When the two 11BMACBs, 11BRV10GS200 & 19BMA00GS105 mentioned above (feeding from BRV and from 19BMA)

are open and the 11BMA voltage is <0,7Un for longer than 1s, the tieCB (11BMA00GS100, BJA-BMA) is automatically closed by GT Controller (Egatrol). Then the operator can stop the SDG.
7.2. SDG Test Mode

By switching SDG Selector Switch to Local, SDG Engine starts and goes into Idle Mode.
7.3.

After local command Close SDG GCB, the SDG will be automatically synchronized to the already energized BMA Bus and the SDG GCB will be closed, SDG is then loaded manually to approx. 25% of the nominal load during approx. 3 Minutes. Then the load is increased to 50 % of the nominal load, at this load, the SDG is monitored for approximately one hour according to SDG Operation Manual, After the test, the SDG has to be unloaded again manually, a local command Open SDG GCB opens the GCB and disconnects the SDG from BMA board, The idle speed and the nominal voltage must be adjusted after the test to their rated voltage and frequency, Now the SDG selector switch must be set back to Remote Position, After pre-defined cooling time, SDG is shut down automatically, from SDG Control Panel, the SDG day tank has to be refilled.
SDG Island Mode

During a long period of Standstill of the whole power plant, SDG can be used to energize the battery chargers and charge the DC System or to feed other loads: By switching SDG Selector Switch to Local, the SDG Engine starts and goes into Idle Mode, the SDG is manually connected to the dead BMA Bus (tieCBs are Open), The chargers are energized, After the charging of the batteries is completed, the SDG is disconnected manually, Now the SDG selector switch must be set back to REMOTE Position, After a pre-defined cooling time, the SDG is shut down automatically from SDG Control Panel.
Black Safe Coast Down (BSCD)
SDG Selector Switch is in REMOTE Position

7.4.
7.4.1.

An undervoltage at 11BMA is detected by undervoltage (UV) relay from GT DCS (EGATROL), whereas an undervoltage at 19BMA is detected by UVrelay from BOP DCS. When Undervoltage at 11BMA is detected: the incomingCB 11BJA10GS100 and tieCB 11BMA00GS100 are tripped in order to isolate 11BMA
Identification number Rev. Date Lang. Sheet

Originator

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

44/93

SDG is started automatically by the GT DCS and SDG Control Panels generates a closing order to feederCB 11BRV10GS100
The BOP DCS initiates an automatic changeover to the other in-feed from 18BFA/B in order to restore supply In case the undervoltage prevails for more than a time preset in BOP DCS (may be due to undervoltage on second incomer as well, automatic opening orders from BOP DCS are given to feederCB 19BMA00GS101 and 19BMA00GS102 (incomerCBs from

When Under-voltage at 19BMA is detected:



18BFA/18BFB board) in order to isolate 19BMA As a result an emergency supply demand from DCS is sent to the SDG (GT DCS). GT DCS generates closing command to tieCB 11BMA00GS101 in order to power 19BMA from the SDG. Status of tieCB 11BMA00GS101 is sent to BOP DCS in order to interlock
18BFA/18BFB incomersCB 19BMA00GS101 and 19BMA00GS102.


7.4.2.

GT BSCD sequencer re-connects the essential drives in predefined order.


SDG Selector Switch is in LOCAL Position

This section describes how the selector switch is in LOCAL position and switches over to REMOTE position e.g. during SDG testing. SDG is connected to 11BMA Bus. In case of power plant shutdown, the SDG disconnects itself automatically through the SDG control panel from 11BMA Bus and goes into SDG Idle Mode via frequency deviation detection. The selector switch will be now set back to REMOTE position directly by the SDG itself. The GT DCS automatically sends a starting signal to the SDG again, initiated by the undervoltage relay (with Remote Override). SDG is re-connected to 11BMA Bus automatically from the SDG Control Panel. GT Black Safe Coast Down sequencer reconnects the essential drives in a predefined order. The alarm Grid Failure displayed on SDG Local Panel must also be reset.

