BUSBAR DIFFERENTIAL RELAY CLIENT CONSULTANT CONTRACTOR PROJECT SUBCONTRACTOR SUBSTATION

BUSBAR DIFFERENTIAL RELAY 1. Name Plate Details:


Relay Make Relay Model. MLFB Number. Serial Number. Aux. Voltage. Rated Current. Rated Frequency. CT Ratio. REYROLLE DAD N

Date

2. General Inspection :
SI No. 1 2 3 4 5 6 7 8 DESCRIPTION Relay Earth connection to local Earth Bar. Binary O/P contacts are operating properly. Binary I/P contacts are operating properly. Trip Indications and Resetting operation Ok Relay front panel push buttons working properly. Relay front panel function keys working properly. Relay front panel LEDs working properly. Relay logic according to the protection scheme. REMARKS

3. Secondary Injection. Current Injection (XIN) 0.5

Analogue input Metering.

Relay Reading (Secondary) Phase A Phase B Phase

1.0 4. Differential Function (87)


Inspected by Name Signature Date

Page 1 of 4

BUSBAR DIFFERENTIAL RELAY CLIENT CONSULTANT CONTRACTOR PROJECT SUBCONTRACTOR SUBSTATION

Id> Pick Up/ Reset. Setting (A) 0.1 0.5 1.0 Operating Time Checks.
Phase A B C Current Setting (Is) Time Setting(Ts) Sec. Operating Time at 2 X Is

A Phase current Pick up Drop-off

B Phase current Pick up Drop-off

C Phase current Pick up Drop-off

Pickup Tolerance =+5% of setting Drop off=95%of Is Operate Time of 2xIs = 1 Cycle Time delay = + 1% or 5ms Id>> Pick Up/ Reset. Setting (A) A Phase current Pick up Drop-off 0.1 0.5 1.0 B Phase current Pick up Drop-off C Phase current Pick up Drop-off

Operating Time Checks.


Inspected by Name Signature Date

Page 2 of 4

BUSBAR DIFFERENTIAL RELAY CLIENT CONSULTANT CONTRACTOR PROJECT SUBCONTRACTOR SUBSTATION

Phase A B C

Current Setting (Is)

Time Setting(Ts) Sec.

Operating Time at 2 X Is

5. CT Supervision Function (50) Pickup Tolerance =+5% of setting Drop off=95%of Is Operate Time of 2xIs = <1.5 Cycle Time Delay = + 5% or 10ms Pick Up/ Reset. Setting A Phase current (A) Pick up Drop-off 0.05 0.08 Operating Time Checks.
Phase A B C Current Setting (Is) Time Setting(Ts) Sec. Operating Time at 2 X Is

B Phase current Pick up Drop-off

C Phase current Pick up Drop-off

6. LEDs Check.
S.No 1 Inspected by Descriptions R-PH PICK UP Name Results Ok / Not Ok Signature Date

Page 3 of 4

BUSBAR DIFFERENTIAL RELAY CLIENT CONSULTANT CONTRACTOR PROJECT SUBCONTRACTOR SUBSTATION

2 3 4 5 6 7 8

Y-PH PICK UP B-PH PICK UP Id > Trip Id >> Trip CT-50 Operated Protection out

Ok Ok Ok Ok Ok Ok Ok

/ Not / Not / Not / Not / Not / Not / Not

Ok Ok Ok Ok Ok Ok Ok

7. Binary Inputs Check.


S.No 1 2 3 4 5 6 7 8 9 10 11 12 13
Comments:

Descriptions

Results Ok / Not Ok Ok / Not Ok Ok / Not Ok Ok / Not Ok Ok / Not Ok Ok / Not Ok Ok / Not Ok Ok / Not Ok Ok / Not Ok Ok / Not Ok Ok / Not Ok Ok / Not Ok Ok / Not Ok

Test Equipment Details. Make Model Serial Number Calibration Date

Inspected by

Name

Signature

Date

Page 4 of 4