Cantt Cottages, Multan Subject: Detail of Houses Progress Report 13 Marla Houses Please Click on House no.

Area Category 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 5 Marla 5 Marla 5 Marla 7 Marla 7 Marla 7 Marla 5 Marla 5 Marla 5 Marla 5 Marla 5 Marla 10 Marla 10 Marla 10 Marla 10 Marla 10 Marla 10 Marla 10 Marla 10 Marla 7 Marla 7 Marla House/ Duplex No.
001+1 2+3 4+5 6+7 8+9 10+11 12+13 14+15 16 17+18 19+20 21+22

Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

Batch No.

Covered Area (Sft) Ground First Floor Floor 3,790 3,790 3,790 3,790 3,790 3,790 3,790 1,978 3,956 3,956 3,956

B-6 B-4 B-3 10 (B2), 11 (B3) 12 (B-1), 13 (B-2) B-5 B-6 B-6 B-5 B-6

2,220 1,782 2,658 2,476 2,658 2,515 1,374 2,678 3,126 2,748

23+24 25+26 27+28 30+31 32+33 34 35+36 37+38 39+40 41+42 43+44 45+46 47+48 49+50 51 52 53+54 55+56 57+58 59+60 61+62

B-5 B-5 B-6 B-4 B-5 B-5 B-4 B-6 B-3 49 (B-1), 50 (B-3) B-6 B-6 Modle House B-3 B-4 B-4 62 (B-1), 61 (B-2)

2676 2604 1302 2,175 2,175 2,175 2,175 3,400 3,400 3,400 1,760 1,760 -3,400 3,400 2,604 2,604

2456 2199 1242 1,131 1,390 1,505 1,853 2,542 1,668 2,850 1,271 1,271 -2,542 2,542 2,400 2,402

34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

7 Marla 7 Marla 7 Marla 7 Marla 7 Marla 7 Marla 5 Marla 5 Marla 7 Marla 7 Marla 7 Marla 7 Marla 7 Marla 7 Marla 7 Marla

63+64 65+66 68+69 70+71 72+73 74+75 76 77+78 79+80 81+82 83+84 85+86 87+88 89+90 91

B-1 65 (B-2), 66 (B-3) Modle House B-1 B-3 B-4 B-6 B-4 80 (B-1), 79 (B-3) 82 (B-1), 81 (B-3) B-2

2,604 2,674 -2,674 2,674 2,674 1088 2175 2,639 2,674 2,674

1,604 2,511 -2,511 2,511 2,511 633 1618 2,190 2,511 2,511

Supervisor Name

13 Marla 5 Marla 7 Marla 10 Marla

--

--

Description Ground Floor First Floor External Work Electric Work Overall work in house # 001+01 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0% 10.0% 2.5% 20.0% 5.0% 8.5%

Work Done 0.0% 0.0% 0.0% 0.0% 0.0%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

4.0% 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% 3.0% 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 0.0%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% 12.0% 1.0% 22.0% 5.0% 11.0% 2.5%

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 0.0%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%

Shuttering

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% 5.5%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% 7.2% 1.85% 4.51% 0.84%

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97%
2.0% 4.4% 0.8% 1.7%

3.65%
3.1% 5.3%

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% 100.0%

0.0%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

Total Work for Electric:

0.00%

Overall work in house # 001+01


100.0% 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% 0.0% Ground Floor 0.0% First Floor 0.0% External Work 0.0% Electric Work Overall work in house # 001+01

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7

3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 2+3 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0% 10.0% 2.5% 20.0% 5.0% 8.5%

Work Done 23.0% 0.0% 2.6% 0.0% 25.6%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

complete complete complete complete complete

4.0% 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% 3.0% 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 23.0%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% 12.0% 1.0% 22.0% 5.0% 11.0% 2.5%

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 0.0%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39% complete

Shuttering

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

complete complete complete complete complete

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% 5.5%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% 7.2% 1.85% 4.51% 0.84%

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97%
2.0% 4.4% 0.8% 1.7%

3.65%
3.1% 5.3%

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% 100.0%

2.6%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

Total Work for Electric:

0.00%

Overall work in house # 2+3


25.0% 23.0% 20.0%

15.0%

10.0%

5.0%

2.6% 0.0% Ground Floor 0.0% First Floor External Work 0.0% Electric Work Overall work in house # 2+3

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7

3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 4+5 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%

Work Done 65.5% 40.0% 0.0% 23.5% 129.0%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

complete complete complete complete complete complete complete complete complete

10.0% complete 2.5% 20.0% 5.0% complete 8.5% complete 4.0% 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 65.5%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

complete complete complete complete

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% complete 12.0% complete 1.0% 22.0% 5.0% 11.0% 2.5%