Originator

Identification number

Rev.

Date

Lang.

Sheet

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

45/93

8.

UNDERVOLTAGE SWITCHING

The following chapter deals with the effect of power supply failures to the MV and LV distribution system.
8.1. Normal State of CBs

The purpose of the Under-voltage switching actions is to switch over to another infeed for the concerned bus bar in case that the normal power supply fails or to isolate a busbar if no infeed is available at all. The normal state of the CBs/SFUs is as follows: Normally closed CBs/SFUs (NC):
11BJA10GS100 11BRV10GS200 19BMA00GS101 19BMA00GS103 19BMA00GS104 11BPA10GS100 11BBT20GT200 18BBT20GT200 19BFT10GT100 19BFT20GT100 18BFT10GT100 18BFT10GT200 18BFT20GT200 19BFT30GT100 19BFT40GT100 19BFT30GT200 19BFT40GT200 19BFT50GT100 19BFT60GT100 19BFT50GT200 19BFT60GT200 19BMA00GS105 19BFT10GT200 19BFT10GT200 19BFT20GT200 11BMA00GS100 18BJA00GS101 18BJA00GS103 19BJA00GS100 19BJA00GS200 19BJB00GS100 19BJB00GS200 19BJC00GS100

Normally open CBs/SFUs (NO):


11BFT10GT100 11BRV10GS100 19BMA00GS102 19BBB00GS100 18BFB00GS100 19BFD00GS100 19BFF00GS100 11BMA00GS101 18BJA00GS102 18BJA00GS104 19BJB00GS101 19BJD00GS101 90ANE00GS103 19BFB00GS100 19BJD00GS101 11/19BTL10GS100 11/19BTM10GS100

Originator

Identification number

Rev.

Date

Lang.

Sheet

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

46/93

19BJC00GS200 19BJD00GS100 19BJD00GS200 90ANE00GS101 90ANE00GS102 90ANE00GS104 Table 8-1: Normal Status of CBs

All switchboards are normally fed by their dedicated transformer and all couplers between switchboards are normally open. The Cooling Tower LV boards BFC and BFD are normally fed by the dedicated transformers. In case of a transformer failure, the infeed will be disconnected and the Bus Coupler will power the affected CT LV board.

Originator

Identification number

Rev.

Date

Lang.

Sheet

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

47/93

8.2.

OverviewFault Scenarios

All MV and LV bus bars are equipped with an under-voltage relay. If the voltage drops under a pre-defined value of 0.7 Un, the DCS will initiate different switching actions.
DISTURBANCE POWER SUPPLY FAILURE TO ONE (19BBA OR 19BBB) MV BUS (BTS IN IN POSITION) POWER SUPPLY FAILURE TO ONE (19BBA OR 19BBB) MV BUS POWER SUPPLY FAILURE TO ONE (19BBA OR 19BBB) MV BUS (BTS IN OUT POSITION) POWER SUPPLY FAILURE TO BOTH (19BBA AND 19BBB) MV BUSES POWER SUPPLY FAILURE TO 11BJA11BMA BUSES DURATION
)

ACTION INSTANT PROTECTIVE / AUTO TRANSFER

EFFECT STATION AUXILIARIES FED FROM ALTERNATE SOURCE; 19BBA AND 19BBB COUPLED VIA BUS COUPLERCB

SEE SECTION

@20 MS

8.3

T 1 SEC.

MV SWITCHING

STATION AUXILIARIES FED FROM ALTERNATE SOURCE; 19BBA AND 19BBB COUPLED VIA BUS COUPLERCB

8.3

T 10 SEC.

