRN 8510 Submission & approval of Civil structural shop drawings for all Train Stations Project: OBG-UPDATE2013-08-25 Activity: TRN 8520 Submisison & approval of MEP Shop drawings for Train Stations Project: OBG-UPDATE2013-08-25 Activity: TRN 8540 Submission & approval of Shop drawings for Shade structure for Main train statio n Project: OBG-UPDATE2013-08-25 Activity: WA - 853 0 Submission & approval of Architectural Shop drawings for Wadi Ancillary Building Project: OBG-UPDATE2013-08-25 Activity: WIL 8520 Submisison & approval of MEP Shop drawings for Wilderness Project: OBG-UPDATE2013-08-25 Activity: WM - 853 0 Submission & approval of Architectural Shop drawings for Waster Manageme nt Facility

Activities with Actual Dates > Data Date.........................0 Milestone Activities with invalid relationships..................0 Finish milestone and predecessors have different calendars.......0 Scheduling/Leveling Results: ---------------------------# Projects Scheduled/Leveled.....................................1 # Activities Scheduled/Leveled...................................683 # Relationships with other projects..............................0 Data Date........................................................25-Aug13 Earliest Early Start Date........................................25-Aug13 Latest Early Finish Date.........................................21-May15 Exceptions: ----------Critical Activities..............................................634 Project: OBG-UPDATE2013-08-25 Activity: A1270 Installlation of Horizontal Roof structual Steel - Vector Foiltec Project: OBG-UPDATE2013-08-25 Activity: A1280 Installation of ETFE Roofing (using nets) - Vector Foiltec Project: OBG-UPDATE2013-08-25 Activity: A1300 Masonry work Project: OBG-UPDATE2013-08-25 Activity: A1310 Install Metallic substructures (for Tecu oxide panels) Project: OBG-UPDATE2013-08-25 Activity: A1320 Install Pladur Gypsum board & Plaster (internal) Project: OBG-UPDATE2013-08-25 Activity: A1330 Install Insulation, board & Tecu oxide Copper Sheets (external) Project: OBG-UPDATE2013-08-25 Activity: A1340 Strip nets / Commissioning / Clean Down Project: OBG-UPDATE2013-08-25 Activity: A1350 MEP Works in Plant Rooms (Basement) & Misc rooms (GF) Project: OBG-UPDATE2013-08-25 Activity: A1370 MEP works inside biome Project: OBG-UPDATE2013-08-25 Activity: A1380 Commissioning of the Biome Project: OBG-UPDATE2013-08-25 Activity: A1390 Snags, Cleaning & Handing over Project: OBG-UPDATE2013-08-25 Activity: A1400 Internal Finishes to Public areas & Rooms at GF Project: OBG-UPDATE2013-08-25 Activity: A1410 Internal Landscaping, Concrete Pathway & Terraces Project: OBG-UPDATE2013-08-25 Activity: A1450 Completion of Northern Biome Project: OBG-UPDATE2013-08-25 Activity: A1490 Construction of Retaining wall Footing, Wall (incl short part) Project: OBG-UPDATE2013-08-25 Activity: A1500 Erect Structural Steel Columns upto roof, etc Project: OBG-UPDATE2013-08-25 Activity: A1510 Completion of Southern Biome Project: OBG-UPDATE2013-08-25 Activity: A1520 Project Completion & Handover Project: OBG-UPDATE2013-08-25 Activity: A1560 Availability of Permanent Services on site - Power, Water, etc Project: OBG-UPDATE2013-08-25 Activity: A1570 Preparation & Submission of Commissioning protocols for the biomes

Project: OBG-UPDATE2013-08-25 Activity: A1580 Power Supply HV : [TRX room layout, HV Switch room lay-out, LDN approval, appr oved HV single line diagram] DESIGN Project: OBG-UPDATE2013-08-25 Activity: A1590 Installlation of Horizontal Roof structual Steel - Vector Foiltec Project: OBG-UPDATE2013-08-25 Activity: A1600 Installation of ETFE Roofing (using nets) - Vector Foiltec Project: OBG-UPDATE2013-08-25 Activity: A1610 Strip nets / Commissioning / Clean Down Project: OBG-UPDATE2013-08-25 Activity: A1690 Blockwork on the back facade & insulation Project: OBG-UPDATE2013-08-25 Activity: A1700 Install Metallic substructures (for Tecu oxide panels) Project: OBG-UPDATE2013-08-25 Activity: A1710 Install Pladur Gypsum board & Plaster (internal) Project: OBG-UPDATE2013-08-25 Activity: A1720 Install Insulation, board & Tecu oxide Copper Sheets Project: OBG-UPDATE2013-08-25 Activity: A1730 Construct MEP trenches & biome platform Project: OBG-UPDATE2013-08-25 Activity: A1740 Erect Structural Steel Framing for Concrete panels on Elevation Project: OBG-UPDATE2013-08-25 Activity: A1750 Place concrete panels, insulation with all supports on Elevation Project: OBG-UPDATE2013-08-25 Activity: A1760 Place Wooden Board, metallic slats & local dressed stones on Elevation Project: OBG-UPDATE2013-08-25 Activity: A1770 Install HE 30 Pillar, Pladur gypsum board all complete with plaster behind eleva tion Project: OBG-UPDATE2013-08-25 Activity: A1780 Install door, windows, louvers Project: OBG-UPDATE2013-08-25 Activity: A1790 Internal finishes incl entry, exit & terrace & installing all walkway elements Project: OBG-UPDATE2013-08-25 Activity: A1800 Internal Landscaping, Concrete Pathway & Terraces Project: OBG-UPDATE2013-08-25 Activity: A1810 Commissioning of the Biome Project: OBG-UPDATE2013-08-25 Activity: A1820 Snags, Cleaning & Handing over Project: OBG-UPDATE2013-08-25 Activity: A1830 MEP works inside biome including interphasing with MEP channel Project: OBG-UPDATE2013-08-25 Activity: A1890 Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: A1900 Pile head breaking, compaction - all incl pile / beam foundation Project: OBG-UPDATE2013-08-25 Activity: A1910 Walls construction from foundation level to First level Project: OBG-UPDATE2013-08-25 Activity: A1920 Construction of Suspended Slab at First Level +128.50 Project: OBG-UPDATE2013-08-25 Activity: A1930 Backfilling / Compaction for Slab on Grade at + 124.15 Project: OBG-UPDATE2013-08-25 Activity: A1940 Walls construction to Roof level Project: OBG-UPDATE2013-08-25 Activity: A1950 Construction of Suspended Slab at Roof +133.50 Project: OBG-UPDATE2013-08-25 Activity: A1960 MEP works and Slab on Grade at Level + 124.15 Project: OBG-UPDATE2013-08-25 Activity: A1970 Structural Steel & Metal Decking works for Chiller Room, Pump Room & Electrogen Project: OBG-UPDATE2013-08-25 Activity: A1980 Internal Finishes to MEP rooms in Basement & GF incl louvers / metal slats

