You are on page 1of 38

ELEMENT NO.

1 - WORK BELOW LOWEST FLOOR FINISH (ALL PROVISIONAL) ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% & '( )OR* +E$O) $O)EST ,$OOR ,INISHES -A$$ PRO.ISIONA$/ E0ca1ate2 co encing fro for ation le1el2 get o3t2 aterials as a!!ro1e" to

!art ret3rn2 fill in an" ra 2 "e!osit s!rea" an" le1el re o1e s3r!l3s e0ca1ate" "e4atering# A B Excavate pit for Pile Cap not exceeding 4.00 Excavate trenc% for (ro'nd Bea deep deep ! 4"! contractor o4n "3 ! incl3"ing str3tting2!lan5ing an"

not exceeding 1.00 ! !4"

Har"core base as s!ecifie" 2s!rea" an" le1elle"24ell ra e"2consoli"ate" an" 4atere" to recei1e concrete# C ##$ t%ic& 'nder (ro'nd )la* # !+,0

$ean concrete 6ra"e &7 as s!ecifie"2 s!rea" an" le1elle" to recei1e concrete2 3n"er# E F $0 'nder Pile Cap ! ! ! 14 #1 1+"

-itto. (ro'nd Bea -itto. (ro'nd )la* .ibrate" reinforce" concrete 6ra"e 89 as s!ecifie" fille" into for 4or5 an" 4ell !ac5e" aro3n" ro" reinforce ent in#

( 0 1 K

Pile Cap Col' n )t' p (ro'nd Bea (ro'nd 3la* exceeding 1$0 !00 t%ic& t%ic& *'t not exceeding

! ! !

1"/ ## !#/

11""

High tensile bar reinforce ent as s!ecifie" # Pile Ca! L M 2 1# 1, #0 -ia eter -ia eter -ia eter Kg Kg Kg "0 1$041 1#0!

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/1/1

ELEMENT NO.1 - WORK BELOW LOWEST FLOOR FINISH (ALL PROVISIONAL) To Collection ITEM DESCRIPTION UNIT RM QTY RATE AMOUNT

E$EMENT NO% & '( )OR* +E$O) $O)EST ,$OOR ,INISHES -A$$ PRO.ISIONA$/ -cont:"/

High tensile bar reinforce ent as s!ecifie" # -cont:"/

Col3 n St3 ! A B #0 #$ -ia eter -ia eter Kg Kg 4#, 4+,4

6ro3n" +ea C E F 1# 1, #0 #$ -ia eter -ia eter -ia eter -ia eter Kg Kg Kg Kg ,+$" 1/+$ !$/0 4,$1+

6ro3n" ,loor Slab ( 0 10 1# -ia eter -ia eter Kg Kg !"/+$ #!"

Mil" steel ro" reinforce ent as s!ecifie" # Col3 n St3 ! 1 10 -ia eter Kg $/!

6ro3n" +ea K L 10 1# -ia eter -ia eter Kg Kg 1$$/ ##4#0

Sa4n for 4or5 as s!ecifie" '( M )ide3 of pile cap . exceeding $00 1.0 eter %ig% )ide3 of Col' n )t' p )ide3 of (ro'nd Bea Edge3 of (ro'nd floor 3la* . exceeding #$0 exceeding $00 %ig% *'t not *'t not exceeding

$,! # # #!, #,1+ /,

2 P 4

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/1/#

ELEMENT NO.1 - WORK BELOW LOWEST FLOOR FINISH (ALL PROVISIONAL)

To Collection ITEM DESCRIPTION UNIT

RM QTY RATE AMOUNT

E$EMENT NO% & '( )OR* +E$O) $O)EST ,$OOR ,INISHES -A$$ PRO.ISIONA$/ -cont:"/

Da ! !roof e brane2 4ell la!!e" at ;oints an" seale" 4ith a!!ro1e" !ress3re sensiti1e ta!e -Meas3re" nett ' no allo4ance a"e for la!s/ A )ingle la6er 0.1#$ pol6t%ene pla3tic 3%eet

7aterproofing laid on lean concrete 7ell lapped at 8oint3 in accordance 7it% t%e nett; no allo7ance an'fact'rer93 in3tr'ction : ea3'red ade for lap3<. # !+,0

Anti(Ter ite Treat ent B Allo7 for all co3t for t%e application of pre=con3tr'ction 3oil poi3oning and 4=3tage Anti=ter ite >?ento&il> or ot%er e@'al and approved )oil 5reat ent )peciali3t to *'ilding area3 a3 re@'ired incl'ding preparation of 3'rface3 to receive treat ent. 7or&ing progre33ivel6 to acco odate t%e Con3tr'ction 7or&3 or in 3ection3. all in accordance to t%e an'fact'rer93 in3tr'ction and to t%e 3ati3faction of t%e I5EM ).A :5%e 3peciali3t contractor 3%all allo7 for 7arrant6 period of $ 6ear3 incl'ding in3pection<

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/1/!

