M/S.

K J S CEMENT LIMITED
FOR- 6000 TPD CEMENT PLANT
DATE : 02.02.2012
CONTRACTOR

DESCRIPTION

M/S. SAI ENGINEERING


R.A. BILL -08

SL.
NO.

DESCRIPTION

RATE /
MT

CLAIMED
QTY.Kgs.

THIS BILL
QTY. Kgs.

DIFF.
Kgs.

AMOUNT
CLAIMED (Rs.)

PAYABLE
AMOUNT (Rs.)

DIFF.
(Rs.)

Fabrication of Oil Line Gallery From 211


BC 7 to DM Plant

6500

4727.00

4131.00

596.00

30725.50

26851.50

3874.00

Erection of Oil Line Gallery From 211


BC 7 to DM Plant

4600

4727.00

4131.00

596.00

21744.20

19002.60

2741.60

Fabrication of Magnetic Separator


Support Platform for 331 BC 2

6500

1412.00

0.00

1412.00

9178.00

0.00

9178.00

Erection of Magnetic Separator Support


Platform for 331 BC 2

4600

1412.00

0.00

1412.00

6495.20

0.00

6495.20

Erection of Magnetic Separator for 331


BC 2

7100

5300.00

0.00

5300.00

37630.00

0.00

37630.00

Erection of Conveyor Belts for 211 BC


7, 311 BC 2, 331 BC 2, L21 BC2,L21
BC3,L21 BC5 & L21 BC6

7100

35280.00 34767.00

513.00

250488.00

246845.70

3642.30

Erection of Counter Wts. for 211 BC 7,


311 BC 2, 331 BC 2, L21 BC2,L21
BC3,L21 BC5 & L21 BC6

7100

25287.00 25287.00

0.00

179537.70

179537.70

0.00

Erection of Motor & Gear Box for 211


BC-7 & 311 BC-2

7100

9140.00

9140.00

0.00

64894.00

64894.00

0.00

Erection of Couplings to 211 BC 7, 311


BC 2, 331 BC 2, L21 BC2,L21 BC3,L21
BC5 & L21 BC6

7100

850.00

850.00

0.00

6035.00

6035.00

0.00

10

Erection of Belt Conveyor Accessoreis


for L21 BC-2, L21 BC-3, L21 BC-5 &
L21 BC-6

7100

774.00

142808.60

137314.00

5494.60

11

Erection of Motor & Gear Box for L21


BC-2, L21 BC-3, L21 BC-5 & L21 BC-6

7100

1197.00

1197.00

0.00

8498.70

8498.70

0.00

12

Fabrication Supporting Structures for


Analyser at 211 BC 7

7100

958.03

958.03

0.00

6227.00

6227.00

0.00

20114.00 19340.00

13

Erection Supporting Structures for


Analyser at 211 BC 7

7100

958.03

958.03

0.00

4406.00

4406.00

0.00

14

Erection of Analyser

7100

4475.00

4475.00

0.00

31772.50

31772.50

0.00

15

Dismantling of Erection of Analyser

3550

4475.00

4475.00

0.00

15886.25

15886.25

0.00

16

Re-Erection of Analyser

7100

4475.00

4475.00

0.00

31772.50

31772.50

0.00

17

Dismantling of Counter Wts. For 211


BC-7, 311 BC-2, 331 BC-2, L21 BC-3 &
L21 BC-6

3550

15990.00 15990.00

0.00

56764.50

56764.50

0.00

18

Balance 20 % Amount against 211 BC7 & 311 BC-2 & 331 BC-2

7100

25800.00 25800.00

0.00

183180.00

183180.00

0.00

10603

1088043.65

1018987.95

69055.70

ABOVE SUM

166577

155974

Net Payable Amount -- Rs. Ten Lac Eighteen Thousand Nine Hundred Eighty Seven and Ninety Five Paisa Only

TRUSST ENGINEERS

DATE : 02.02.2012

REMARKS
Exess Weight
Exess Weight

Fabrication & Erection Work


done by other Agency
Erection Work done by other
Agency
Difference due to excess Wt.
in 211 BC 7

To noted that Erection Work


Done by two times &
Dismantled by one time

ve Paisa Only

TRUSST ENGINEERS

DEDUCTABLE QUANTITY DESCRIPTION FROM M/S. SAI ENGINEERING R.A. BILL-08


Date:- 28.0.2012
SL .

DESCRIPTION

NO .

Nos.

L (MM)

W (MM)

T (MM)

UNIT WT.

TOTAL WT.

CLAIMED WT.

PAYABLE WT.

DIFF.

STATUS

REMARKS

Deduction From - Fab. & Ere. Of Diesel Line Gallery from 211 BC 7 to DM-Plant
2

ISA-100X100X10

30

800

..

..

14.9

357.60

953.60
357.60
596.00
4727.30
4131.30
596.00
Fab. & Ere. Of Supporting Structure for Magnetic Separator for 331 BC 2 & Ere. Of Magnetic Separator
.
..
..
..
..
1412.00
1412.00
0.00
1412.00
Hold
..
..
..
..
..
5300.00
5300.00
0.00
5300.00
Hold

Calculation Difference

Total Weight (Kgs.)

3
4

Fab. & Ere. Of Str.


Ere. Of Magnetic Sep.

Work done by Other Agency


Work done by Other Agency

Ere. Of Conveyor Belts & Counter Weights


5
6
7
8
9
10

Conv. Belt 211 BC 7


Counter Wt. 211 BC 7
Counter Wt. 311 BC 2
Counter Wt. 331 BC 2
Counter Wt. L21 BC 3
Counter Wt. L21 BC 6

1
14
13
14
10
4

1046.00
..
..
..
..
..

..
..
..
..
..
..

..
..
..
..
..
..

22.00
450.00
300.00
300.00
300.00
300.00

23012.00
6300.00
3900.00
4200.00
3000.00
1200.00

Total Weight (Kgs.)

23535.00
7350.00
5687.00
6125.00
4375.00
1750.00
60577.00

23012.00
6300.00
3900.00
4200.00
3000.00
1200.00
53367.00

523.00
1050.00
1787.00
1925.00
1375.00
550.00
7210.00

Ere. Of Belt Conveyor Accessories


11
12
13
14

Belt
Belt
Belt
Belt

Conveyor
Conveyor
Conveyor
Conveyor

15
16
17
18
19

Counter Wt.
Counter Wt.
Counter Wt.
Counter Wt.
Counter Wt.

L21
L21
L21
L21

211
311
331
L21
L21

BC
BC
BC
BC

BC
BC
BC
BC
BC

7
2
2
3
6

2
3
5
6

1-set
1-set
1-set
1-set

..
..
..
..

..
..
..
..

..
..
..
..

13
11
6
2
2

..
..
..
..
..

..
..
..
..
..

..
..
..
..
..

..
..
..
..

..
..
..
..

2795.00
2732.00
5823.00
5823.00
3353.00
3353.00
8143.00
7432.00
Total Weight (Kgs.) 20114.00
19340.00
Dismantling Work for Counter Weights
..
..
..
..
..

450
300
300
300
300

Total Weight (Kgs.)

6825.00
4790.00
2625.00
875.00
875.00
15990.00

Gross Sum of Diff. (Kgs.)

5850.00
3300.00
1800.00
600.00
600.00
12150.00

63.00
0.00
0.00
711.00
774.00
975.00
1490.00
825.00
275.00
275.00
3840.00

19132.00

Extra running mtr. Wt. taken


The Payable Weight calculation are
based on the list as recommended by
SHREE CONV. SYSTEMS Pvt. Ltd.