You are on page 1of 29

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

F3

DL + LL + Self Weight Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 3197.5 3197.5 0.8 0.8 0.72 0.72 5.7 5.7 5.13 5.13

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1 1

Increment for current load case finc = 1

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3646.80 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 1

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

531.7 533.9 531.8 534.1 531.9 534.2

531.657 533.937 531.777 534.057 531.897 534.177 SFp 3197.5 534.18 kN 531.66 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 5.7 kN 0.8 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 531.66 kN Permissible Tensile Force Finc * Ppp 300 kN SHx SHz Ge =
=

1.00 534.2 kN 550 kN Safe

Finc * Ppv * Ge =

5.76 kN 0.96 kN 55.0 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 2

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

F3

DL + LL + Self Weight + Wind Load/sl(case 1) Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 2733.8 2733.8 0.8 0.8 0.72 0.72 91.3 91.3 82.17 82.17

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1.25 1.25

Increment for current load case finc = 1.25

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3183.10 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 3

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

437.3 473.8 437.4 473.9 437.5 474

437.253 473.773 437.373 473.893 437.493 474.013 SFp 2733.8 474.01 kN 437.25 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 91.3 kN 0.8 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 437.25 kN Permissible Tensile Force Finc * Ppp 375 kN SHx SHz Ge =
=

1.00 474.0 kN 687.5 kN Safe

Finc * Ppv * Ge =

91.30 kN 15.22 kN 68.8 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 4

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

F3

DL + LL + Self Weight + Wind Load/sl(case 2) Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 3429.7 3429.7 4.7 4.7 4.23 4.23 5.7 5.7 5.13 5.13

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1.25 1.25

Increment for current load case finc = 1.25

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3879.00 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 5

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

569.8 572.1 570.5 572.8 571.2 573.5

569.772 572.052 570.477 572.757 571.182 573.462 SFp 3429.7 573.46 kN 569.77 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 5.7 kN 4.7 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 569.77 kN Permissible Tensile Force Finc * Ppp 375 kN SHx SHz Ge =
=

1.00 573.5 kN 687.5 kN Safe

Finc * Ppv * Ge =

7.39 kN 1.23 kN 68.8 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 6

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

H3

DL + LL + Self Weight Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 3271.4 3271.4 2.6 2.6 2.34 2.34 0.7 0.7 0.63 0.63

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1 1

Increment for current load case finc = 1

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3720.70 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 7

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

544.7 545 545.1 545.4 545.5 545.8

544.703 544.983 545.093 545.373 545.483 545.763 SFp 3271.4 545.76 kN 544.7 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 0.7 kN 2.6 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 544.70 kN Permissible Tensile Force Finc * Ppp 300 kN SHx SHz Ge =
=

1.00 545.8 kN 550 kN Safe

Finc * Ppv * Ge =

2.69 kN 0.45 kN 55.0 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 8

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

H3

DL + LL + Self Weight +WL /SL(CASE 1) Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 2966.5 2966.5 2.6 2.6 2.34 2.34 38.1 38.1 34.29 34.29

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1.25 1.25

Increment for current load case finc = 1.25

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3415.80 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 9

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

486.4 501.6 486.8 502 487.2 502.4

486.407 501.647 486.797 502.037 487.187 502.427 SFp 2966.5 502.43 kN 486.41 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 38.1 kN 2.6 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 486.41 kN Permissible Tensile Force Finc * Ppp 375 kN SHx SHz Ge =
=

1.00 502.4 kN 687.5 kN Safe

Finc * Ppv * Ge =

38.19 kN 6.36 kN 68.8 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 10

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

H3

DL + LL + Self Weight +WL /SL(CASE 2) Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 3609.9 3609.9 3.7 3.7 3.33 3.33 0.7 0.7 0.63 0.63

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1.25 1.25

Increment for current load case finc = 1.25

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 4059.20 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 11

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

601 601.2 601.5 601.8 602.1 602.3

600.955 601.235 601.510 601.790 602.065 602.345 SFp 3609.9 602.35 kN 600.96 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 0.7 kN 3.7 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 600.96 kN Permissible Tensile Force Finc * Ppp 375 kN SHx SHz Ge =
=

