Area Category 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 13 Marla 5 Marla 5 Marla 5 Marla 7 Marla 7 Marla 7 Marla 5 Marla 5 Marla 5 Marla 5 Marla 5 Marla 10 Marla 10 Marla 10 Marla 10 Marla 10 Marla 10 Marla 10 Marla 10 Marla 7 Marla 7 Marla House/ Duplex No.
001+1 2+3 4+5 6+7 8+9 10+11 12+13 14+15 16 17+18 19+20 21+22
Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Batch No.
Covered Area (Sft) Ground First Floor Floor 3,790 3,790 3,790 3,790 3,790 3,790 3,790 1,978 3,956 3,956 3,956
B-6 B-4 B-3 10 (B2), 11 (B3) 12 (B-1), 13 (B-2) B-5 B-6 B-6 B-5 B-6
2,220 1,782 2,658 2,476 2,658 2,515 1,374 2,678 3,126 2,748
23+24 25+26 27+28 30+31 32+33 34 35+36 37+38 39+40 41+42 43+44 45+46 47+48 49+50 51 52 53+54 55+56 57+58 59+60 61+62
B-5 B-5 B-6 B-4 B-5 B-5 B-4 B-6 B-3 49 (B-1), 50 (B-3) B-6 B-6 Modle House B-3 B-4 B-4 62 (B-1), 61 (B-2)
2676 2604 1302 2,175 2,175 2,175 2,175 3,400 3,400 3,400 1,760 1,760 -3,400 3,400 2,604 2,604
2456 2199 1242 1,131 1,390 1,505 1,853 2,542 1,668 2,850 1,271 1,271 -2,542 2,542 2,400 2,402
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
7 Marla 7 Marla 7 Marla 7 Marla 7 Marla 7 Marla 5 Marla 5 Marla 7 Marla 7 Marla 7 Marla 7 Marla 7 Marla 7 Marla 7 Marla
63+64 65+66 68+69 70+71 72+73 74+75 76 77+78 79+80 81+82 83+84 85+86 87+88 89+90 91
B-1 65 (B-2), 66 (B-3) Modle House B-1 B-3 B-4 B-6 B-4 80 (B-1), 79 (B-3) 82 (B-1), 81 (B-3) B-2
2,604 2,674 -2,674 2,674 2,674 1088 2175 2,639 2,674 2,674
1,604 2,511 -2,511 2,511 2,511 633 1618 2,190 2,511 2,511
Supervisor Name
--
--
Description Ground Floor First Floor External Work Electric Work Overall work in house # 001+01 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0% 10.0% 2.5% 20.0% 5.0% 8.5%
4.0% 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% 3.0% 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 0.0%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 0.0%
7.00%
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%
Shuttering
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% 5.5%
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97%
2.0% 4.4% 0.8% 1.7%
3.65%
3.1% 5.3%
0.9% 100.0%
0.0%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
0.00%
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7
Description Ground Floor First Floor External Work Electric Work Overall work in house # 2+3 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0% 10.0% 2.5% 20.0% 5.0% 8.5%
4.0% 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% 3.0% 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 23.0%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 0.0%
7.00%
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39% complete
Shuttering
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% 5.5%
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97%
2.0% 4.4% 0.8% 1.7%
3.65%
3.1% 5.3%
0.9% 100.0%
2.6%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
0.00%
15.0%
10.0%
5.0%
2.6% 0.0% Ground Floor 0.0% First Floor External Work 0.0% Electric Work Overall work in house # 2+3
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7
Description Ground Floor First Floor External Work Electric Work Overall work in house # 4+5 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%
10.0% complete 2.5% 20.0% 5.0% complete 8.5% complete 4.0% 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 65.5%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
20.0% 7.0% complete 12.0% complete 1.0% 22.0% 5.0% 11.0% 2.5%
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 40.0%
7.00%
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%
Shuttering
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% 5.5%
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97%
2.0% 4.4% complete 0.8% 1.7%
3.65%
3.1% 5.3%
0.9% 100.0%
0.0%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
complete complete
complete
23.50%
50.0%
20.0%
23.5%
10.0%
0.0% Ground Floor First Floor 0.0% External Work Electric Work
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7
Description Ground Floor First Floor External Work Electric Work Overall work in house # 6,7 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%
10.0% complete 2.5% complete 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% complete 7.0% 2.5% 4.5% complete 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 79.0%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
20.0% 7.0% complete 12.0% complete 1.0% complete 22.0% 5.0% complete 11.0% complete 2.5% complete
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% 9.0% 4.0% 5.0% complete 6.0% 6.0% 5.0% 3.0% complete 1.3% complete 2.0% 83.0% 68.8%
7.00%
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% complete 1.17% complete 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%
Shuttering
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9%
complete
4.6% 1.31% complete 3.29% complete 2.7% 2.7% 4.2% 1.7% 13.8% 5.5%
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97%
2.0% 4.4% complete 0.8% complete 1.7%
3.65%
3.1% 5.3% complete
0.9% 100.0%
10.4%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
58.00%
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7
Description Ground Floor First Floor External Work Electric Work Overall work in house # 8,9 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%
10.0% complete 2.5% complete 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% complete 7.0% 2.5% complete 4.5% complete 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 81.5%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