ISOLATION OF BOARDS AND BSCD ISOLATION OF BOARD AND BSCD

PROTECTIVE LOAD SHEDDING FOLLOWED BY TRIP (PLST) SDG WILL START AND CONNECT TO BMA AND POWER THE BOARD AUTOMATICALLY RESPECTIVE LV BUS FED FROM ONE AUX TRANSFORMER; RESPECTIVE BUSES COUPLED VIA BUS COUPLER CB PROTECTIVE LOAD SHEDDING FOLLOWED BY TRIP (PLST) LV BUS FED FROM ONE AUX. TRANSFORMER, 19BFC AND 19BFD COUPLED VIA BUS COUPLER CB PLANT WILL BE ABLE TO OPERATE WITH REDUCED OUTPUT (GT REMAINS IN OPERATION) 19BMA BUS FED FROM OTHER SOURCE FROM 18BFA/18BFB ISOLATION OF 19BMA BUS AND COUPLING WITH 11BMA BUS

8.3

T 3 SEC.

8.4

POWER SUPPLY FAILURE TO ONE LV BUS (18BFA, 18BFB, 19BFA, 19BFB, 19BFE, 19BFF) POWER SUPPLY FAILURE TO BOTH RELATED LV BUSES (18BFA, 18BFB, 19BFA, 19BFB, 19BFE, 19BFF) POWER SUPPLY FAILURE TO COOLING TOWER LV BUSBAR (19BFC OR 19BFD) POWER SUPPLY FAILURE TO BUSBAR (19BFC OR 19BFD)

T 3 SEC.

LV SWITCHING (SLOW TRANSFER)

8.5, 8.6, 8.9, 8.10

T 10 SEC.

ISOLATION OF BOARDS AND BSCD LV SWITCHING (SLOW TRANSFER) ISOLATION OF AFFECTED CT LV BOARD 19BFC OR 19BFD LV SWITCHING (SLOW TRANSFER) EMERGENCY SUPPLY DEMAND TO 11BMA

8.5/8/9

T 3 SEC.

8.7/8.10

T 10 SEC.

8.7/8.10

POWER SUPPLY FAILURE TO LV BUS 19BMA

T 3 SEC.

8.11

POWER SUPPLY FAILURE TO LV BUS 19BMA

T 5 SEC

8.11

Table 8-2:

Fault Scenarios

*)
Originator

duration of Undervoltage to be set in FBTS/DCS accordingly


Identification number Rev. Date Lang. Sheet

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

48/93

Table 8-2 gives a summary of possible supply failures (Under voltage: U<0.7 Un) and the corresponding actions. For more detailed information see the subsequent sections.

Originator

Identification number

Rev.

Date

Lang.

Sheet

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

49/93

8.3.

6.6kV Busbars 19BBA and 19BBB

If the regular power supply from the UAT (11BBT20) fails for longer than 1s, a slow transfer to the SAT (18BBT20) will be initiated automatically by the DCS: Open Order to the incomerCB 11BBT20GT200 Close Order to the MV Bus CouplerCB 19BBB00GS100

If the slow transfer was not successful (U<0.7Un for longer than 10sec.), the following switching actions will be initiated automatically by the DCS: Open Order to the incomerCB 11BBT20GT200 Open Order to the outgoingCBs of all MV-loads (auxiliary transformers and motors)

BBA board under suspect is now isolated. If an Undervoltage on both bus bars occur (U<0.7 Un), the following switching actions will be initiated automatically by the DCS: Open Order to both incomerCB 11BBT20GT200 & 18BBT20GT200 Open Order to the outgoingCBs of all MV-loads (auxiliary transformers and motors) BSCD according 7.4.1 NOTE: This is also valid for transfer from SAT(18BBT20) to UAT(11BBT20) (Replace 11 by 18 and 18 by 11).
8.4.
8.4.1.