1.00 602.3 kN 687.5 kN Safe

Finc * Ppv * Ge =

3.77 kN 0.63 kN 68.8 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 12

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

H5

DL + LL + Self Weight Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 3298.1 3298.1 2.5 2.5 2.25 2.25 0.5 0.5 0.45 0.45

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1 1

Increment for current load case finc = 1

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3747.40 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 13

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

549.2 549.4 549.6 549.8 550 550.2

549.208 549.408 549.583 549.783 549.958 550.158 SFp 3298.1 550.16 kN 549.21 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 0.5 kN 2.5 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 549.21 kN Permissible Tensile Force Finc * Ppp 300 kN SHx SHz Ge =
=

1.00 550.2 kN 550 kN UNSAFE

Finc * Ppv * Ge =

2.55 kN 0.42 kN 55.0 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 14

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

H5

DL + LL + Self Weight +WL /SL(CASE 2) Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 3350.8 3350.8 2.5 2.5 2.25 2.25 37.8 37.8 34.02 34.02

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1.25 1.25

Increment for current load case finc = 1.25

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3800.10 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 15

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

550.5 565.7 550.9 566 551.3 566.4

550.532 565.652 550.907 566.027 551.282 566.402 SFp 3350.8 566.4 kN 550.53 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 37.8 kN 2.5 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 550.53 kN Permissible Tensile Force Finc * Ppp 375 kN SHx SHz Ge =
=

1.00 566.4 kN 687.5 kN Safe

Finc * Ppv * Ge =

37.88 kN 6.31 kN 68.8 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 16

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

H5

DL + LL + Self Weight +WL /SL(CASE 2) Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 2969.9 2969.9 8.4 8.4 7.56 7.56 0.5 0.5 0.45 0.45

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1.25 1.25

Increment for current load case finc = 1.25

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3419.20 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 17

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

493.6 493.8 494.9 495.1 496.1 496.3

493.623 493.823 494.883 495.083 496.143 496.343 SFp 2969.9 496.34 kN 493.62 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 0.5 kN 8.4 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 493.62 kN Permissible Tensile Force Finc * Ppp 375 kN SHx SHz Ge =
=

1.00 496.3 kN 687.5 kN Safe

Finc * Ppv * Ge =

8.41 kN 1.40 kN 68.8 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 18

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

F5

DL + LL + Self Weight Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 3280.8 3280.8 0.9 0.9 0.81 0.81 5 5 4.5 4.5

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1 1

Increment for current load case finc = 1

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3730.10 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 19

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

545.7 547.7 545.8 547.8 545.9 547.9

545.665 547.665 545.800 547.800 545.935 547.935 SFp 3280.8 547.94 kN 545.67 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 5 kN 0.9 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 545.67 kN Permissible Tensile Force Finc * Ppp 300 kN SHx SHz Ge =
=

1.00 547.9 kN 550 kN Safe

Finc * Ppv * Ge =

5.08 kN 0.85 kN 55.0 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 20

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

F5

DL + LL + Self Weight +WL/SL(CASE1) Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 2836.5 2836.5 0.9 0.9 0.81 0.81 95.8 95.8 86.22 86.22

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1.25 1.25

Increment for current load case finc = 1.25

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3285.80 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 21

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

453.5 491.8 453.6 491.9 453.7 492

453.455 491.775 453.590 491.910 453.725 492.045 SFp 2836.5 492.05 kN 453.46 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 95.8 kN 0.9 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 453.46 kN Permissible Tensile Force Finc * Ppp 375 kN SHx SHz Ge =
=

1.00 492.0 kN 687.5 kN Safe

Finc * Ppv * Ge =

95.80 kN 15.97 kN 68.8 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 22

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

F5

DL + LL + Self Weight +WL/SL(CASE1) Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 3532.3 3532.3 0.9 0.9 0.81 0.81 84.5 84.5 76.05 76.05

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 1.10

kN/m3 m m m Nos. m2

2 1.10 m

Ppv Ppp Pph Fincw Fincs

550 kN 55 kN 300 kN 1.25 1.25

Increment for current load case finc = 1.25

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 8.90 m 199.30 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 449.30 kN 3981.60 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 23