ELEMENT NO.1 - WORK BELOW LOWEST FLOOR FINISH (ALL PROVISIONAL)

To Collection ITEM DESCRIPTION UNIT

RM QTY RATE AMOUNT

E$EMENT NO% & '( )OR* +E$O) $O)EST ,$OOR ,INISHES -A$$ PRO.ISIONA$/

CO$$ECTION Page 2o. LKIM/FB/1/1 Page 2o. LKIM/FB/1/# Page 2o. LKIM/FB/1/!

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/1/4

ELEMENT NO.1 - WORK BELOW LOWEST FLOOR FINISH (ALL PROVISIONAL)

Carried To Summary

RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/1/$

ELEMENT NO.2 - APRON AND PERIMETER DRAIN ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% < '( APRON AND PERIMETER DRAIN

Har"core base as s!ecifie" 2s!rea" an" le1elle"24ell ra e"2consoli"ate" an" 4atere" to recei1e concrete# A 100 t%ic& 'nder Apron )la* # //4

.ibrate" reinforce" concrete 6ra"e 89 as s!ecifie" fille" into for 4or5 an" 4ell !ac5e" aro3n" ro" reinforce ent in# B Apron )la* not exceeding 1$0 t%ic& ! /$

Steel esh fabric reinforce ent to 4ell la!!e" at ;oints incl3"ing notching aro3n" all obstr3ctions an" ben"ing as re=3ire" - eas3re" nett ( no allo4ance a"e for la!s/ in a!ron slab # C A la6er of B?C 2o. A/ Peri eter Drain ##$ dia eter %alf ro'nd glaBed cla6 7are peri eter drain a3 3pecified in 3'ita*le lengt%. fini3% fair on expo3ed 3'rface3. *edded. 8ointed and pointed in ce ent and 3and :1;!< ortar and incl'ding 400 concrete *a3e. Mil" Steel 6rating E #$0 7ide %eav6d't6 ild 3teel grating incl'ding all nece33ar6 fixing and painting a3 3pecified a3 per Arc%itect93 dra7ing and ).A93 approval. Ce ent an" san" -&'8/ as s!ecifie" !a1ing tro4elle" s ooth# F #0 5%ic& to floor # !"/ 7ide x /$ t%ic& 1#+ # //4

"

Anti(Ter ite Treat ent ( Allo7 for all co3t for t%e application of pre=con3tr'ction 3oil poi3oning and 4=3tage Anti=ter ite >?ento&il> or ot%er e@'al and approved )oil 5reat ent )peciali3t to *'ilding area3 a3 re@'ired incl'ding preparation of 3'rface3 to receive treat ent. 7or&ing progre33ivel6 to acco odate t%e Con3tr'ction 7or&3 or in 3ection3. all in accordance to t%e an'fact'rer93 in3tr'ction and to t%e 3ati3faction of t%e I5EM ).A :5%e 3peciali3t contractor 3%all allo7 for 7arrant6 period of $ 6ear3 incl'ding in3pection<

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/#/,

ELEMENT NO.2 - APRON AND PERIMETER DRAIN Carried To Summary RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/#//

ELEMENT NO.3 - FRAME ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% 8 '( ,RAME

.ibrate" reinforce" concrete 6ra"e 89 as s!ecifie" fille" into for 4or5 an" 4ell !ac5e" aro3n" ro" reinforce ent in# A B C Col' n and 3tiffener ?oof Bea ?oof )la* High tensile bar reinforce ent as s!ecifie" # Col3 n an" stiffener E F 1, #0 #$ -ia eter -ia eter -ia eter Kg Kg Kg /, ##!1 $0,+ ! ! ! $1 ,# /,$

Roof +ea ( 0 1 K 1# 1, #0 #$ -ia eter -ia eter -ia eter -ia eter Kg Kg Kg Kg 1#"4 !4+ #// 1!"1