415V 11BJA and 11BMA


Normal Configuration

The CB configuration is as follows: 11BJA is fed by the auxiliary transformer 11BFT10 through CB 11BJA10GS100 11BMA is fed from 11BJA through tieCB 11BMA00GS100

If an undervoltage on 11BJA busbar occurs (U<0.7 Un) a similar undervoltage will occur on 11BMA too. The following actions will be initiated automatically by the DCS: Open to incomerCB 11BJA10GS100 Open tieCB 11BMA00GS100 to BJA Start SDG 11BRV SDG is connected to 11BMA busbar automatically from SDG Control Panel

The return to the normal configuration is described in section 7.


8.4.2. Emergency Situation

The CB configuration is as follows: 11BMA is fed by SDG through CB 11BRV10GS100 and GS200 TieCB 11BMA00GS100 to BJA is open TieCB 19BMA00GS105 and 11BMA00GS101 (supply to 19BMA) are closed

Originator

Identification number

Rev.

Date

Lang.

Sheet

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

50/93

If an Undervoltage occurs on coupled 19BMA board without busbar fault (e.g. line fault between 11BRV10GS100 und GS200), the GT DCS will send an automatic opening order to the tieCB 11BMA00GS101 (powering 19BMA).
8.5. 415V 19BFA Busbar

The CB configuration is as follows: The MV feeders to the OFFSITE Switchgear Transformers 19BFT10 and 19BFT20 are normally closed (NC) and the OFFSITE Switchgear Transformers are normally energized. If an Undervoltage on 19BFA occurs, the following actions will be initiated automatically by DCS in order to backup the 19BFA power supply: Open Order to the incoming CB 19BFT10GT200, Close Order to LV tieCB 19BFB00GS100 if 19BFB has normal voltage and 19BFA bus has no short circuit fault.

If the slow transfer was not successful, the following switching actions will be initiated automatically by DCS in order to isolate the BFA board: Open Order to the incoming CB 19BFT10GT200, Open Order to the LV tieCB 19BFB00GS100

19BFA board is isolated.


8.6. 415V 19BFB Busbar

If an undervoltage on 19BFB occurs, the following actions will be initiated automatically by DCS in order to backup of 19BFB power supply: Open Order to the incoming CB 19BFT20GT200, Close Order to LV tieCB 19BFB00GS100 if 19BFA has normal voltage and 19BFB bus has no short circuit fault.

If the slow transfer was not successful, the following switching actions will be initiated automatically by DCS in order to isolate the 19BFB board: Open Order to the incoming CB 19BFT20GT200, Open Order to the LV tieCB 19BFB00GS100

19BFB board is isolated.


8.7. 415V 19BFC Busbar

The CB configuration is as follows: The MV feeders to the Cooling Tower Switchgear Aux. Transformers are all normally closed (NC) and the Cooling Tower Switchgear Transformers, 19BFT30 and 19BFT40 are normally energized. If an undervoltage on 19BFC occurs, the following actions will be initiated automatically by DCS: Open order to the incomingCB 19BFT30GT200

Originator

Identification number

Rev.

Date

Lang.

Sheet

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

51/93

Close Order to LV tieCB 19BFD00GS100 if 19BFD has normal voltage and 19BFC bus has no short circuit fault, If the slow transfer to the standby LV Auxiliary Transformer was not successful, the following switching actions will be initiated automatically by DCS: Open Order to the incoming LV CB 19BFT30GT200, Open Order to the incoming LV tieCB 19BFD00GS100 19BFC board is isolated.
8.8. 415V 19BFD Busbar

If an undervoltage on 19BFD occurs, the following actions will be initiated automatically by DCS: Open order to the incoming LV CB 19BFT40GT200 Close order to the incoming LV tieCB 19BFD00GS100 if 19BFC has normal voltage and 19BFD bus has no short circuit fault.

If the slow transfer to the standby LV Auxiliary Transformer was not successful, the following switching actions will be initiated automatically by DCS: Open Order to the incoming LV CB 19BFT40GT200, Open Order to the incoming LV tieCB 19BFD00GS100

19BFD board is isolated.


