You are on page 1of 4

1 MUHAMMAD BASHIR S/O Zakir Hussain(R.H) Registered Civil Engineer of PEC (Civil/30842) Address Mobile No.

Email : : : House# 1405, Street# 35, Sector# G-11/2, Islamabad Pakistan. +92-345-9428914 engr_bashir1214@hotmail.com

PROFESSIONAL PROFILE

1.5 years experience in project development, management, implementation and site supervision. Able to handle all assigned works with minimal supervision and can manage to work for long hours to meet the given schedules. Posses good communication skills that can communicate and negotiate at all levels.

Career Objectives: To share knowledge, skills and upgrade experiences for a much challenging position in different field of engineering. February 2012 up to April 2012 Allied Construction Company (ACC) Main Office in 3rd floor Jawad Tower Arbab Road Peshawar Position: Project: Responsibilities:

Site Engineer/Supervisor Bridge Over Shalozan khwar Parachinar.

Planning for the up coming orders of the project. Lining of the bridge at each and every support from abutment till end. Determining the quantity of the material before concreting of the pile cap, pier shaft and other parts of the bridge. Supervision of manpower, equipments, materials and other tools of this project.

Implementation of drawing details(layout) on ground and marking for the pile cap, front wall, pier shaft etc. Familiar about bar bending schedule and guide steel fixer day by day about bar bending according to the construction of this RCC structure. Discussing detail of structural drawing with XEN & SDO of the Communication & Works(C&W) department at Parachinar. Length of the bridge over Shalozan khwar is about 150 meters and it have six spans. Each span is 23.6 meters long. Layout and supervision of excavation and stone in the construction of 175 meter long gabion having height in three steps and each step is one meter. HSK General Contractors

January 2011 up to January 2012 Plot# 96-E, Basement-1, United Plaza, Blue Area Islamabad. Position: Project: Commercial Building) Responsibilities:

Site Supervisor. Silver City (5 stories

Close coordination with the construction Manager, in planning and controlling the required manpower, equipment, material and tools required for project. Estimation of the required quantities like Cement, Sand, Crush, Steel etc for the whole project. Review the Structural details prior to implementation (Layout). Quantity and Quality control assessment is the main purpose through out the project duration y making supervision on each and every item equipment and tool. Inspects & close supervise work in progress work in ensure conformity with specifications and quantity requirement and provides technical advice to resolve problems. Leading & manage site activities by giving instruction to sub-engineer. Preparing and submitting daily report to project manager(senior engineer) and consult for daily project progress update. Carry out such other duties as may properly be those of a Quantity Surveyor. KARCON Construction Company

July 2009 up to November 2009 Main office near WAPDA House Peshawar.

Position: Project: Chamkani Peshawar. Responsibilities:


Site Trainee Engineer Motorway (M1) Interchange at

Having good supervision, installation and control of drawing of the project. Familiar from the drawing detail of flyover like bar bending schedule for the deck slab, girder etc. Does drafting work using Auto CAD. Supervision of the ratio for the concrete in batching plant located at the site for the Concrete blocks (PCC & RCC blocks) for the road division and kerb stone etc. Having command on load test to familiar from its capacity of load. Preparing geotechnical reports for the material having load bearing capacity for compaction of that material. Practical Survey

July 3,2009 up to July 19,2009 Abbott Abad Position in each group) Responsibilities:

Group Leader (14 member

Leading authority of the group given by Chef Coordinator of the Campus. Perform different survey of land like contouring, leveling, triangulation, plan tabling survey. Preparing all the survey reports and drawing sheets at the end of every survey and submitted it to the coordinator of the camp.

Qualification:

Graduate in Bachelor of science in Civil Engineering, 2007-2010

CECOS UNIVERSITY OF IT & EMERGING SCIENCES Peshawar (Marks obtained=70.2%)

F.Sc (Pre Engineering Group), 2004-2006

B.I.S.E Peshawar Pakistan (Marks obtained=67%)

Matric (Science Group) 2004

B.I.S.E Kohat Pakistan (Marks obtained=61%) Computer Skills: MS Office, AutoCAD, MD Solid. Final Year Project: Investigation of ruts and pot holes on ring road Peshawar. Languages: 1. English (Fluent) 2. Urdu 3. Pashto. Personal Information: Age D.O.B Religion Permanent Residence Passport No References: Will be furnished on demand. I hereby certify that the above information is true & correct to the best of my knowledge and beliefs. : : : : : 25 years 18/03/1987 Islam Parachinar Kurram Agency BS3842141

You might also like