Project: OBG-UPDATE2013-08-25 Activity: A1990 MEP Works in Plant Rooms (Basement) & Misc rooms (GF) Project: OBG-UPDATE2013-08-25 Activity: A2000 Commissioning of the Building / equipment Project: OBG-UPDATE2013-08-25 Activity: A2010 Snags, Cleaning & Handing over Project: OBG-UPDATE2013-08-25 Activity: A2020 Power Supply LV: [Electric room layouts, approved LV single line diagrams & lo ad schedules ] DESIGN Project: OBG-UPDATE2013-08-25 Activity: A2070 Approved Kitchen Layout drawings - approved by Muscat Food Control Authority Project: OBG-UPDATE2013-08-25 Activity: A2080 Suspended Slab for Entry Buildings Project: OBG-UPDATE2013-08-25 Activity: A2100 Blockwork on Roof Parapets Project: OBG-UPDATE2013-08-25 Activity: A2110 Erect structural Steel Columns for Car Parks Project: OBG-UPDATE2013-08-25 Activity: A2120 Erect Horizontal Joints & Roofing for Car Parks Project: OBG-UPDATE2013-08-25 Activity: A2130 Blockwork on Roof Parapets for Car Parks Project: OBG-UPDATE2013-08-25 Activity: A2140 Blockwork Project: OBG-UPDATE2013-08-25 Activity: A2150 MEP 1st Fix & Plaster finish Project: OBG-UPDATE2013-08-25 Activity: A2160 MEP 2nd Fix Project: OBG-UPDATE2013-08-25 Activity: A2170 Ceiling Finishes Project: OBG-UPDATE2013-08-25 Activity: A2180 Floor Finishes Project: OBG-UPDATE2013-08-25 Activity: A2190 Door & Windows Project: OBG-UPDATE2013-08-25 Activity: A2200 Waterproofing & Insulation on Roof Project: OBG-UPDATE2013-08-25 Activity: A2210 External Color Plaster & Finishing Project: OBG-UPDATE2013-08-25 Activity: A2220 MEP Final Fixes & Painting Project: OBG-UPDATE2013-08-25 Activity: A2230 Testing, Commissioning & Handing over Project: OBG-UPDATE2013-08-25 Activity: A2240 Erection of Fencing & Gate incl commissioning Project: OBG-UPDATE2013-08-25 Activity: A2400 Preparation of shop drawings for HV rooms based on approved SLD & load schedules Project: OBG-UPDATE2013-08-25 Activity: A2530 Preparation of shop drawings for LV rooms based on approved SLD & load schedules Project: OBG-UPDATE2013-08-25 Activity: A2550 MEP 2nd Fix Project: OBG-UPDATE2013-08-25 Activity: A2560 Ceiling Finishes (offices) Project: OBG-UPDATE2013-08-25 Activity: A2570 Floor Finishes (offices) Project: OBG-UPDATE2013-08-25 Activity: A2580 External Color Plaster & Finishing Project: OBG-UPDATE2013-08-25 Activity: A2590 Door & Windows Project: OBG-UPDATE2013-08-25 Activity: A2600 MEP Final Fixes & Painting Project: OBG-UPDATE2013-08-25 Activity: A2610

Testing, Commissioning & Handing over Project: OBG-UPDATE2013-08-25 Activity: Site Survey Project: OBG-UPDATE2013-08-25 Activity: Excavation for wall foundations - Transformation Cenre Building Project: OBG-UPDATE2013-08-25 Activity: Construction foundations for walls - Transformation Centre Building Project: OBG-UPDATE2013-08-25 Activity: Construction foundations for walls - Retaining Wall behind the Building Project: OBG-UPDATE2013-08-25 Activity: Construct Walls - Transformation Centre Building Project: OBG-UPDATE2013-08-25 Activity: Construct Retaining Walls behind the building Project: OBG-UPDATE2013-08-25 Activity: Excavation for wall foundations behind the building Project: OBG-UPDATE2013-08-25 Activity: Suspended Slab for Transformation Centre Building Project: OBG-UPDATE2013-08-25 Activity: Blockwork parapet Walls / Roof insulation Project: OBG-UPDATE2013-08-25 Activity: MEP works & Internal Finishes Project: OBG-UPDATE2013-08-25 Activity: Slab on Grade / Ground Floor Slab Project: OBG-UPDATE2013-08-25 Activity: Install Doors & Louvers Project: OBG-UPDATE2013-08-25 Activity: Prepare Course rubble cladded wall panels behind retaining walls Project: OBG-UPDATE2013-08-25 Activity: Place Course rubble cladded wall panels behind retaining walls Project: OBG-UPDATE2013-08-25 Activity: Commissioning, Snags & Handover Project: OBG-UPDATE2013-08-25 Activity: Install 3rd / 4th Levels of Anchors Project: OBG-UPDATE2013-08-25 Activity: Excavate 3rd / 4th Stage Project: OBG-UPDATE2013-08-25 Activity: Excavate for Wall Foundations Project: OBG-UPDATE2013-08-25 Activity: Wall Foundations Project: OBG-UPDATE2013-08-25 Activity: General Excavation for Southern Biome areas Project: OBG-UPDATE2013-08-25 Activity: Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: Excavation Project: OBG-UPDATE2013-08-25 Activity: Compaction Project: OBG-UPDATE2013-08-25 Activity: Concrete Base Project: OBG-UPDATE2013-08-25 Activity: Small Masonry Wall Project: OBG-UPDATE2013-08-25 Activity: Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2013-08-25 Activity: Granular Material stabilised with Lime Project: OBG-UPDATE2013-08-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Activity: Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity:

A2620 A2630 A2640 A2650 A2660 A2670 A2680 A2690 A2700 A2710 A2720 A2730 A2740 A2750 A2760 A2860 A2870 A2880 A2890 A2900 A2920 A2930 A2940 A2950 A2960 A2970 A2980 A2990 A3000 A3010