Roof Slab L 10 -ia eter Kg "1$

Mil" steel ro" reinforce ent as s!ecifie" # Col3 n an" stiffener M 10 -ia eter Kg 1/,0

Roof +ea 2 P 10 1# -ia eter -ia eter Kg Kg ##1, 101

Sa4n for 4or5 as s!ecifie" '( 4 ? ) )ide3 of col' n and 3tiffener )ide3 and 3offit of roof *ea )ide3 and 3offit of roof 3la* # # # !!"/ ,## /+#

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/!/"

ELEMENT NO.3 - FRAME Carried To Summary RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/!/+

ELEMENT NO.4 - ROOF ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% > '( ROO, PITCH ROO, CONSTRUCTION STEE$ ROO, STRUCTURE A 5o de3ign. 3'ppl6 )teel ?oof 5r'33 )63te of 4$/ x 1+1 x +" Kg/ C=Bea (rade 4! for A3*e3to3 Free ?oofing incl'ding all a33e *ling and 7elding. 3pla6 c'tting. fitting3. fixing and %oi3ting in po3ition approxi atel6 1# a*ove gro'nd level incl'ding all 3ite and 3%op 7or&3 and 7elding on 3ite. filling all 7eld3 3 oot% incl'ding all painting 7or&3 7it% one coat pri er and fini3%ing coat3 of ena el paint to t%e expo3ed 3'rface3 of 3tr'ct're a3 per Engineer93 dra7ing no )DE.44,/LKIM FA)A #/10/0#"/FB=)5L.01 = 0# B 5o de3ign. 3'ppl6 )teel ?oof 5r'33 )63te of 4$/ 1+1 x +" Kg/ C=Bea :c't to 3%ape< ditto x &g 1/$4,

&g

10/,+"

5o de3ign. 3'ppl6 )teel ?oof 5r'33 )63te of 100 x 100 x$ t%ic& 14.4 Kg/ )@'are 0ollo7 )ection (rade 4! ditto )teel 7or& ancillarie3 incl'ding 7elding. pri e and paint a3 de3cri*ed;

&g

100#

1$# x ,4 x# 5%ic& galvani3ed 0i=5en3ile p'rlin at 1.00 centre to centre 1, #0 -ia eter 5%ic& ild 3teel 3ag rod no no

$$#0 ",4 !!, 10$,

E F (

ild 3teel plate

M#0 0F)( *olt3 a3 de3cri*ed ROO, CO.ERIN6

Approved a3*e3to3 free roofing fixed to 1$ degree pitc% to 3teel *atten3 incl'ding all capping and acce33orie3. all in accordance 7it% an'fact'rer93 in3tr'ction and ).A.3 ade for lap3< # # $!,$ !1 1!#

approval : ea3'red nett=no allo7ance 1 K Pol6car*onate tran3parent roofing 3%eet Extra Aver for Cla6 ?idge Cap 6UTTER L 1$0

7ide 'npla3tici3ed pol6vin6l c%loride :'PFC<

g'tter incl'ding o'tlet 7it% 3trainer 3'pported *6 and incl'ding approved *rac&et3 at approved di3tance centre3 and fixed to FARM BUILDING KOLAM TERNAKAN ild 3teel roof tr'33e3 : ea3'red 3eparatel6< 1+"

LKIM/FB/4/10

ELEMENT NO.4 - ROOF To Collection ITEM DESCRIPTION UNIT RM QTY RATE AMOUNT

E$EMENT NO% > '( ROO, -cont:"/ 6UTTER -Cont:"/ A 1$0 no3. 1# x 10 5%ic& plate 3'pport at #.0 centre to

centre to *e 8ointed 7it% f'll penetration *'tt 7elding and # dia eter *olt to p'rlin a3 per Engineer93 no !4 approval and Engineer93 dra7ing no. )DE.44,/LKIM FA)A #/10/0#"/FB=)5L.0# RAIN )ATER DO)N PIPE B 1$0 -ia eter Cnpla3tici3ed polivin6l c%loride :'PFC<

rain 7ater do7n pipe fixed to col' n or 7all *6 Al' ini' Brac&et incl'ding extra over 37an nec& and *end incl'ding extra 8oint3. connection to 3ide3 drain and a&e 1/$ "" good and te3t a3 per Arc%itect93 and Engineer93 approval. C -itto. e *edded in col' n A)NIN6 Con3tr'ct ild 3teel 3tr'ct're a7ning incl'ding a3*e3to3 free roofing at 1$ degre pitc% incl'ding all nece33ar6 fixing. 8ointing. and ot%er 7or&3 a3 per Engineer93 approval.