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 40.0%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%

Shuttering

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% 5.5%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% 7.2% 1.85% 4.51% 0.84%

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97%
2.0% 4.4% complete 0.8% 1.7%

3.65%
3.1% 5.3%

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% 100.0%

0.0%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

complete complete

complete

Total Work for Electric:

23.50%

Overall work in house # 4+5


70.0% 65.5% 60.0%

50.0%

40.0% 40.0% 30.0%

20.0%

23.5%

10.0%

0.0% Ground Floor First Floor 0.0% External Work Electric Work

Overall work in house # 4+5

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7

3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 6,7 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%

Work Done 79.0% 68.8% 10.4% 58.0% 216.2%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

complete complete complete complete complete complete complete complete complete

10.0% complete 2.5% complete 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% complete 7.0% 2.5% 4.5% complete 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 79.0%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

complete complete complete complete

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% complete 12.0% complete 1.0% complete 22.0% 5.0% complete 11.0% complete 2.5% complete

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% 9.0% 4.0% 5.0% complete 6.0% 6.0% 5.0% 3.0% complete 1.3% complete 2.0% 83.0% 68.8%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% complete 1.17% complete 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%

Shuttering

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

complete
4.6% 1.31% complete 3.29% complete 2.7% 2.7% 4.2% 1.7% 13.8% 5.5%

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% 7.2% 1.85% 4.51% 0.84%

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97%
2.0% 4.4% complete 0.8% complete 1.7%

3.65%
3.1% 5.3% complete

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% 100.0%

10.4%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

complete complete complete

complete complete complete

Total Work for Electric:

58.00%

Overall work in house # 6,7


90.0% 80.0% 79.0% 70.0% 68.8% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 10.4% 0.0% Ground Floor First Floor External Work Electric Work 58.0%

Overall work in house # 6,7

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7

3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 8,9 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%

Work Done 81.5% 82.3% 61.7% 58.0% 283.5%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

complete complete complete complete complete complete complete complete complete

10.0% complete 2.5% complete 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% complete 7.0% 2.5% complete 4.5% complete 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 81.5%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

complete complete complete complete

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% complete 12.0% complete 1.0% complete 22.0% 5.0% complete 11.0% complete 2.5% complete

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% complete 9.0% 4.0% complete 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0%

complete complete complete complete


82.3%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

complete

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6%

complete complete complete complete complete

Shuttering

0.39% complete

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

complete complete complete complete complete

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

complete
4.6% 1.31% complete 3.29% complete 2.7% 2.7% complete 4.2% complete 1.7% complete 13.8% complete 5.5% complete

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% complete 7.2% 1.85% complete 4.51% complete 0.84% complete

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97% complete
2.0% 4.4% complete 0.8% complete 1.7% complete

3.65% complete 3.1% complete 5.3% complete

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% complete 100.0%

61.7%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

complete complete complete

complete complete complete

Total Work for Electric:

58.00%

Overall work in house # 8,9


90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% Ground Floor First Floor External Work Electric Work 61.7% 81.5% 82.3%

58.0%

Overall work in house # 8,9

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7

3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 10,11 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%

Work Done 81.5% 78.8% 59.1% 58.0% 277.4%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

complete complete complete complete complete complete complete complete complete

10.0% complete 2.5% complete 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% complete 7.0% 2.5% complete 4.5% complete 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 81.5%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

complete complete complete complete

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% complete 12.0% complete 1.0% complete 22.0% 5.0% complete 11.0% complete 2.5% complete

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% 9.0% 4.0% complete 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0%

complete complete complete complete


78.8%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

complete

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%

complete complete complete complete complete

Shuttering

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

complete
4.6% 1.31% complete 3.29% complete 2.7% 2.7% complete 4.2% complete 1.7% complete 13.8% complete 5.5% complete

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% complete 7.2% 1.85% complete 4.51% complete 0.84% complete

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97% complete
2.0% 4.4% complete 0.8% complete 1.7% complete

3.65%
3.1% complete 5.3% complete

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% complete 100.0%

59.1%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

complete complete complete

complete complete complete

Total Work for Electric:

58.00%

Overall work in house # 10,11


90.0% 80.0% 70.0% 60.0% 59.1% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% Ground Floor First Floor External Work Electric Work 58.0% 81.5%

78.8%

Overall work in house # 10,11

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7

3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 12,13 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0%

368.50%
15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0% 10.0% 2.5% 20.0% 5.0% 8.5% 4.0%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

2.5% 7.0% 2.5% 4.5% 7.5% 0.5% 3.0% 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 20.0%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Front Crown

Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

7.0% 12.0% 1.0% 22.0% 5.0% 11.0% 2.5%

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill 3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39% 0.21% 0.30%

Shuttering Concrete with Steel Brick Work for Parapet Wall

Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

1.10% 0.11% 0.48%

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% 5.5%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than i) building, Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% 7.2% 1.85% 4.51% 0.84%

iv) vii) ix) x) xi) xii) xiii) xiv) xv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete Patio wall plaster complete

5.97%
2.0% 4.4% 0.8% 1.7%

3.65%
3.1% 5.3% 0.9% 100.0%

Total Work for External Area:


Electric Works

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Ground Floor Electric Condute work of slab Down Piping on Wall with boxing Wiring with UPS Completion Gate light,Gardon light,M,C,B and Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager First Floor Electric Condute work of slab Down Piping on Wall with boxing Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

Total Work for Electric:

Work Done 85.5% 84.3% 63.1% 58.0% 290.91%

Overall work in house # 12,13


90.0% 80.0% 85.5% 84.3%

complete complete complete complete complete complete complete complete complete complete complete

70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 63.1% 58.0%

complete complete complete complete complete complete

0.0% Ground Floor First Floor External Work Electric Work Overall work in house #

complete complete complete complete


85.5%

complete complete complete complete

complete complete complete

complete complete complete complete complete complete complete complete complete complete
84.3%

complete

complete complete complete complete complete complete complete complete complete complete

not included

complete complete complete

not included

not included

complete

complete complete complete complete complete complete complete

complete complete complete complete complete complete complete complete complete complete complete 86.0%

complete complete complete

complete complete complete

58.00%

58.0%

Electric Work

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 8988 4108.75 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

1.306364 5738.416 3.293062 5739.416

478.8 258.4 368.6 1349 133 590.9

0.391632 0.211357 0.301494 1.103407 0.108787 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7 3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 14,15 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%

Work Done 74.0% 73.8% 7.3% 35.0% 190.1%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

Complete Complete Complete Complete Complete Complete Complete Complete Complete

10.0% Complete 2.5% 20.0% 5.0% Complete 8.5% Complete 4.0% Complete 2.5% 7.0% 2.5% 4.5% Complete 7.5% 0.5% Complete 3.0% Complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 74.0%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

Complete Complete Complete Complete

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% Complete 12.0% Complete 1.0% 22.0% 5.0% Complete 11.0% Complete 2.5% Complete

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0%

Complete Complete Complete Complete


73.8%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%

Shuttering

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% complete 3.29% complete 2.7% 2.7% complete 4.2% 1.7% 13.8% 5.5%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% 7.2% 1.85% 4.51% 0.84%

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97%
2.0% 4.4% complete 0.8% complete 1.7%

3.65%
3.1% 5.3% complete

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% complete 100.0%

7.3%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

complete complete

complete complete

Total Work for Electric:

35.00%

Overall work in house # 14,15


80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 7.3% 0.0% Ground Floor First Floor External Work Electric Work 35.0% 74.0% 73.8%

Overall work in house # 14,15

All Most

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7

3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 16 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%

Work Done 69.5% 62.8% 28.1% 35.0% 195.4%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

complete complete complete complete complete complete complete complete complete

10.0% complete 2.5% 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 69.5%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

complete complete complete complete

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% complete 12.0% complete 1.0% 22.0% 5.0% complete 11.0% complete 2.5% complete

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% complete 1.3% complete 2.0% 83.0% 62.8%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

complete

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%

Shuttering

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% complete 3.29% complete 2.7% 2.7% complete 4.2% 1.7% 13.8% complete 5.5%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% 7.2% 1.85% 4.51% 0.84%

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97%
2.0% 4.4% complete 0.8% complete 1.7%

3.65%
3.1% 5.3%

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% 100.0%

28.1%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

complete complete

complete complete

Total Work for Electric:

35.00%

Overall work in house # 16


80.0% 70.0% 69.5% 60.0% 50.0% 40.0% 30.0% 28.1% 20.0% 10.0% 0.0% Ground Floor First Floor External Work Electric Work 35.0% 62.8%

Overall work in house # 16

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7

3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 17,18 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%

Work Done 64.5% 57.0% 15.1% 23.5% 160.1%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

complete complete complete complete complete complete complete complete complete

10.0% complete 2.5% complete 20.0% 5.0% complete 8.5% complete 4.0% 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% 3.0% 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 64.5%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

complete complete complete complete

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% complete 12.0% complete 1.0% complete 22.0% 5.0% complete 11.0% complete 2.5%

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 57.0%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%

Shuttering

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% complete 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% complete 5.5%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% 7.2% 1.85% 4.51% 0.84%

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97%
2.0% 4.4% complete 0.8% 1.7%