8.9. 415V 19BFE Busbar

The CB configuration is as follows: The MV feeders to the BOP Miscellaneous Switchgear Transformers 19BFT50 and 19BFT60 are normally closed (NC) and the BOP Miscellaneous Switchgear Transformers are normally energized. If an undervoltage on 19BFE occurs, the following actions will be initiated automatically by DCS: Open order to the incomingCB 19BFT50GT200 Close Order to LV tieCB 19BFF00GS100 if 19BFF has normal voltage and 19BFE bus has no short circuit fault

If the slow transfer to the standby LV Auxiliary Transformer was not successful, the following switching actions will be initiated automatically by DCS: Open Order to the incoming LV CB 19BFT50GT200, Open Order to the incoming LV tieCB 19BFF00GS100 19BFE board is isolated.
8.10. 415V 19BFF Busbar

If an undervoltage on 19BFF occurs, the following actions will be initiated automatically by DCS: Open order to the incoming LV CB 19BFT60GT200
Identification number Rev. Date Lang. Sheet

Originator

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

52/93

Close order to the LV tieCB 19BFF00GS100 if 19BFE has normal voltage and 19BFF bus has no short circuit fault.

If the slow transfer to the standby LV Auxiliary Transformer was not successful, the following switching actions will be initiated automatically by DCS: Open Order to the incoming LV CB 19BFT60GT200, Open Order to the incoming LV tieCB 19BFF00GS100

19BFF board is isolated.


8.11. 415V 18BFA Busbar

If an undervoltage on 18BFA occurs, the following actions will be initiated automatically by DCS: Open Order to the incoming CB 18BFT10GT200, Close Order to LV TIE CB 18BFB00GS100 if 18BFB has normal voltage and 18BFA bus has no short circuit fault.

If the slow transfer was not successful, the following switching actions will be initiated automatically by DCS: Open Order to the incoming CB 18BFT10GT200, Open Order to the LV TIE CB 18BFB00GS100

18BFA board is isolated


8.12. 415V 18BFB Busbar

If an undervoltage on 18BFB occurs, the following actions will be initiated automatically by DCS: Open Order to the incoming CB 18BFT20GT200, Close Order to LV TIE CB 18BFB00GS100 if BFA has normal voltage and BFB bus has no short circuit fault.

If the slow transfer was not successful, the following switching actions will be initiated automatically by DCS: Open Order to the incoming CB 18BFT20GT200, Open Order to the LV TIE CB 18BFB00GS100

18BFB board is isolated


8.13. 415V 19BMA Essential Busbar B

The CB configuration is as follows: 19BMA busbar is fed from 18BFA busbar through CB 19BMA00GS101 &
19BMA00GS103

Emergency supply CB 11BMA00GS101 from 11BMA busbar is open

If an under voltage on 19BMA occurs during 3s (loss of LV switchgear 18BFA/BFB), the following sequence will be initiated by DCS for a slow transfer:

Send opening order to the incomerCB 19BMA00GS101


Identification number Rev. Date Lang. Sheet

Originator

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

53/93

Send closing order to 19BMA00GS102 Incomer CB from 18BFB if BFB has normal voltage and busbar BMA has no short circuit fault.

If an under voltage on 19BMA occurs during 5s (loss of LV switchgear 18BFA/BFB), the following sequence will be initiated by DCS: Send opening order to the incomerCB 19BMA00GS101 Send opening order to the incomer CB 19BMA00GS102 (if closed) Send Emergency Supply Demand to the EGATROL DCS EGATROL DCS check 11BMA busbar voltage is at normal value EGATROL DCS send a closing order to the Emergency Supply CB 11BMA00GS101

Originator

Identification number

Rev.

Date

Lang.

Sheet

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

54/93

9.