4#"

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/4/11

ELEMENT NO.4 - ROOF

Carried To Summary ITEM DESCRIPTION UNIT

RM QTY RATE AMOUNT

E$EMENT NO% > '( ROO,

CO$$ECTION Page 2o. LKIM/FB/4/1 Page 2o. LKIM/FB/4/#

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/4/1#

ELEMENT NO.4 - ROOF

Carried To Summary

RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/4/1!

ELEMENT NO.5 - EXTERNAL WALL ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% 7 '( E?TERNA$ )A$$

Metal Dec5ing A 0.4# t%ic& approved etal 3%eet incl'ding fixing and acce33orie3 a3 per an'fact'rer93 in3tr'ction3 and Engineer93 dra7ing no. )DE.44,/LKIM FA)A #/10/0#"/FB= 0# +lac5 Netting B ,.0 %ig% Blac& 2etting incl'ding fixing and acce33orie3 an'fact'rer93 in3tr'ction and Engineer93 dra7ing # 14"/

!,0

a3 per

no. )DE.44,/LKIM FA)A #/10/0#"/FB=0#

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/$/14

ELEMENT NO.5 - EXTERNAL WALL Carried To Summary RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/$/1$

ELEMENT NO. -INTERNAL WALL ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% @ '( INTERNA$ )A$$

+ric54or5 in claA bric5s in ce ent an" san" -&'@/ ortar reinforce" 4ith :e0 et: at e1erA fo3rth co3rse an" @ >79 "ia eter il" steel bar as bon"ing tie long one en" hoo5e" an" cast into concrete

an" other en" b3ilt ;oints of bric54or5 to' A 11#.$ 5%ic& *ric&7all # 1/!0

HoriBontal "a ! !roof co3rse consisting t4o laAers of bit3 ino3s felt -No allo4ance B 11#.$ RC )all C 1$0 5%ic& Fi*rated ?einforced Concrete Gall ,000 %ig% (rade !0 incl'ding for 7or&. reinforce ent and all nece33ar6 7or&3 a3 per -ra7ing no. )DE.44,/LKIM FA)A #/10/0#"/FB=0# 5%ic& *ric&7all a"e for la!s/ to# 1!/

1$,

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/,/1,

ELEMENT NO. -INTERNAL WALL Carried To Summary RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/,/1/

ELEMENT NO.! - DOOR AND WINDOW ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% C '( DOOR AND )INDO) Door $intol A 1$0 x #$0 x 4!00 Long ?einforced concrete (rade !0 Lintol incl'ding 4 no3 1, dia eter %ig% tendile ain *ar 7it% %oo&ed end and , dia eter ild 3teel 3tirr'p3 at 1$0 centre3 inlc'ding for 7or& %oi3ting and 3etting in po3ition. *edding. 8ointing and pointing in ce ent ortar :1;!< all a3 per Engineer93 dra7ing no. )DE.44,/LKIM FA)A #/10/0#"/)5-=01 1$0 x 1/$ x 1400 Long ?einforced concrete (rade !0 Lintol incl'ding 4 no3 10 dia eter %ig% tendile ain *ar 7it% %oo&ed end and , dia eter ild 3teel 3tirr'p3 at 100 centre3 inlc'ding for 7or& %oi3ting and 3etting in po3ition. *edding. 8ointing and pointing in ce ent ortar :1;!< all a3 per Engineer93 dra7ing no. )DE.44,/LKIM FA)A #/10/0#"/)5-=01 1$0 x 1/$ x 1!00 Long ditto

2o

2o 2o

! #

Door ,ra e F )'ppl6 and fix %ard7ood door fra e incl'ding painting a3 3pecified 3iBe ##00 %ig% x 1000 7ide :-1< )'ppl6 and fix 3teel door fra e incl'ding painting a3 3pecified 3iBe 4000 %ig% x 4000 7ide :-#< )'ppl6 and fix 3teel door fra e incl'ding a3 3pecified painting 3iBe 4$00 %ig% x #"00 7ide :-!< )'ppl6 and fix 3teel door fra e incl'ding painting a3 3pecified 3iBe 4000 %ig% x #000 7ide :-4< )'ppl6 and fix al' ini' 3pecified 3iBe #100 Door $ea1es L 1000 x ##00 %ig% )ingle Leaf Fl'3% -oor incl'ding door fra e incl'ding painting a3 %ig% x +00 7ide :-$< 2o #