Excavation Project: Compaction Project: Lime Gravel mix Project: OBG-UPDATE2013-08-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Activity: Construction of all Walls & Slabs upto Level 144.90 (Segment 1, 2, 3) Project: OBG-UPDATE2013-08-25 Activity: Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: Excavation Project: OBG-UPDATE2013-08-25 Activity: Compaction Project: OBG-UPDATE2013-08-25 Activity: Concrete Base Project: OBG-UPDATE2013-08-25 Activity: Masonry Kerbs Project: OBG-UPDATE2013-08-25 Activity: Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2013-08-25 Activity: Steel Mesh & Concrete Jointless Flooring Project: OBG-UPDATE2013-08-25 Activity: Top Soil Filling on the edges Project: OBG-UPDATE2013-08-25 Activity: Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: Excavation Project: OBG-UPDATE2013-08-25 Activity: Compaction Project: OBG-UPDATE2013-08-25 Activity: Concrete Base Project: OBG-UPDATE2013-08-25 Activity: Masonry Retaining walls & Masonry Kerbs Project: OBG-UPDATE2013-08-25 Activity: Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2013-08-25 Activity: Aggregate pavement stabilised with Lime Project: OBG-UPDATE2013-08-25 Activity: Top Soil Filling on the edges Project: OBG-UPDATE2013-08-25 Activity: Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: Excavation Project: OBG-UPDATE2013-08-25 Activity: Compaction Project: OBG-UPDATE2013-08-25 Activity: Install Structural Steel Framing on side Elevations Project: OBG-UPDATE2013-08-25 Activity: Install Steel & Cable System for ETFE Project: OBG-UPDATE2013-08-25 Activity: Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2013-08-25 Activity: Install ETFE Roofing Panels Project: OBG-UPDATE2013-08-25 Activity: Top Soil Filling on the edges Project: OBG-UPDATE2013-08-25 Activity: Divert / Control Water of the Wadi Project: OBG-UPDATE2013-08-25 Activity: A3040 A3050 A3060 A3070 A3080 A3090 A3100 A3110 A3120 A3130 A3140 A3150 A3160 A3170 A3180 A3190 A3200 A3210 A3220 A3230 A3240 A3250 A3260 A3270 A3280 A3290 A3300 A3310 OBG-UPDATE2013-08-25 Activity: A3030 OBG-UPDATE2013-08-25 Activity: A3020

Excavate & Compact Wadi base Project: OBG-UPDATE2013-08-25 Activity: A3320 Waterproof layer of clay as water bed Project: OBG-UPDATE2013-08-25 Activity: A3330 Dress & Place Wadi Natural rocks in Wadi area Project: OBG-UPDATE2013-08-25 Activity: A3340 Dress & Place Seat Stones in Wadi area Project: OBG-UPDATE2013-08-25 Activity: A3350 All MEP services related to Wadi incl irrigation, drainage, electrical, HVAC, fi re, etc Project: OBG-UPDATE2013-08-25 Activity: A3360 Construction of MEP Tunnels & Backfilling in Biome 1 Project: OBG-UPDATE2013-08-25 Activity: A3380 Wall Foundations Project: OBG-UPDATE2013-08-25 Activity: A3390 Construction of all Walls & Slabs upto Level 144.90 (Segment 1, 2, 3) Project: OBG-UPDATE2013-08-25 Activity: A3400 Install Structural Steel Framing on side Elevations Project: OBG-UPDATE2013-08-25 Activity: A3410 Install Steel & Cable System for ETFE Project: OBG-UPDATE2013-08-25 Activity: A3420 Install ETFE Roofing Panels Project: OBG-UPDATE2013-08-25 Activity: A3430 Construction of MEP Tunnels & Backfilling in Biome 1 Project: OBG-UPDATE2013-08-25 Activity: A3450 Wall Foundations Project: OBG-UPDATE2013-08-25 Activity: A3460 Construction of all Walls & Slabs upto Level 144.90 (Segment 1, 2, 3) Project: OBG-UPDATE2013-08-25 Activity: A3470 Install Structural Steel Framing on side Elevations Project: OBG-UPDATE2013-08-25 Activity: A3480 Install Steel & Cable System for ETFE Project: OBG-UPDATE2013-08-25 Activity: A3490 Construction of MEP Tunnels & Backfilling in Biome 1 Project: OBG-UPDATE2013-08-25 Activity: A3500 Install ETFE Roofing Panels Project: OBG-UPDATE2013-08-25 Activity: A3530 Backfill for Ground Floor Slab including Tunnel Project: OBG-UPDATE2013-08-25 Activity: A3540 Construct Slab on Ground Floor +123.40 Level including Tunnel Section Project: OBG-UPDATE2013-08-25 Activity: A3550 Verticals & Slab for First Floor + 128.50 Level including Tunnel Section Project: OBG-UPDATE2013-08-25 Activity: A3560 Verticals & Slab for Roof Slab + 132.85 Level Project: OBG-UPDATE2013-08-25 Activity: A3570 Blockwork Project: OBG-UPDATE2013-08-25 Activity: A3580 MEP 1st Fix & Plaster finish Project: OBG-UPDATE2013-08-25 Activity: A3590 Waterproofing & Insulation on Roof Project: OBG-UPDATE2013-08-25 Activity: A3600 MEP 2nd Fix incl installing of Equipments Project: OBG-UPDATE2013-08-25 Activity: A3610 External Plaster & Finishing Project: OBG-UPDATE2013-08-25 Activity: A3620 Ceiling Finishes Project: OBG-UPDATE2013-08-25 Activity: A3630 Floor Finishes Project: OBG-UPDATE2013-08-25 Activity: A3650 Door & Windows

Project: OBG-UPDATE2013-08-25 Activity: A3660 MEP Final Fixes & Painting Project: OBG-UPDATE2013-08-25 Activity: A3670 Testing, Commissioning & Handing over Project: OBG-UPDATE2013-08-25 Activity: A3680 Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: A3690 Excavation Project: OBG-UPDATE2013-08-25 Activity: A3700 Compaction Project: OBG-UPDATE2013-08-25 Activity: A3710 Concrete Base Project: OBG-UPDATE2013-08-25 Activity: A3720 Masonry Kerbs Project: OBG-UPDATE2013-08-25 Activity: A3730 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2013-08-25 Activity: A3740 Steel Mesh & Concrete Jointless Flooring Project: OBG-UPDATE2013-08-25 Activity: A3750 Top Soil Filling on the edges Project: OBG-UPDATE2013-08-25 Activity: A3890 All MEP services incl irrigation, drainage, electrical, HVAC, fire, etc Project: OBG-UPDATE2013-08-25 Activity: A3900 Aggregate pavement stabilised with Lime Project: OBG-UPDATE2013-08-25 Activity: A3910 Excavation & Cutting to profiles Project: OBG-UPDATE2013-08-25 Activity: A3920 Placing stones / boulders for terrace profile incl retaining wall & brackets Project: OBG-UPDATE2013-08-25 Activity: A3930 Excavation of Structural building for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: A3940 Construction of foundations, walls & Slab Project: OBG-UPDATE2013-08-25 Activity: A3950 Construction of Footings for Cables Project: OBG-UPDATE2013-08-25 Activity: A3960 Install Cables & Sun shade polythene material Project: OBG-UPDATE2013-08-25 Activity: A3970 Finishing works for the shaded building Project: OBG-UPDATE2013-08-25 Activity: A3980 Excavate for Foundation Project: OBG-UPDATE2013-08-25 Activity: A3990 Lean Concrete & Reinforced Concrete Base Project: OBG-UPDATE2013-08-25 Activity: A4000 Construct Reinforced concrete Wall Project: OBG-UPDATE2013-08-25 Activity: A4010 Install Steel structure frame Project: OBG-UPDATE2013-08-25 Activity: A4020 Place concrete sag Project: OBG-UPDATE2013-08-25 Activity: A4030 Place projected concrete & Surface resin coating Project: OBG-UPDATE2013-08-25 Activity: A4040 Excavate Pit for Platform Lift Project: OBG-UPDATE2013-08-25 Activity: A4050 Foundation pit for lift Project: OBG-UPDATE2013-08-25 Activity: A4060 Reinforced concrete walls for Lift Pit Project: OBG-UPDATE2013-08-25 Activity: A4070 Retaining wall with stone masonry Project: OBG-UPDATE2013-08-25 Activity: A4080 Backfill with granular material, soil, etc