20.0% 7.0% complete 12.0% complete 1.0% complete 22.0% 5.0% complete 11.0% complete 2.5% complete
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% complete 9.0% 4.0% complete 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0%
7.00%
complete
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
Shuttering
0.39% complete
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9%
complete
4.6% 1.31% complete 3.29% complete 2.7% 2.7% complete 4.2% complete 1.7% complete 13.8% complete 5.5% complete
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97% complete
2.0% 4.4% complete 0.8% complete 1.7% complete
61.7%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
58.00%
58.0%
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7
Description Ground Floor First Floor External Work Electric Work Overall work in house # 10,11 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%
10.0% complete 2.5% complete 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% complete 7.0% 2.5% complete 4.5% complete 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 81.5%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
20.0% 7.0% complete 12.0% complete 1.0% complete 22.0% 5.0% complete 11.0% complete 2.5% complete
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% 9.0% 4.0% complete 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0%
7.00%
complete
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%
Shuttering
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9%
complete
4.6% 1.31% complete 3.29% complete 2.7% 2.7% complete 4.2% complete 1.7% complete 13.8% complete 5.5% complete
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97% complete
2.0% 4.4% complete 0.8% complete 1.7% complete
3.65%
3.1% complete 5.3% complete
59.1%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
58.00%
78.8%
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7
Description Ground Floor First Floor External Work Electric Work Overall work in house # 12,13 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0%
368.50%
15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0% 10.0% 2.5% 20.0% 5.0% 8.5% 4.0%
2.5% 7.0% 2.5% 4.5% 7.5% 0.5% 3.0% 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 20.0%
Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill 3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0%
7.00%
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39% 0.21% 0.30%
Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% 5.5%
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than i) building, Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete Patio wall plaster complete
5.97%
2.0% 4.4% 0.8% 1.7%
3.65%
3.1% 5.3% 0.9% 100.0%
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Ground Floor Electric Condute work of slab Down Piping on Wall with boxing Wiring with UPS Completion Gate light,Gardon light,M,C,B and Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager First Floor Electric Condute work of slab Down Piping on Wall with boxing Wiring with UPS Completion Gate light,Gardon light,M,C,B Service line completion Switch light with Arthaning A,C Drain pipe Completion Home light compeltion hand over to project Manager
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
complete complete complete complete complete complete complete complete complete complete complete
0.0% Ground Floor First Floor External Work Electric Work Overall work in house #
complete complete complete complete complete complete complete complete complete complete
84.3%
complete
complete complete complete complete complete complete complete complete complete complete
not included
not included
not included
complete
complete complete complete complete complete complete complete complete complete complete complete 86.0%
58.00%
58.0%
Electric Work
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
Description Ground Floor First Floor External Work Electric Work Overall work in house # 14,15 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%
10.0% Complete 2.5% 20.0% 5.0% Complete 8.5% Complete 4.0% Complete 2.5% 7.0% 2.5% 4.5% Complete 7.5% 0.5% Complete 3.0% Complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 74.0%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
20.0% 7.0% Complete 12.0% Complete 1.0% 22.0% 5.0% Complete 11.0% Complete 2.5% Complete
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0%
7.00%
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%
Shuttering
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% complete 3.29% complete 2.7% 2.7% complete 4.2% 1.7% 13.8% 5.5%
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97%
2.0% 4.4% complete 0.8% complete 1.7%
3.65%
3.1% 5.3% complete
7.3%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
complete complete
complete complete
35.00%
All Most
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7
Description Ground Floor First Floor External Work Electric Work Overall work in house # 16 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%
10.0% complete 2.5% 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 69.5%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
20.0% 7.0% complete 12.0% complete 1.0% 22.0% 5.0% complete 11.0% complete 2.5% complete
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% complete 1.3% complete 2.0% 83.0% 62.8%
7.00%
complete
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%