2o

2o

2o

2o

painting a3 3pecified. nece33ar6 iron ongerie3 and acce33orie3 all a3 per ).A93 approval :-1< M 4000 x 4000 %ig% t%ree Leave3 )teel )liding -oor incl'ding painting a3 3pecified. nece33ar6 iron ongerie3 and acce33orie3 all a3 per ).A93 approval :-#< 2 1400 x 4$00 %ig% do'*le Leave3 )teel )liding -oor incl'ding painting a3 3pecified. nece33ar6 iron ongerie3 and acce33orie3 all a3 per ).A93 approval :-!< 2o !

2o

2o

FARM BUILDING KOLAM TERNAKAN

LKIM/FB///1"

ELEMENT NO.! - DOOR AND WINDOW To Collection ITEM DESCRIPTION UNIT RM QTY RATE AMOUNT

E$EMENT NO% C '( DOOR AND )INDO) -cont:"/ Door $ea1es -cont:"/ A #000 x 4000 %ig% fo'r Leave3 )teel Folding -oor incl'ding painting a3 3pecified. nece33ar6 iron ongerie3 and acce33orie3 all a3 per ).A93 approval :-4< B 1"00 x ##00 %ig% do'*le Leave3 (la33 )liding -oor incl'ding painting a3 3pecified. nece33ar6 iron ongerie3 and acce33orie3 all a3 per ).A93 approval :-$< )in"o4 $intol C 1$0 x #$0 x 4!00 Long ?einforced concrete (rade !0 Lintol incl'ding 4 no3 1, dia eter %ig% tendile ain *ar 7it% %oo&ed end and , dia eter ild 3teel 3tirr'p3 at 1$0 centre3 inlc'ding for 7or& %oi3ting and 3etting in po3ition. *edding. 8ointing and pointing in ce ent ortar :1;!< all a3 per Engineer93 dra7ing no. )DE.44,/LKIM FA)A #/10/0#"/)5-=01 )in"o4 ,ra e )'ppl6 and fix 7ood fra e 3iBe1#00 Gide incl'ding painting a3 3pecified )in"o4 Panel E 5%ree panel3 of 2aco or e@'ivalent and approved ad8'3ta*le lo'vre3 7indo7 panel3 3iBe 1#00 %ig% x 1"00 7ide incl'ding painting a3 3pecified. nece33ar6 iron ongerie3 and acce33orie3 all a3 per ).A93 approval 2o / 0ig% x 1"00

2o

2o

2o

2o

FARM BUILDING KOLAM TERNAKAN

LKIM/FB///1+

ELEMENT NO.! - DOOR AND WINDOW

To Collection ITEM DESCRIPTION UNIT

RM QTY RATE AMOUNT

E$EMENT NO% C '( DOOR AND )INDO)

CO$$ECTION Page 2o. LKIM/FB///1 Page 2o. LKIM/FB///#

FARM BUILDING KOLAM TERNAKAN

LKIM/FB///#0

ELEMENT NO.! - DOOR AND WINDOW

Carried To Summary

RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB///#1

ELEMENT NO." - INTERNAL WALL FINISHES ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% D '( INTERNA$ )A$$ ,INISHES

Ce ent an" San" -&'@/ !lastering as "escribe" ' A 1#.$ 5%ic& to Gall # !$",

Ri1er Stones B Free 3iBe of river 3tone3 to filteration area 7all a3 per -ra7ing 2o. )DE.44,/LKIM FA)A #/10/0#"/FB=01 Pre!are an" a!!lA one coat al5alA resisting an" t4o finishing coats of e 3lsion !aints as s!ecifie"' C 5o Pla3tered Gall # !$", # !4"

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/"/##

ELEMENT NO." - INTERNAL WALL FINISHES Carried To Summary RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/"/#!

ELEMENT NO.# - INTERNAL FLOOR FINISHES ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% E '( INTERNA$ ,$OOR ,INISHES

<9 Thic5 ce ent an" San" -&'@/ !a1ing tro4elle" s ooth as "escribe" ' A B C 5o floor 5o $0 5o /$ t%ic& to 'p t%ic& to 'p # !+,0 1# 1

<9 Thic5 ce ent an" San" -&'@/ scree"ing to recei1e floor tiles as "escribe" ' E 5o floor 5o 3&irting 899 0 899 a!!ro1e" cera ic tiles as !er Dra4ing No% SFY%>>@G$*IM ,ASA <G&9G9<DG,+(9& as "escribe" ' F ( 5o Floor 5o 3&irting # /" !" # /" !"