Project: Install Lift

OBG-UPDATE2013-08-25

Activity:

A4090 A4100 A4110 A4120 A4130 A4140 A4150 A4160 A4170 A4180 A4190 A4200 A4210 A4220 A4230 A4240 A4250 A4260 A4270 A4280 A4290 A4300 A4310 A4320 A4330 A4340 A4350 A4360 A4370 A4380

Project: OBG-UPDATE2013-08-25 Activity: Testing & Commissioning Project: OBG-UPDATE2013-08-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing for Columns & Walls inc Tie Beams Project: OBG-UPDATE2013-08-25 Activity: Construction of column upto Ground Slab level Project: OBG-UPDATE2013-08-25 Activity: Compaction & Backfill incl soil & base course Project: OBG-UPDATE2013-08-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2013-08-25 Activity: Columns from Ground Slab to Roof Project: OBG-UPDATE2013-08-25 Activity: Construct Roof Slab (RCC) Project: OBG-UPDATE2013-08-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2013-08-25 Activity: Install Structural Steel Columns on Ground Floor Project: OBG-UPDATE2013-08-25 Activity: Construct Stone Walls in Building & Stone Cladding to Retaining walls Project: OBG-UPDATE2013-08-25 Activity: Blockwork inside building incl thermal insulation Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fix & Internal Plaster to walls & ceiling Project: OBG-UPDATE2013-08-25 Activity: MEP 2nd Fix Project: OBG-UPDATE2013-08-25 Activity: Flooring & Ceiling Finishes Project: OBG-UPDATE2013-08-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: Roof Insulation and Stone finish Project: OBG-UPDATE2013-08-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2013-08-25 Activity: Install Maintance Rings, maintenance cables on the periphery Project: OBG-UPDATE2013-08-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2013-08-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2013-08-25 Activity: Main Plantations in Northern Mountains (by others) Project: OBG-UPDATE2013-08-25 Activity: Construct Retaining Wall for External Bench & Waiting area

Project: OBG-UPDATE2013-08-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2013-08-25 Activity: Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2013-08-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2013-08-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2013-08-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2013-08-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2013-08-25 Activity: Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2013-08-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2013-08-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2013-08-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2013-08-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: MEP 2nd Fixes

A4410 A4440 A4450 A4460 A4470 A4490 A4500 A4510 A4520 A4530 A4540 A4550 A4560 A4570 A4580 A4590 A4600 A4610 A4620 A4630 A4640 A4650 A4660 A4670 A4680 A4690 A4700 A4710 A4720 A4730

Project: OBG-UPDATE2013-08-25 Activity: Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2013-08-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2013-08-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2013-08-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2013-08-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2013-08-25 Activity: Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2013-08-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2013-08-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2013-08-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2013-08-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2013-08-25 Activity: Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: Site Survey and identify building points

A4740 A4750 A4760 A4770 A4780 A4790 A4800 A4810 A4820 A4830 A4840 A4850 A4860 A4870 A4880 A4890 A4900 A4910 A4920 A4930 A4940 A4950 A4960 A4970 A4980 A4990 A5000 A5010 A5020 A5030

Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2013-08-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2013-08-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2013-08-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2013-08-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2013-08-25 Activity: Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2013-08-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2013-08-25 Activity: Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2013-08-25 Activity: Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2013-08-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2013-08-25 Activity: Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: Construction of Footing for Retaining Wall Project: OBG-UPDATE2013-08-25 Activity: Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2013-08-25 Activity: Construct RCC Ground Slab with all MEP embedments

A5040 A5050 A5060 A5070 A5080 A5090 A5100 A5110 A5120 A5130 A5140 A5150 A5160 A5170 A5180 A5190 A5200 A5210 A5220 A5230 A5240 A5250 A5260 A5270 A5280 A5290 A5300 A5310 A5320 A5330

Project: OBG-UPDATE2013-08-25 Activity: A5340 Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2013-08-25 Activity: A5350 Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: A5360 MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: A5370 Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: A5380 MEP 2nd Fixes Project: OBG-UPDATE2013-08-25 Activity: A5390 Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: A5400 MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: A5410 Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: A5420 Site Survey and identify building points Project: OBG-UPDATE2013-08-25 Activity: A5430 General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: A5440 Construction of Footing for Retaining Wall Project: OBG-UPDATE2013-08-25 Activity: A5450 Compaction & Backfill incl soil & base course for grade slab Project: OBG-UPDATE2013-08-25 Activity: A5460 Construct RCC Ground Slab with all MEP embedments Project: OBG-UPDATE2013-08-25 Activity: A5470 Construct Retaining Wall for External Bench & Waiting area Project: OBG-UPDATE2013-08-25 Activity: A5480 Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: A5490 MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: A5500 Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: A5510 MEP 2nd Fixes Project: OBG-UPDATE2013-08-25 Activity: A5520 Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: A5530 MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: A5540 Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: A5550 Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: A5560 Excavation Project: OBG-UPDATE2013-08-25 Activity: A5570 Compaction Project: OBG-UPDATE2013-08-25 Activity: A5580 Concrete Base Project: OBG-UPDATE2013-08-25 Activity: A5590 Masonry Kerbs Project: OBG-UPDATE2013-08-25 Activity: A5600 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2013-08-25 Activity: A5610 Steel Mesh & Concrete Jointless Flooring Project: OBG-UPDATE2013-08-25 Activity: A5620 Top Soil Filling on the edges Project: OBG-UPDATE2013-08-25 Activity: A5630 All MEP services related to Southern Mountains incl irrigation, drainage, electr