Shuttering
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% complete 3.29% complete 2.7% 2.7% complete 4.2% 1.7% 13.8% complete 5.5%
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97%
2.0% 4.4% complete 0.8% complete 1.7%
3.65%
3.1% 5.3%
0.9% 100.0%
28.1%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
complete complete
complete complete
35.00%
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7
Description Ground Floor First Floor External Work Electric Work Overall work in house # 17,18 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%
10.0% complete 2.5% complete 20.0% 5.0% complete 8.5% complete 4.0% 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% 3.0% 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 64.5%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
20.0% 7.0% complete 12.0% complete 1.0% complete 22.0% 5.0% complete 11.0% complete 2.5%
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 57.0%
7.00%
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%
Shuttering
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% complete 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% complete 5.5%
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97%
2.0% 4.4% complete 0.8% 1.7%
3.65%
3.1% 5.3%
0.9% 100.0%
15.1%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
complete complete
complete
23.50%
All most
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7
Description Ground Floor First Floor External Work Electric Work Overall work in house # 19,20 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%
10.0% complete 2.5% 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 69.5%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
20.0% 7.0% complete 12.0% complete 1.0% 22.0% 5.0% complete 11.0% complete 2.5% complete
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 58.5%
7.00%
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% 1.17% 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%
Shuttering
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% complete 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% complete 5.5%
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97%
2.0% 4.4% complete 0.8% 1.7%
3.65%
3.1% 5.3%
0.9% 100.0%
15.1%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
complete complete
complete complete
35.00%
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7
Description Ground Floor First Floor External Work Electric Work Overall work in house # 21,22 Ground Floor
Brick Work upto DPC Level
Total %age
85.5% 83.0% 100.0% 100.0% 368.5% 15.0% 7.0% 6.0% 2.0% 15.0% 4.0% 4.0% 3.0% 4.0% 21.0% 6.5% 2.0%
10.0% complete 2.5% 20.0% 5.0% complete 8.5% complete 4.0% complete 2.5% 7.0% 2.5% 4.5% 7.5% 0.5% complete 3.0% complete 2.0% 2.0% 85.5% 21.0% 5.0% 5.0% 5.0% 6.0% 69.5%
Casting of RCC Slab & Front Crown Shuttring at site Casting of Slab Front Crown Internal Plaster with Wabrobe Platform, Kitchen Slab and Bath vanity Plaster under sofit (Ceiling) Internal Plaster complete All Edge plastering of Doors, Windows etc.
20.0% 7.0% complete 12.0% complete 1.0% 22.0% 5.0% complete 11.0% complete 2.5% complete
Wardrobe Platforms , Bath Vanity slab, Kitchen Slab etc. External Plastering Front Elevation external plaster Side wall And other external plaster with perpet plaster Roof Treatment Roof Treatment Brick Ballast, PCC & Window sill PCC flooring Extra Amount in PCC flooring Window Sill
3.5% 9.0% 4.0% 5.0% 6.0% 6.0% 5.0% 3.0% 1.3% 2.0% 83.0% 58.5%
7.00%
Shuttering Concrete with Steel Parapet Wall With Shuttering Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor Skirting
ii) Side Balcony
7.3% 0.71% complete 1.17% complete 1.12% 2.44% 0.49% 0.97% 0.39% 2.6% 0.39%
Shuttering
Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iii) Laundry
Shuttering Concrete with Steel Brick Work for Parapet Wall Plaster of Balcony P.C.C.(1:3:6) with Brick Ballast in Floor Tile Work in Floor
iv) Big Arch with Projection 3.9% 3.9% 4.6% 1.31% complete 3.29% 2.7% 2.7% 4.2% 1.7% 13.8% complete 5.5% complete
P.C.C.(1:3:6) with Brick Ballast in Floor Front Terrace Parapet Wall Pouring Front Terrace Parapet Wall Plaster Top Parapet Wall Pouring Top Parapet Wall Plaster External Work
Front Boundary Wall , inculding excavation, PCC, Brick work in F&P, DPC, Bick work in other than building, i) Cement plaster, copping & steel railing . Plan No. Amount @ 200/- Per Rft ii) Toe Wall
iii) External Flooring Work
8.35%
Earth filling in passages P.C.C(1:3:6) with Brick Ballast Earth filling in Lawn Manholes Ramp Over Head Water Tank Civil Works AC Sills Front crown plaster Patio PCC inculding Tile & skirting Front Terrace Common wall complete Front Terrace PCC complete
5.97%
2.0% 4.4% complete 0.8% complete 1.7%
3.65%
3.1% 5.3%
0.9% 100.0%
22.6%
6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00% 6.00% 11.50% 11.50% 4.50% 3.50% 10.00% 3.00%
100.0%
complete complete
complete complete
35.00%
Not included
Not included
Not included
9100 9462 3346 5018 6040 5406 2163 18000 7200 10864 4524 9374 7760 2622 5672 1040 2200 4750 3988 6900 1140
7.00% 7.28% 2.57% 3.86% 4.64% 4.16% 1.66% 13.84% 5.54% 8.35% 3.48% 7.21% 5.97% 2.02% 4.36% 0.80% 1.69% 3.65% 3.07% 5.31% 0.88%
130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059 130059
880 0.714731 1440 1.169559 1380 1.120828 3000 2.436582 608 0.493814 1200 0.974633 480 0.389853
8988 8988 8988 8988 1629.666 1.306364 5738.416 8988 4108.75 3.293062 5739.416 8988 8988
590.9 0.483323
3178.7