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/+/#4

ELEMENT NO.# - INTERNAL FLOOR FINISHES Carried To Summary RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/+/#$

ELEMENT NO.1$ - INTERNAL %EILING FINISHES ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% &9 '( INTERNA$ CEI$IN6 ,INISHES

&<<9 o3t sA al3 ini3

0 @&9

0 @%C

Thic5 :UAC S3!erfle0: or the centre incl3"ing ano"ises to s3it the

other e=3i1alent asbestos free fiber ce ent boar" set etricallA fro s3s!en"e" e0!ose" gri" sAste

!anels co !lete 4ith all necessarA steel hangers2 cable ro" an" other associate" accessories to an3fact3rer:s "etail an" S%O:s a!!ro1al A B Fixed to internal area Extra over for ace33 panel and for ing opening overall 3iBe ,00 x ,00 x ,./ t%ic& co plete 7it% al' ini' edging Pre!are an" a!!A one coat of sealer an" t4o finishings coats of e 3lsion !aint on ceiling boar" s3rfaces# colo3rs to S%O:s a!!ro1al C 5o 3'rface3 of 9CAC )'perflex9 a3*e3to3 free fi*er ce ent *oard # !+,0

no

!+,0

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/10/#,

ELEMENT NO.1$ - INTERNAL %EILING FINISHES Carried To Summary RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/10/#/

ELEMENT NO.11 - EXTERNAL %EILING FINISHES ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% && '( E?TERNA$ CEI$IN6 ,INISHES

&<<9 o3t sA al3 ini3

0 @&9

0 @%C

Thic5 :UAC S3!erfle0: or the centre incl3"ing ano"ises to s3it the

other e=3i1alent asbestos free fiber ce ent boar" set etricallA fro s3s!en"e" e0!ose" gri" sAste

!anels co !lete 4ith all necessarA steel hangers2 cable ro" an" other associate" accessories to an3fact3rer:s "etail an" S%O:s a!!ro1al A B Fixed to external area Extra over for ace33 panel and for ing opening overall 3iBe ,00 x ,00 x ,./ t%ic& co plete 7it% al' ini' edging Pre!are an" a!!A one coat of sealer an" t4o finishings coats of 4eathershiel" !aint on ceiling boar" s3rfaces# colo3rs to S%O:s a!!ro1al C 5o 3'rface3 of 9CAC )'perflex9 a3*e3to3 free fi*er ce ent *oard # /+# #".,0

no

#0.00

/+#

".00

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/11/#"

ELEMENT NO.11 - EXTERNAL %EILING FINISHES Carried To Summary RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/11/#+

ELEMENT NO.12 - SUNDRIES ITEM DESCRIPTION UNIT QTY RATE AMOUNT

E$EMENT NO% &< '( SUNDRIES Reinforce" Concrete Ra ! A 10." Long x !.0 7ide x 1.# %ig% reinforced Concrete

(rade !0 a3 ra p incl'ding for 7or&. reinforce ent. for ing #$ 7ide groove line. reinforced concrete no 1 3t' p. fini3%e3 and all nece33ar6 7or&3 a3 per Engineer93 -ra7ing 2o. )DE.44,/LKIM FA)A #/10/0#"/FB=0! Reinforce" Concrete Ele1ate" )ater Tan5 B 5o con3tr'ct and co plete of ?einforced Concrete Elevated Gater 5an& incl'ding ?einforced Concrete )la* to place t%e $000 (allon Gater 5an&. Cat Ladder. pipe7or&3 and all nece33ar6 7or&3 a3 Engineer93 approval and Engineer93 -ra7ing 2o. )DE.44,/LKIM FA)A #/10/0#"/FB=01 Reinforce" Concrete S3 ! C 5o con3tr'ct and co plete of 1!.0 long x /.0 7ide x 1.0 %ig% reinforced concrete 3' p incl'ding for 7or&. reinforce ent. fini3%e3 and all nece33ar6 7or&3 and acce33orie3 a3 Engineer93 approval and Engineer93 -ra7ing 2o. )DE.44,/LKIM FA)A #/10/0#"/FB=01 and )DE.44,/LKIM FA)A #/10/0#"/FB=0! 6ro4 O3t Tan5 #4 x $# H 4/.# c'*ic eter 7ater capacit6 Metal Fra e Pool con3tr'cted of (alvaniBed )teel Fra e. ! la6er3 3eparate Liner of Intex PFC La inated and Pol6e3ter e3% for extra reinforce ent. incl'ding all nece33ar6 7or&3. pipe7or&3 and acce33orie3. all a3 per Engineer93 approval and Engineer93 -ra7ing 2o. )DE.44,/LKIM FA)A #/10/0#"/FB=01 ,rA Tan5 E )'ppl6 and in3tall IM5 Fr6 5an& :F?P< incl'ding all nece33ar6 7or&3. pipe7or&3 and acce33orie3 a3 per Engineer93 approval and Engineer93 -ra7ing 2o. )DE.44,/LKIM FA)A #/10/0#"/FB=01 +roo"stoc5 Tan5 F $.0 x !.0 x #.0 ?einforced concrete Brood3toc& 5an& incl'ding all nece33ar6 7or&3. pipe7or&3 and acce33orie3 a3 per Engineer93 approval and Engineer93 -ra7ing 2o. )DE.44,/LKIM FA)A #/10/0#"/FB=01 no #