ical, HVAC, fire, etc Project: OBG-UPDATE2013-08-25 Activity: Aggregate pavement stabilised with Lime Project: OBG-UPDATE2013-08-25 Activity: Excavation & Cutting to profiles Project: OBG-UPDATE2013-08-25 Activity: Placing stones / boulders for terrace profile Project: OBG-UPDATE2013-08-25 Activity: Construct steps in stone masonry Project: OBG-UPDATE2013-08-25 Activity: Install Handrails for the Steps Project: OBG-UPDATE2013-08-25 Activity: Install Handrail Lift Project: OBG-UPDATE2013-08-25 Activity: Testing & Commissioning Project: OBG-UPDATE2013-08-25 Activity: Divert / Control Water of the Wadi Project: OBG-UPDATE2013-08-25 Activity: Excavate & Compact Wadi base Project: OBG-UPDATE2013-08-25 Activity: Waterproof layer of clay as water bed Project: OBG-UPDATE2013-08-25 Activity: Dress & Place Wadi Natural rocks in Wadi area Project: OBG-UPDATE2013-08-25 Activity: Dress & Place Seat Stones in Wadi area Project: OBG-UPDATE2013-08-25 Activity: Rock Retaining walls with joints & strata look Project: OBG-UPDATE2013-08-25 Activity: Survey & Set up Project: OBG-UPDATE2013-08-25 Activity: General Excavation and formation Project: OBG-UPDATE2013-08-25 Activity: MEP underground services - Irrigation, Fire piping, Electrical, etc Project: OBG-UPDATE2013-08-25 Activity: Concrete works for Barbeque stoves & fountain, etc incl concrete base Project: OBG-UPDATE2013-08-25 Activity: Stone works for Barbeque stoves, fountains, containers, etc Project: OBG-UPDATE2013-08-25 Activity: Install final fittings - light fixtures, sanitary accessories, etc Project: OBG-UPDATE2013-08-25 Activity: Erect Timber planks & Palm Rachis Shade Project: OBG-UPDATE2013-08-25 Activity: Construct Dirt Track in Picnic area Project: OBG-UPDATE2013-08-25 Activity: Construct Pedestrain Walkway area Project: OBG-UPDATE2013-08-25 Activity: Prepare substrate for Landscaping works Project: OBG-UPDATE2013-08-25 Activity: Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: MEP 2nd Fixes Project: OBG-UPDATE2013-08-25 Activity: Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity:

A5640 A5650 A5660 A5810 A5820 A5830 A5840 A5850 A5860 A5870 A5880 A5890 A5900 A5910 A5920 A5930 A5940 A5950 A5960 A5970 A5980 A5990 A6000 A6070 A6080 A6090 A6100 A6110 A6120 A6130

Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: A6200 Construct Stone Walls in Retaining walls Project: OBG-UPDATE2013-08-25 Activity: A6210 MEP 1st Fixes Project: OBG-UPDATE2013-08-25 Activity: A6220 Structural Steel Installations for Shaded Structure Project: OBG-UPDATE2013-08-25 Activity: A6230 MEP 2nd Fixes Project: OBG-UPDATE2013-08-25 Activity: A6240 Install Sun Shade Project: OBG-UPDATE2013-08-25 Activity: A6250 MEP Final fixes, Painting, accessories, etc Project: OBG-UPDATE2013-08-25 Activity: A6260 Testing, Commissioning & handing over Project: OBG-UPDATE2013-08-25 Activity: A6350 Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: A6360 Excavation Project: OBG-UPDATE2013-08-25 Activity: A6370 Compaction Project: OBG-UPDATE2013-08-25 Activity: A6380 Concrete Base Project: OBG-UPDATE2013-08-25 Activity: A6390 Masonry Kerbs Project: OBG-UPDATE2013-08-25 Activity: A6400 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2013-08-25 Activity: A6410 Aggregate pavement stabilised with Lime Project: OBG-UPDATE2013-08-25 Activity: A6420 Top Soil Filling on the edges Project: OBG-UPDATE2013-08-25 Activity: A6430 Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: A6440 Excavation Project: OBG-UPDATE2013-08-25 Activity: A6450 Compaction Project: OBG-UPDATE2013-08-25 Activity: A6460 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2013-08-25 Activity: A6470 Top Soil Filling on the edges Project: OBG-UPDATE2013-08-25 Activity: A6480 All MEP services related to Sabkha incl irrigation, drainage, electrical, HVAC, fire, etc Project: OBG-UPDATE2013-08-25 Activity: A6490 Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: A6500 Excavation Project: OBG-UPDATE2013-08-25 Activity: A6510 Compaction Project: OBG-UPDATE2013-08-25 Activity: A6520 Lime Gravel mix Project: OBG-UPDATE2013-08-25 Activity: A6530 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Activity: A6540 Excavate and site clearance Project: OBG-UPDATE2013-08-25 Activity: A6550 Compaction and formation Project: OBG-UPDATE2013-08-25 Activity: A6560 Bedding Sand layer

Project: OBG-UPDATE2013-08-25 EPDM waterproof geo-membrane Project: OBG-UPDATE2013-08-25 Fill with Salted crusts Project: OBG-UPDATE2013-08-25 Site Survey and identify building points Project: OBG-UPDATE2013-08-25 General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Construction of Footing Project: OBG-UPDATE2013-08-25 Construct Tie Beams Project: OBG-UPDATE2013-08-25 Backfilling for Slab on Grade / Ground Slab Project: OBG-UPDATE2013-08-25 Concrete Walls & Suspended Slab for Roof Project: OBG-UPDATE2013-08-25 Concrete Roof Parapets Project: OBG-UPDATE2013-08-25 Erect structural Steel Columns for Stone Masonry walls Project: OBG-UPDATE2013-08-25 Construct Slab on Grade Project: OBG-UPDATE2013-08-25 Construct Stone masonry walls Project: OBG-UPDATE2013-08-25 Blockwork Project: OBG-UPDATE2013-08-25 MEP 1st Fix & Plaster Project: OBG-UPDATE2013-08-25 MEP 2nd Fix Project: OBG-UPDATE2013-08-25 Install Doors & Windows incl Glass wall Project: OBG-UPDATE2013-08-25 Flooring Finish Project: OBG-UPDATE2013-08-25 MEP Final fix, painting, etc Project: OBG-UPDATE2013-08-25 Testing, Commissioning & Handing over Project: OBG-UPDATE2013-08-25 Roofing insulation & Stone works Project: OBG-UPDATE2013-08-25 Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Excavation Project: OBG-UPDATE2013-08-25 Compaction Project: OBG-UPDATE2013-08-25 Concrete Base Project: OBG-UPDATE2013-08-25 Masonry Kerbs Project: OBG-UPDATE2013-08-25 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2013-08-25 Aggregate pavement stabilised with Lime Project: OBG-UPDATE2013-08-25 Top Soil Filling on the edges Project: OBG-UPDATE2013-08-25 Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Excavation

Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity:

A6570 A6580 A6590 A6600 A6610 A6620 A6630 A6640 A6650 A6660 A6670 A6680 A6690 A6700 A6710 A6720 A6730 A6740 A6750 A6760 A6770 A6780 A6790 A6800 A6810 A6820 A6830 A6840 A6850 A6860