EXTERNAL POWER SUPPLY DURING PLANT STANDSTILL

During power plant standstill, it is possible to supply the auxiliary systems of the units and the common system as well via the 6.6kV Tie Feeder from Phase-I Plant of GSECL. The Tie in-feed 19BBA10GS001 / 19BBB10GS001 has to be energized manually and connected to the MV busbars 19BBA and 19BBB. An interlock is provided to ensure single source powering of the MV boards BBA/BBB. It is also possible to connect the Station 6.6kV Bus to the 6.6kV external switchboard of Phase-I through Tie Feeders, which shall be used only in case of emergencies in Phase-I Plant of GSECL. These Tie Feeders are not meant for continuous export of power to the Phase-I, 6.6kV Network of GSECL except in case of emergencies only. The external power supply may only be used strictly during standstill of the power plant.
9.1. Procedure after a Normal Shutdown of the Power Plant

Preconditions: Plant is at standstill and in rotor barring mode after normal shutdown (see section 5.6) Auxiliary network is supplied by HV grid via GSU and UAT/SAT transformers The pre-defined GT cooling process is completed. Activate MV SWGR Manual Mode Open MV board incomerCB 18BBT20GT200 Open incomerCB 11BBT20GT200 and tie CB 19BBB00GS100 The MV boards have no more power supply and the DCS will open all outgoing CB (MV feeders) after 10s Ensure that the MV boards are now completely isolated Coordinate with Phase-I Plant to cllose the Phase-I side CB of the 6.6kV Tie Feeder Close 19BBA10GS001 (to energize 19BBA Bus) and Bus Coupler CB 19BBB00GS100 (to energize 19BBB Bus)

Enabling external power supply:

The MV boards are now supplied by the external 6.6kV power supply provided by Phase-I plant of GSECL. Now the MV/LV auxiliary transformers may be individually re-energized to feed selected LV boards.
9.2. Procedure after Shutdown in House Load Operation

Preconditions: HV grid is not available any more (e.g. due to HV grid failure) Plant in House Load Operation has been shut down using the SDGs (see section 5.4.2) SDGs are still running, feeding essential boards 11BMA DCS has opened all MV CBs due to undervoltage on MV boards (see section 8.3)
Identification number Rev. Date Lang. Sheet

Originator

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

55/93

MV board Bus Coupler CB 19BBB00GS100 is open Ensure that the MV boards are completely isolated Coordinate with Phase-I Plant to cllose the Phase-I side CB of the 6.6kV Tie Feeder Close 19BBA10GS001 (to energize 19BBA Bus) and Bus Coupler CB 19BBB00GS100 (to energize 19BBA Bus) The MV boards are now supplied by the external 6.6kV power supply provided by Phase-I Plant of GSECL Now the MV/LV auxiliary transformers may be re-energized to feed selected LV boards except unit essential boards 11BMA (unit 11) Unit 11: To transfer the 11BMA supply back to 11BJA, the SDG return to normal supply sequence has to be started manually according to section 7.1.4

Enabling external power supply:

Originator

Identification number

Rev.

Date

Lang.

Sheet

ALSTOM Power Systems


ALSTOM 2008. All rights reserved.

UTR/00/E/----------/DO/001

09.05.2008

Eng

56/93

10.

OPERATION OF HARDWIRED ELECTRICAL BACK-UP PANEL

Refer System Description for Hardwired Electrical Back-Up Panel (Ref. 9) for details. Electrical Back-up Panel provided for ST Generators, their sub-systems and the MV/LV auxiliary power supply system for the Combined Cycle Plant along with required mimic diagrams is located in CCR. Breaker control from EBCP shall be provided for MV Switchgear (Incomers & Bus-coupler) & LV Switchgear (Incomers & Bus-couplers), which shall be operative in case of failure of DCS. Upon failure of DCS, a signal shall be taken from DCS to the EBCP, multiplied & used in the close permissive for the closing circuits of the respective breakers for the various Switchgear/MCCs. All interlocks for close / Open permissive as explained in preceding sections for MV and LV switchgear shall be built in locally in the respective Switchgear/MCCs.

Originator

Identification number

Rev.

Date

Lang.

Sheet