ERT 349 SOIL AND WATER ENGINEERING DESIGN PROJECT

DESIGN PROJECT A farmer intended to develop 1 ha plantation near Padang Besar, Perlis. As consultant, you are assigns to advice the farmer with the design project for irrigation and water resources management . The crops are: 1. For hilly area plantation (strawberry) Group Gellisols 2. For Greenhouse planted with chili plant by Overhead Sprayer-Aridisols 3. Greenhouse planted with tomato plant with drip tape-Mollisols 4. For field crop (maize) with sprinkler 5. For hybrid rice with surface irrigation-Vertisols 6. For hybrid rice with terraces irrigation-Oxisols 7. For okra plantation with furrow -Alfisols 8. Subsurface irrigation for Roselle - Histosols 9. Nursery irrigation for palm oil tree - Entisols 10. For tree crops plantation - Ultisols Includes in your report: 1. Soil map for an area found that suitable for plantation. (Scaled drawing) a. Locate all existing structures, drainage, river, vegetation, etc. b. Indicate north on the drawing c. Types of soil in the farm sites (Collect at least 4 soil samples from different location on the site) 2. Design an erosion and sediment control plan (ESCP) 3. Design a drainage and irrigation system for your plantation (open channel and irrigation) a. Irrigation water requirement i. Crop water requirement ii. Climate iii. Crop stages iv. ET potential b. Irrigation schedule and frequency c. Irrigation System Design i. System Layout ii. Pipe sizing iii. Pump requirement and power 4. Water resources intake point, flow rate and piping requirement 5. Detailed drawing for drainage and irrigation system 6. Costing for the plantation drainage and irrigation a. Fix cost b. Variable cost 7. References 8. Appendices Calculations Picture showing the sampling points and soil samples

ERT 349 SOIL AND WATER ENGINEERING DESIGN PROJECT

The report format 1. 2. 3. 4. 5. 6. 7. Executive summary (in one paragraph) Introduction Design Criteria Design and Calculation Example Layout Plan and Detailed Drawing References Appendices

Due date: Presentation will be carry on Week 15. Project report should be submitted not later than 5.00PM 20 DECEMBER 2013 Design Project Group
Group 1 (HISTOSOLS) CHEE LAI JU NUR ADARIAH SYAFIKA BINTI MOHAMAD SABRI NUR FARAHIN BINTI CHE NORDIN MAGESWARAN A/L MURUGIYA Group 3 (ENTISOLS) ENNA SYAZWANNIE BINTI JUHARI MIMI ANAK RUBEN NUR FITRIAH BINTI SAIDIN NURUL NAJWA BINTI HALIM Group 5 (ARIDISOLS) FARAH BINTI ROSLI MUHAMMAD FARHAN ASYRAF BIN BUSHRAL KARIM NUR ALISSA BINTI RAMLEY ODILIA PETRINA BINTI FRANCIS Group 7 (OXISOLS) GAN PEI GIE MUHAMMAD FARHAN HADI NURAINI HANISAH BINTI MAT HUSIN NURUL FARHANA BINTI HARUN Group 9 (GELLISOLS) LIM WEI LUN NOR FADHUA BINTI ABD RAHMAN NUR SALWANA BINTI ISMAIL MUSLIM NORFAZIDAH BINTI OTHMAN WAN NURUL MASLIZA BINTI WAN OTHMAN Group 2 (ALFISOLS) CHUA SENG WEI NOOR IZZAH BINTI AZMI NUR FATAHIYAH BINTI MOHAMED HATA WAN NUR ASNIDA BINTI WAN OTHMAN Group 4 (MOLLISOLS) FAKHRUL ANWAR BIN KAMARUL AZMI NOOR HAYATI BINTI OSMAN NUR NAZIHAH BINTI MD LAZIM PUTERI IZZAH HANISAH BINTI ZAKI Group 6 (ULTISOLS) FARHANI BINTI A RAZAK MUHAMMAD NAZRIN SHAH BIN FAROOK NURUL ZAHIRAH BINTI MD ZAKARIA SARAH INGRID XERVASER Group 8 (VERTISOLS)

MOHAMED

KUAN JING YI NUR ATIQAH LYANA BINTI NOR ASHIKIN NUUR MUHAIMIN BIN HUSSIN WAN NUR HASLINA BINTI WAN HUSSIN SITI FATIMAH BINTI ZUBIR