Assumption:
Shutdown Operation
Pipeline De-Gassing to be done
Low level construction HSE Pre-Lay Survey
Inshore Replacement Location
4.5m minimum offset / parallel
distance (depend on trench width
and soil shear strength) Mob. Personnel &
Equipments
Transportation to Offshore
- West/East Gooseneck (optional to be To be coordinated with all
Launching new U-Spool Coordinated Pipeline De-
fabricated on derrick barge) construction preparation
- Install floaters & wire on new U-Spool pressurized/shutdown
- Material for Tie-In Spool (west/east)
- A-Frame (if any offshore lifting required - Install stability guide on new U-Spool
for tie-in) - Side-boom/Backhoe required
Pipeline De-Gassing / N2
Purging
Towing to offshore
Cutting Process
- West/East Point for future tie-in on the
Using WELDING/Flange
existing mainline/OLD U-Spool
Using WELDING/Flange TIE-IN (west point) – Lift & Lower
TIE-IN (west point) – Cofferdam
- Lifting on WEST line & new U-Spool Drag / Lift the OLD U-Spool
end (west side) – check integrity Remove OLD U-Spool using AHT/Derrick Barge
- Lowering new U-Spool in new Trench
- 1st Metrology and Fit-up (TBA)
- 1st Metrology and Fit-up new U-Spool
- Welding west point (tie-in spool will be
end to west/east point Alternative required)
- Welding west point (tie-in spool will be
using WELDING - Lowering (mainline & new U-Spool)
required) inside Cofferdam
west side
- Connecting Flange (optional tie-in)
- Connecting Flange (optional tie-in)
TIE-IN (east point) – Cofferdam TIE-IN (east point) – Lift & Lower
nd
- 2 Metrology and Fit-up new U-Spool - Lifting on EAST line & new U-Spool
end to east point only (east side) – check integrity
Alternative
- Welding east point (tie-in spool will be - 2nd Metrology and Fit-up
required) inside Cofferdam using WELDING
- Welding east point (tie-in spool will be
- Connecting Flange (optional tie-in) required)
- Lowering (mainline & new U-Spool)
east side
- Connecting Flange (optional tie-in)
As Built Survey