no

no

no

#,

no

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/1#/!0

ELEMENT NO.12 - SUNDRIES To Collection ITEM DESCRIPTION UNIT RM QTY RATE AMOUNT

E$EMENT NO% &< '( SUNDRIES -cont:"/ +io +alls A )'ppl6 and in3tall Bio Ball3 inlc'ding all nece33orie3 7or&3 and acce33orie3 a3 per Engineer93 approval. an'fact'rer93 detail and Engineer93 dra7ing no. no $# )DE.44,/LKIM FA)A #/10/0#"/FB=01 RC Staircase B 1.$ 7ide x /.$ Long x 4.0 0ig% of ?einforced Concrete (rade !0 )tairca3e incl'ding for 7or&. reinforce ent. fini3%e3 and all nece33ar6 7or&3 and acce33orie3 a3 per Engineer93 -ra7ing 2o. )DE.44,/LKIM FA)A #/10/0#"/FB=0# 1!.0 7ide x 11.0 Long x 4.0 0ig% ditto

no no

# 1

Signage Propo3ed Le *aga Ke a8'an I&an Mala63ia :LKIM< 9Logo9 incl'ding painting a3 3pecified. all nece33ar6 7or&3 and acce33orie3 a3 per Engineer93 -ra7ing no. no 1

)DE.44,/LKIM FA)A #/10/0#"/FB=0# and ).A93 approval U. $ights Cha ber E 5o con3tr'ct and co plete of #.! 1.# %ig% reinforced concrete reinforce ent. and Engineer93 reinforced -ra7ing long x #.! incl'ding plint% 7ide x and all for 7or&.

concrete 2o.

nece33ar6 7or&3 and acce33orie3 a3 Engineer93 approval )DE.44,/LKIM FA)A no 1 #/10/0#"/FB=01 and )DE.44,/LKIM FA)A #/10/0#"/FB=0! D3ctile Iron Pi!e F )'ppl6 and in3tall #00 dia eter d'ctile iron pipe 7it% 3co'r valve incl'ding fitting3. all nece33ar6 8ointing3 and a33ociated 7or&3 a3 per Engineer93 dra7ing no. )DE.44,/LKIM FA)A #/10/0#"/FB=01 Internal Reinforce" Concrete Drain ( )'ppl6 and con3tr'ct $00 x #00 x 400 t%ic& reinforced concrete drain 7it% ild 3teel grating la6ered 7it% one :1< la6er of antir'3t incl'ding all nece33ar6 8ointing3. reinforce ent. for 7or& and a33ociated 7or&3 a3 per Engineer93 dra7ing no. )DE.44,/LKIM FA)A #/10/0#"/FB=0# I )DE.44,/LKIM FA)A #/10/0#"/FB=)EC 01;(B

11

!10

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/1#/!1

ELEMENT NO.12 - SUNDRIES

To Collection ITEM DESCRIPTION UNIT

RM QTY RATE AMOUNT

E$EMENT NO% &< '( SUNDRIES -cont:"/ Reinforce" Concrete S3 ! )'ppl6 and con3tr'ct reinforced concrete 3' p co plete 7it% ild 3teel grating incl'ding all nece33ar6 8ointing3. reinforce ent. for 7or& and a33ociated 7or&3 a3 per Engineer93 dra7ing no. )DE.44,/LKIM FA)A #/10/0#"/FB= 01 I )DE.44,/LKIM FA)A #/10/0#"/FB=01