3.65%
3.1% 5.3%

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% 100.0%

15.1%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

complete complete

complete

Total Work for Electric:

23.50%

Overall work in house # 17,18


70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% Ground Floor First Floor External Work Electric Work 15.1% 23.5% 64.5% 57.0%

Overall work in house # 17,18

All most

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7

3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 19,20 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%

Work Done 69.5% 58.5% 15.1% 35.0% 178.1%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

complete complete complete complete complete complete complete complete complete

10.0% complete 2.5% 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 69.5%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

complete complete complete complete

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% complete 12.0% complete 1.0% 22.0% 5.0% complete 11.0% complete 2.5% complete

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 58.5%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%

Shuttering

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% complete 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% complete 5.5%

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% 7.2% 1.85% 4.51% 0.84%

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97%
2.0% 4.4% complete 0.8% 1.7%

3.65%
3.1% 5.3%

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% 100.0%

15.1%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

complete complete

complete complete

Total Work for Electric:

35.00%

Overall work in house # 19,20


80.0% 70.0% 69.5% 60.0% 58.5% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% Ground Floor First Floor External Work Electric Work 35.0%

Overall work in house # 19,20

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7

3178.7

Description Ground Floor First Floor External Work Electric Work Overall work in house # 21,22 Ground Floor
Brick Work upto DPC Level

Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%

Work Done 69.5% 58.5% 22.6% 35.0% 185.6%

Brick work in substructure upto 9"


DPC Completion Earth Filling Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level Casting of RCC Slab & Stair Shuttring at Site Casting of Porch Slab Casting of Slab (Shuttering, Steel fixing & pouring) Casting of Stair Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster inculding Edge plastering complete All Bath & Kitchen walls inculding Edge plastering complete Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation Side/Back walls &other External Plaster Earth filling, Brick Ballast, PCC, Stair Marble & Window sill Earth filling & compaction PCC flooring Stair Marble Window Sill

complete complete complete complete complete complete complete complete complete

10.0% complete 2.5% 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 69.5%

Total Work for Ground Floor:


First Floor
Brick Work upto Roof Level Brick work upto 3'-0" Height Upto Lintel Level Casting of Lintel Above Lintel upto Roof Level

complete complete complete complete

Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.

20.0% 7.0% complete 12.0% complete 1.0% 22.0% 5.0% complete 11.0% complete 2.5% complete

Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill

3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 58.5%

Total Work for First Floor:


External Works Altration Work Altration According to Drawing Qibla Altration Marketing Altration Architect Altertaion Side & Back Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, Cement plaster & copping. Plan No. Amount @ 182/- Per Rft Out of Covered Area Work
i) Front Balcony

1 i) ii) iii) iv)

0.0% 0.0% 0.0% 0.0% 0.0%

7.00%

Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony

7.3% 0.71% complete 1.17% complete 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%

Shuttering

Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry

0.21% 0.30% 1.10% 0.11% 0.48%

Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% complete 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% complete 5.5% complete

Shuttering Concrete with Steel Plaster of Balcony


v) Back Tarrace Parapet Wall

Brick Work for Parapet Wall Plaster of Parapet Wall


vi) Back Terrace Flooring Work

vii) vii - a) viii) viii - a) 4

P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work

Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work

8.35%

3.5% 7.2% 1.85% 4.51% 0.84%

iv) vii) ix) x) xi) xii) xiii) xiv)

Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete

5.97%
2.0% 4.4% complete 0.8% complete 1.7%

3.65%
3.1% 5.3%

xv) Patio wall plaster complete

Total Work for External Area:


Electric Works Ground Floor Electric Condute work of slab 1 Down Piping on Wall with boxing 2 Wiring with UPS Completion 3 Gate light,Gardon light,M,C,B and 4 Service line completion 5 Switch light with Arthaning A,C Drain pipe Completion 6 Home light compeltion hand over to project Manager 7 First Floor Electric Condute work of slab 8 Down Piping on Wall with boxing 9 10 11 12 13 14 Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager

0.9% 100.0%

22.6%

6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%

complete complete

complete complete

Total Work for Electric:

35.00%

Overall work in house # 21,22


80.0% 70.0% 69.5% 60.0% 58.5% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% Ground Floor First Floor External Work Electric Work 22.6% 35.0%

Overall work in house # 21,22

Not included

Not included

Not included

9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140

7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%

130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059

880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853

8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988

2282.408 1.845379 8905.129 5580.619 4.511551 8906.129 1042.103 0.842374 8907.129

478.8 258.4 368.6 1349 133

0.391632 0.211357 0.301494 1.103407 0.108787

590.9 0.483323

3178.7 3178.7 3178.7 3178.7 3178.7