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

571.7 605.5 571.8 605.6 572 605.8

571.682 605.482 571.817 605.617 571.952 605.752 SFp 3532.3 605.75 kN 571.68 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 84.5 kN 0.9 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 571.68 kN Permissible Tensile Force Finc * Ppp 375 kN SHx SHz Ge =
=

1.00 605.8 kN 687.5 kN Safe

Finc * Ppv * Ge =

84.50 kN 14.08 kN 68.8 kN

Safe

Safe

175319119.xls.ms_office

ANALYSIS 24

AVANT GARDE Project :Ram Nagar Chinni Mills - Boiler foundation

Design of Pile Cap for PC Column Grid: F3

500

P1 P3

P2 P4

4000 3000 P5 500 500 1500 2500 500 P6

Pedestal Size Width Depth

B= D=

500 mm 900 mm

Strength of Concrete Strength of Steel 20 mm 16 mm 40 mm 50 mm

fck = fy =

25 N/mm 415 N/mm

Assuming the Dia of Main Bar Assuming the Dia of Main Bar (other direction) Clear Cover to the Tie Reinf. Effective Cov. Eff. Depth of Pile Cap Loads on pile cap : Self Weigth of pile cap Total pressure Pile reaction Distance of Pile from the face of pedestal Distance from the face of Ped. to edge of PC B.M at the face of pedestal 40+20/2 deff

950.00 mm

= = = = =

2 25 kN/m 2 25.00 kN/m

unit wt. of Soil Thickness of PC pile diameter 550.0

18.00 kN/m 1.00 m 500 mm

550

1050 mm 1550 mm

(550.00 + 550.00)x1.05 - 25 x 2.5 x 1.55/2 = = 1079.92 + 1080.21 kNm 0.288

Shear force at d/2 from face of pedestal Critical shear section Shear force at critical section = 475 mm from face of column (As per cl34.2.4.1 IS456:2000) Factor = 1.00

= (550.00 + 550.00)x 1.000 -25x2.5 x 1.075 = 1032.81 kN

OTHER DIRECTION Max. pile reaction occur in pile Distance of Pile from the face of pedeatal Distance from the face of coln to edge of PC B.M at the face of pedestal = = = 550 + 1100.00 ( 437.37+437.49)

500 mm 1000 mm

(550.00 + 1100.00)x0.5 - 25 x 4 x 1/2 = 775 + = 795.543 kNm Shear force at d/2 from face of pedestal Critical shear section Shear force at critical section =

20.5425

475 mm from face of column

(As per cl34.2.4.1 IS456:2000) Factor = 1.000

= (550.00 + 1100.00)x 1.000 -25x4 x 0.53 = 1597.5 kN

175319119.xls.ms_office

DESIGN 25

Direction 1

Direction. 2

Load Factor
Factored Moment Factored Shear

1.5
648.13 619.69

1.5 298.33 599.06

648.13 kN.m / m - width 619.69 kN / m -width

Reinforcement Longer span: Mu Mu/bd Pt Ast Required Spacing Provide 20 @


2

= 648.13 = 648.13 kN.m = 648.13 / (1000 x 950^2) 2 = 0.7181451 N/mm = 0.206 %


2 = 1957.4939 mm = 160.49055 mm

125

mm C/C

Pt =

0.26

Reinforcement shorter span: = 298.33 = 298.33 kN.m 2 Mu/bd = 298.33 / (1000 x 950^2) 2 = 0.3305578 N/mm Pt = 0.093 % < 0.15% Provide minimum Pt = 0.15 % Ast Required Spacing Provide 16 @
2 = 1425 mm = 141.09609 mm

Mu

125

mm C/C

Pt =

0.26

Top Reinforcement Providing Minimum % of Steel = Ast = 0.12 % 1000

0.12 x 1000 x 100 2 = 1200 mm Providing 12 mm dia Bar at 100 mm C/C in Shorter Span Providing 12 mm dia Bar at 100 mm C/C in Longer Span
Check for Punching Shear : For Column load : Maximum column load (V) Vu = 3300 kN

