Subject : Sanabil

Bill of Quantities (Annex B)

for the Renovations, Maintenance of

Business Offices on 21st, 23rd, 24th Floors of Al Faisaliah Tower Dear Mr. Ibrahim: Concerning to your request, please find below our best and lowest revised quotation for your server room in Al Faisaliah Building.

S/N 1 1.1

1.2 1.3 1.4 1.5 1.6 1.7 2 2.1

3 3.1

3.2 4 4.1

DESCRIPTION Level 21 and 23 Civil Works Provide and perform demolition works for Gypsum wall, Gypsum Ceiling, Glass and Acoustic and protect existing materials and furnitures including repair of damage area during removal/ demolition, clearing of debris, disposal to waste container. Supply and install gypsum partition wall with complete accessories. Supply & Install Vinyl wallpaper Painting works Supply and Install wooden skirting Dismantling and relocation of existing wooden doors Wall Wood Cladding works MECHANICAL WORKS Modification of existing HVAC and firefighting system which includes relocation, cleaning and rehabilitation and re installation of all necessary as per required. ELECTRICAL WORKS Modification of existing electrical system which includes relocation, cleaning and rehabilitation and re installation of all necessary as per required. Supply and installation of floor box MAINTENANCE st Maintenance for 21 floor Maintenance for 23rd floor Maintenance for 24th floor

QTY

UNIT

Ls

110 220 390 1 3 1

m2 m2 m2 Ls pc Ls

Ls

1 7

Ls set

Subject : Sanabil

Bill of Quantities (Annex B)

for the Renovations, Maintenance of

Business Offices on 21st, 23rd, 24th Floors of Al Faisaliah Tower

S/N 1 1.1

1.2 1.3 1.4 1.5 1.6 1.7 2 2.1

3 3.1

3.2 4 4.1

DESCRIPTION Level 21 and 23 Civil Works Provide and perform demolition works for Gypsum wall, Gypsum Ceiling, Glass and Acoustic and protect existing materials and furnitures including repair of damage area during removal/ demolition, clearing of debris, disposal to waste container. Supply and install gypsum partition wall with complete accessories. Supply & Install Vinyl wallpaper Painting works Supply and Install wooden skirting Dismantling and relocation of existing wooden doors Wall Wood Cladding works MECHANICAL WORKS Modification of existing HVAC and firefighting system which includes relocation, cleaning and rehabilitation and re installation of all necessary as per required. ELECTRICAL WORKS Modification of existing electrical system which includes relocation, cleaning and rehabilitation and re installation of all necessary as per required. Supply and installation of floor box MAINTENANCE st Maintenance for 21 floor Maintenance for 23rd floor Maintenance for 24th floor

QTY

UNIT

Ls

110 220 390 1 3 1

m2 m2 m2 Ls pc Ls

Ls

1 7

Ls set