Project: Compaction

OBG-UPDATE2013-08-25

Activity:

A6870

Project: OBG-UPDATE2013-08-25 Activity: A6880 Wet mix Macadam with Irrigation pipe Project: OBG-UPDATE2013-08-25 Activity: A6890 Top Soil Filling on the edges Project: OBG-UPDATE2013-08-25 Activity: A6900 Site Survey & Site Clearance Project: OBG-UPDATE2013-08-25 Activity: A6910 Excavation Project: OBG-UPDATE2013-08-25 Activity: A6920 Compaction Project: OBG-UPDATE2013-08-25 Activity: A6930 Lime Gravel mix Project: OBG-UPDATE2013-08-25 Activity: A6940 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Activity: A6950 All MEP services related to Central Desert incl irrigation, drainage, electrica l, HVAC, fire, etc Project: OBG-UPDATE2013-08-25 Activity: A6960 Construction of Harkanawt Cliff - All complete including rockwork Project: OBG-UPDATE2013-08-25 Activity: A6970 Construction of Al Huqf Cliff - All complete including rockwork Project: OBG-UPDATE2013-08-25 Activity: A6980 Blockwork partitions inside the biome Project: OBG-UPDATE2013-08-25 Activity: A7010 Limestone Cladding on Elevations Project: OBG-UPDATE2013-08-25 Activity: A7020 Install Metallic substructures (for Tecu oxide panels - external) Project: OBG-UPDATE2013-08-25 Activity: A7030 MEP works inside biome including interphasing with MEP channel Project: OBG-UPDATE2013-08-25 Activity: A7040 Install Insulation, board & Tecu oxide Copper Sheets Project: OBG-UPDATE2013-08-25 Activity: A7050 Install Curtain Walling on Internal face side elevations Project: OBG-UPDATE2013-08-25 Activity: A7080 Install door, windows, louvers Project: OBG-UPDATE2013-08-25 Activity: A7090 All Internal finishes incl entry, exits, Technical gallery, MEP Cooling units, e tc Project: OBG-UPDATE2013-08-25 Activity: A7100 Internal Landscaping & Wadi works, Concrete Pathway & Terraces Project: OBG-UPDATE2013-08-25 Activity: A7110 Commissioning of the Biome Project: OBG-UPDATE2013-08-25 Activity: A7120 Snags, Cleaning & Handing over Project: OBG-UPDATE2013-08-25 Activity: A7130 Blockwork partitions inside the biome Project: OBG-UPDATE2013-08-25 Activity: A7140 Limestone Cladding on Elevations Project: OBG-UPDATE2013-08-25 Activity: A7150 Install Metallic substructures (for Tecu oxide panels - external) Project: OBG-UPDATE2013-08-25 Activity: A7160 MEP works inside biome including interphasing with MEP channel Project: OBG-UPDATE2013-08-25 Activity: A7170 Install Insulation, board & Tecu oxide Copper Sheets Project: OBG-UPDATE2013-08-25 Activity: A7180 Install Curtain Walling on Internal face side elevations Project: OBG-UPDATE2013-08-25 Activity: A7190 Install door, windows, louvers

Project: OBG-UPDATE2013-08-25 Activity: A7200 All Internal finishes for entry, exits,Technical gallery, MEP Cooling units, Caf eteria, etc Project: OBG-UPDATE2013-08-25 Activity: A7210 Internal Landscaping & Wadi works, Concrete Pathway & Terraces Project: OBG-UPDATE2013-08-25 Activity: A7220 Commissioning of the Biome Project: OBG-UPDATE2013-08-25 Activity: A7230 Snags, Cleaning & Handing over Project: OBG-UPDATE2013-08-25 Activity: A7240 Blockwork partitions inside the biome Project: OBG-UPDATE2013-08-25 Activity: A7250 Limestone Cladding on Elevations Project: OBG-UPDATE2013-08-25 Activity: A7260 Install Metallic substructures (for Tecu oxide panels - external) Project: OBG-UPDATE2013-08-25 Activity: A7270 MEP works inside biome including interphasing with MEP channel Project: OBG-UPDATE2013-08-25 Activity: A7280 Install Insulation, board & Tecu oxide Copper Sheets Project: OBG-UPDATE2013-08-25 Activity: A7290 Install Curtain Walling on Internal face side elevations Project: OBG-UPDATE2013-08-25 Activity: A7300 Install door, windows, louvers Project: OBG-UPDATE2013-08-25 Activity: A7310 All Internal finishes incl entry, exits, Technical gallery, MEP Cooling units, e tc Project: OBG-UPDATE2013-08-25 Activity: A7320 Internal Landscaping & Wadi works, Concrete Pathway & Terraces Project: OBG-UPDATE2013-08-25 Activity: A7330 Commissioning of the Biome Project: OBG-UPDATE2013-08-25 Activity: A7340 Snags, Cleaning & Handing over Project: OBG-UPDATE2013-08-25 Activity: A7370 Receipt of "FOR CONSTRUCT" info for ETFE steel & panels - Northern Biome Project: OBG-UPDATE2013-08-25 Activity: A7400 Receipt of "FOR CONSTRUCT" info for Internal Landscape works - Northern Biome Project: OBG-UPDATE2013-08-25 Activity: A7470 Receipt of "FOR CONSTRUCT" info for ETFE steel & panels - Southern Biome Project: OBG-UPDATE2013-08-25 Activity: A7890 Receipt of "FOR CONSTRUCT" info for Architectural Finishes - Transformation cent re Project: OBG-UPDATE2013-08-25 Activity: A7930 Submission & approval of Structural Steel trusses Project: OBG-UPDATE2013-08-25 Activity: A7940 Submission & approval of ETFE panels Project: OBG-UPDATE2013-08-25 Activity: A7950 Submission & approval of Tecu Oxide copper panels Project: OBG-UPDATE2013-08-25 Activity: A7960 Submission & approval of Curtain Walling Project: OBG-UPDATE2013-08-25 Activity: A7980 Submission & approval of Platform & rail side Lifts Project: OBG-UPDATE2013-08-25 Activity: A7990 Submission & approval of Kitchen equipment Project: OBG-UPDATE2013-08-25 Activity: A8000 Submission & approval of Limestone cladding. Project: OBG-UPDATE2013-08-25 Activity: A8020 Submission & approval of Shade structures - Train stations Project: OBG-UPDATE2013-08-25 Activity: A8030 Submission & approval of Shaded structure - Northern Mountains Project: OBG-UPDATE2013-08-25 Activity: A8060