A B C

,00 ,00 !00

x ,00 x !00 x !00

reinforced concrete 3' p reinforced concrete 3' p reinforced concrete 3' p

no no no

+ 1 4

Stainless Steel Railing 1.# 0ig% of 3tainle33 3teel railing incl'ding painting a3 3pecified and all nece33ar6 7or&3 and acce33orie3 a3 per Engineer93 approval and Engineer93 -ra7ing 2o. )DE.44,/LKIM FA)A #/10/0#"/FB=0# Reinforce" Concrete Raise" Platfor E 5o con3tr'ct !00 rai3ed platfor 7ide x 1.# %ig% reinforced concrete

//

incl'ding for 7or&. reinforce ent. paving.

painting a3 3pecified and all nece33ar6 7or&3 and acce3orie3 a3 per Engineer93 approval and Engineer93 -ra7ing 2o. )DE.44,/LKIM FA)A #/10/0#"/FB=01 no 1

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/1#/!#

ELEMENT NO.12 - SUNDRIES

To Collection ITEM DESCRIPTION E$EMENT NO% &< '( SUNDRIES UNIT

RM QTY RATE AMOUNT

CO$$ECTION

Page 2o. LKIM/FB/10/1 Page 2o. LKIM/FB/10/# Page 2o. LKIM/FB/10/!

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/1#/!!

ELEMENT NO.12 - SUNDRIES

Carried To Summary

RM

FARM BUILDING KOLAM TERNAKAN

LKIM/FB/1#/!4

)' I5EM 2A. -E)C?IP5IA2 PA(E 2A

ar6 = FA?M BCIL-I2( AMAC25

,ARM +UI$DIN6 SUMMARY 1 ELEME25 2A.1 = GA?K BELAG LAGE)5 FLAA? FI2I)0 :ALL P?AFI)IA2AL< # ELEME25 2A.# = AP?A2 A2- PE?IME5E? -?AI2 ELEME25 2A.! = F?AME ELEME25 2A.4 = ?AAF ELEME25 2A.$ = EJ5E?2AL GALL ELEME25 2A., = I25E?2AL GALL ELEME25 2A./ = -AA? A2- GI2-AG ELEME25 FI2I)0E) 2A." = I25E?2AL GALL LKIM/FB/#/1 LKIM/FB/1/4

! 4 $ , / "

LKIM/FB/!/1 LKIM/FB/4/! LKIM/FB/$/1 LKIM/FB/,/1 LKIM/FB///! LKIM/FB/"/1

ELEME25 2A.+ = I25E?2AL FLAA? FI2I)0E) ELEME25 2A.10 = I25E?2AL CEILI2( FI2I)0E) ELEME25 2A.11 = EJ5E?2AL CEILI2( FI2I)0E) ELEME25 2A.1# = )C2-?IE)

LKIM/FB/+/1

10

LKIM/FB/10/1

11 1#

LKIM/FB/11/1 LKIM/FB/1#/4

5A (?A2- )CMMA?E FA?M BCIL-I2( KALAM 5E?2AKA2


LKIM/FB/)CM

FA?M BCIL-I2( KALAM 5E?2AKA2

LKIM/FB/)CM

I5EM 2A.

-E)C?IP5IA2

PA(E 2A

AMAC25

,ARM +UI$DIN6 )CMMA?E 1 Gor& Belo7 Lo7e3t Floor Fini3%e3 :ALL P?AFI)IA2AL< Apron and Peri eter -rain :ALL P?AFI)IA2AL<

K?EFL

0.00 K?EFL K?EFL 0.00 0.00 0.00 0.00 0.00 0.00

! 4 $ , / " + 10

Fra e :ALL P?AFI)IA2AL< ?oof :ALL P?AFI)IA2AL< External Gall :ALL P?AFI)IA2AL< Internal Gall :ALL P?AFI)IA2AL< -oor and Gindo7 :ALL P?AFI)IA2AL< Internal Gall Fini3%e3 :ALL P?AFI)IA2AL< Internal Floor Fini3%e3 :ALL P?AFI)IA2AL< )'ndrie3 :ALL P?AFI)IA2AL<

5A (?A2- )CMMA?E FA?M BCIL-I2( KALAM 5E?2AKA2

K?EFL

FA?M BCIL-I2( KALAM 5E?2AKA2

You might also like