Professional Documents
Culture Documents
How Management Standards Can Shape the Future Development, Roll-out and Implementation of Asset Integrity Management System
Abdel Aziz. M. Salah Eldin Integrity & Quality Management Consultant Hudson Technology & Strategic Studies Ottawa-Canada
Discussing the road map to translating standards into in-house Integrity Management document.
ISO 9004 Rev 2008. British Standards Institutions (BSI) PAS 55 part 1 & 2. British Standards Institutions (BSI) DPC PD 8010. API Standard 1160.
In any system, it is not sufficient solely to ensure that there are no leaks of hydrocarbons or other hazardous to the environment; the system needs to be able to handle fluids throughout its design life without blockages, unacceptable reductions in flow rate, or de-rating required due to excessive corrosion or erosion. The management of reliability and maintainability in operations is closely related to integrity management.
DPC PD 8010: Part 4, General Introduction, July 2012
A System that maintains asset operation profitable and productive. It Continuously assess the HSE risks and implement mitigation measures to minimize those risks throughout the Asset life cycle from design to decommissioning.
Key Principles
It is important that certain key principles are established for a successful and effective integrity management process, including:
Authorization at the highest level.
Adequate resources. Definition of key roles and processes, including lines of communication with all third parties. Regular review and auditing of processes.
Definition of failure.
Investigation of incidents, including failures. Consideration to through-life integrity management.
Standards promote industry best practice and set minimum requirements. Higher or lower requirements are acceptable if justified by recognized research, development and more importantly experience.
Industry is encouraged to engage with standards and in particular the development of new standards, and to be active in the processes keeping standards up to date.
Part 3: Steel pipelines on land Guide to the application of pipeline risk assessment to proposed developments in the vicinity of major accident hazard pipelines containing flammables.
Part 4: Integrity management for steel pipelines on land and subsea pipelines (published as DPC 16th December 2011 ). Part 5: Guidance notes for offshore practices.
Plan
Act
Do
Check
Integrity is never an accident; it is always the result of high intention, sincere effort, intelligent direction and skillful execution; it represents the wise choice of many alternatives.
William A. Foster
Prove it
Performance Records Internal & External Audit Key Performance Indicators KPIs
Improve it
Innovations Knowledge Transfer Training
New Technology
Internal Review
Independent Audit
Integrity Management can only be recognized when we see it all in one complete image not in pieces, cant we?
Design
Decommission
Procurement
Replace
Construction
Commissioning
Maintain
Operation
They are performing excellently against what is assumed to be their potential level of performance; They are judged by informed observers to be doing substantially better qualitatively than other comparable systems; They are doing whatever they do with significantly less resources than is assumed are needed to do what they do; They are perceived as role model the way to do whatever they do, and thus they become a source of ideals for the culture within which they exist;
Or, They are the only organizations that have been able to do what they do at all.
Use one of the internationally recognized standard as a template to guide the process of developing your own in-house AIM document. Use a competent consultant to assist your staff across the AIM journey and to correct the pass and monitor the AIM service provider performance.
Only trust IM business solution with a proven track record. Engage your own experts in the module development, they are the best to know the operation gaps and understand the organization specific needs. Ensure that necessary competences are integrated into the development team. Dont use sophisticated data management, predictive models or Risk assessment tools at the early stages of the modules development.
24
Produce clear tasks and work instructions to concerned parties so responsibilities and accountability are identified. Capture industry best practices and measure performance against peers.
Develop a process to identify, measure, weight and report the significant integrity KPIs. Roll- out CMS across the organization ( Organization Readiness) and provide professional training to employees and continuously assess their competencies.
Quality and Integrity Management Consultant Hudson Technology & Strategic Studies Ottawa-Canada