Procurement of all MEP materials & equipment Project: OBG-UPDATE2013-08-25 Activity: Procurement, fabrication & delivery of Structural Steel trusses Project: OBG-UPDATE2013-08-25 Activity: Procurement & delivery of ETFE panels Project: OBG-UPDATE2013-08-25 Activity: Procurement, fabrication & delivery of Tecu Oxide copper panels Project: OBG-UPDATE2013-08-25 Activity: Procurement, fabrication & delivery of Curtain Walling Project: OBG-UPDATE2013-08-25 Activity: Procurement, fabrication & delivery of Aluminium doors & Windows Project: OBG-UPDATE2013-08-25 Activity: Procurement of Platform & rail side Lifts Project: OBG-UPDATE2013-08-25 Activity: Procurement & delivery of Kitchen equipment Project: OBG-UPDATE2013-08-25 Activity: Procurement & delivery of Stone cladding. Project: OBG-UPDATE2013-08-25 Activity: Procurement of Artificial Rock items Project: OBG-UPDATE2013-08-25 Activity: Procurement & delivery of Shade structures - Train stations Project: OBG-UPDATE2013-08-25 Activity: Procurement of Shaded structure - Northern Mountains Project: OBG-UPDATE2013-08-25 Activity: Procurement of various Floor finishes Project: OBG-UPDATE2013-08-25 Activity: Testing & Commissioning of the Biome non-exhibit areas Project: OBG-UPDATE2013-08-25 Activity: Procurement & delivery duration for Landscape plantations, etc Project: OBG-UPDATE2013-08-25 Activity: Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: Main Plantations in overall Southern Mountains (by others) Project: OBG-UPDATE2013-08-25 Activity: Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: Plantings (by others) Project: OBG-UPDATE2013-08-25 Activity: All Plantings for the Wadi area (by others) Project: OBG-UPDATE2013-08-25 Activity: Testing & Commissioning of the area Project: OBG-UPDATE2013-08-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Activity: Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Activity:

A8080 A8090 A8100 A8110 A8120 A8130 A8140 A8150 A8160 A8170 A8180 A8200 A8220 A8290 A8410 A8420 A8430 A8440 A8450 A8460 A8470 A8480 A8490 A8500 A8510 A8520 A8530 A8540 A8550 A8560

Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Restoration of area, if damaged Project: OBG-UPDATE2013-08-25 Site Survey and identify building points Project: OBG-UPDATE2013-08-25 General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Construction of Footing Project: OBG-UPDATE2013-08-25 Construct Tie Beams Project: OBG-UPDATE2013-08-25 Concrete Walls & Suspended Slab for Roof Project: OBG-UPDATE2013-08-25 Backfilling for Slab on Grade / Ground Slab Project: OBG-UPDATE2013-08-25 Concrete Roof Parapets Project: OBG-UPDATE2013-08-25 Erect structural Steel Columns for Stone Masonry walls Project: OBG-UPDATE2013-08-25 Construct Slab on Grade Project: OBG-UPDATE2013-08-25 Construct Stone masonry walls Project: OBG-UPDATE2013-08-25 Blockwork Project: OBG-UPDATE2013-08-25 MEP 1st Fix & Plaster Project: OBG-UPDATE2013-08-25 MEP 2nd Fix Project: OBG-UPDATE2013-08-25 Install Doors & Windows incl Glass wall Project: OBG-UPDATE2013-08-25 Flooring Finish & erect pergolas Project: OBG-UPDATE2013-08-25 MEP Final fix, painting, etc Project: OBG-UPDATE2013-08-25 Testing, Commissioning & Handing over Project: OBG-UPDATE2013-08-25 Roofing insulation & Stone works Project: OBG-UPDATE2013-08-25 Site Survey and identify building points Project: OBG-UPDATE2013-08-25 General Excavation & localised for footings Project: OBG-UPDATE2013-08-25

Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity: Activity:

A8570 A8580 A8590 A8600 A8610 A8620 A8630 A8640 A8650 A8660 A8670 A8680 A8690 A8700 A8710 A8720 A8730 A8740 A8750 A8760 A8770 A8780 A8790 A8800 A8810 A8820 A8830 A8840 A8850 A8860

Construction of Footing Project: OBG-UPDATE2013-08-25 Activity: Construct Tie Beams Project: OBG-UPDATE2013-08-25 Activity: Concrete Walls & Suspended Slab for Roof Project: OBG-UPDATE2013-08-25 Activity: Backfilling for Slab on Grade / Ground Slab Project: OBG-UPDATE2013-08-25 Activity: Concrete Roof Parapets Project: OBG-UPDATE2013-08-25 Activity: Erect structural Steel Columns for Stone Masonry walls Project: OBG-UPDATE2013-08-25 Activity: Construct Slab on Grade Project: OBG-UPDATE2013-08-25 Activity: Construct Stone masonry walls Project: OBG-UPDATE2013-08-25 Activity: Blockwork Project: OBG-UPDATE2013-08-25 Activity: MEP 1st Fix & Plaster Project: OBG-UPDATE2013-08-25 Activity: MEP 2nd Fix Project: OBG-UPDATE2013-08-25 Activity: Install Doors & Windows incl Glass wall Project: OBG-UPDATE2013-08-25 Activity: Flooring Finish & erect pergolas Project: OBG-UPDATE2013-08-25 Activity: MEP Final fix, painting, etc Project: OBG-UPDATE2013-08-25 Activity: Testing, Commissioning & Handing over Project: OBG-UPDATE2013-08-25 Activity: Roofing insulation & Stone works Project: OBG-UPDATE2013-08-25 Activity: Testing & Commissioning of the Biome non-exhibit areas Project: OBG-UPDATE2013-08-25 Activity: Testing & Commissioning of the Biome non-exhibit areas Project: OBG-UPDATE2013-08-25 Activity: Testing & Commissioning of the Biome non-exhibit areas Project: OBG-UPDATE2013-08-25 Activity: RC Slab on opening Project: OBG-UPDATE2013-08-25 Activity: MEP Plant Installations Project: OBG-UPDATE2013-08-25 Activity: Fixing Windows & Doors Project: OBG-UPDATE2013-08-25 Activity: MEP Works Project: OBG-UPDATE2013-08-25 Activity: Testing Commissioning & Handover Project: OBG-UPDATE2013-08-25 Activity: Testing Commissioning & Handover Project: OBG-UPDATE2013-08-25 Activity: Submission & approval of all Civil Structural shop drawings for Central Project: OBG-UPDATE2013-08-25 Activity: Submission & approval of MEP Shop drawings for Central Desert Project: OBG-UPDATE2013-08-25 Activity: Submission & approval of Landscaping Shop drawings for Central Desert Project: OBG-UPDATE2013-08-25 Activity: Submission & approval of Architectural Shop drawings for Central Desert Project: OBG-UPDATE2013-08-25 Activity: Submission & approval of Rockwork shop drawings for the Cliffs Project: OBG-UPDATE2013-08-25 Activity:

