Drive Pipe NU Diverter Prepare to Spud Run Conductor Cement Conductor Install Conductor Spool Drill Surface Hole Run Surface Casing Cement Surface Casing ND Diverter / NU Stack Drill Inter. Casing Hole Run Intermediate Cement intermediate Install Inter. Casing Drill Out for Liner Running Liner String Cement Liner String Install liner Spool Skidding Operations CkLst1 CkLst2 CkLst3 CkLst4 CkLst5 CkLst6 CkLst7 CkLst8 CkLst9 CkLst10 CkLst11 CkLst12 CkLst13 CkLst14 CkLst15 CkLst16 CkLst17 CkLst18

High Island 9
CHECKLIST
HAMMER DRIVE PIPE ITEM Drive Pipe Measurement On Pipe Running Order Pipe Tongs Drivepipe Hammer & Unit Hammer Crew Drivepipe handling equip. Pick-up Slings Hammer Rig Up Slings Rotary Bushings Texas Deck RKB To Drivepipe Cut Drive Pipe Flange Oxy-Ace Torch or cold cut equip. Oxy-Ace Supply Drawworks Brakes Elmago Brake Bit sub for drill/drive assy. Bit breaker DC's (5x8") HWDP (7x4 1/2IF) XO (6 5/8RPx4 1/2IFB) LIFT CAPS 7 5/8R 6 5/8R 4 1/2IF Hole opener if needed OPERATOR_PERENCO_________________ MONTH/YEAR__March 04_____________ WELL NUMBER_EBOME KB-4 DAY REMARKS G.M. SUPERVISOR OPERATOR

High Island 9
CHECKLIST
OPERATOR_____ADDAX_____________ NIPPLE UP DIVERTER 29.5 MONTH/YEAR JULY 06_______ WELL NUMBER___OKW-4____________ ITEM DAY REMARKS GSF. SUPERVISOR OPERATOR Diverter/Element Hydraulic Controll Lines Overboard Lines/Valves Diverter Flange-Nuts&Bolts Ring Gaskets/Spares B.O.P. Hoist Pickup Slings/Shackles Oxy-Ace Torch Bell Nipple Lenght Flow Line/Fill Line Impact Wrench&Sockets Hammer Wrenches Sledge Hammers B.O.P. Accumulator Unit B.O.P. Fluid Function Test Diverter Seals For Slip On Flanges Verify flanges are compatable correct unions for fill up line chains and binders permits for manriding grease gun w/ psi gauge radios rope packing plate bell nipple 50' x 1/2" 16-Sep bucket ep2 (manual gun) 100PSI over expected working psi verify flanges are compatable R 73 3/8 allen key function test 1.5 60' slings for drawworks check shackles and slings rated for load choke control line and closed annular hose

SLINGS 60' 1.5 FOR BLOCK 30' FOR MUD CROSS 30' FOR CRANE WITH LONG STINGER KEEL HAUL FROM STARBOARD CRANE TO BLOCK PASS ROPE TO DRIVE PIPE DECK FROM SHAKER DECK (TO PULL SLINGS) 2 11/16 WRENCH FOR NO WELD ADAPTER BOLTS 28 STUDS ENSURE TO BACKTHEY OUT DIES BACK BOLTS ALL THE WAY JUMP STARBOARD TUGGER TO PORT SIDE WITH SNATCH BLOCK TO HANDLE VENT LINE CLOSE ALL VALVES ON KOMMEY UNIT 5 AGL BUCKET GREASE AND GUN WITH GAUGE BELL NIPLLE USING 30" SEAL RUBBER FOR PACKING 9/16 WRENCH FOR PACING BOLTS 29.5 diverter secure to stump install plug for closed inlet clean threads and lube clean ring grovves and lube same bop stump chase threads and lube same and cover

High Island 9
CHECKLIST
PREPARE TO SPUD ITEM DC/DP Elevators DC/DP Slips Rotary Bushings DC Safety Clamp Bit & Nozzles Bit Breaker Hole Opener DC Lifting Subs Stabilizers X/O Subs Drill Collars Heavy Weight Drill Pipe Drill Pipe Drill Collar/Drill Pipe Dope Float Valve Inside BOP TIW Valve Pipe Spinner Drill Pipe Tong/Jaws Drill Collar Tongs If Required Tong Sublines/Jerklines Mouse Hole Mud Bucket w/ Inserts Drawwork Break Bands Elmago Break Wireline Unit Single Shot Survey Totco Landing Ring Mud Pumps/Spares Mud Mixed Desilter Unit Desander Unit Mud Cleaner & Screens Degasser If Required Shale Shaker Screens Bulk Mud System Checked Barite On Board Pressure Test Diverter Drill Water On Board Trip Tank Operational OPERATOR PERENCO MONTH/YEAR March 04 DAY REMARKS WELL NUMBER_____EBOME KB-4 G.M. SUPERVISOR OPERATOR