Load Factor

1.5

= 1.5 x 3300.00 = 4950.00 kN = Vu / bo x d = (500 + 950 + 900 +950)x 2 = 6600 mm = 0.79 N/mm2

Shear stress bo

Shear stress Permisible shear stress

= 0.25 x fck 2 1.25 N/mm SAFE

For pile reaction : Maximum pile reaction Vu Punching shear at pile perimeter = 474.01 kN Load Factor 1.5

= 1.5 x 474.01 = 711.0 kN = 711.0x1000/(3.14x(500+950))*950 N/mm2 = 0.16 N/mm2 < 1.25 SAFE

175319119.xls.ms_office

DESIGN 26

Check for one way shear Maximum shear force Vu (Calculated above) = 619.69 kN

Width of pilecap at shear section Shear stress, tv Allowable shear stress for Pt 0.26 Increased Shear Stress

tc

= 619.69 = 619.7 kN = 1000 mm = 0.65 N/mm = 0.36 N/mm = 2d x tc/av = 0.72 N/mm > 0.65 SAFE

(IS456:2000 Table 19) av = d (IS456:2000 Cl.40.5.1)

175319119.xls.ms_office

DESIGN 27

AVANT GARDE

Project :Ram Nagar Chinni Mills - Boiler foundation


ANALYSIS OF 6 PILE GROUP

Column Grid:
Load Combination :

E3

DL + LL + Self Weight + Wind Load Axis:


Y(dn)

Column size = 1050 x 1050

Design Data : X

Sum

Column Load
500 p1 P2

Fy Fz Mx Fx Mz

Unit KN-m 2664.5 2664.5 3.42 3.42 2.74 2.74 162.5 162.5 117 117

P3 4000 3000 P4

P5 500 500 1500 2500

P6

500

Unit Weight of soil Length of Pile Cap Width of Pile Cap Depth of Pile Cap No of Piles Area of pedestal Total area of pedestal Capacity of pile Vertical Lateral Pullout Increment Factor for Wind loads Increment Factor for Seismic forces Calculations : Vertical Loads Area of Pile Cap Soil Weight Wsoil

gs l b Dpc n Apeach Ap

16.00 2.50 4.00 1.00 6 0.27

kN/m3 m m m Nos. m2

2 0.27 m

Ppv Ppp Pph Fincw Fincs

450 kN 45 kN 210 kN 1.25 1.25

Increment for current load case finc = 1.25

Apc l*b Apcnett = (Apc-Ap) (df-dpc) *gs * Apcnett

2 10 m 2 9.73 m 217.95 kN

Self Weight of Pile Cap Wswpc Apc * Dpc * 25 Total Vertical Load SW Pv

250 kN 467.95 kN 3132.45 kN

SFy + SW

175319119.xls.ms_office

ANALYSIS 28

Pile Forces PV = Pv / n + Mx/ z* n + Mz / x n


Sl No Pile Desig x (m) z (m) Pv / n (kN) Fp (kN)

1 2 3 4 5 6

P1 P2 P3 P4 P5 P6

-0.75 0.75 -0.75 0.75 -0.75 0.75

-1.50 -1.50 0.00 0.00 1.50 1.50

417.6 469.6 418.1 470.1 418.5 470.5

417.627 469.627 418.083 470.083 418.540 470.540 SFp 2664.5 470.54 kN 417.63 kN

Sx2 Sz
2

3.375 9.0

Max Min

Check for Compressive Force Pile group efficency for For Six pile Max force in Pile Permissible Compressive Force Check for Lateral Force 162.5 kN 3.42 kN sqrt( SHx2 + SHy2) Resultant H Lateral Force per Pile H/n Permissible Lateral force Finc * Pph * Ge = Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary Minimum compressive force 417.63 kN Permissible Tensile Force Finc * Ppp 262.5 kN SHx SHz Ge =
=

1.00 470.5 kN 562.5 kN Safe

Finc * Ppv * Ge =

162.54 kN 27.09 kN 56.3 kN