A8870 A8880 A8890 A8900 A8910 A8920 A8930 A8940 A8950 A8960 A8970 A8980 A8990 A9000 A9010 A9020 A9030 A9040 A9130 A9160 A9290 A9360 A9370 A9380 CD 8510 Desert CD 8520 CD 8530 CD 8540 CD 8550 ENT 8520

Submisison & approval of Project: Submission & approval of e Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of re Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project:

MEP Shop drawings for Entry Gate Building OBG-UPDATE2013-08-25 Activity: NB8580 Vertical Structural steel shop drawings - Northern Biom OBG-UPDATE2013-08-25 Activity: NB8590 ETFE panels design / shop drawings - Northern Biome OBG-UPDATE2013-08-25 Activity: NB8600 Kitchen equipment shop drawings - Northern Biome OBG-UPDATE2013-08-25 Activity: NB8610 Tecu Oxide copper panels shop drawings - Northern Biome OBG-UPDATE2013-08-25 Activity: NB8620 Curtain Walling shop drawings - Northern Biome OBG-UPDATE2013-08-25 Activity: NB8760 all MEP shop drawings - Northern Biome OBG-UPDATE2013-08-25 Activity: NM8290 Platform & rail side Lifts - shop drawings OBG-UPDATE2013-08-25 Activity: NM8775 Civil Structural shop drawings for Northern Mountains OBG-UPDATE2013-08-25 Activity: NM8780 all Landscaping shop drawings OBG-UPDATE2013-08-25 Activity: NM8790 Shop drawings Structural works frame for Shaded structu OBG-UPDATE2013-08-25 Activity: NM8800 Shop drawings for Shaded Structure OBG-UPDATE2013-08-25 Activity: NM8810 MEP shop drawings for Northern Mountains OBG-UPDATE2013-08-25 Activity: PIC 8520 MEP Shop drawings for Picnic Areas OBG-UPDATE2013-08-25 Activity: PIC 8530 Landscaping Shop drawings for Picnic Areas OBG-UPDATE2013-08-25 Activity: PIC 8540 Architectural Shop drawings for Picnic Areas OBG-UPDATE2013-08-25 Activity: SAB 8510 all Civil Structural shop drawings for Sabkha OBG-UPDATE2013-08-25 Activity: SAB 8520 MEP Shop drawings for Sabkha OBG-UPDATE2013-08-25 Activity: SAB 8530 Landscaping Shop drawings for Sabkha OBG-UPDATE2013-08-25 Activity: SAB 8540 Architectural Shop drawings for Sabkha OBG-UPDATE2013-08-25 Activity: SB8670 shop drawings for wall foundations - Southern Biome OBG-UPDATE2013-08-25 Activity: SB8680 shop drawings for Ground Floor slabs - Southern Biome OBG-UPDATE2013-08-25 Activity: SB8690 shop drawings for Suspended slabs - Southern Biome OBG-UPDATE2013-08-25 Activity: SB8700 ETFE cables & system Shop drawings - Southern Biome OBG-UPDATE2013-08-25 Activity: SB8710 Structural Steel Shop drawings - Southern Biome OBG-UPDATE2013-08-25 Activity: SB8720 Stone Cladding shop drawings - Southern Biome OBG-UPDATE2013-08-25 Activity: SB8730 Glazing shop drawings - Southern Biome OBG-UPDATE2013-08-25 Activity: SB8750 Copper Cladding Shop drawings - Southern Biome OBG-UPDATE2013-08-25 Activity: SB8770 MEP Shop drawings - Southern Biome OBG-UPDATE2013-08-25 Activity: SM8510

Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of entre Project: Submisison & approval of Project: Submission & approval of re Project: Submission & approval of Project: Submisison & approval of Project: Submission & approval of Project: Submission & approval of n Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submission & approval of Project: Submisison & approval of Project: Submission & approval of Project: Submission & approval of

Civil Structural shop drawings for Southern Mountains OBG-UPDATE2013-08-25 Activity: SM8520 all Architectural shop drawings for Southern Mountains OBG-UPDATE2013-08-25 Activity: SM8820 MEP shop drawings for Southern Mountains OBG-UPDATE2013-08-25 Activity: SM8821 Platform & rail side Lifts - shop drawings OBG-UPDATE2013-08-25 Activity: SM8830 all Landscaping shop drawings for Southern Mountains OBG-UPDATE2013-08-25 Activity: TRA 8510 Civil structural shop drawings for the Transformation C OBG-UPDATE2013-08-25 Activity: TRA 8520 MEP Shop drawings for the Transformation Centre OBG-UPDATE2013-08-25 Activity: TRA 8530 Architectural Shop drawings for the Transformation Cent OBG-UPDATE2013-08-25 Activity: TRN 8510 Civil structural shop drawings for all Train Stations OBG-UPDATE2013-08-25 Activity: TRN 8520 MEP Shop drawings for Train Stations OBG-UPDATE2013-08-25 Activity: TRN 8530 Architectural Shop drawings for Train Stations OBG-UPDATE2013-08-25 Activity: TRN 8540 Shop drawings for Shade structure for Main train statio OBG-UPDATE2013-08-25 Activity: all Civil Structural shop drawings for Wadi OBG-UPDATE2013-08-25 Activity: MEP Shop drawings for Wadi OBG-UPDATE2013-08-25 Activity: Landscaping Shop drawings for Wadi OBG-UPDATE2013-08-25 Activity: Architectural Shop drawings for Wadi OBG-UPDATE2013-08-25 Activity: Rockwork shop drawings for the Wadi OBG-UPDATE2013-08-25 Activity: Civil structural shop drawings for Wilderness OBG-UPDATE2013-08-25 Activity: MEP Shop drawings for Wilderness OBG-UPDATE2013-08-25 Activity: Architectural Shop drawings for Wilderness OBG-UPDATE2013-08-25 Activity: Shop drawings for Landscaping for Wilderness WAD 8510 WAD 8520 WAD 8530 WAD 8540 WAD 8550 WIL 8510 WIL 8520 WIL 8530 WIL 8540

Activities with unsatisfied constraints..........................2 Project: OBG-UPDATE2013-08-25 Activity: A1520 Project Completion & Handover Project: OBG-UPDATE2013-08-25 Activity: A2070 Approved Kitchen Layout drawings - approved by Muscat Food Control Authority Activities with unsatisfied relationships........................5 Project: OBG-UPDATE2013-08-25 Activity: A2040 General Excavation & localised for footings Project: OBG-UPDATE2013-08-25 Activity: A2880 Excavate for Wall Foundations Project: OBG-UPDATE2013-08-25 Activity: A2900 General Excavation for Southern Biome areas Project: OBG-UPDATE2013-08-25 Activity: A3370 Excavate for Wall Foundations

Project: OBG-UPDATE2013-08-25 Excavation for Foundations & Tunnel

Activity:

A3510

Activities with external dates...................................0