High Island 9
CHECKLIST
RUN CONDUCTOR ITEM Conductor Casing Measurements On Casing Running Sequence Shoe/Float Collar Thread Lock Barite & Wire Brushes Cap. & Disp. Of Casing Hydraulic Tongs & Unit Manual Casing Tongs Rotary Bushings Casing Slips & Spider Safety Clamp Casing Elevators Stabbing Board Pick-up Slings Casing Dope Solf Rope Oxy-Ace Torch Drawworks Brakes Elmago Brake Casing Fill Up Line Casing Cent. & Pins Casing Make Up Torque OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR

High Island 9
CHECKLIST
CEMENT CONDUCTOR ITEM Cement On Board Cement Additives Cement Unit Lines Pumped Through Chicksan Lines Required Cementing Head Bulk Cement System Cement Lines Purged Hopper Weight Indicator Air Compressors Checked Bulk Pod Fluffed Weight Scales Sample Containers Diverter Wash Tool Check For Cmt At Shakers OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR

High Island 9
CHECKLIST
OPERATOR_________________ INSTALL CONDUCTOR SPOOL MONTH/YEAR_______________ WELL NUMBER_________________________ ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR RKB-LMF Measurement Conductor Pipe Spool Cross Over Swedge Double Studded Adapter Ring Gaskets For Same Flange Bolts & Nuts Diverter OVBD Lines BOP Hoist Impact Wrench & Sockets Hammer Wrenches Sledge Hammers Bell Nipple Lenght Oxy-Ace Torch

High Island 9
CHECKLIST
DRILL SURFACE HOLE ITEM D.P. Elevators D.C. Elevators Rotary Bushings D.P./D.C. Slips D.C. Safety Clamp Bit w/ Nozzles Bit Breaker Hole Opener D.C. Lift Nipples Stabilizers X-O Subs Drill Collars Heavy Weight Drill Pipe Drill Pipe Dope Float Valve Inside BOP Stabbing Valve DP Tongs/Dies Tong Snublines/Chains Mouse Hole Mud Bucket Drawworks Brake Bands Elmago Brake Wire Line Unit Totco Angle Recorder Totco Landing Ring Mud Pumps/Spares Mud Mixed Mud Supply Desilter/Desander Degasser Shale Shaker & Screens Bulk Mud System Pressure Test Divertor D.P./D.C. Disp & Cap Directional Equipment Minimum 1000 sx Barite Minumum 2000 bbl Water Minimum 500 bbl Diesel Torque to Torque to Torque to OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR

High Island 9
CHECKLIST
RUN SURFACE CASING ITEM Surface Casing Measurements on Casing Running Sequence Shoe/Float Collar Thread lock Compound Casing Disp/Cap Cal. Hydraulic Tongs/Unit Jaws f/ Back up tongs to size csg. Manual Casing Bushings Manual Slips/Elevators Spider Slips/Elevators Casing Fill Up Line Stabbing Board Pick up Slings Casing Dope Solf Rope Quick Release Protectors Casing Cent. & Pins Casing Scratchers/Pins Drawworks Brake Bands Elmago Brake Casing Makeup Torque Casing Drifted OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER___________________ DAY REMARKS G.M. SUPERVISOR OPERATOR

High Island 9
CHECKLIST
OPERATOR_________________ CEMENT SURFACE CASING MONTH/YEAR_______________ WELL NUMBER_________________________ ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR Class & Amt. of Cement Cement Additives Cement Unit Pump Through Cmt. Lines 8 Hrs. Prior to Job Chicksan Lines Cementing Head & Plugs Bulk Cement System Purge Cement Lines Check Out Air Compressor Bulk Pods Fluffed Mud Scales Sample Containers Displacement Calculation Diverter Wash Tool Man to Dump Cmt. @ S.S.

High Island 9
CHECKLIST
ND DIVERTER/NU STACK ITEM Surface Casing Spool Double Studded Adapter Ring Gaskets Choke & Kill Wing Valves BOP Stack Bell Nipple Lenght Bell Nipple: Nuts & Bolts C & K Valve: Nuts & Bolts Wellhead: Nuts & Bolts Impact Wrench & Sockets Hammer Wrenches Air Hoist Stack PU Slings Oxy-Ace Torch Texas Deck C & K Lines to Floor BOP Hydralic Control Lines Casing Spool Testing Equip Bebe Winches Flowline/Fillup Line Rig Floor C & K Manifold Adjustable Chokes BOP Control Panel Accumulator System BOP Fluid "Poor Boy" Degasser BOP Test Tool/O Rings Bore Protector & R.T. RKB Measurements Test BOP & Manifold Rig Floor & Remote OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR

Psi Ratings #Ring Gaskets # -

PSI Low:

PSI High:

SLINGS 60' 1.5 FOR BLOCK 30' FOR MUD CROSS 30' FOR CRANE WITH LONG STINGER KEEL HAUL FROM STARBOARD CRANE TO BLOCK PASS ROPE TO DRIVE PIPE DECK FROM SHAKER DECK (TO PULL SLINGS) 2 11/16 WRENCH FOR NO WELD ADAPTER BOLTS 28 STUDS TO BACK OUT DIES ENSURE THEY BACK BOLTS ALL THE WAY JUMP STARBOARD TUGGER TO PORT SIDE WITH SNATCH BLOCK TO HANDLE VENT LINE CLOSE ALL VALVES ON KOMMEY UNIT 5 AGL BUCKET GREASE AND GUN WITH GAUGE BELL NIPLLE USING 30" SEAL RUBBER FOR PACKING 9/16 WRENCH FOR PACING BOLTS 29.5 diverter secure to stump install plug for closed inlet clean threads and lube clean ring grovves and lube same bop stump chase threads and lube same and cover

High Island 9
CHECKLIST
OPERATOR_________________ DRILL INTER. CASING HOLE MONTH/YEAR_______________ WELL NUMBER_________________________ ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR Trip Tank Operational DC & DP Elevators DC & DP Slips Spare Inserts/dies for Above Rotary Bushings DC Safety Clamp Bit w/ Nozzles Bit Breaker DC Lift Nipples Stabilizers X-O Subs Drill Collars Heavy Weight Drill Pipe Drill Pipe Dope Float Valve Inside BOP TIW Valve Pipe Spinner DP Tongs & Jaws Tong Lines & Chain Mouse Hole Mud Bucket w/ Inserts Drawworks Brake Bands Elmago Brake Wireline Unit Totco Recorde-8/16 Totco Landing Ring Mud Pumps Checked Mud Supply Desander/Desilter Degasser Shale Shaker Screens Bulk Mud System Pressure Test BOP Disp/Cap Figures Directional Drilling Equip. Minimum 1000 Sx Barite Minimum 2000 bbls Water Minimum 500 bbl Diesel Torque to: Torque to: Torque to:

PSI Low:

PSI High:

High Island 9
CHECKLIST
OPERATOR_________________ RUN INTERMIATE CASING MONTH/YEAR_______________ WELL NUMBER_________________________ ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR Intermiate Casing Measurements on Casing Running Sequence Shoe/Float Collar Thread lock Compound Casing Disp/Cap Cal. Hydraulic Tongs/Unit Manual Casing Bushings Manual Slips/Elevators Spider Slips/Elevators Casing Fill Up hose & valve. Stabbing Board Pick up Slings Casing Dope Solf Rope Quick Release Protectors Casing Cent. & Pins Casing Scratchers/Pins Oxy-Ace Torch Drawworks Brake Bands Elmago Brake Casing Makeup Torque Casing Drifted stab board insp. Check list

High Island 9
CHECKLIST
CEMENT INTER. CASING ITEM Class & Amount of Cement Cement Additives Cement Unit Pump Through Cmt Lines 8 Hours Prior to Job Chicksan Lines Cement head & Plugs Bulk Cement System Check Out Air Compressor Bulk Pods Fluffed Weight Scales Sample Containers Displacement Calculations Man to Dump Cmt @ S.S. OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR

High Island 9
CHECKLIST
OPERATOR_________________ INSTALL INT. CSG. SPOOL MONTH/YEAR_______________ WELL NUMBER_________________________ ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR Intermediate Casing Spool Casing Slips Double Studded Adapter Ring Gaskets Bell Nipple Lenght Wellhead Flange & Bolts Impact Wrench Hammer Wrenches BOP Hoist Oxy-Ace Torch Texas Deck C & K Lines to Rig Floor Bebe Winches Flow Line/Fill up Line BOP Test Tools Bore Protector Distance to RKB Pipe Rams Test BOP Casing Spool Test Equip. Test Low: Test High: PSI Rating: Ring #

High Island 9
CHECKLIST
DRILL OUT FOR LINER ITEM Trip Tank Operational DC & DP Elevators DC & DP Slips Spare Inserts/dies for Above Rotary Bushings DC Safety Clamp Bit w/ Nozzles Bit Breaker DC Lift Nipples Stabilizers X-O Subs Drill Collars Heavy Weight Drill Pipe Drill Pipe Dope Float Valve Inside BOP Pipe Spinner DP Tongs & Jaws Tong Lines & Chain Mouse Hole Mud Bucket w/ Inserts Drawworks Brake Bands Elmago Brake Wireline Unit Totco Recorde-8/16 Totco Landing Ring Mud Pumps Checked Mud Supply Desander/Desilter Degasser Shale Shaker Screens Bulk Mud System Pressure Test BOP Disp/Cap Figures Directional Drilling Equip. Minimum 1000 Sx Barite Minimum 2000 bbls Water Minimum 500 bbl Diesel Torque to: Torque to: Torque to: OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR

PSI Low:

PSI High:

High Island 9
CHECKLIST
RUNNING LINER STRING ITEM Liner Casing Measurements on Casing Running Sequence Shoe/Float Collar Thread lock Compound Liner Hanger/Running Tool DP Landing String Casing Disp/Cap Cal. Hydraulic Tongs/Unit Manual Casing Bushings Manual Slips/Elevators Spider Slips/Elevators Casing Fill Up Line Stabbing Board Pick up Slings Casing Dope Solf Rope Quick Release Protectors Casing Cent. & Pins Casing Scratchers/Pins Oxy-Ace Torch Drawworks Brake Bands Elmago Brake Casing Makeup Torque Casing Drifted BOP Rams Mill(Tie Back) OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR

High Island 9
CHECKLIST
CEMENT LINER STRING ITEM Class & Amount of Cement Cement Additives Cement Unit Pump Through Liner 8 Hour Prior to Job Rabbit Landing String Chicksan Lines Cement Head &n Plugs Bulk Cement System Check Out Air Compressor Bulk Pods Fluffed Weight Scales Sample Containers Displacement Calculations OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR

____________

High Island 9
CHECKLIST
INSTALL LINER SPOOL ITEM Liner Casing Spool Casing Slips Double Studded Adapter Ring Gaskets Bell Nipple Lenght Wellhead Flange & Bolts Impact Wrench Hammer Wrenches BOP Hoist Oxy-Ace Torch Texas Deck C & K Lines to Rig Floor Bebe Winches Flow Line/Fill up Line BOP Test Tools Bore Protector Distance to RKB Pipe Rams Test BOP Casing Spool Test Equip. Test Low: Test High: PSI Rating: Ring # OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_________________________ DAY REMARKS G.M. SUPERVISOR OPERATOR

High Island 9
CHECKLIST
Skidding Operations ITEM Skidder Control Handrails OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_______________________ DAY REMARKS GSF SUPERVISOR OPERATOR Test emergency stop prior to use - motorman to stand by breakers in scr room Handrails inboard of skid beam removed to allow bop setback area to clear Handrails outside skid beam swung inward for teeth rack to pass All stairs removed or lifted up & secured Items secured or removed from both walkways under cantilever Walk along upper cantilever walkways to ensure nothing attached Fittings greased - located along inside of skid beam - EP2 Bottom & outside edge of beam lubricated w/ pipe dope Bronze wear strips lubricated w/ pipe dope Teeth rack cleaned & doped w/ pipe dope Ensure small pipe extension removed - located on end of trough going into shakers - extension usually left inside trough when removed Man to watch constantly to ensure trolley system operating properly Men to watch when going over the fire station to ensure no hang ups Watch when going over handrails & drive pipe deck Completely removed prior to skid - Note air line has bleed off line by 30" diverter Check height of anything in hwdp bay because the accumulator unit skids in over it Skid in to were end of cantilever & end of skid beam are flush Always hang in proper rack prior to skidding Small 4" co-flex hose hang off at drill floor level next to v-door stairs Connects port side monkey board to padeye on aft walkaround on port leg Check for obstructions on teeth - remove outside covers Ensure electrical supply cable disconnected and clear

Walkway - stairs

Skid beams

Mud return trough

Electrical umbilical cord BOP control lines

Supply & drain hoses Accumulator unit Skid in location Jumper hoses - C & K hose

Derrickman escape cable Skid motors Hi -pressure washer

High Island 9
CHECKLIST
change annular element ITEM Verify JRA Verfiy new element on board make and type Verfiy seals are on board verfiy lifting eyes for element verfiy lifting eyes for annular head wrench for lock down bolt function bop hoist sheaves for tuggers sling for block shackle for block safety belts check sala lines rags soap wrenches for bell nipple slings for bell nipple shackles for bell nipple pull mouse hole 2 x 30' x 7/8 2 x 7/8 1 box three buckets 1 1/2 x 60' 20 ton 1 1/2" torque= 100 ft/lb long life hydril p/n 3131189 head gasket= 38150 upper u seal= 38151 OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_______________________ DAY REMARKS GSF SUPERVISOR OPERATOR

weight of equipment screw head element total annular

3445 lb 480 lb 14800 lb

High Island 9
CHECKLIST
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_______________________ DAY REMARKS GSF SUPERVISOR OPERATOR

ITEM

High Island 9
CHECKLIST
OPERATOR_________________ MONTH/YEAR_______________ WELL NUMBER_______________________ DAY REMARKS GSF SUPERVISOR OPERATOR

ITEM

You might also like